  • 8/9/2019 CVC Study on Power Sector

    1/59

     

    By:Chief Technical Examiner’s

    Organization

    Central Vigilance Commission

    Preventive Vigilance in PublicProcurement

    ~: Study based on the PowerSector :~

  • 8/9/2019 CVC Study on Power Sector

    2/59

    IntroductionChief Technical Examiner’sOrganization Setup in !"#$ in %o&$'(S

    To secure economy in expenditure and)etter technical ( *nancial control+

    Santhanam Committee ,!-./ Extend 0urisdiction o1er construction 2or3

    of all other ministries also+ To )e )rought under CVC+

    Studies Civil, Electrical$ %echanical$ C(I$4urchase$ IT Contract a2ard and execution+

  • 8/9/2019 CVC Study on Power Sector

    3/59

     

    Pre – Tender Stage

     5ppointment of Consultants

     4reparation of 6478Estimates

  • 8/9/2019 CVC Study on Power Sector

    4/59

    4reparation of

    6478EstimateCommon de*ciencies Estimated made in hurried manner

    9ac3 of conformity )82 1arious schedules of items$dra2ings$ speci*cations$ and contract conditions$

    etc+ Estimated made on last accepted rates )asis only +

    4resent mar3et conditions also to )e accounted for

    Cascading eect ,higher LPP ! higher EvaluatedCost ! higher LPP/

    Estimated not prepared on actual site conditions Borro2ed ;uantities from similar pre1ious pro0ect

    7esult: 6elays$ 6e1iations$ Time (8 costo1errun

  • 8/9/2019 CVC Study on Power Sector

    5/59

    Example +Earth *lling pac3age < Estimated Cost:"# Cr  9 ;uoted price : $%& Cr' ,#-= higher/

    TC again e1aluated estimated of $(( Cr   )yadding non>standard stipulations li3e localarea taxes$ etc+

    ?inally$ re>tendering of 2or3+ @e2 estimate ,$(# Cr / 2ith )orro2 area lead

    distance of $) *+ instead of original ) *+ @e2 9 ;uoted price : $&% Cr' Option of 4SA’s explored$ a2arded to @BCC:

    $$- Cr 

  • 8/9/2019 CVC Study on Power Sector

    6/59

     52arded 1alue of Cr againstestimated cost of . Cr doesn’t seems

     0usti*ed+

     5ctual execution of 2or3 from )orro2area of D>" % only$ )ut re1isedestimate 2as prepared on lead distanceof D %+ 'ence$ a2ard of contract

    2ith lead area of D % not 0usti*ed+ 5lso$ resultant payments 2ith D%lead distance turn out to )e inFated

    and un0usti*ed+

  • 8/9/2019 CVC Study on Power Sector

    7/59

    Example G+ 6etailed estimate for a po2er pro0ect HE’ )ased

    on the pre1iously executed po2er pro0ect O’+ 4ro0ect HE’ 2as an e./ansion /ro0ect$ 2here

    the electricity ( 2ater 2as supplied to the

    contractor free of cost+ In pro0ect HO’contractors 2ere to arrange electricity ( 2atersupply+ O)1iously$ the estimated cost of pro0ectHE’ should ha1e )een less than for the pro0ectHO’+

    In the same estimate$ ;uantity of HExtraction ofroc3’ in the C'4 area de1iated from ((( cumto 1(((  cum$ 2hich indicates that estimate2as not prepared on the )asis of actual site

    conditions+

  • 8/9/2019 CVC Study on Power Sector

    8/59

    Example .+ In a 4SA$ the estimate for a 2or3 2as

    prepared for 7s+ ""+# crores+

    Estimated cost of plants$ e;uipments (auxiliaries deri1ed from the L% bid 

    recei1ed for some other similar ongoing2or3+

    The ;uoted rates of 9 )idder 2as 7s+.-+. crores$ 2hich 2ereapproximately ."= lo2+

