Top Banner
BAMBANG Widiyanto PERSON IN CHARGE DISCIPLINES ELECTRICAL & INSTRUMENT SUPERVISOR Address Perum Papan Mas Block A10 No 06 Rt 06 Rw 04, Setia Mekar – Bekasi, West Java Phone +628125595346 or +6282111898346 Indonesia E-Mail [email protected] National Indonesian nationality Passport No Expire - A 1702018 - Nov 2016 Language - English - Indonesian STUDIES 01 July, 1987 Diploma / Academic seaman ship 02 June 1979 Senior High School COURSES ATTENDED 2013 November 26 “ SWING ROPES “ Training by PT Bina Nusantara for Client TOTAL INDONESIE 2013 July 4/5 “ BOSIET “ Training By PT Indosafe Pratama for Client TOTAL INDONESIE August 14 “ ELECTRICAL ABILITY PERMIT TRAINING For Level LR, L2V, H2 By TOTAL INDONESIE PROFFESIONAL SKILLS Project Supervisor Electrical & Instrument. ` o Offering comprehensive experience and expertise in the following area of responsibility Capable to develop Company works concept, to distribute duty and responsibility between subcontractor and subordinate. Experience in extensive planning, organizing, schedule evaluating, and follow up varied responsibilities in a timely and completed manners. Proficient in developing excellent relationship with client and consultants. Experience in knowledge provision analyses and policies in Order to decide eligible benefit. Skilled at organizing work and resolving problem, which arise in daily activities. Curriculum Vitae1 / 7
7

CV New 2016

Jan 09, 2017

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CV New 2016

BAMBANG WidiyantoPERSON IN CHARGE DISCIPLINESELECTRICAL & INSTRUMENT SUPERVISORAddress  Perum Papan Mas Block A10 No 06 Rt 06 Rw 04, Setia Mekar – Bekasi, 

West JavaPhone  +628125595346 or +6282111898346 IndonesiaE-Mail [email protected] Indonesian nationalityPassport NoExpire

- A 1702018- Nov 2016

Language - English- Indonesian

STUDIES

01 July, 1987 Diploma / Academic seaman ship

02June 1979

Senior High School

COURSES ATTENDED

2013 • November 26 “ SWING ROPES “ Training by PT Bina Nusantara for Client TOTAL INDONESIE

2013 • July 4/5 “ BOSIET “ Training By PT Indosafe Pratama for Client TOTAL INDONESIE• August 14 “ ELECTRICAL ABILITY PERMIT TRAINING For Level LR, L2V, H2 By TOTAL INDONESIE

PROFFESIONAL SKILLS

Project Supervisor Electrical & Instrument.

`

o Offering comprehensive experience and expertise in the following area of responsibility Capable to develop Company works concept, to distribute duty and responsibility between subcontractor and subordinate. Experience in extensive planning, organizing, schedule evaluating, and follow up varied responsibilities in a timely and completed manners. Proficient in developing excellent relationship with client and consultants. Experience in knowledge provision analyses and policies in Order to decide eligible benefit. Skilled at organizing work and resolving problem, which arise in daily activities.

PROFESSIONAL EXPERIENCE

01March 2014 – April 2014

Person in charge Disciplines: Electrical Commissioning Supervisor with SCHNEIDER IndonesiaProject: Renewal - Indocement PalimananCleint : Schneider

Duties and Responcibility

Work under the direction of the Lead Electrical Commissioning Engineer to assure timely, appropriate and demonstrable commissioning of the facilities with due regard to the Environment and Health and Safety of Personnel in His or Her discipline

Apply and share with team members experience and lessons learned from previous Projects

Input of relevant information to the Completions Management System for the Electrical discipline

Be conversant with check sheet Completion and Management Develop supporting Commissioning documentation and conversant with IT

Curriculum Vitae1 / 5

Page 2: CV New 2016

application. Liaise with construction during completion to ensure the facilities are handover

in accordance with specifications and with the minimal quantity of punch list items.

Ensure commissioning safety and that any incidents and near misses are reported

Ensure commissioning activities are implemented in accordance with the project’s Operations Permit to Work system.

Prepare daily reports re: progress and commissioning / materials / logistics issues.

Verify commissioning is completed and documented in accordance with approved Commissioning procedures

Perform all Pre-Commissioning and Commissioning function tests relevant to the Mechanical discipline

Interface with other discipline Commissioning Engineers to commission systems as required

Liaise with Operations on issues of commissioning implementation Raise permits to work prior to submission to Permit Controller Verify mechanical completion, pre-commissioning and commissioning

activities Assist with Preparation of all certification documents for completion and hand-

over To Operations. Ensure commissioning is in accordance with approved commissioning

procedures.

02March 2013 - 18 Dec 2013

Person in charge Disciplines: E&I Supervisor with PT.Prima Langkah PratamaProject : Sisi nubi WPN3, WPS2 and SWPJCleint : Total E&P Indonesie

Duties and Responcibility

Supervised Contractor/Sub Contractor for their activities on site. Inspected Installation as per standard and carried out functional testing

Commissioning for all equipment as : Motors, Transformer, UPS, Lighting System,Grounding system, LV / HV Switchgear, HVAC system, PCV, PSV etc.

. Arrange/record the test on Pre-commissioning / Commissioning Dossier Supervised & Performing Erection work, Connection Cable, Install Cubicle, Instrument device.

Report to E & I Superintendent and Company Site Representative (CSR) for all Electrical & Instrument activities at site.

03Augst 2011 - Nov 2012

Person in charge Disciplines: E&I Supervisor with PT. Spei Energy Service.Project : Peciko 7B Extention Project Brown Field.Cleint : Total E & P Indonesie

Duties and Responcibility

Supervised Contractor/Sub Contractor for their activities on site. Inspected Installation as per standard and carried out functional testing

Commissioning for all Equipmentas : Lighting System,Grounding System,LV Switchboard, PCV, PSV etc.

Arrange/record the test on Pre-commissioning / Commissioning Dossier Supervised & Performing Erection work, Connection Cable, Install Cubicle, Instrument device.

Report to E & I Superintendent and Company Site Representative (CSR) for all Electrical&Instrument activities at site.

04Des 2010 – April 2011

Person in charge Disciplines : E&Isupervisor with PT Surveyor IndonesiaProject : CPP, AUP AND LIVING QUARTER PROJECT.Cleint : Amerelda HESS

Duties and Responcibility

Supervised Contractor/Sub Contractor for their activities on site. Inspected Installation as per standard and carrieoutfunctionaltesting

Commissioning for all equipment as : Motors, Transformer, UPS, Lighting system,Grounding system LV / HV Switchgear, HVAC system, PCV, PSV etc.

Pre-commissioning and commissioning of electrical items such as: Power and

Curriculum Vitae2 / 5

Page 3: CV New 2016

Control Cables, Cable Trays, Wiring, Lighting, Motors, Relay/Limit Switches, Switch Gear, Control Panels.

Coordination with representatives E&I of the Customer & final Customer for all activities E&I of the Project.

Preparation, implementation, control, review and update of specific documentation E&I of the project ( procedures, plane of quality control…) in coordination with supervisors E&I and the personnel of Construction.

Coordination with the Site Manager/the persons in charge disciplines and inspectors QC for the Inspections and the tests.

Direction of supervisors E&I (20 people) for the realization of work and the inspections  during the various training courses of the project.

Control and followed performance of the subcontractors with the requirements quality.

Checking and review of the corrective actions and preventive concerning internal Nonconformities of the Customer.

To ensure that work is completed according to the plans and estimate of the project.

To ensure that the working methods and the quality of the finished product are according to code's of practice.

To ensure that work is completed safely. To ensure that work is completed inside the deadlines and of the budget,

without generating the additional costs. To prepare the daily progress report. Insurance of the maintenance and the calibration of the instruments of the

project Compilation of the File final Manufacturer of the project.

05April 2010- Nov 2010  Person in charge Disciplines : E&I Supervisor with PT Inamco Indonesia

Project : Bekapai De Bottle Necking ( Extention Project ) Brown field Cleint : Total E&P Indonesie

Duties and Responcibility

Supervised Contractor/Sub Contractor for their activities on site. Inspected Installation as per standard and carried out functional testing

Commissioning for all equipmentas:Lightingsystem,Groundingsystem,LV Switchboard PCV, PSV etc.

Arrange/record the test on Pre-commissioning / Commissioning Dossier Supervised & Performing Erection work, Connection Cable, Install Cubicle, Instrument device

Report to E&I Superintendent and Company Site Representative(CSR)for all Electrical & Instrument activities at site.

06

May 2007 – Dec 2009 Person in charge Disciplines : E&I Supervisor with PT Ideal Patra IndonesiProject : OWT Tunu tambora. PECIKO 6 Prosess Area Control, Power Distribution and Facilities Senipah Project.Cleint : Total E&P Indonesie

Duties and Responcibility

Supervised Contractor/Sub Contractor for their activities on site. Inspected Installation as per standard and carried out functional testing

Commissioning for all equipment as : Motors,Transformer,UPS, Lighting System,Grounding system, LV / HV Switchgear, HVAC system, PCV, PSV etc.

Arrange/record the test on Pre-commissioning / Commissioning Dossier Supervised & Performing Erection work, Connection Cable, Install Cubicle, Instrument device, fiber optic, FG and Telecom.

Report to E & I Superintendent and Company Site Representative (CSR) for all Electrical&Instrument activities at site.

07 May2001 – April2006  Person in charge Disciplines : Electrical Commissioning with PT CEGELEC / Indokomas Project : NCP Tunu 8 Tambora, Peciko 3&4 Prosess Area Control, Power Distribution and Facilities

Curriculum Vitae3 / 5

Page 4: CV New 2016

Cleint : Total E & P IndonesieDuties and Responcibility

To ensure HSE requirements are met during the execution of all pre-commissioning and commissioning activities.

To review all Pre-commissioning and Commissioning Dossiers before Sub-System acceptance.

To validate electrical and instrument check sheets and functional test sheets. To oversee electrical and instrument equipment suppliers’ and vendors’ test

sheets. To review and validate vendor electrical and instrument reports. To consolidate electrical and instrument pre-commissioning and

commissioning progress. To perform follow-up of electrical and instrument punch lists and be proactive

in the Punch List Clearance process. To perform follow-up of required electrical and instrument tools, consumables

and Spare parts. To validate any technical change or modification for electrical and instrument

Equipment. To ensure proper preservation of electrical and instrument equipment. Any other work of a similar nature as may be requested by COMPANY.

08

June 1989 – April 2000 Person in charge Disciplines : Electrical Supervisor with PT CEGELEC / Indokomas Project : British Petroleum Fire & Gas Protection Project – Java Sea.

Chevron Geothermal Project. Semen tonasa biringkasi Shiplaoder Project. Amoseas Geothermal Project. Arun LNG/NSO Project. Inalum Indonesia Modification 510 of pot control Panel Project. UP V Pertamina Up Grade Project Alcatel Telecomunication Cross Sumatra Project

Duties and Responcibility

Oversee all activities of members, starting from the preparation work equipment, materials until the whole installation of electrical or electronic Equipment. As :

MCC switchgear installation (Schneider) Installation of cables tray Cables glanding &termination. Installation of earthing system. Electrical equipment installation (junction box, lighting, electrical

Switchboard,pumps…) Instrument cable pulling and termination. Report all activities to Site Manager.

09

June1984 – April 1989 PT. Kartika Satya EngineeringPosition : Electrician ForemanProject : SLIPI JAYA PLAZA Construction Project, MATA HARI PLAZA Construction Project - Jakarta.

10 June 1982– April 1984 PT. Kaefer Isolier TechnicPosition : ElectricianProject : Train IV & V Project, ARUN LNG Lhokseumawe, North Aceh

Curriculum Vitae4 / 5

Page 5: CV New 2016

Indonesia

11

September 1979 – April1982

PT. Jaya Tehnik IndonesiaPosition: CRAFMANProject : ICCO Project, Pulo Gadung, Jakarta

SUMMARY OF COMPETENCES

Electric & Instrumentation: installation of cables tray Cables glanding&termination. Installation of earthing system. Electrical equipment installation (junction box, lighting, electrical switchboard, pumps…) instrumentation Calibration instrumentation Installation (instruments, cables, tubing,…) Inspection of the loops (Loop Check)Planning and preparation of works E&I.

OTHERS

Driving licence (since 2012)Centers of interests: Sports, Reading (History)

I declare that the above data properly described me, My Experiences and My Qualifications, and that I am Employed as declared above.

Curriculum Vitae5 / 5