Top Banner
Cyfarthfa Retail Park North B&Q
16

Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Jul 03, 2018

Download

Documents

vandieu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Cyfarthfa Retail Park North

B&Q

Page 2: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Name: David Humphrey

Position: Design Manager

Company: BAM Construction

Client: Hammerson

Tenant: B&Q

Sustainability: Installation of a Transpired Solar

Collector

Introduction

Page 3: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Issues:

• 15% Roof light requirement

• Confirmation of Smoke Vent size & Position

• Full Sprinkler Installation

• 2.5m3/m2.hr air tightness requirement

• Blockwork to B&Q requirements

Design Coordination

Page 4: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Issues:

• Bottom 2.475m constructed of blockwork

Design Coordination

Page 5: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Issues:

• A completely new technology with no experience

• We didn’t know the who, the how or the specific

requirements for the installation

• Main problem was placing the subcontract order and

timing for the install

• Tata Steel’s Terms and Conditions were ‘difficult’ for

BAM to agree.

• Not just a product specified by an Architect/

Engineer for installation by a BAM Subcontractor

Design Coordination

Page 6: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Design Changes:

Headlines

• Change of roof from Kalzip to Euroclad SF500

• Green Roof required to outer slopes for planning

• Roof light requirement of 15% compromised by Solar

Collector and other design requirements.

• Mansafe requirement for ‘Fall Prevention’ to roof

rather than ‘Fall Arrest’, increased walkway/

latchway requirement.

Value Engineering

Page 7: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Changing Location

Page 8: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Changing Location

Page 9: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Changing Location

Page 10: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Commercial Reality

■ Tata asked to provide a Performance Warranty

■ BAM had to take make some very difficult decisions

regarding roofing products

■ Value Engineering assistance provided by Tata was

supportive

■ Numerous hours spent by Tata and BAM discussing the

objectives of the SBED programme

■ Understanding of the what was important of the install of

what appeared to be ‘standard’ building components

Page 11: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Build Reality

■ Standard recognisable building components

■ Understanding of bringing ‘stranger’ trades together

■ Length of panels were difficult to handle

■ Installed following completion of the main roof

Page 12: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Installed TSC

Page 13: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Internal Ductwork

Page 14: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Holes through roof

Page 15: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Control Panel

Page 16: Cyfarthfa Retail Park North - SBEDsbed.cardiff.ac.uk/...10-14-SBED-Presentation-BAM1.pdf · BAM had to take make some very difficult decisions regarding roofing products Value Engineering

Any Questions?