Manufacturing Lead Time for the week of: April 30, 2018 *NOTE: Natural Veneer, Flintwood, and Seamless finishes require 5-6 weeks lead time Please review fabrics requiring order preview below Notes & Exception List 4 to 5 May 28, 2018 Thru Jun 04, 2018 Glass 4-5 Lyft 4-5 Int'l Electrics 8-9 4 to 5 May 28, 2018 Thru Jun 04, 2018 Notes & Exception List 3 to 4 May 21, 2018 Thru May 28, 2018 5 to 6 Jun 04, 2018 Thru Jun 11, 2018 Back Painted Glass: 6-7 Speciality Glass: 7-8 Tempered+laminated glass DOORS ONLY :7-8 5 to 6 Jun 04, 2018 Thru Jun 11, 2018 5 to 6 Jun 04, 2018 Thru Jun 11, 2018 Speciality Glass: 7-8 Tempered or Laminated Glass (no framing): 4-5 Tempered+laminated glass DOORS ONLY:7-8 4 to 5 May 28, 2018 Thru Jun 04, 2018 Polished aluminium: 16-17 Speciality Glass: 7-8 Tempered+laminated glass DOORS ONLY:6-7 Notes & Exception List 3 to 4 May 21, 2018 Thru May 28, 2018 4 to 5 May 28, 2018 Thru Jun 04, 2018 Seat cusions: 4-5 Glass fronts: 5-6 4 to 5 May 28, 2018 Thru Jun 04, 2018 Notes & Exception List 4 to 5 May 28, 2018 Thru Jun 04, 2018 4 to 5 May 28, 2018 Thru Jun 04, 2018 4 to 5 May 28, 2018 Thru Jun 04, 2018 Notes & Exception List 3 to 4 May 21, 2018 Thru May 28, 2018 Contessa: 4-5 Variable: 6-7 3 to 4 May 21, 2018 Thru May 28, 2018 Variable: 6-7 Synapse, Taiga: 4-5 Laminate Tablet: 5-6 4 to 5 May 28, 2018 Thru Jun 04, 2018 Variable: 6-7 Nami Wood: 5-6 Laminate Tablet: 5-6 4 to 5 May 28, 2018 Thru Jun 04, 2018 Laminate Tablet: 5-6 Marble/Solid Surfaces: 5-6 8 to 9 Jun 25, 2018 Thru Jul 02, 2018 8 to 9 Jun 25, 2018 Thru Jul 02, 2018 Notes & Exception List 4 to 5 May 28, 2018 Thru Jun 04, 2018 Orders submitted this week will be ready for shipping the weeks of Orders submitted this week will be ready for shipping the weeks of Orders submitted this week will be ready for shipping the weeks of Orders submitted this week will be ready for shipping the weeks of Orders submitted this week will be ready for shipping the weeks of Orders submitted this week will be ready for shipping the weeks of TSC RCA THA Catalog Code TCO Catalog Code TCO Lead Time Range ( Business weeks) TSC Zone Soft / Lounge Soft/ Lounge Seating ( incl DNA* and Vignette tables*) Stacking Chairs TFF Laterals / Pedestals * Lead Time Range ( Business weeks) Lead Time Range ( Business weeks) Catalog Code Lead Time Range ( Business weeks) TSC TZN TSC Expansion Casegoods Metal Peds & Laterals * Optos LP Expansion Modular Cabinets * Filing & Storage TFW Catalog Code RMC Focus Walls * W/R/S * RWR TAL Altos & Altos Landscape internal Framing, Electrics & Track Altos & Altos Landscape all other products (Incl door frames, rails, corners, covers, Tek Pier) * Height Adjustable Products Lead Time Range ( Business weeks) T/O/S/ Transit / Leverage * TOS, TST, TLE District (Including Storage) * TDI Architectural Products Catalog Code TAL TOP All lead times are based on fabric availability (see fabric exception list). Order sizes with a $1M list or 200 panels or 70 chairs or 400 linear feet of Architectural Products or exception fabrics requires an order preview. *NOTE: Over 180K List, Order Preview required for Teknion Wood (US). Lead times are accurate at the time of printing and are subject to change based on material and capacity. Orders received with multiple product lines will receive the longest lead time for the entire order (including CR lead times). Lead time listed is the time to manufacture the product (excludes lane day and transit time and assuming order is clean). Lead time for custom requests ( CR's ) will be the longest duration of the CR or the product line published lead time. Panel Systems Catalog Code Lead Time Range (Business weeks) Complements TZN Multi-Use Chairs Complements (includes Livello) * Hi-Space Seating Work Chairs Height-Adjustable Bench (HAB) * TCO Complements line Zones Multi-Use