    Estimates 2ere seemingly 3ept on thehigher side+

  • 8/9/2019 CVC Study on Power Sector

    9/59

    Example D+ In one 4SA$ 2or3 2as a2arded on ST to another

    4SA 2ithout a realistic estimated cost+ 5s initialcost 2as not properly 2or3ed out )efore$ amountof 7s+ .+" Cr 2as allo2ed a)o1e the initial cost2ithout 0usti*cation+

    Sanction 5mendment letter of the cost estimate2as issued after " months of issue of 9O5+ 

    %any a times the 2or3 a2arded on ST to the4SAs are getting executed through pri1ateagencies )y a )ac3 to )ac3 arrangement+

    eeping higher estimates in the )eginningresults in a2ard of 2or3 at higher rates topri1ate parties in a non>transparent 2ay+

  • 8/9/2019 CVC Study on Power Sector

    10/59

     

    Tendering Stage

      4reparation of Tenderdocuments

     In1iting and Opening of tenders

     4re>Juali*cation E1aluation of Bids and a2ard of2or3 

  • 8/9/2019 CVC Study on Power Sector

    11/59

    4reparation of Tender

    6ocumentsContract K 9egal 6ocument4oor 5greement: 4oor contract performance$ delays$ cost o1er>

    run

    9itigation

    Opportunity for contractor to ma3e undue pro*t

    7easons of poor agreement:

    Tender documents prepared in hurried manner 4repared )y 1arious sections$ no conformance

    Copied from older tender documents

    Clu))ing of contracts$ @o modi*cations

  • 8/9/2019 CVC Study on Power Sector

    12/59

    Example + @IT en1isaged 6esign$ %anufacture$ Supply$

    Erection$ Testing and Commissioning,6%SETC/ of the proposed pac3age

    One trading *rm re;uested for 2ai1er of

    6%SETC as it itself didn’t ;uali*ed the criteria 4SA modi*ed it’s 4J7 to allo2 )idding )y

    parties ha1ing design ( manufacturingexperience and intimated all the )iddingparties

    4SA intimated of amendment only toparties 2ho had purchased )id documentsagainst original @IT$ hence inade;uate

    pu)licity+

  • 8/9/2019 CVC Study on Power Sector

    13/59

    Example G+ Tender Conditions stipulated pro1ision of

    penalty in case of failing to meet theguaranteed po2er consumption

    4enalty Ceiling of = of Contract Value

    @o threshold or minimum po2er consumption

    'ence$ Bidders could deli)erately 3eepminimum po2er consumption to geta2ard

    If fail to consume the minimum po2erconsumption$ get a2ay 2ith only =penalty

    @on>o)0ecti1e e1aluation

  • 8/9/2019 CVC Study on Power Sector

    14/59

    In1iting ( Opening of

    TendersOpen Tendering %ost preferred

    9imited Tendering

    Small Value Argent 2or3  ?e2 )idders in mar3et

    Single ,@ominated/ Tendering Exceptional cases K @atural calamities$

    Emergencies 4roprietary Items in case of goods

    procurement

    @o )ids inspite of repeated tenders

  • 8/9/2019 CVC Study on Power Sector

    15/59

  • 8/9/2019 CVC Study on Power Sector

    16/59

    7eceipt ( Opening of Tenders Circular @o+ ">D>>CTE> dt+ +-+GD

    Suitable arrangements 2or recei/t o2

    sealed tenders  at the scheduled dateand time through conspicuously locatedtender )oxes needs to )e ensured+

    In case of )ul3y tender documents the/rovision 2or submission o2 bids todesignated o3icials by hand should )emade in the tender document itself+

    Open the )ids in the presence of )idders+ 

  • 8/9/2019 CVC Study on Power Sector

    17/59

    Example + One 4SA in1ited oers from t2o arbitrarily

    chosen *rms$ %8s 5 and %8s B for an osite area2or3 ,7s+ . Cr/ for pretender tie up+ +4s 5 )ecame the lo2est+

    The 4SA then reinvited the bids from these t2o

    *rms after deleting t2o items i+e+ structural steeland sheeting+ This time +4s 6  )ecame the 9>+

     5gain a re1ised )id for the third time 2as in1itedonly 2rom +4s 6  after adding item of sheeting+%8s 5 in their re1ised )id 2hile 7uoting higher

    rates for sheeting$ also increased their rates forother items also+

    The total pre>tender tie>up 2as entered intoin a non>transparent ( unfair mannerresulting in undue )ene*t to one contractor+

  • 8/9/2019 CVC Study on Power Sector

    18/59

    Example G+ The 4SA HE’ in1ited )ids for SL area 2or3

    costing 8s' 1) Cr   from arbitrary subcontractors 2ithout any J7+

    %8s H5’ oered highest margin and )ecame '>+

    'o2e1er$ it 2as re0ected )y the client 4SA HC’stating that %8s H5’ 2as not meeting itsre;uirements > PS9 C; had not earliersti/ulated any /articular

  • 8/9/2019 CVC Study on Power Sector

    19/59

    &hole su)>contracting process 2as non>transparent and 2as left to the mercy of theclient 4SA HC’+

    In this case$ a clear cut J7 for su)>contractors

    should ha1e )een stipulated )y the 4SA HC’ inthe tender document itself$ instead of ar)itraryre0ection of proposed su)>contractors+

    In fact the 4SA HC’ should ha1e 3ept itself

    a2ay from suggesting the names of the su)>contractors+

     5lso$ the 4SA HE’ should ha1e prepared a panelof su)>contractors in a transparent 2ay+

  • 8/9/2019 CVC Study on Power Sector

    20/59

    Example .+ In one case$ 2hile in1iting tenders$ the pu)licity

    made for short>listing of )idders 2as stated toha1e )een gi1en in 1arious ne2spapers and alsothrough the 2e)site+

     5 copy of only one ne2spaper cutting 2asmade a1aila)le+ Organization 2as not sureif the same had appeared in all thene2spapers en1isaged+

     5lso in the tender notice$ no details ofeligi)ility criteria$ pro)a)le cost of 2or3$etc+ had )een mentioned$ neither anyreference to the a1aila)ility of the detailed

    tender information on any 2e)site+

  • 8/9/2019 CVC Study on Power Sector

    21/59

    Example D+ In one of the tenders a condition 2as

    incorporated authorizing the )uyerorganization to a2ard contract to the nextlo2est e1aluated )idder ,9G/ in the e1ent of the

    failure of the 9 )idder to sign the contract andfurnish performance security+

    This is in 1iolation to Commission’sguidelines on the su)0ect 2hich prescri)es

    that if 9 )idder )ac3s out due to anyreason$ there should )e a re>tender in afair and transparent manner+

    Splitting of 2or3s )et2een 9 ( 9G parties

    2ithout pre1ious such noti*cations in @IT+

  • 8/9/2019 CVC Study on Power Sector

    22/59

    Example "+ In one case$ a stamp 2as put on each page of the

    9 price )id$ containing date of opening (signatures of the mem)ers of the tender openingcommittee+ 'o2e1er the column for the num)erof corrections 2as 3ept )lan3+

    The 9 corrected 7uoted amount  2as 7s+D+#! crores$ 2hich 2as 0ust 8s' lac less thanthe 9G ;uote of 7s+ D+D crores+

    In the price )id$ a = discount on total price

    2as mentioned )elo2 the stamp and signature ofthe TOC+

    This insertion also 2as not attested )y the TOC+

    &hen 2as the discount percentage addedMMM

  • 8/9/2019 CVC Study on Power Sector

    23/59

    Example -+ In one case$ the covering letter o2 the /rice

    bid of one of the )idders to 2hom the 2or3 2as*nally a2arded 2as having a list o2 all thedocuments enclosed in the )id+

    'o2e1er$ a letter indicating a discount wasalso enclosed  )ut this letter 2as not havingany mention  in the covering letter of theprice )id 2hich 2as containing the list of all theenclosures+ 

    Incidentally$ this )idder could )ecome 9 onlyafter considering the discount as per this letter+

