CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

May 28, 2019

Download

Documents

duongkhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING
Page 2: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

CUSTOMER: Ciment Calcia – Heidelberg Cement (former Italcementi)

LOCATION: Couvrot (France)

YEAR: 2012

PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill

COAL RECEIVING,

SIZING &

CLASSIFICATION

…Building for the Future

COAL TRANSPORT

CO

AL

ST

OR

AG

E

Page 3: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill

DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING & CLASSIFICATION

BAG

FILTER

VIBRATING SCREEN

…Building for the Future

BW 1000 – CAPACITY 250 tph

CONVEYOR TO

STORAGE

TRUCK SURFACE

FEEDER

MAGNETIC

SEPARATOR

METAL

DETECTORDISCARDED

SIZE

Page 4: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill

DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING & CLASSIFICATION

BAG FILTERTRAMP METAL

SEPARATION / DETECTIONVIBRATING SCREENDISCARDED SIZE

…Building for the Future

BW 1000 – CAPACITY 250 tph

Screen House and Discarded Size Handling

(pre-cladding)

Truck Surface Feeder and Tramp Metal Facility

Page 5: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill

DESCRIPTION: TPD-04 / COAL TRANSPORT

PREVAILING WIND

…Building for the Future

BW 800 – CAPACITY 150 tph

WEIGHING SYSTEM

COUNTERWEIGHT TOWER

BAG FILTER

PREVAILING WIND

Page 6: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill

DESCRIPTION: HP-01 / COAL STORAGE AND FEEDING TO GRINDING MILL

HOPPER

VOLUME 120m3

NET CAPACITY 75m3

EX

TR

AC

TIN

G R

ED

LER

W1

20

0 L

=6

08

5m

m 3

0tp

h

REDLER TO MILL

W1000 L=7625mm 30tph

WITH 2 SLIDE GATES

…Building for the Future

TPD-04

EX

TR

AC

TIN

G R

ED

LER

W1

20

0 L

=6

08

5m

m 3

0tp

h

EM

ER

GE

NC

Y R

ED

LER

W6

30

L=

10

22

5m

m 3

0tp

h

WITH 2 SLIDE GATES

Page 7: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

CUSTOMER: Sommet SA – Arcelor Mittal

LOCATION: Cokerie de Seremange, Florange (France)

YEAR: 2014

PROJECT: Job No. 2962 - Coke Handling and Emergency Stock

COKE CAR

RECEIVING

EMERGENCY

STOCKPILE

SORTING

…Building for the Future

TRANSFER TO

RAILCAR LOADING

SORTING

TOWER

Page 8: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Job No. 2962 - Coke Handling and Emergency Stock

DESCRIPTION: COKE CAR RECEIVING AND CONVEYOR TS1

SORTING TOWERVIBRATING FEEDER

…Building for the Future

BW 1200 – CAPACITY 170 tph

Page 9: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Job No. 2962 - Coke Handling and Emergency Stock

DESCRIPTION: STOCKPILE BELT CONVEYOR TS2

SORTING TOWER

…Building for the Future

BW 1200 – CAPACITY 170 tph

Page 10: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Job No. 2962 - Coke Handling and Emergency Stock

DESCRIPTION: SORTING TOWER

…Building for the Future

BW 1200 – CAPACITY 170 tph

HIGH ABRASIVE MATERIAL

REQUIRES CUSTOMIZED

SOLUTION ON IMPACT AND

TRANSFER ARE SUCH AS SPECIAL

LINERS, ROCK BOX, ETC..

HIGH ABRASIVE MATERIAL

REQUIRES CUSTOMIZED

SOLUTION ON IMPACT AND

TRANSFER ARE SUCH AS SPECIAL

LINERS, ROCK BOX, ETC..

Page 11: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Job No. 2962 - Coke Handling and Emergency Stock

DESCRIPTION: TRANSFER TO RAILCAR LOADING CONVEYOR

…Building for the Future

BW 1200 – CAPACITY 170 tph

HIGH ABRASIVE MATERIAL

REQUIRES CUSTOMIZED

SOLUTION ON IMPACT AND

TRANSFER ARE SUCH AS SPECIAL

LINERS, ROCK BOX, ETC..

HIGH ABRASIVE MATERIAL

REQUIRES CUSTOMIZED

SOLUTION ON IMPACT AND

TRANSFER ARE SUCH AS SPECIAL

LINERS, ROCK BOX, ETC..

Page 12: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

CUSTOMER: Coeclerici Logistics SpA

LOCATION: East Kalimantan, Borneo Region (Indonesia)

YEAR: From 2008 to today

PROJECT: Various - Offshore Floating (Storage) Transfer Station

…Building for the Future

Page 13: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

CUSTOMER: Coeclerici Logistics SpA

LOCATION: East Kalimantan, Borneo Region (Indonesia)

YEAR: From 2008 to today

PROJECT: Various - Offshore Floating (Storage) Transfer Station

…Building for the Future

Page 14: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Various - Offshore Floating (Storage) Transfer Station

DESCRIPTION: FTS “Bulk Java” in Operation

…Building for the Future

BW 1200/1600 - CAPACITY UP TO 2.400 tph

Page 15: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Various - Offshore Floating (Storage) Transfer Station

DESCRIPTION: COAL RECEIVING HOPPERS

…Building for the Future

CAPACITY abt. 50m3 (each)

Page 16: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Various - Offshore Floating (Storage) Transfer Station

DESCRIPTION: TRANSFER CONVEYORS, TRAMP METAL DETECTORS, SAMPLING SYSTEM

TRAMP METAL DETECTOR

…Building for the Future

BW 1200/1600 - BELT SPEED 4m/s - CAPACITY 1.200 tph (each)

SAMPLING

SYSTEM

Page 17: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Various - Offshore Floating (Storage) Transfer Station

DESCRIPTION: TRANSFER CONVEYORS, E-HOUSE

E-HOUSE

WEIGHING

SYSTEM

…Building for the Future

BW 1200/1600 - BELT SPEED 4m/s - CAPACITY 1.200 tph (each)

Page 18: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING

PROJECT: Various - Offshore Floating (Storage) Transfer Station

DESCRIPTION: SHIPLOADER

LOADING SPOUT:

� AXIAL TILTING +50/-25° FROM VERTICAL (HYDRAULIC)

� TRAVERSE TILTING ±25° FROM VERTICAL (HYDRAULIC)

…Building for the Future

BW 1200 - BELT SPEED 4m/s - CAPACITY 1.200 tph (each)

BOOM LENGTH 30m / LUFFING RANGE -10/+12° (hydraulic) / SLEWING RANGE 270° (hydraulic)

Page 19: CUSTOMER: CimentCalcia–Heidelberg Cement (former Italcementi) · PROJECT: Job No. 2870 -Coal & Petcoke Handling System to Grinding Mill DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING