ROGELIO B. GUINIR JR. Present Address: Purok 7 Upper Magsaysay, Bayombong, Nueva Vizcaya 3700 Philippines Email Address: [email protected] Contact No.+639364774935 Passport Number: EC5099097 Fin No.G5285040T Apllied Position:Project Engineer/ Site Engineer OBJECTIVES: To seek advancement and growth in my chosen field of profession and to carry out duties and responsibilities exemplary performance that my service will be great contribution to the company. QUALIFICATION: SketchUp 3D Operator CADD Operator (Architectural, Plumbing, Electrical, Mechanical and Fire Protection) Knowledgeable in Microsoft Word and Excel Knowledgeable in Sanitary / Plumbing, Fire Protection and Electrical Works With background on vertical and horizontal construction and estimates Can work with minimum supervision and can handle pressure EDUCATIONAL ATTAINMENT: Tertiary Level: Bachelor of Science in Civil Engineering 2000-2009 Nueva Vizcaya State University Bayombong, Nueva Vizcaya` Date Graduate: April 21, 2009 Secondary Level: Saint Mary’s High School 1996-2000 Dupax del Sur, Nueva Vizcaya Elementary Level: Cabaruguis Elementary School 1991-1996 Luna Cabaruguis, Quirino 1. Project Engineer April 25, 2016 to Up-to Present Project: Paseo De Roxas Corner Ayala Avenue, Makati City Philippines Job Description 1. Perform such other duties and responsibilities as required by the project in general. 2. Responsible for entire project cycle including design, development, implementation and project completion. 3. Supervising/monitoring and delegation of works and by issuing that all priorities are made as per plan and specification of works. 4. Prepare and give leveling for drainage canal, slab & columns before casting 5. Submit daily accomplishment report for the actual site condition. 6. Prepare shop drawing and request for approval to consultant 7. Check safety issues on site and compliance with to our maincontractor 8. Implement work as per design and submit a proposal incase conflicts arises in actual construction for designers’ approval. 9. Coordinate with other trade sub-contractor for the execution of work 10. Inspection of materials installed on site and verify plan if followed according to specification details 11. Prepare for inspection of sanitary plumbing and fire protection before installation on works 12. Attend meeting to the management reporting the status of work on site 13. Review development plans for compliance with adopted engineering standards and good Engineering practices. 14. Work requires willingness to work a flexible schedule.
11

CV-R.B.Guinir Jr.(01-15-17)

Jan 25, 2017

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CV-R.B.Guinir Jr.(01-15-17)

ROGELIO B. GUINIR JR. Present Address: Purok 7 Upper Magsaysay, Bayombong, Nueva Vizcaya

3700 Philippines

Email Address: [email protected]

Contact No.+639364774935

Passport Number: EC5099097

Fin No.G5285040T

Apllied Position:Project Engineer/ Site Engineer

OBJECTIVES:

To seek advancement and growth in my chosen field of profession and to carry out duties and

responsibilities exemplary performance that my service will be great contribution to the company.

QUALIFICATION: SketchUp 3D Operator

CADD Operator (Architectural, Plumbing, Electrical, Mechanical and Fire Protection)

Knowledgeable in Microsoft Word and Excel

Knowledgeable in Sanitary / Plumbing, Fire Protection and Electrical Works

With background on vertical and horizontal construction and estimates

Can work with minimum supervision and can handle pressure

EDUCATIONAL ATTAINMENT: Tertiary Level: Bachelor of Science in Civil Engineering

2000-2009 Nueva Vizcaya State University

Bayombong, Nueva Vizcaya`

Date Graduate: April 21, 2009

Secondary Level: Saint Mary’s High School

1996-2000 Dupax del Sur, Nueva Vizcaya

Elementary Level: Cabaruguis Elementary School

1991-1996 Luna Cabaruguis, Quirino

1.

Project Engineer April 25, 2016 to Up-to Present

Project: Paseo De Roxas Corner Ayala Avenue, Makati City

Philippines

Job Description

1. Perform such other duties and responsibilities as required by the project in general.

2. Responsible for entire project cycle including design, development, implementation and project

completion.

3. Supervising/monitoring and delegation of works and by issuing that all priorities are made as per

plan and specification of works.

4. Prepare and give leveling for drainage canal, slab & columns before casting

5. Submit daily accomplishment report for the actual site condition.

6. Prepare shop drawing and request for approval to consultant

7. Check safety issues on site and compliance with to our maincontractor

8. Implement work as per design and submit a proposal incase conflicts arises in actual construction for

designers’ approval.

9. Coordinate with other trade sub-contractor for the execution of work

10. Inspection of materials installed on site and verify plan if followed according to specification details

11. Prepare for inspection of sanitary plumbing and fire protection before installation on works

12. Attend meeting to the management reporting the status of work on site

13. Review development plans for compliance with adopted engineering standards and good

Engineering practices.

14. Work requires willingness to work a flexible schedule.

Page 2: CV-R.B.Guinir Jr.(01-15-17)

2.

Site Engineer

December 19, 2015 to February 06, 2016

Project: Tuas Terminal Reclamation Works

Tuas Singapore

Job Description

1. Perform such other duties and responsibilities as required by the project in general.

2. Responsible for entire project cycle including design, development, implementation and project

completion.

3. Supervising/monitoring and delegation of works and by issuing that all priorities are made as per plan

and specification of works.

4. Prepare and give leveling for drainage canal, slab & columns before casting

5. Submit daily accomplishment report for the actual site condition.

6. Prepare shop drawing and quantity of materials

7. Check safety issues on site and compliance with the subcontractors

8. Implement work as per design and submit a proposal incase conflicts arises in actual construction for

designers’ approval.

9. Coordinate with other trade sub-contractor for the execution of work

10. Check the reinforced installed on site and verify dimension spacing as per plan detail for the design

11. Summit daily of number of quantity materials installed on site

12. Inspection of materials installed on site and verify plan if followed according to specification details

13. Prepare for inspection of steel column before installation on works

14. Everyday attend meeting to the management reporting the status of work on site

15. Prepare construction schedule following the schedule of general construction works.

16. Review development plans for compliance with adopted engineering standards and good

Engineering practices.

3.

Site Engineer

March 28, 2014 – December 18, 2015

ERECTION “BUROH CRESCENT” OF A 9-STOREY MULTIPLE-USER GENERAL INDUSTRIAL DEVELOPMENT WITH TEMPORARY

ANCILLARY STAFF CANTEEN AND OTHER ANCILLARY FACILITIES (TOTAL: 100 FACTORY UNITS AND 1 CANTEEN) ON

LOTS 00529V, 02387M, 02388W AND 04637N MK 06 AT

BUROH CRESCENT (BOONLAY PLANNING AREA)

Jan.26, 2014-March 27, 2014 Erection “Horizon” Of a 8-Storey Multiple-User clean and light industry comprising 287 ramp-up factory units

with temporary staff canteen on lot 05911L MK13 at Woodlands Close, Woodlands Avenue 12 and

Woodlands Drive 64 ( Woodlands Planning Area )

May 25, 2012-Jan.25, 2014 ERECTION ” PRIMZ BIZHUB” OF A 9-STOREY MULTIPLE-USER CLEAN AND LIGHT INDUSTRIAL DEVELOPMENT WITH

MEZZANINE FLOOR AT 1ST STOREY COMPRISING 380 FLATTED FACTORY UNITS AND ANCILLARY STAFF CANTEEN ON

LOT 05890L MK13 AT WOODLANDS CLOSE, WOODLANDS DRIVE64, AND WOODLANDS AVENUE 12 (WOODLANDS

PLANNING AREA)

Job Description 1. Receives instruction from the MEP supervisor on all priority works to be performed.

2. Perform such other duties and responsibilities as required by the project in general.

3. As-built drawing regarding on conflict installation base on as per plan in architectural

4. Implement work as per design and submit a proposal incase conflicts arises in actual construction

for designers’ approval.

5. Verifies lay-out of all plumbing fixtures and its alignment.

6. Prepare drawing and estimate, bill of materials and specification of the plan.

7. Coordinate with other trade sub-contractors for the execution of work.

8. Monitoring and delegation of works and by issuing that all priorities are made as per plan and

specification of works.

9. Responsible for entire project cycle including design, development, implementation and project

completion.

10. Prepare drawing section and Update the plan for plumbing layout and plumbing fixtures.

11. Review development plans for compliance with adopted engineering standards and good

engineering practices.

Page 3: CV-R.B.Guinir Jr.(01-15-17)

12. Conduct surveys to gather field data

13. Prepare and interpret Auto Cad blueprints, schematic drawings, layouts and other visual aids.

14. Prepare and give leveling for drainage canal, slab & columns before casting

15. Work requires willingness to work a flexible schedule.

4.

Engineering Aide II

June 19,2011 to Up to its completion – (2CL) Wangal Elementary School, Kasibu, Nueva Vizcaya

August 15,2011 to Up to its completion – (2CL) Binugawan Elementary School, Kasibu, Nueva Vizcaya

September 22,2011 to Up to its completion – (2CL) Bacneng Elementary School, Sta.Fe, Nueva Vizcaya

June 25, 2012 to Up to its completion – (2CL) Balete Elementary School, Diadi, Nueva Vizcaya

Job Description

1. Supervision/monitoring and delegation of works and by issuing that all priorities are made as per plan

and specification of works.

2. Preparing of sketch/detailed plan & specification of work.

3. Conduct inspection of layout the dimension of the building, establish finish floor line from natural

grade line base on architectural plan.

4. Inspect & check materials delivered on site to insure that all materials delivery conforms to

specification.

5. Recorded number utilized construction materials, personnel and equipment

6. Prepare quantity computation base on physical accomplishment to plan for final billing

7. Check laid forms of rebar, isolated footing, reinforced concrete column, ground floor slab, beams,

wall footing, laying CHB and all scope of work in accordance to plan.

8. Submit weekly accomplishment and quincenal project report.

9. Recorded and quantify day-to-day activities

10. Prepared as-built drawing regarding on conflict installation base on as per plan in architectural

11. Prepare drawing and estimate, bill of materials and specification of the plan.

5.

Project Engineer January 19, 2011 – March 30, 2011

Project: One Ecome Center, Mall of Asia, Pasay City

Job Description: 1. Prepare the material estimate particularly used in the preparation of the site development include area drain,

manhole, curve inlet, storm drain and open canal.

2. Preparation letters to the project director for every concern we raise especially with regards to variation quotations,

requisition, permits, and delays in work schedule.

3. Direct supervision and monitoring of work installation of hot and cold water lines, sanitary sewer lines, waste lines,

storm drain lines, soil and vent stacks.

4. Implement work as per design and submit a proposal incase conflicts arises in actual construction for designers’

approval.

5. Coordinate with other trade sub-contractors for the execution of work.

6. Attend a weekly coordination meeting with the project management group, general contractor and trade

contractor.

7. Prepare a plan of work activities for the coming week based on the general project work schedule to serve as

guide to the foreman in the carrying out of various works.

8. Always find time with warehouse about the stock levels of delivered materials to know if there is already a need

to request materials. This also includes regular inspection including cost proposal.

6.

Quality Control Engineer January 18, 2010 – January 18, 2011

Project: The Infinity tower

Lot 3,25th& 26th Street, Bonifacio Global City, Taguig City

Job Description: 1. Conducts verification of lay-out and location of all plumbing fixtures in accordance to plan.

2. Witness and conduct inspection of sanitary pipes and perforated pipes.

3. Verifies lay-out of all plumbing fixtures and its alignment.

4. Conduct inspection of all plumbing fixtures water closet, lavatory, kitchen sink, and all types of floor drain.

Page 4: CV-R.B.Guinir Jr.(01-15-17)

5. Inspection lay-out of perforated pipes prior to installation, conduct inspection of water lines for pressure test and

conduct inspection of sanitary pipes for gravity test and its flow test.

6. Supervision/monitoring and delegation of works to subordinates by insuring that all priorities are made as per

general construction schedule.

7. Attending management meeting and coordinates with other contractors regarding conflicts of installation and

preparing recommendation and proposal to avoid repetition of same mistake in future installation.

8. Teach all workers to read key plan layout for proper piping installation and issued memoranda to workers to

improved their performances and working habits.

9. Implement the existing Company Rules and Programs as well as the Client’s Rules and Regulations.

10. Preparing / conducting gravity test, hydrostatic test and pressure test

11. Preparing daily man power report and scope of work

12. Received instructions from the Project in-Charge on all priority work to be performed.

13. Prepare construction schedule following the schedule of general construction works.

14. Estimate additional works and including cost proposal.

7.

Project Engineer November 25, 2009 – December 30, 2009

Project: District VI Hospital Project

New Panaderos St. Sta. Ana, Manila

Job Description: 1. Preparing of sketch / detailed Plan, Specification and Scope of work

2. Assist of paper works and Up-dating Submittals log

3. Received instructions from the project manager on all priority work to be performed.

4. Prepare construction schedule following the schedule of general construction works.

5. Monitor daily accomplishment of workers to determine their performance as being Planned and

targeted by the head office.

6. Prepare and summit materials requisition to the head office for delivery to site.

7. Performed or assume the responsibility of project manager in case of absence of the Project

manager.

8.

Assistant Project Engineer January 06, 2009 – October 15, 2009

Project: The Beacon Tower Project

Chino Roces Ave., cor. Arnaiz Ave., Makati City

Job Description:

1. Supervision/monitoring and delegation of works to subordinates by insuring that all priorities are made

as per general construction schedule.

2. Inspect and study materials requisition and delivery to insure that all materials delivered conform to specification

and sufficient enough to complete the targeted floor levels per month to minimize over stocking.

3. Attending management meeting and coordinates with other contractors regarding conflicts of installation and

preparing recommendation and proposal to avoid repetition of same mistake in future installation.

4. Teach all workers to read key plan layout for proper piping installation and issued memoranda to workers to

improved their performances and working habits.

5. Implement the existing Company Rules and Programs as well as the Client’s Rules and Regulations.

6. Preparing of sketch / detailed Plan, Specification and Scope of work

7. Assist of paper works and Up-dating Submittals log

8. Preparing accomplished weekly report

9. Received instructions from the project engineer on all priority work to be performed.

10. Prepare construction schedule following the schedule of general instruction works.

11. Monitor daily accomplishment of workers to determine their performance as being

Planned and targeted by the head office.

12. Prepare and submit materials requisition to the head office for delivery to site.

13. Submit weekly / monthly accomplishment to the project engineer for the purposes of Progress billing.

14. Performed or assume the responsibility of project-in-in charge in case of absence of the Project

engineer.

Page 5: CV-R.B.Guinir Jr.(01-15-17)

SEMINARS ATTENDED

Certificate of Commendation

September 08, 2010

Infinity at fort Project Site

Fort Bonifacio, Taguig City, Philippines.

Basic Occupational Safety and Health Seminar

Jan.24,31 to Feb.7,14 & 21,2009 – (40 hrs.)

Exchange Regency Project Site

Mandaluyong City.

2nd Luzon Regional Conference and Trade Exhibit

Theme:” Plumbing Engineers: A Global Technocrat”

October 17 – 18, 2008

Hotel Supreme Convention Plaza

Magsaysay Avenue, Baguio City.

Lecture Series on RA 9184 & IRR of the National Building Code

March 15, 2008

Engineering Annex

Nueva Vizcaya State University

Bayombong, Nueva Vizcaya.

Business Planning and Simple Bookkeeping

August 09, 2008

University Mini – Theater

Nueva Vizcaya State University Bayombong, Nueva Vizcaya.

PERSONAL PARTICULARS Birth Date: January 05, 1982

Birth Place: Dupax del Sur, Nueva Vizcaya

Age: 34 yrs. old

Gender: Male

Citizenship: Filipino

Height: 5’ 7”

Weight: 140.8 lbs.

Religion: Roman Catholic

Civil Status: Married

Spoken Language: English, Tagalog, Ilocano, Isinai

CHARACTER REFERENCES:

Mary Mariano

Daycare School Teacher Purok 07 Upper Magsaysay Bayombong, Nueva Vizcaya

Phone No.+639367908827

Relvin B. Aggasid Purok 07 Upper Magsaysay Bayombong, Nueva Vizcaya

Phone No.+639269523598

Randy B. Guinir Forman Site Supervisor

ASD Engineering Construction Pte. Ltd.

Phone No.+639262747935/+6584214496

I hereby certify that all data in my resume are true and correct to the best of my

knowledge and belief

Page 6: CV-R.B.Guinir Jr.(01-15-17)