    4ossi)ility of discount letter )een added ata later stage exists+

  • 8/9/2019 CVC Study on Power Sector

    24/59

    4re>Juali*cation:

    6e*cienciesTo select competent contractors 2ithtechnical and *nancial capa)ilitycommensurate 2ith the su)0ect 2or3re;uirement through ade;uatecompetition

    Stringent 4J7 N 4oor competition

    7estricti1e 4J7 N Barriers to potential )idders

    E1aluating criteria not noti*ed to )idders4J7 relaxed during e1aluation

    Credentials of )idders not matched 2ith 4J7 

    Credentials not 1eri*ed

    Completed 2or3 credential 18s 2or3 in progress

  • 8/9/2019 CVC Study on Power Sector

    25/59

    Example + 4J7 for ci1il 2or3s of hydro plant re;uired

    )idder to ha1e achie1ed concreting of G"cum8month+

    One )idder re;uested for lo2ering of capacity

    to G cum8month$ )ut *nally su)mittedexperience certi*cate of G" cum8month

    &or3 a2arded to the same )idder

    4arty re;uested for lo2ering of J7$ hence

    it o)1iously didn’t e1er had theexperience+

    'ence$ certi*cate needed close 1eri*cation+

  • 8/9/2019 CVC Study on Power Sector

    26/59

    Example G+ 5m)iguous 4J7  In transmission line pro0ect$ 4J7 re;uired

    successful completion of G ,t2o/ pro0ects ofsimilar nature )y the )idder and$

    Completion of G % of route length

    &hether t2o pro0ects 2ith )oth ofindividual  completed route lengths of

    G %$ or&hether t2o pro0ects 2ith cumulative route lengths of G %

  • 8/9/2019 CVC Study on Power Sector

    27/59

    Example .+ In a case of a2ard of mechanical pac3age )y a

    4o2er 4SA for 2or3 of G %&$ only t2o2or3s of G %& 2ere en1isaged to )ecompleted )y the prospecti1e )idders+

     5gainst this$ a *rm to 2hom the 2or3 2asa2arded produced t2o certi*cates ha1ingcompleted 2or3s of G %& and G %&only+ 

    The 4J7 appeared to )e s3e2ed in fa1orof the *rm to 2hom 2or3 2as *nallya2arded+

    Incidentally$ the *rm pro1ided these t2o

    certi*cates also only after opening of )ids+ 

  • 8/9/2019 CVC Study on Power Sector

    28/59

    Example D+ In a2ard of E(% pac3age )y a 4SA$ the J7

    en1isaged ma0or share of contri)ution )y theleader in case of the Point Venture )idder$

     5s per the )id proposal of a PV$ the leader )eing

    a foreign company indicated ma0or supplies fromtheir oshore 2or3 )ut in the price )ids$ thedistri)ution of 2or3s appeared such that ma0orportion 2ould )e supplied )y Indian partner+ 

    4rima>facie$ the PV got the a2ard )y

    circum1enting the prescri)ed tender J7 asthe 2or3 distri)ution 2as am)iguous+ 

    Circum1ention o1erloo3ed )y a2arding 4SA

  • 8/9/2019 CVC Study on Power Sector

    29/59

    Example "+ The original J7 en1isaged$ a speci*c technology

    )ased e;uipment ha1ing satisfactory operationfor at least two years as on the 5=>+

    The 4SA amended the J7 through a corrigendumin a 2ay that the amended J7 did not specify any

    period and rather en1isaged that the e;uipmentshould )e in satisfactory operation on BO6+

    This re;uirement 2as ful*lled )y the fa1ored *rm)ased on a user certi*cate stating that theoered e;uipments 2ere 2or3ing satisfactorily

    since ?ovember, %((( as against the 5=> o2 @une, %(($' , %onths/

    The period of successful operation of thee;uipment 2as deli)erately not speci*ed inthe amended J7 to suit a particular *rm+

  • 8/9/2019 CVC Study on Power Sector

    30/59

    Tender E1aluation and

     52ard%ost sensiti1e area suscepti)le to corruption+Chec3points: E1aluation of tenders as per the noti*ed J7 only

