Frans Paterson Barnabas [email protected]Jl. Bonto Bulaeng No.02 Kel. Sumber Rejo, Rt.049 Kec. Balikpapan Tengah (Kal-Tim) 76124 - Indonesia Cell. 081254588840 DATA PRIBADI Nama Lengkap : Frans Paterson Barnabas Warga Negara : Indonesia Agama : Kristen Protestan Tempat & Tanggal Lahir : Balikpapan, 10 September 1980 Status Perkawinan : Kawin Alamat : Jl. Bonto Bulaeng No.02, Kel. Sumber Rejo, Rt.049, Kec. Balikpapan Tengah (Kal-Tim), Kode Pos: 76124 - Indonesia. No. Telepon : 081254588840 PENDIDIKAN 2010 – 2011 Universitas Tridharma (UNTRI - Balikpapan), Program Strata 1 Jurusan Teknik Mesin (S1) 2001 – 2007 Institut Sains Teknologi Nasional (ISTN - Jakarta), Program Strata 1 Jurusan Teknik Mesin- Metalurgi (Pindah Kuliah/ Transfer Nilai) 1995 – 1999 STM Pangeran Antasari, Balikpapan 1992 – 1995 SLTP Katolik Yos Sudarso, Balikpapan 1986 – 1993 SDN 010 Handil II Muara-Jawa Kab. Kutai, Kal-Tim PELATIHAN 2010 Training Basic Machine, Hydraulic and Heavy Equipment Component By PT. Sanggar Sarana Baja (Remanufacturing Division); 1. Basic Machine (Structure and Function): > Track- Type Tractors (Buldozer) > Motor Greder > Wheel Loader > Articulated Truck > Hydraulic Excavator > Off Highway Truck
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Jl. Bonto Bulaeng No.02 Kel. Sumber Rejo, Rt.049 Kec. Balikpapan Tengah (Kal-Tim) 76124 - Indonesia Cell. 081254588840
DATA PRIBADI
Nama Lengkap : Frans Paterson Barnabas
Warga Negara : Indonesia
Agama : Kristen Protestan
Tempat & Tanggal Lahir : Balikpapan, 10 September 1980
Status Perkawinan : Kawin
Alamat : Jl. Bonto Bulaeng No.02, Kel. Sumber Rejo, Rt.049,
Kec. Balikpapan Tengah (Kal-Tim), Kode Pos: 76124
- Indonesia.
No. Telepon : 081254588840
PENDIDIKAN
2010 – 2011 Universitas Tridharma (UNTRI - Balikpapan), Program Strata 1
Jurusan Teknik Mesin (S1)
2001 – 2007 Institut Sains Teknologi Nasional (ISTN - Jakarta), Program Strata 1
Jurusan Teknik Mesin- Metalurgi (Pindah Kuliah/ Transfer Nilai)
1995 – 1999 STM Pangeran Antasari, Balikpapan
1992 – 1995 SLTP Katolik Yos Sudarso, Balikpapan
1986 – 1993 SDN 010 Handil II Muara-Jawa Kab. Kutai, Kal-Tim
PELATIHAN
2010 Training Basic Machine, Hydraulic and Heavy Equipment Component By
PT. Sanggar Sarana Baja (Remanufacturing Division);
1. Basic Machine (Structure and Function):
> Track- Type Tractors (Buldozer)
> Motor Greder
> Wheel Loader
> Articulated Truck
> Hydraulic Excavator
> Off Highway Truck
2. Basic Component:
> Engine
> Torque Converter and Transmission
> Differential
> Brake
> Final Drive
> Hydraulic Cylinder
> Suspension
2000 Seminar Automotive Indonesia – “Optimalisasi Kualitas Manufactur di
Bidang Industri Otomotif Menyongsong Era Globalisasi” (UKI – Mitsubishi
Motors, Jakarta)
1999 Praktek Kejuruan Mesin Produksi – Balai Latihan Kerja (BLK Balikpapan)
1998 Program Sistem Ganda (Schlumberger – Balikpapan)
KEMAMPUAN YANG DIMILIKI
Hydraulic System (Reconditioning, Remanufacture and Rebuild)
SAP 2000 (Structure Analysis Program)
Auto Cad 2012 ( 2D&3D )
Mechanical Desktop 2012 ( 2D&3D )
Inventor 2012 ( 2D&3D )
Metallurgy (Material Logam)
Microsoft Office Program:
- Word
- Excel
- PowerPoint
Internet:
- Browsing
- E-mail
- Etc
ORGANISASI
2001 – 2004 Pemimpin Redaksi Lembaga Pers Mahasiswa “Black Post Magazine”–
ISTN Jakarta.