4
Embed
D v µ ( µ ] v P > d ] u ( } Z Á l } ( W & µ Ç ñ U î ì í ôhome.teknion.com/teknimerge/CDN_downloads/Service/CDNLeadtime.… · ð } ñ D l ì ñ l î ì í ô d Z µ D l
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Manufacturing Lead Time for the week of: April 30, 2018
*NOTE: Natural Veneer, Flintwood, and Seamless finishes require 5-6 weeks lead time
Please review fabrics requiring order preview below
Notes & Exception List
4 to 5 May 28, 2018 Thru Jun 04, 2018Glass 4-5Lyft 4-5
Int'l Electrics 8-9
4 to 5 May 28, 2018 Thru Jun 04, 2018
Notes & Exception List
3 to 4 May 21, 2018 Thru May 28, 2018
5 to 6 Jun 04, 2018 Thru Jun 11, 2018
Back Painted Glass: 6-7 Speciality Glass: 7-8
Tempered+laminated glass DOORS ONLY :7-8
5 to 6 Jun 04, 2018 Thru Jun 11, 2018
5 to 6 Jun 04, 2018 Thru Jun 11, 2018
Speciality Glass: 7-8Tempered or Laminated Glass (no
framing): 4-5Tempered+laminated glass
DOORS ONLY:7-8
4 to 5 May 28, 2018 Thru Jun 04, 2018
Polished aluminium: 16-17Speciality Glass: 7-8
Tempered+laminated glass DOORS ONLY:6-7
Notes & Exception List
3 to 4 May 21, 2018 Thru May 28, 2018
4 to 5May 28, 2018 Thru Jun 04, 2018
Seat cusions: 4-5Glass fronts: 5-6
4 to 5 May 28, 2018 Thru Jun 04, 2018
Notes & Exception List
4 to 5 May 28, 2018 Thru Jun 04, 2018
4 to 5 May 28, 2018 Thru Jun 04, 2018
4 to 5 May 28, 2018 Thru Jun 04, 2018
Notes & Exception List
3 to 4 May 21, 2018 Thru May 28, 2018 Contessa: 4-5Variable: 6-7
3 to 4 May 21, 2018 Thru May 28, 2018Variable: 6-7
Synapse, Taiga: 4-5Laminate Tablet: 5-6
4 to 5 May 28, 2018 Thru Jun 04, 2018Variable: 6-7
Nami Wood: 5-6Laminate Tablet: 5-6
4 to 5 May 28, 2018 Thru Jun 04, 2018 Laminate Tablet: 5-6Marble/Solid Surfaces: 5-6
8 to 9 Jun 25, 2018 Thru Jul 02, 2018
8 to 9 Jun 25, 2018 Thru Jul 02, 2018
Notes & Exception List
4 to 5 May 28, 2018 Thru Jun 04, 2018
Orders submitted this week will be ready for shipping the weeks of
Orders submitted this week will be ready for shipping the weeks of
Orders submitted this week will be ready for shipping the weeks of
Orders submitted this week will be ready for shipping the weeks of
Orders submitted this week will be ready for shipping the weeks of
Orders submitted this week will be ready for shipping the weeks of
TSC
RCA
THA
Catalog Code
TCO
Catalog Code
TCO
Lead Time Range ( Business weeks)
TSC
Zone Soft / Lounge
Soft/ Lounge Seating ( incl DNA* and Vignette tables*)
Altos & Altos Landscape all other products (Incl door frames, rails, corners, covers, Tek Pier) *
Height Adjustable Products
Lead Time Range ( Business weeks)
T/O/S/ Transit / Leverage * TOS, TST, TLE
District (Including Storage) * TDI
Architectural Products Catalog Code
TAL
TOP
All lead times are based on fabric availability (see fabric exception list). Order sizes with a $1M list or 200 panels or 70 chairs or 400 linear feet of Architectural Products or exception fabrics requires an order preview. *NOTE: Over 180K List, Order Preview required for Teknion Wood (US). Lead times are accurate at the time of printing and are subject to change based on material and capacity. Orders received with multiple product lines will receive the longest lead time for the entire order (including CR lead times). Lead time listed is the time to manufacture the product (excludes lane day and transit time and assuming order is clean). Lead time for custom requests ( CR's ) will be the longest duration of the CR or the product line published lead time.
Panel Systems Catalog Code Lead Time Range (Business weeks)
Complements
TZN
Multi-Use Chairs
Complements (includes Livello) *
Hi-Space
Seating
Work Chairs
Height-Adjustable Bench (HAB) *
TCOComplements line
Zones Multi-Use
Notes & Exception List
1 to 2 May 07, 2018 Thru May 14, 2018
2 to 3 May 14, 2018 Thru May 21, 2018
4 to 5 May 28, 2018 Thru Jun 04, 2018
Notes & Exception List
4 to 5 May 28, 2018 Thru Jun 04, 2018
2 to 3 May 14, 2018 Thru May 21, 2018cushions : 3-4
5 to 6 Jun 04, 2018 Thru Jun 11, 2018
4 to 5 May 28, 2018 Thru Jun 04, 2018
5 to 6 Jun 04, 2018 Thru Jun 11, 2018
6 to 7 Jun 11, 2018 Thru Jun 18, 2018
5 to 6 Jun 04, 2018 Thru Jun 11, 2018
Notes & Exception List
2 to 3 May 14, 2018 Thru May 21, 2018
2 to 3 May 14, 2018 Thru May 21, 2018
4 to 5 May 28, 2018 Thru Jun 04, 2018 Club Talk : 6-7Natural Venner : 8-9
8 to 9 Jun 25, 2018 Thru Jul 02, 2018
11 to 12 Jul 16, 2018 Thru Jul 23, 2018
Notes & Exception List
2 to 3 May 14, 2018 Thru May 21, 2018cushions : 3-4
4 to 5 May 28, 2018 Thru Jun 04, 2018
9 to 10 Jul 02, 2018 Thru Jul 09, 2018 W/Metal or glass: 11-12
11 to 12 Jul 16, 2018 Thru Jul 23, 2018
5 to 6 Jun 04, 2018 Thru Jun 11, 2018
4 to 5 May 28, 2018 Thru Jun 04, 2018
8 to 9 Jun 25, 2018 Thru Jul 02, 2018 With glass: 9-10
6 to 7 Jun 11, 2018 Thru Jun 18, 2018
6 to 7 Jun 11, 2018 Thru Jun 18, 2018
Notes & Exception List
4 to 5 May 28, 2018 Thru Jun 04, 2018
5 to 6 Jun 04, 2018 Thru Jun 11, 2018
6 to 7 Jun 11, 2018 Thru Jun 18, 2018
Fabrics -Panels(Order Preview Recommended)
Boulevard fabrics
Boucle Grid - Gr 2 CycloneCarreaux- Gr 5 UniverseComplement-Gr 2Essentials- Gr 1Flicker - Gr 1 Homage -Gr 7India- Gr 1Intercept- Gr 5Tangle- Gr A
Orders submitted this week will be ready for shipping the weeks of
Orders submitted this week will be ready for shipping the week of
Orders submitted this week will be ready for shipping the weeks of
Orders submitted this week will be ready for shipping the weeks of
TCW
RNH
Orders submitted this week will be ready for shipping the weeks of
Lead Time Range ( Business weeks)
Freestanding & Desking Systems
Leverage, Marketplace, Filing & Storage, Complements HAT, Seating Wood
Expansion Desking Casegood and Training, Complements, Thesis, Seating
Tous les délais de fabrication sont basés sur la disponibilité du tissu (voir la liste d'exception des tissus). Les commandes de plus de 1 Million $ liste ou 200 panneaux ou 70 chaises ou 400 pieds linéaire de produits architecturaux ou contenant des tissus d'exception, nécessitent une pré-commande. *NOTE: Pour les commande de Teknion Wood (US) de plus de 180 000$ liste, une pré-commande est requise. Les délais de fabrication sont exactes au moment de leur publication et sont sujet à changement en fonction de la disponibilité du matériel et des capacités. Les commandes contenants plusieurs lignes de produit et/ou des CR recevront le plus long délai de fabrication pour l'ensemble de la commande. Les délais de fabrication ci-bas représentent le temps nécessaire à la fabrication du produit, ils excluent les zone d'expédition et les délais de livraison.
Systèmes de Panneaux Code de Catalogue
Délai de fabrication (semaines ouvrables)
T/O/S/ Transit / Leverage *
Les commandes reçues cette semaine seront prêtes pour expéditon la semaine
du
TOPOptos LP
TOS, TST, TLE
Produits Architecturaux
TDI
Délai de fabrication (semaines ouvrables)
TAL
TAL
4 à 5 28/May/2018 à 04/Jun/2018
Notes & Exceptions
1 à 2 07/May/2018 à 14/May/2018
2 à 3 14/May/2018 à 21/May/2018
4 à 5 28/May/2018 à 04/Jun/2018
Notes & Exceptions
4 à 5 28/May/2018 à
2 à 3 14/May/2018 à 21/May/2018coussins : 3-4
5 à 6 04/Jun/2018 à 11/Jun/2018
4 à 5 28/May/2018 à 04/Jun/2018
5 à 6 04/Jun/2018 à 11/Jun/2018
6 à 7 11/Jun/2018 à 18/Jun/2018
5 à 6 04/Jun/2018 à 11/Jun/2018
Notes & Exceptions
2 à 3 14/May/2018 à 21/May/2018
2 à 3 14/May/2018 à 21/May/2018
4 à 5 28/May/2018 à 04/Jun/2018Club Talk : 6-7
Natural Veneer : 8-9
8 à 9 25/Jun/2018 à 02/Jul/2018
11 à 12 16/Jul/2018 à 23/Jul/2018
Notes & Exceptions
2 à 3 14/May/2018 à 21/May/2018coussins : 3-4
4 à 5 28/May/2018 à 04/Jun/2018
9 à 10 02/Jul/2018 à 09/Jul/2018 avec Metal ou verre: 11-12
11 à 12 16/Jul/2018 à 23/Jul/2018
5 à 6 04/Jun/2018 à 11/Jun/2018
4 à 5 28/May/2018 à 04/Jun/2018
8 à 9 25/Jun/2018 à 02/Jul/2018 avec verre: 9-10
6 à 7 11/Jun/2018 à 18/Jun/2018
6 à 7 11/Jun/2018 à 18/Jun/2018
Tissus -Panneaux(Pré-commande recommandée)
Tissus Boulevard
Boucle Grid - Gr 2 CycloneCarreaux- Gr 5 UniverseComplement-Gr 2Essentials- Gr 1Flicker - Gr 1 Homage -Gr 7India- Gr 1Intercept- Gr 5Tangle- Gr A
Les commandes reçues cette semaine seront prêtes pour expéditon la semaine
du
Les commandes reçues cette semaine seront prêtes pour expéditon la semaine
du
Les commandes reçues cette semaine seront prêtes pour expéditon la semaine