    Timely decision 2ithin 1alidity period

    @egotiation 2ith 9 only ,"8C768G dated.+.+#/

    Conditions8speci*cations are not relaxed in fa1or ofthe 2inning contractor ,!8O768 dated D+!+./

    9 is not ignored on Fimsy grounds Ensuring that 2or3 order8supply order is placed

    2ithin 0usti*ed estimated rates+ 

    6etails of a2ard on 2e)sites ,"8VL98D dt+-+.+"/

  • 8/9/2019 CVC Study on Power Sector

    31/59

    Example + In a 4SA$ tenders 2ere in1ited under ICB+ 5fter

    detailed e1aluation of the )ids$ a PV *rm 2ith its;uoted price of 8s' 1( Cr  )ecame 9+

    The Arm was invited 2or /ost tender

    discussions+ 6uring discussion$ Arm started /utting

    certain unwarranted conditions$ e+g+exemption of taxes ( duties etc+ 2hich 2ere notmentioned in the *rm’s original oer+

    6ue to reluctance of the *rm$ the 4SA con1eyedthat in case they did not come 2orward in/ost tender discussion, their action would

    be treated as withdrawal o2 bid+ 

  • 8/9/2019 CVC Study on Power Sector

    32/59

    In the mean time$ the minor  @V /artnera//roached the PS9  2ith the re;uest thatsince the ma0or partner of the PV is )ac3ing out$they might be allowed to re/lace the ma0or/artner  2ith the *rm of re;uired credentials+

    4SA allo2ed the minor partner to propose ane2 ma0or partner 2ithin a period of D 2ee3s)ut the minor @V /artner could not suggestone'

    In this )ac3ground PS9 decided to go 2or asna/ bid among the agencies 2ho participatedin the original )idding and *nally one of thoseemerged as 9> )idder 2ith its ;uoted price of8s' 11 Cr'

  • 8/9/2019 CVC Study on Power Sector

    33/59

     5 ne2 line of thought emerged 2hether the actionof the original 9> )idder should )e treated as withdrawal o2 o3er or the bid had becomenonres/onsive'

     5 decision 2as ta3en to not to 2or2eit the E+> o2  8s' &'( Cr   on the plea of the )id )ecoming non>responsi1e+

    'o2e1er$ the o/inion o2 B+ LawD  of the 4SA2as that since the conditions put forth )y 9> *rm2ere un2arranted and 2ere after opening of the)id$ as such their action amounted to withdrawal o2 bid necessitating 2or2eiture o2E+> of 7s+ !+ crores+

    The opinion of L% ,9a2/ 2as also not /laced

    be2ore the board for ta3ing decision on this issue+

  • 8/9/2019 CVC Study on Power Sector

    34/59

    4utting any conditions contrary to the)id re;uirements )y the )idder at thetime of   /ost tender negotiations

    amounts to stalling the process of*nalization of tender and$ e1entually$ withdrawal o2 the o3er +

    The 1ie2 ta3en )y the 4SA$ against the

    ad1ice of its 9a2 6ept+$ had gi1en anundue *nancial )ene*t of 8s' &'( Cr  tothe )idder+

  • 8/9/2019 CVC Study on Power Sector

    35/59

    Example G+ 4SA H5’ in1ited tenders 2herein$ one 4SA HB’ )idder

    ;uoted 8s' $)&(4 as item rate )ut calculateditem amount 8s' %)&(4+

     5s per the ambiguity clause$ ;uoted item ratehad precedence o1er the amount 2or3ed out+

    'o2e1er$ the 4SA considered 7s+ GD!"8> as unitrate against 1iolation of the tender condition+

    Contract 1alue of 8s' %)'1 Cr, 8s'$)&(4 and8s' %1'114 Cr 8s'%)&(4+ 

    Thus$ po2er sector 4SA H5’ a2arded the 2or3at higher rate )y 7s+ G+ Cr+ )y 1iolatingam)iguity clause of tender document+

  • 8/9/2019 CVC Study on Power Sector

    36/59

    Example .+ In another case$ a )id guarantee of 7s+ crore

    gi1en )y 9 )idder 2as initially 1alid up to.++GD+

    The 9OI 2as issued to this )idder on .+G+GD$after the 1alidity of the )id guarantee 2as o1er+

    It 2as only after placement of 9OI$ that the )idguarantee 2as got extended up to -+G+GD+

    There 2as no )id guarantee during theinter1ening period from ($'$$'%(() to

    (1'$%'%(() during 2hich the case 2as )eingprocessed+

    Such situations needs to be discouraged' Separate oicial to o1ersee the E%6 1alidation >

    CVC

  • 8/9/2019 CVC Study on Power Sector

    37/59

     

    E.ecution Stage

      Compliance of 5greementConditions

     %a3ing 4ayments

     Ensuring Juality Timely Completion

  • 8/9/2019 CVC Study on Power Sector

    38/59

    Common o)ser1ation of

    CTEO%ain focus remains on 2or3BOJ8Speci*cations

    'ence$ other pro1isions get ignored e+g+:

    7oyalty$ 7e)ate$ Test charges$ etc+ 6eployment of manpo2er$ machinery$ etc %aterial 7econciliation

    6eduction of taxes$ charges$ fees$ ad1ances$

    etc+ 4?$ 9a)or licenses$ Safety$ Insurance$ etc+

     7esult ?inancial irregularity 2ith8or undue )ene*t to

    contractor

  • 8/9/2019 CVC Study on Power Sector

    39/59

    Example +Contract 4ro1ision’s Compliance  5s per contract condition$ in a pro0ect

    costing 7s+ " crores$ 2ater for construction2as to )e arranged )y the contractor+

    They 2ere also supposed to pay Hroyalty’ forthe surplus earth generated fromexca1ation+

    The PS9 /rovided the water and did not

    deduct the royalty   from the contractor’s)ill+

    The contractor 2as unduly )ene*ted )y7s+ D 9acs on this account+

  • 8/9/2019 CVC Study on Power Sector

    40/59

    Example G+ In hydro po2er pro0ect$ it 2as seen that only

    )atching plant 2as deployed against Gre;uired+ 'ence$ re;uired ;uantity of concrete2as not produced and the 2or3 got delayed+

    Similarly$ in another case$ )atching plant 2asnot installed at all e1en after lapse of "months from the date of start+

     5gain$ concrete 2or3 2as )eing executed atsite using 1olumetric method instead of design

    mix concrete produced 2ith )atching plant

    Thus$ the contractor not only sa1ed money)ut also compromised the ;uality+

  • 8/9/2019 CVC Study on Power Sector

    41/59

    Example .+Interest free ad1ance$ Ser1ice Tax In a po2er pro0ect costing 7s+ GG crores$ "=

    interest free ad1ance 2as pro1ided in thecontract agreement+

     6nother interest 2ree advance o2 8s' $$crores was allowed  to the contractor 2ithoutany contract pro1ision+

     5s per the special condition of the contract$ theservice ta.   2as the lia)ility of the contractor

    still it  was being reimbursed to thecontractor $ causing undue *nancial )ene*t tothe contractor+

    Thus$ undue *nancial )ene*t 2as extended

    to the contractor+

  • 8/9/2019 CVC Study on Power Sector

    42/59

  • 8/9/2019 CVC Study on Power Sector

    43/59

    Example "+Insurance 4olicies It 2as o)ser1ed that contractor’s are either

    not ta3ing 1arious insurance policies at all orta3ing these policies for part period or for

    part 1alue of pro0ect+

    This not only defeats the 1ery purpose ofstipulating these insurance policies$ )utalso results in undue *nancial gain to the

    contractor+

    CVO of one 4SA reported the reco1ery of7s+ +" Cr against short insurance in all

    the running contracts at the chec3 time+

  • 8/9/2019 CVC Study on Power Sector

    44/59

    Example -+ In one case$ the 9OI 2as issued and the

    successful )idder 2as re;uired to furnishperformance guarantee 2ithin #( days of 9OI+

    It 2as further stipulated that if the successful

    )idder failed to su)mit the C4L in theprescri)ed form 2ithin . calendar days afterdate of 9OI$ then the )id guarantee amount ofthe successful )idder 2ould )e forfeited )y thepurchaser as 96+

    The 4BL 2as su)mitted )y the successful)idder after 1% days of issue of 9OI$ no 96 2asimposed

     Violation of tender conditions$ )ene*t to

    contractor

  • 8/9/2019 CVC Study on Power Sector

    45/59

    Example #+&ai1er of charges$ etc In a particular po2er 4SA$ the ma0or items

    2ere re;uired to )e type tested )y the

    contractor )efore supplying to the site+ 

    It 2as found that type tests 2ere 2ai1edand as a result$ type test charges$ as;uoted )y the )idder$ 2ere not deducted

    from the contractor+Such incidence of 2ai1ing contractconditions may not only ha1e )earing onthe ;uality aspects )ut also ha1e

    *nancial )earing+

  • 8/9/2019 CVC Study on Power Sector

    46/59

    4ayment to ContractorsCircular @o+8D8# dated +D+G# Commission has allowed  the organizations to

    sti/ulate interest 2ree advance  2ith ela)oratemechanism for safeguards against its misuse+

    BLs ta3en in lieu of %o)ilization 5d1ance need tobe /ro/erly e.amined  2ithin respect to theaccepta)le format

     5ny condition deterrent to the Company’s interestshould )e got 2ithdra2n )efore acceptance

     Veri2ying the genuineness o2 the 5B  from the)an3ers+

    Separate oicer for veriAcation4 timely renewal4timely encashment o2 5Bs  to )e designated >CVC

  • 8/9/2019 CVC Study on Power Sector

    47/59

    6uplicate payment 4ayment for the same acti1ity is made under

    t2o dierent items should )e a1oided+,Clubbed Contracts/

    7eco1eries for statutory taxes8duties 7eco1eries not made as per contract condition+

    7eim)ursements: 7eim)ursement of ser1ice tax$ excise duty etc+

    done 2ithout o)taining the actual proof ofdepositing the same 2ith authoritiesconcerned+

    4ossi)ility of excess reim)ursement+

  • 8/9/2019 CVC Study on Power Sector

    48/59

    4ayments made for 2or3 not done

    Escalation paid more than admissi)le Escalation clause’s detailed formula not

    applied correctly+  5r)itrary ad1ance gi1en ins/ite  of

    escalation clause+

    'ire charges not deducted

    Company’s machinery used )y thecontractor for speeding up 2or3$ e1enthough there is no pro1ision in the contract+In such cases$ if the hire charges are not

    deducted$ contractors get unduly )ene*ted+

  • 8/9/2019 CVC Study on Power Sector

    49/59

    Example + Total exca1ated ;uantity of earth 2as

    considered for disposal under extra lead2ithout deducting for )ac3>*ll ;uantity+

    Thus$ payment 2as made e1en for the

    ;uantity not disposed+

    This 2as o)ser1ed in the 2or3 of 7CCchimney for a po2er pro0ect+

  • 8/9/2019 CVC Study on Power Sector

    50/59

    Example G+ One organization$ executing the 2or3s 2orth

    7s+ " crores 2as reim)ursing the exciseduty to the contractors to the tune of 7s+ Crores 2ithout 1erifying the excise dutychallans+

    E1en after the lapse of one and half year$the organization 2as not a)le to su)mitthe reconciled statement of

    reim)ursement of excise duty recei1ed )ythe contractor and the actual excise dutypaid )y the contractor+

    'ence$ pro)a)le undue )ene*t to supplier

  • 8/9/2019 CVC Study on Power Sector

    51/59

    Example .+ In case of a thermal po2er expansion

    pro0ect$ concrete mix 2as designed 2ithparticular cement content$ )ut at the timeof appro1al of deign mix$ the cement

    content was increased arbitrarily +Since$ the cement 2as to )e suppliedfree of cost )y the department$ itultimately resulted in infructuous

    expenditure to the tune se1eral lacs+

    The possi)ility of pilferage of cementcan not )e ruled out+

  • 8/9/2019 CVC Study on Power Sector

    52/59

    Example D+  5 po2er sector 4SA allo2ed 7s+ D Cr interest

    free ad1ance during the 2or3 execution 2ithoutany contract condition on the ground of rise inthe steel prices+

    There 2as a speci*c escalation clause for steeland contractor 2as )eing ade;uatelycompensated for rise in the steel prices$ so thisaction 1irtually resulted in undue *nancial)ene*t to the contractor+

    If the rate of interest on this extra ad1ancepayment is considered same as on themo)ilization ad1ance stipulated in thecontract agreement$ this undue )ene*t

    2ould amount to almost 7s+ " la3hs+ 

  • 8/9/2019 CVC Study on Power Sector

    53/59

    Example "+ Before a2ard of 2or3$ 9> *rm con*rmed to

    /ass on the mega /ro0ect concessions+PCD  to the 4SA+ 'o2e1er$ no %4C 2erepassed on to the 4SA+

    7ather a proposal 2as in the process forpayment of $1F  of the total %4C to the 9>*rm as a fee for the consultant 2ho 2ill )eappointed )y the 9> *rm for a1ailing these%4C+

    Before placing the a2ard letter the 4SAcategorically had re0ected the demand of the 9> *rm on this account+ 

    -= of %4C ,7s+ G Crores/ : 7s+ .+G

    Crores

  • 8/9/2019 CVC Study on Power Sector

    54/59

    Juality  5s per the contract$ surface cleaning and

    preparation on steel structural mem)ers 2asto )e done 2ith 2ire )rushing or mechanicaltools depending upon the condition of surface+ 

    But$ at site surface cleaning8preparation2as )eing done only 2ith 2ire>)rush$2hereas certain structural steel mem)ersneeded cleaning 2ith mechanical tools

    )ecause of scaling+The thic3ness of paint o1er structuralsteel mem)ers 2as found less than there;uired+

  • 8/9/2019 CVC Study on Power Sector

    55/59

    Example G+ In a 77 stone masonry drain 2or3 of a

    @uclear po2er pro0ect$ bond stones werenot /rovided  at all$ 2hich are necessaryfor the sta)ility of the stone 2or3+

    Similarly the 0oints in the stone masonry2ere o)ser1ed more than the maximumpermissi)le size of the 0oints$ 2hich is alsoindicati1e of poor ;uality of construction+

  • 8/9/2019 CVC Study on Power Sector

    56/59

    Example .+ In one case$ it 2as found that 2hile

    dispatching the material from contractor’sstores$ the items$ 2hich 2ere earlierre0ected$ deformed and rusted$ 2ere mixed

    2ith the other items ready for dispatch toerection site+

    Such lapses pro1e that super1ision atthe time of execution is not gi1en due

    importance )y the 4SA particularly2hen the executing agency is another4SA+

  • 8/9/2019 CVC Study on Power Sector

    57/59

    Time O1errun%any pro0ects ha1e )een unduly delayed dueto contractor’s fault such as non deployment of ade;uate plant ( machinery$

    technical sta$

    material$ la)or etc+'o2e1er$ no 5ction against the contractor interms of the agreement 2ere ta3en )y the4SAs+

    In some pro0ects$ it 2as further o)ser1ed thatHE.tension o2 Time;  2as granted 2ithoutclaiming com/ensation 2or   L>$ ignoring allsuch correspondence that implicate the

    contractor+

  • 8/9/2019 CVC Study on Power Sector

    58/59

     

     51aila)ility of Complete7eport CVC &e)site

     http:88222+c1c+nic+in8cte)oo3+htm

     ?ara33a 95@ http:88!+G"D+G+G"81igilance8CTEOStudy+htm

  • 8/9/2019 CVC Study on Power Sector

    59/59