Page 1: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

D. Britton

GridPP Status - ProjectMap8/Feb/07

Page 2: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.100 0.101 0.102 0.103 0.104 0.105 0.106 0.107 0.108 0.109 0.110 0.111 0.112 0.113 0.114 0.115 0.116

0.18 0.19 0.20 0.21 0.22 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30 0.31 0.32 0.33 0.34 0.117 0.118 0.119 0.120 0.121 0.122 0.123 0.124 0.125 0.126 0.127 0.128 0.129 0.130 0.131 0.132 0.133

0.35 0.36 0.37 0.38 0.39 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.134 0.135 0.136 0.137 0.138 0.139 0.140 0.141 0.142 0.143 0.144 0.145 0.146 0.1470.52 0.53 0.54 0.55 0.56 0.57 0.58 0.59 0.60 0.61 0.62 0.63 0.64 0.65 0.66 0.67 0.68

2.1 3.1 4.1 5.1 6.1 1.1.1 1.1.2 1.1.3 1.1.4 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5

1.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 6.1.6 6.1.7 6.1.8 6.1.9

2.1.11 2.1.12 3.1.11 3.1.12 3.1.13 4.1.11 4.1.12 5.1.11 5.1.12

2.2 3.2 4.2 5.2 6.2 1.2.1 1.2.2 1.2.3 1.2.4 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5

1.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10 3.2.6 3.2.7 4.2.6 4.2.7 4.2.8 4.2.9 4.2.10 5.2.6 5.2.7 5.2.8 5.2.9 5.2.10 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10

2.2.11 2.2.12 2.2.13 2.2.14 2.2.15 4.2.11 4.2.12 4.2.13 4.2.14 4.2.15 5.2.11 5.2.12 5.2.13 5.2.14 5.2.15 6.2.11 6.2.12 6.2.13 6.2.14

2.3 3.3 4.3 6.3 1.3.1 1.3.2 1.3.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5

2.3.6 2.3.7 2.3.8 2.3.9 2.3.10 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10

2.3.11 3.3.11 3.3.12 3.3.13 4.3.11 4.3.12 4.3.13

2.4 3.4 4.4 6.4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 6.4.1 6.4.2 6.4.3 6.4.4

2.4.6 2.4.7 2.4.8 2.4.9 2.4.10 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 4.4.6 4.4.7 4.4.8 4.4.9

2.4.11 2.4.12 2.4.13 2.4.14 2.4.15 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15

2.5 3.5 60 Days2.5.1 2.5.2 2.5.3 2.5.4 2.5.5 3.5.1 3.5.2 3.5.3 3.5.4 3.5.5

2.5.6 2.5.7 2.5.8 2.5.9 2.5.10 3.5.6 3.5.7 3.5.8 3.5.9 Monitor OK 1.1.1 2.5.11 2.5.12 2.5.13 2.5.14 Monitor not OK 1.1.1 Milestone complete 1.1.1

2.6 3.6 Milestone overdue 1.1.1

2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 Milestone due soon 1.1.1

2.6.6 2.6.7 2.6.8 2.6.9 2.6.10 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10 Milestone not due soon 1.1.1

2.6.11 2.6.12 2.6.13 Item not Active 1.1.1

Other Link Network LHC Deployment

Project Planning

CMS

Portal

Status Date - 31/Dec/06 + next

UKQCD

Navigate downExternal link

PhenoGrid

LHC Apps

1.1

1.3

Security

InfoMon

Design

Service Challenges

Production Grid Milestones Production Grid Metrics

1LCG External

4M/S/N

5Non-LHC Apps Management

2 3

Knowledge Transfer

LHCb

GANGA

ATLAS

InteroperabilitySamGrid

EngagementWorkload

6

1.2

Development

Dissemination

Project Execution

BaBarMetadata

Storage

Update

Clear

GridPP2 ProjectMap

Metric OK

Metric not OK

Tasks Complete

Tasks Overdue

Tasks due in next 60 days

Items Inactive

Tasks not Due

Change Forms

90

(92%)

8 175

(69%)

5 14 34 58 20

Page 3: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

Metrics

90 are currently satisfied; the 8 below are not:

0.105: Number of LCG/EGEE jobs slots used (but up from 37% to 60%).

0.108: GridPP disk storage available (lower than planned but meeting user needs in 2007).

0.111: Tape storage to LCG 130TB low (BaBar has 275TB); 350TB purchased 07Q1

0.131: Tier-1 service disaster recovery plans up to date.

5.2.2: Vacant posts (6 on Dec 31st but 5 now started or appointed).

5.2.11: Only 3 F2F meetings (but 39 VRVS)

5.2.13: Only 3 UB meetings (but “4th” was on Jan 4th).

5.2.14: Only 1 DB meetings (DTeam meets ~weekly).

