CV Carlo Magno R. Muñiz T +971 50 4573704 E [email protected]With over 26 years of professional and diversified experience in the design of Mixed-Use, High-Rise, Hotel, Office, Commercial, Residential and Recreational projects both Design and Construction in the Middle East and Asia I have gained a breadth of International experience and understanding that allowed me to relate to client perspectives and goals while still providing innovative solutions. In addition to my Architectural responsibilities, I am a member of the RMJM CAD Committee as Group Lead CAD coordinator involved in coordination, research and implementing CAD standards in RMJM across all disciplines. Position in RMJM Position in RMJM Position in RMJM Position in RMJM Technical Technical Technical Technical Architect rchitect rchitect rchitect Education & Education & Education & Education & Professional Membership Professional Membership Professional Membership Professional Membership Far Eastern University - Manila, Philippines Bachelor of Science in Architecture Society of Engineers -Dubai (Member) Countries of Work Experience Countries of Work Experience Countries of Work Experience Countries of Work Experience UAE, Philippines Employment Record Employment Record Employment Record Employment Record RMJM RMJM RMJM RMJM INTERNATIONAL INTERNATIONAL INTERNATIONAL INTERNATIONAL Technical Architect (13 years) - Middle East September 2002 – Present -Dubai, UAE ATKINS ATKINS ATKINS ATKINS (W.S. Atkins & Partners Overseas) (W.S. Atkins & Partners Overseas) (W.S. Atkins & Partners Overseas) (W.S. Atkins & Partners Overseas) Architect (9 years) - Middle East September 1993 – September 2002, Dubai, UAE PRSP PRSP PRSP PRSP ARCHITECTS ARCHITECTS ARCHITECTS ARCHITECTS Architect / Lead CAD (4 years) - Asia November 1991 – September 1993 Assistant Architect / CAD Coordinator October 1989 – November 1991 Makati, Philippines Duties and Responsibilities Duties and Responsibilities Duties and Responsibilities Duties and Responsibilities • Prepare Concept / Schematic design and drawing design development in schematic code conformance ensuring the Quality System Procedures (QSP) and operational standards are maintained. • In-charge of coordination and liaison with MEP, Structural, Statutory Authority, Sub-consultants, Contractors, Sub-Contractors, Suppliers and Manufacturers ensuring construction drawings are fully reviewed and coordinated prior to submission. • Prepare the local authority submissions in accordance with the relevant authority requirements and complied with international building code standards to ensure all submissions are monitored to obtain approvals and every issuance of drawings or submissions are correct and collated in order. • Assist in site inspection, if required. Response on a daily bases regarding site issues, closing the RFI, coordinate with the site team, Consultant and Client to close the site issues, coordinate with other Design and Engineering team related to Structural, Electrical & MEP. Review and approve Sub-contractors’ shop drawings. Manage the team to update the drawings as per the site condition. • Take responsibility, where required by the project leader, for specific areas of the design and project development. • Design Studio Team member involved in concept to scheme to produce design, analysis, and presentations using free hand sketching and other 2D/3D platform design media. • CAD Group Lead Coordinator- CAD management, training and monitoring of staffs in terms of standards and procedures
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Duties and ResponsibilitiesDuties and ResponsibilitiesDuties and ResponsibilitiesDuties and Responsibilities
• Prepare Concept / Schematic design and drawing
design development in schematic code conformance
ensuring the Quality System Procedures (QSP) and
operational standards are maintained.
• In-charge of coordination and liaison with MEP,
Structural, Statutory Authority, Sub-consultants,
Contractors, Sub-Contractors, Suppliers and
Manufacturers ensuring construction drawings are fully
reviewed and coordinated prior to submission.
• Prepare the local authority submissions in accordance
with the relevant authority requirements and complied
with international building code standards to ensure all
submissions are monitored to obtain approvals and
every issuance of drawings or submissions are correct
and collated in order.
• Assist in site inspection, if required. Response on a
daily bases regarding site issues, closing the RFI,
coordinate with the site team, Consultant and Client to
close the site issues, coordinate with other Design and
Engineering team related to Structural, Electrical &
MEP. Review and approve Sub-contractors’ shop
drawings. Manage the team to update the drawings as
per the site condition.
• Take responsibility, where required by the project
leader, for specific areas of the design and project
development.
• Design Studio Team member involved in concept to
scheme to produce design, analysis, and presentations
using free hand sketching and other 2D/3D platform
design media.
• CAD Group Lead Coordinator- CAD management,
training and monitoring of staffs in terms of standards
and procedures
Relevant Project ExperienceRelevant Project ExperienceRelevant Project ExperienceRelevant Project Experience ---- Asia & Asia & Asia & Asia & MiddleMiddleMiddleMiddle----EastEastEastEast
High Rise / High Rise / High Rise / High Rise / MixedMixedMixedMixed----UUUUsesesese Development & Commercial Development & Commercial Development & Commercial Development & Commercial
High Rise/ High Rise/ High Rise/ High Rise/ MixedMixedMixedMixed----UseUseUseUse CommercialCommercialCommercialCommercial & & & & HotelHotelHotelHotel
ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE
The Capital Gate feature tower flanks Abu Dhabi’s
historical Grandstand, one of the city’s cultural landmarks.