PENGALAMAN KERJA
2007 – 2008 Administrasi Proyek, PT. Juang Area Sejahtera, (Bengalon) Kal-Tim
Kontraktor Umum, Supplier, Perkebunan, Kehutanan dan Pertambangan. Kontraktor dari PT. Borneo Multi Resource, (Samarinda) Kal-Tim Mining Contractor & Rental Heavy Equipment.
My Responsibilities:
Membuat Data Daftar Gaji Karyawan Bulanan, Harian dan Borongan
Membuat Data Anggaran Operational Proyek
Membuat Data dan Monitoring Fuel (Supply dan Pemakaian)
Membuat Data dan Monitoring Time Sheet Alat Berat (13 Unit Tractor Buldozer, 3 Unit Excavator, 1 Unit Motor Grader, 1 Unit Bomag)
Membuat Data dan Monitoring Hasil Kerja Alat Berat (13 Unit Tractor Buldozer, 3 Unit Excavator, 1 Unit Motor Greeder, 1 Unit Bomag), Etc..
2009 – 2010 Designer Engineering, PT. Anugerah Sukses Bersama (Mining Industri & Multi Purpose Vehicle Carroserie), KM. 7, No.98, Balikpapan
(KAL-TIM). My Responsibilities:
Design Calculation, Engineering, Estimator, Technical of Manufacturing/ Fabrication
Design & Modification (Construction of Conveyor & Carroserie)
Design for Repair, Modification, Upgrades & New Fabricate of: 1). Conveyor: Stock Pile, Crushing Plane, Loading Barge System Conveyor (Coal Mining, Bricket, Palm Oil Mild) c/w Supervise Erection or Install all Structure 2). Trailer Lowboy (Caps 80 Ton and Caps 100 Ton) 3). Mixer Molen (Caps 7M3) 4). Tank Truck/ Storage Tank (Fuel Tank, Water Tank, Water Sprayer, Palm Oil, Iso Tank) 5). Dump Truck, Long Bed, Flat Bed, Logging Truck, Etc..
Filling Technical Data- Engineering, BOM (Bill of Material), Etc..
RAB (Rencana Anggaran Biaya), Etc..
2010 – 2010 Drafter, PT. Linda Jaya Mandiri (Mining/ Oil & Gas Supply and Services), Komplek Ruko Balikpapan Baru, Fantasy Junction, Blok FJ3, No.12A – 16, Balikpapan
(KAL-TIM). My Responsibilities:
Design Calculation, Engineering, Estimator, Technical of Manufacturing/ Fabrication
Design for Repair, Modification, Upgrades & New Fabricate of: 1). Conveyor: Stock Pile, Crushing Plane, Loading Barge System Conveyor (Coal Mining) 2). Storage Tank c/w All System Storage Facility 3). Workshop (Civil Construction) 4). Workshop Container, Office Container, Tool Room Container, Etc..
Register and Filling Technical Data- Engineering, BOQ (Bill of Quantity), Etc..
Design Calculation, Engineering, Technical of Reconditioning and Manufacturing
Design, Upgrades, Modification & Rebuild Part Component: 1). Hydraulic 2). Final Drive 3). Under Carriage
Drawn New Part
Drawn Production Process
Provide Standard SOW (Scope of Work) Production and Defect Report, Etc..
Register and Filling Technical Data- Engineering, BOM (Bill of Material), Etc..
2011 – 2012 Engineering, PT. Abadi Teknik Engineering (Reconditioning Hydraulic, Heavy Equipment Component and Fabrication), Jalan. A. W Syahrani, No. 818, Samarinda
(KAL-TIM). My Responsibilities:
Design Calculation, Engineering, Estimator, Technical of Manufacturing/ Fabrication
Organize Material, Equipment and Crew
Design, Upgrades, Modification & Rebuild Part Component: 1). Hydraulic 2). Final Drive 3). Under Carriage
Design for Repair, Modification, Upgrades & New Fabricate of: 1). Ponton Batubara (Loading Ponton) 2). Ponton Pompa (Heavy Duty Mine Dewatering Pontoon) 3). Ponton Darat (Spilling Pontoon) 4). Bucket Excavator, Bucket Crabber- Crane Bars Bucket 5). Conveyor: Stock Pile, Crushing Plane, Loading Barge System Conveyor (Coal Mining, Bricket, Palm Oil Mild) c/w Supervise Erection or Install all Structure 6). Storage Tank c/w All System Storage Facility c/w Erection or Install all Structure
Provide Standard Job Instruction and Inspection Report (Before and After Repair) , Etc..
Register and Filling Technical Data- Engineering, BOM (Bill of Material), Etc..
2012 – 2014 Project Engineer, PT. Hidup Baru Perdana Abadi (Construction, Fabrication and Maintenance Service of Mining/ Oil & Gas Industries), Jl. Mulawarman, No. 19, RT. 23, Manggar - Balikpapan
(KAL-TIM). My Responsibilities:
Assist Project Manager in Planning, Organizing, Controlling, Monitoring, and Coordinating all Activities of Project
Execution of Assigned Projects from Proposal, Budgeting, Engineering Designs and Calculations to Project Completion
Prepare and Coordinate Project Issues, Structural Design and Analysis, Calculations, Budgets and Schedules and Maintain Throughout the Project.
Provide Technical Advise Regarding Design, Budgeting, Construction, Structural and Problem Solvings.
Ensuring that all Projects are Completed in time and According to Project Plans, as well as in compliance with Company HSE Policies and Procedure.
2014 – 2016 Workshop Supervisor, PT. Hidup Baru Perdana Abadi (Construction, Fabrication and Maintenance Service of Mining/ Oil & Gas Industries), Jl. Mulawarman, No. 19, RT. 23, Manggar - Balikpapan
(KAL-TIM). My Responsibilities:
Incharge for Fabrication Workshop, Organize Material, Consumable, Equipment, Man Power/ Crew, Etc..
Managing and Supervising Project Sites to Monitor Job Progress and Advising on Mechanical Engineering Issues.
Design Calculation, Engineering, Estimator, Technical of Manufacturing/ Fabrication
Scheduling Material, Consumable and Equipment Purchases and Delivery.
Communicating and Liasing Effectively with Clients, Sub- Contractors and Co- Workers.
Provide Technical Advise Regarding Design, Budgeting, Construction, Structural and Problem Solvings.
Prepare and Present Project Reports.
Ensuring that all Projects are Completed in time and According to Project Plans, as well as in compliance with Company HSE Policies and Procedure.
Design for Repair, Modification, Upgrades & Fabrication of: 1). Pump Filling Stations and Pipelines (Chemical Process, Water, Fuel and Waste- Products). 2). Heavy Duty Mine Dewatering- Pump Pontoon (Caps 2 Tons to Caps 25 Tons) 3). Mobile Lighting Tower (Lighting for Mining Area) 4). Workshop (Civil & Construction) c/w Erection or Install all Structure 5). Chipper Feed Chute (Mill Conveyor) 6). Simulator Container, Office Container, Tool Room Container, Etc..
Register and Filling Technical Data- Engineering, BOQ (Bill of Quantity), Etc..
2016 – Present Operational Manager, PT. Primha Putera Perkasa (Construction, Fabrication and Labour Supply), Jl. Indrakila, No. 1, RT. 52 – Balikpapan (KAL-TIM).
My Responsibilities:
Supervise and Grow Up Technical of Manufacturing/ Fabrication
Planning, Organizing, Controlling, Monitoring, and Coordinating all Activities Which are Part of the Project Construction.
Covering A Wide Range Of Areas Such As Project Setup Procedures, Review / Site Surveys, Scheduling, Planning, Updating Contract Progress, Procurement Planning, Supplier Negotiations, Requisitions And Material Scheduling, Variations And Re- Submissions.
Ensuring Quality Control System are in Place, Inspections and Developing Test Plans and Procedures.
Implement Office and Site Safety Plans, Weekly Safety Meetings, JSA Pre- Start Meetings.
Internal and External Office Administration Procedures.
On-Base and On-Site Labour Management.
Assist With Sales Marketing Team to Achieve Internal Targets.
Performing all Project Activities from Proposal, Budgets and Schedules, Engineering Designs and Calculations to Project Completion.
Ensuring that Project Meets all Requirements and Objectives as well as HSE Policies and Procedure.
Grow Strong Relationships With key Custumers and Vendors
Develop a Positive Environment for Employees, Etc..
REFERENSI
Darwin Npt, Site Manager, PT. Juang Area Sejahtera, Phone Number: 081253088886.
Agus Limbong, Head of Project, PT. Juang Area Sejahtera, Phone Number:
081973094164, 087811182965.
Ridwan, Managing Director, PT. Borneo Multi Resource, Phone Number:
0816938849.
Anton Salim, Director, PT. Borneo Multi Resource, Office Number: 0541-273388.
Untung Sugianto, Managing Director, PT. Anugerah Sukses Bersama, Phone Number:
08158802731
Agung Sugiharto, Director, PT. Anugerah Sukses Bersama, Office Number: 0542-
862369, Phone Number: 08129502249.
Jeffry Alexander, Director, PT. Linda Jaya Mandiri, Office Number: 0542-7204467,
Phone Number: 08125414232.
Harrya Hady Widjaya, Operational Manager, PT. Linda Jaya Mandiri, Office Number: