= EXISTING CONTOUR LINE = DEMO CONTOUR LINE = PROPOSED CONTOUR LINE "T.O.W." = TOP OF RETAINING WALL ELEVATION "B.O.W." = BOTTOM OF RETAING WALL ELEVATION PLOT PLAN NOTES: PROJECT: PHELAN RESIDENCE OWNER: TIM & KELLY PHELAN 540 ELKTON DR. #202 COLORADO SPRINGS, CO 80907 BUILDER: ALL ABOUT HOME DESIGN CONTACT- SCOTT MAYNES (719) 465-8888 ARCHITECT: DESIGN RENAISSANCE DAN SIEVERS 815 W. JEFFERSON STREET COLORADO SPRINGS, CO 80907 (719) 633-4684 PROPERTY: 5155 OLD STAGECOACH RD LEGAL DESCRIPTION: LOT 38 FLYING HORSE NORTH FIL NO 1 LOT SIZE: 3.62 ACRES (APPROX. 157,687 S.F.) BUILDING AREA: * STRUCTURE, COVR'D PATIOS & DECKS: 7,548 S.F. (FRONT ENTRY- 342 S.F., REAR COVER'D PATIOS- 811 S.F., HOUSE- 4,823 S.F. & GARAGE- 1,572 S.F.) LOT COVERAGE: * PROPOSED COVERAGE: 4.79% ZONING: PUD SETBACKS: 10' SIDE, 35' REAR, 30' FRONT SCHEDULE #: 6136004006 BUILDING HEIGHT: MAX. HEIGHT ALLOWABLE = 30' PROPOSED MAX. HEIGHT = 28.75' SHEET INDEX SP A1 SITE PLAN LOWER FLOOR PLAN/ FOUNDATION LAYOUT A2 MAIN LEVEL FLOOR PLAN A3 BUILDING ELEVATIONS A4 BUILDING ELEVATIONS BUILDING AREAS: * MAIN LEVEL FINISHED = 4,809 S.F. FINISHED * LOWER LEVEL AREA = 657 S.F. UNFINISHED * UPPER LEVEL AREA = 3,868 S.F. FINISHED * TOTAL AREA = 9,334 S.F. * GARAGE = 1,200 S.F. PARKING & 372 S.F. STORAGE * 6 BEDROOMS A5 BUILDING SECTIONS A6 ROOF PLAN UPPER LEVEL FLOOR PLAN E1 LOWER ELECTRICAL PLAN E2 MAIN ELECTRICAL FRAMING UPPER ELECTRICAL PLAN M1-M3 MECHANICAL DUCTWORK PLANS & DETAILS S1 MAIN FLOOR FRAMING PLAN S2 MAIN ROOF & UPPER FLOOR FRAMING S3 UPPER ROOF FRAMING PLAN A0 E0 Drawn by Date APRIL 27, 2020 Design Renaissance 815 W. Jefferson Street Colorado Springs, CO 80907 719.633.4684 v [email protected]Custom Home: Architectural Design & Planning &&5 Date Revised Tim & Kelly Phelan 5155 Old Stagecoach Road Colorado Springs, CO
4
Embed
Custom Home: Design Renaissance · 2020. 5. 14. · Design Renaissance 815 W. Jefferson Street Colorado Springs, CO 80907 719.633.4684 v [email protected] Custom Home: Architectural
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
= EXISTING CONTOUR LINE
= DEMO CONTOUR LINE
= PROPOSED CONTOUR LINE
"T.O.W." = TOP OF RETAINING WALL ELEVATION
"B.O.W." = BOTTOM OF RETAING WALL ELEVATION
PLOT PLAN NOTES:
PROJECT: PHELAN RESIDENCE
OWNER: TIM & KELLY PHELAN
540 ELKTON DR. #202
COLORADO SPRINGS, CO 80907
BUILDER: ALL ABOUT HOME DESIGN
CONTACT- SCOTT MAYNES
(719) 465-8888
ARCHITECT: DESIGN RENAISSANCE
DAN SIEVERS
815 W. JEFFERSON STREET
COLORADO SPRINGS, CO 80907
(719) 633-4684
PROPERTY: 5155 OLD STAGECOACH RD
LEGAL DESCRIPTION: LOT 38 FLYING HORSE NORTH
FIL NO 1
LOT SIZE: 3.62 ACRES (APPROX. 157,687 S.F.)
BUILDING AREA:
* STRUCTURE, COVR'D PATIOS & DECKS: 7,548 S.F.
(FRONT ENTRY- 342 S.F., REAR COVER'D PATIOS-
811 S.F., HOUSE- 4,823 S.F. & GARAGE- 1,572 S.F.)
LOT COVERAGE:
* PROPOSED COVERAGE: 4.79%
ZONING: PUD
SETBACKS: 10' SIDE, 35' REAR, 30' FRONT
SCHEDULE #: 6136004006
BUILDING HEIGHT: MAX. HEIGHT ALLOWABLE = 30'
PROPOSED MAX. HEIGHT = 28.75'
SHEET INDEX
SP
A1
SITE PLAN
LOWER FLOOR PLAN/ FOUNDATION LAYOUT
A2
MAIN LEVEL FLOOR PLAN
A3
BUILDING ELEVATIONS
A4
BUILDING ELEVATIONS
BUILDING AREAS:
* MAIN LEVEL FINISHED = 4,809 S.F. FINISHED
* LOWER LEVEL AREA = 657 S.F. UNFINISHED
* UPPER LEVEL AREA = 3,868 S.F. FINISHED
* TOTAL AREA = 9,334 S.F.
* GARAGE = 1,200 S.F. PARKING &
372 S.F. STORAGE
* 6 BEDROOMS
A5
BUILDING SECTIONS
A6
ROOF PLAN
UPPER LEVEL FLOOR PLAN
E1
LOWER ELECTRICAL PLAN
E2
MAIN ELECTRICAL FRAMING
UPPER ELECTRICAL PLAN
M1-M3
MECHANICAL DUCTWORK PLANS & DETAILS
S1MAIN FLOOR FRAMING PLAN
S2
MAIN ROOF & UPPER FLOOR FRAMING
S3
UPPER ROOF FRAMING PLAN
A0
E0
Drawn by
Date
APRIL 27, 2020
Design Renaissance
815 W. Jefferson StreetColorado Springs, CO 80907719.633.4684 v
Address: 5155 OLD STAGECOACH RD, COLORADO SPRINGS Parcel: 6136004006
Map #: 315G
Plan Track #: 127900 Received: 30-Apr-2020 (BECKYA)
Description:
RESIDENCE
Contractor:
Type of Unit:
Garage 1572
Lower Level 2 657
Main Level 4809
Upper Level 1 3868
10906 Total Square Feet
Required PPRBD Departments (4)
Enumeration Floodplain
(N/A) RBD GIS
Construction Mechanical
Required Outside Departments (1)
County Zoning
Release of this plan does not preclude compliance with allapplicable codes, ordinances and other pertinent regulations.This plan set must be present on the job site for every inspection.
DENNIS ARCHULETA
EPC DR Approval
BEN DIXON
Enumeration Approval
DAN MCCULLY
Construction Approval
JUSTIN COUTURIER
Architect
Home heated with hydronic heat. Duct designs provided for reference only as they only serve air conditioning.
JUSTIN COUTURIER
Mechanical Approval
FLYING HORSE NORTH ARCHITECTURAL CONTROL COMMITTEE
April 27, 2020
Tim & Kelli Phelan c/o Dan Sievers Design Renaissance 815 W. Jefferson St. Colorado Springs, CO. 80907 RE: Phelan/ Lot #38/ Filing #1/ 5155 Old Stagecoach Rd-Flying Horse North Dear Tim, Kelli, & Dan: Acting on behalf of the Flying Horse North Architectural Control Committee (ACC), please be advised that the ACC has completed its review of the revised Design Development Submitted plans of 4/27/2020 for the above referenced Flying Horse North property. The Design Development has been accepted and you are free to pursue for permit. It is understood that the Barn Accessory Structure is latter phase and that character/elevations of the barn are not reviewed or approved at this time on the understanding the Barn will be submitted for later build-out and consist of the same material palette used on the main residence and with Barn to occur in the footprint, 25’ from property line as shown in the 4/27/2020 submitted site plan. Please note, it is the sole responsibility of the builder and owner to verify safe separation distance of well and septic prior to application, placement & install.
Please note the following:
1.) Upon completion of the scope in your submittal please contact Tom E. Hoover
AIA at (303) 810-1146 for inspect your completed construction for ACC acceptance. Please allow for a minimum of two (2) weeks to complete the final review process.
2
2.) The final refund check (less expenses outlined in the Design Guidelines) will be dispersed by the management company within 45 days from the date of the final inspections by the ACC and the final landscape approval.
Thank you for your cooperation during this review process and good luck with the construction of the residence.