The feature tower acts as a dramatic termination to the
organic free-form stainless steel mesh canopy that forms
the Grandstand roof and provides a visual anchor for the
ADNEC Capital Centre Development as a whole within the
Abu Dhabi City Skyline. Phase 3- the Capital Gate feature
tower is now in construction. At 35 storeys high, it will offer
over 20,000 m2 of high quality offices and retail units as
well as Abu Dhabi’s first Hyatt hotel, ‘The Hyatt@Capital
Centre’. Standing at over 160m tall, the building has been
designed to be the landmark statement for the whole of the
The design for Dubai Towers – Jeddah is an iconic multi-
storey elegantly proportioned skyscraper, providing over
450,000m2 of gross built-up area consisting of offices, 5-
star hotel, serviced apartments, residential apartments,
spa, ballroom, marina and a retail podium with three
underground parking levels.
Site Area: 450,000m2
Client: Sama Dubai
Status: Detail Design
Role: Design & Production team / Architect
(Concept to Schematic design package)
Hyatt RegencyHyatt RegencyHyatt RegencyHyatt Regency Creek Creek Creek Creek Hotel & Apartments, Hotel & Apartments, Hotel & Apartments, Hotel & Apartments, Dubai, UAEDubai, UAEDubai, UAEDubai, UAE
Situated near the Dubai creek, these 166.5m high towers
are intended to provide amazing views of Dubai Creek and
Sheikh Zayed Road skyline. The development will contain
world-class retail, offices, hotel, and serviced apartment
units. Three service floors are introduced at both towers to
Architectural, Structural and MEP Design Services for the
Al Rayyan Hills project. The Al Rayyan Hills Project is
located on the Faj Attan Hill and Phase 1 consists of 172
residential villas and one residential apartment block. The
site is located on an exclusive steep-sided plateau of
about 440000sqm located within Sana’a city limits. It is
approximately 200m higher than the surrounding areas
giving it an impressive panoramic view from all sides to
various sections of the Capital, Sana’a.
Site Area: 440,000m2
Client: Consolidated Contractors Group Sal
(Offshore) (CCC)
Status: Constructed
Role: Production team / Architect
(Concept to Schematic design package)
Education Education Education Education
American School of Dubai, UAEAmerican School of Dubai, UAEAmerican School of Dubai, UAEAmerican School of Dubai, UAE
Designed to be a model of best practices for sustainable
design in the Middle East, the new campus for the
American School of Dubai is set on a 27-acre site in the Al
Barsha district of Dubai within a kilometer of Arabian Gulf
beaches and the famous Burj Al Arab Hotel. The school
accommodates 1,600 students in a Pre-K through 12th
grade curriculum.
Site area: 50,000m2
Client: American School of Dubai
Status: Constructed
Role: Production team / Architect
(Schematic design stage)
SkillsSkillsSkillsSkills and Abilitiesand Abilitiesand Abilitiesand Abilities::::
• Adapting technical design planning according to
Local / International Building Code standards and
regulation authority requirements in resolving any
problems/ circumstances that may arise during
construction.
• Creating building designs and highly detailed
drawing both by sketch freehand and by using
2D/3D specialist computer-aided design (CAD)
applications
• Working closely with a team of other professionals
such as building service engineer, construction
managers, quantity surveyors and arch’l technician.
• Knowledgeable in AutoCAD, Revit-(Basic),
Microsoft Office and Excel
• Basic to intermediate knowledge of Sketch Up
and Adobe Photoshop
Major Major Major Major Project Project Project Project Undertaken Undertaken Undertaken Undertaken ---- Visual photosVisual photosVisual photosVisual photos
RRRR MMMM JJJJ M M M M INTERNATIONALINTERNATIONALINTERNATIONALINTERNATIONAL ---- PPPP oooo rrrr tttt ffff oooo llll i i i i oooo
DWTC DWTC DWTC DWTC CONVENTION CENTER CONVENTION CENTER CONVENTION CENTER CONVENTION CENTER –––– Dubai, UAEDubai, UAEDubai, UAEDubai, UAE
MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development (Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)
Status: Constructed
AAAA TTTT KKKK IIII NNNN S S S S –––– PPPP oooo rrrr tttt ffff oooo llll i i i i oooo
Role: Production team / Architect. Concept, Schematic &
Detail Design to Construction stage
CCCCEBUEBUEBUEBU HOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, Philippines
Cebu Business Park Cebu Business Park Cebu Business Park Cebu Business Park –––– Office BuildingOffice BuildingOffice BuildingOffice Building