[email protected]Astrophysics Detector Workshop – Nice – November 18 th , 2008 1 D. Attié , P. Colas, M. Dixit, M. Riallot, Y.-H. Shin ILC-TPC panel ILC-TPC panel + + T2K electronics T2K electronics RD51 Mini Week - CERN irfu y a l c a s irfu y a l c a s
6
Embed
D. Attié , P. Colas, M. Dixit, M. Riallot, Y.-H. Shin
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
•Particles: 2-3 days muons , if possible. 50-100 Hz sufficient (limited by DAQ rate). The rest can be hadrons, from low to very high rates
•Precision tracking and behaviour of the resistive coverlay.
•We need to scan the detector (move frequently) for homogeneity studies. Most data to be taken with T2K gas (ArCF4Iso) but would be nice if a part can be Ar+5%Iso
•Need to install the box on a small lift table and secure it
•Optical fiber, SHV, gas cable already installed
•We also plan to contribute to the RESIST test organized by S. Aune and F. Kunne next to our setup in the magnet
WG7 6RD51 Mini Week – CERN – September 24, 2009
Requests and status of the beam testsRequests and status of the beam testsRequests and status of the beam testsRequests and status of the beam tests