Page 4: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

Metrics – Update on Usage

http://www.gridpp.ac.uk/wiki/RAL_Tier1_Metrics_for_GridPP

0.101 Number of registered users (DNs excluding DTEAM)

0.102 Number of active users (DNs excluding DTEAM)

Page 5: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

Metrics – Usage (Jan07)

95 .atlas 78 .dteam 46 .lhcb 25 .cms 11 dteamsgm 9 .pheno 9 .ilc 7 .babar 5 .dzero 4 .fusn 3 cmssgm 3 cmsprg 3 .bio

3 atlassgm 3 .alice 2 .t2k 2 dteamprg 2 .cedar 2 babarsgm 2 atlasprg 1 phenosgm 1 minossgm 1 .minos 1 lhcbsgm1 lhcbprg1 ilcsgm

UK Certificates= 320799 .atlas 774 .dzero 617 .dteam 492 .cms 141 .alice 119 .lhcb 74 dteamsgm 59 .bio 52 .esr 40 .ilc 37 cmsprg 33 alicesgm 32 atlassgm 25 .fusn 20 dteamprg 20 atlasprg 18 .zeus 16 .hone

14 cmssgm 10 .geant 9 .pheno 9 lhcbprg 9 .babar 6 aliceprg 5 biosgm 5 babarsgm 4 lhcbsgm 3 zeussgm 3 geantsgm 2 .t2k 2 ilcsgm 2 .cedar 1 phenosgm 1 minossgm 1 .minos 1 honesgm 1 .cdf

Registered User = 345613 atlas 7 babar 1 bio 1 cedar6 cms 12 dteam 2 dzero 4 fusn 2 ilc 16 lhcb 2 minos 8 pheno 1 t2k

Active UK = 75

Page 6: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

Milestones

A total of 252 active milestones; 175 (69%) have been completed; there are 5 milestones overdue:

0.16: Tier2s meet bandwidth requirements (requirements still being defined)

0.37: Full Tier-1 Team in place (1 post under discussion).

0.56: GridPP able to monitor networks to all supported sites. (3 out of 19 missing).

4.1.4: BaBar Grid Analysis: Emphasis now on skimming developments. 6.2.5: Integrated plans for NGS and GridPP (separate funding tracks).

Page 7: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

Change Forms

Twenty change forms have been submitted, reviewed, enacted.

Production Grid (7)Storage Group (2)WLMS (1)Interoperability (2)

ATLAS (1)GANGA (1)LHCb (2)CMS (1)BaBar (1)SAM (2)

Page 8: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

Risk Register

R10-Apps: External middleware dependence (gLite)R15-Apps: Software maintainability (Rolling Grant outcome).

R40-Apps: Lack of future funding (Rolling Grant outcome)

R40-MSN: Lack of future funding (GridPP2+ outcome).

Four high risks identified:

ID NameLi Im Risk Li Im Risk Li Im Risk Li Im Risk Li Im Risk

R1 Recruitment/retention difficulties 2 2 4 2 2 4 2 2 4 2 2 4R2 Sudden loss of key staff 1 3 3 1 3 3 1 3 3 1 4 4R3 Minimal Contingency 2 2 4 1 2 2R4 GridPP deliverables late 1 3 3 2 3 6 2 2 4R5 Sub-components not delivered to project 1 2 2 2 3 6 2 3 6 2 3 6R6 Non take-up of project results 2 1 2 1 4 4 2 2 4 1 4 4R7 Change in project scope 1 1 1 2 2 4R8 Bad publicity 1 3 3 1 3 3 1 3 3 2 3 6R9 External OS dependence 3 1 3

R10 External middleware dependence 4 2 8 1 4 4 3 3 9 2 2 4R11 Lack of monitoring of staff 1 2 2 2 2 4 2 2 4 1 3 3R12 Withdrawal of an experiment 2 3 6 1 4 4R13 Lack of cooperation between Tier centres 2 2 4 1 3 3R14 Scalablity problems 1 2 2 2 2 4R15 Software maintainability problems 2 2 4 1 3 3 3 3 9 1 4 4R16 Technology shifts 1 2 2 2 3 6 2 3 6R17 Repitition of research 3 2 6R18 Lack of funding to meet LCG PH-1 goals 4 1 4R20 Conflicting software requirements 3 2 6 2 3 6R22 Hardware resources inadequate 2 3 6 2 3 6 2 3 6R25 Hardware procurement problems 2 2 4 2 3 6R26 LAN Bottlenecks 1 3 3R27 Tier-2 organisation fails 2 2 4

R28 Experiment Requirements not met 2 3 6R29 SYSMAN effort inadequate 2 3 6R30 Firewalls interfere with Grid 2 3 6R31 Inablility to establish trust relationshipsR32 Security inadequate to operate Grid 2 3 6R33 Interoperability 2 3 6R35 Failure of international cooperation 2 1 2R36 e-Science and GridPP divergence 2 3 6R37 Institutes do not embrace Grid 2 2 4R38 Grid does not work as required 4 2 8 4 2 8R39 Delay of the LHC 2 2 4R40 Lack of future funding 2 3 6 3 3 9 4 3 12R41 Network backbone failure 0 4 1R42 Network backbone bottleneck 2 2 4R43 Network backbone upgrade delay 1 4 4R44 Inadequate User Support 2 3 6

Alt-i-r

Pro. GridGridPP LCG MSN Apps

Page 9: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

D. Britton

GridPP Status - Resources08/Feb/2007

Page 10: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

GridPP Financial Summary

Integrated GridPP1 + GridPP2 picture.

Category Sub-Cat FY01 FY02 FY03 FY04 FY05 FY06 FY07 Total CostLCG £0 £907,843 £2,379,162 £2,379,829 £0 £0 £0 £5,666,835Tier-1 Staff £62,045 £311,089 £513,625 £671,501 £680,315 £675,456 £410,135 £3,324,166Tier-1 Hardware £776,300 £602,366 £116,927 £820,535 £529,182 £961,500 £1,508,318 £5,315,128Tier-2 Staff £0 £0 £24,499 £293,881 £717,622 £1,012,503 £616,525 £2,665,030Tier-2 Hardware £0 £0 £0 £105,719 £23,660 £0 £96,621 £226,000Applications Staff £97,528 £668,448 £726,561 £776,943 £1,028,243 £1,068,155 £483,221 £4,849,100N/M/S Staff £561,819 £1,028,552 £1,203,242 £1,053,794 £862,805 £939,004 £477,777 £6,126,993Operations Managers £127,827 £243,448 £267,729 £294,056 £315,432 £322,791 £141,085 £1,712,367Operations Staff £0 £0 £0 £17,339 £135,548 £145,973 £61,147 £360,007Operations Travel £175,000 £182,733 £274,825 £259,295 £264,771 £290,000 £275,000 £1,721,624Operations Misc £113,000 £5,000 £45,195 £149,872 £3,953 £11,559 £40,625 £369,204

£1,913,519 £3,949,478 £5,551,766 £6,822,763 £4,561,531 £5,426,942 £4,110,454 £32,336,453£32,900,000

£35,000£598,547

TotalTotal PPARC funding

EU Travel RebateUnallocated Funds

Page 11: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

Unallocated Funds

• Unallocated Funds of £599K:

• Includes £255k noted in February 2006.

• Mainly arise from reduced average staff costs at CCLRC and reduced effort delivered at CCLRC

• Smaller contributions from EU travel rebates and under-spend on Tier-2 hardware reserve.

• These funds are critically needed to address hardware funding in FY07 and GridPP2 GridPP2+ GridPP3 transition issues.

• Full proposal will be made once GridPP3 outcome is known.

Page 12: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

FY06 Travel

Out-turn is estimated to be £290k

EU-rebate estimated to be £35k

Net cost to GridPP estimated to be £255k

Page 13: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

GridPP2 Post Summary

Note-1: Brunel CMS post now finished; LCG-deployment post redefined.Note-2: Storage group lost 2 staff; some effort recovered from in-house effort.Note-3: Tier-2 operational security posts starts March-07.Note-4: Three (of 4) vacancies refilled; one post under discussion.

Work Area FTE Total Posts Unfilled

Application Interfaces 17 18 0 Note-1

Middleware/Security/Networking 14.5 18 1 Note-2

Tier-2 14.5 21 1 Note-3

Tier-1 13.5 13.5 4 Note-4

EGEE Infrastructure Support 4 4 0

Project Management Board 3.4 6 0

Operations 3.5 4 0

TOTAL 70.4 84.5 6

GridPP2 Funding

Page 14: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

GridPP2 Effort Summary

Of planned Of actualGridPP and EU effort.

Of plannedGridPP and EU effort.

Disclaimer: Numbers are indicative. There are many known effects that would need to be taken out to obtain precise statistics.

06Q4GridPP EU Other Total

Applications 94% #DIV/0! 30% 121%MSN 102% 80% 32% 126%Tier-1 80% #DIV/0! 30% 103%Tier-2 91% 97% 50% 139%

TOTAL 97% 88% 35% 129%

Cumulative to end of

Page 15: D. Britton GridPP Status - ProjectMap 8/Feb/07. D. Britton08/Feb/2007GridPP Status GridPP2 ProjectMap.

08/Feb/2007 GridPP Status D. Britton

Resource Summary

• GridPP continues to spend within budget.• £599K currently unallocated awaiting

outcome of GridPP3 proposal to help manage the inevitable transition issues and address the large hardware ramp-up needed in FY07.

• Effort is being delivered to the project (and levered by the project) according to plan.