ORGANIZATION YEAR ATTENDED Saudi Council of Engineers – SCE 2014 – 2017 Architectural Engineer Associate Degree (Previous Working Visa Category) United Architects of the Philippines - IAPOA 2012 – Present The Integrated and Accredited Professional Organization of Architects United Architects of the Philippines – Pasig Chapter 2012 – Present The Integrated and Accredited Professional Organization of Architects SCHOOL YEAR ATTENDED TERTIARY/COLLEGE: Polytechnic University of the Philippines (Mabini Campus) 2002 - 2009 Anonas St., Sta. Mesa Manila, Philippines Bachelor of Science in Architecture and Fine Arts *ARCHITECT/DESIGN ASSISTANT Creative + Productive + Hard Working + Multi-Tasking + Observant PRC Reg. No. : 29661 Date Issue : July-06, 2012 Date Expired : October-12, 2019 UAP No. : 25914 PTR No. : 1687924 Place Issue : Pasig City Hall, Pasig City, Metro Manila Philippines Home Address : #0435 Baltazar St., Brgy. Sto. Tomas, Pasig City, Metro Manila, Philippines Contact No. : +63 995 4835988 (Globe) +63 921 4149574 (Smart) Skype Account : mauipogi_101285 E-mail : [email protected]Career Objective: Architect MAURICIO P. CABANILLAS JR. i. AFFILIATION/MEMBERSHIP ORGANIZATION: ii. EDUCATIONAL BACKGROUND:
18
Embed
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ORGANIZATION YEAR ATTENDED
Saudi Council of Engineers – SCE 2014 – 2017Architectural Engineer Associate Degree(Previous Working Visa Category)
United Architects of the Philippines - IAPOA 2012 – PresentThe Integrated and Accredited Professional Organization of Architects
United Architects of the Philippines – Pasig Chapter 2012 – PresentThe Integrated and Accredited Professional Organization of Architects
SCHOOL YEAR ATTENDED
TERTIARY/COLLEGE:Polytechnic University of the Philippines (Mabini Campus) 2002 - 2009Anonas St., Sta. Mesa Manila, Philippines Bachelor of Science in Architecture and Fine Arts
SECONDARY/HIGH SCHOOL:Rizal High School (Main Campus) 1998 - 2002Dr. Sixto Antonio Avenue St., Brgy. Caniogan, Pasig City, Philippines
PRIMARY/ELEMENTARY:Bagong Diwa Elementary School 1992 – 1998#2244 Linceo St. Pandacan Manila, Philippines
*ARCHITECT/DESIGN ASSISTANT Creative + Productive + Hard Working + Multi-Tasking + Observant
PRC Reg. No. : 29661Date Issue : July-06, 2012Date Expired : October-12, 2019UAP No. : 25914PTR No. : 1687924 Place Issue : Pasig City Hall, Pasig City, Metro Manila PhilippinesHome Address : #0435 Baltazar St., Brgy. Sto. Tomas,
Pasig City, Metro Manila, PhilippinesContact No. : +63 995 4835988 (Globe)
Career Objective:“To pursue a professional challenging Architectural & Engineering
working experience in any Architectural/Engineering Firm to help broaden my experience in the related field & enhances my knowledge & professional growth in the world of Architecture, Construction, & Oil & Gas Industry.”
Birthday : October – 12, 1985Birth Place : Giporlos, Eastern Samar, PhilippinesAge : 31Sex : MaleCivil Status : SingleHeight : 5’4” (162 cm)Weight : 145 lbs. (65 kilos)Religion : Roman CatholicNationality : FilipinoLanguage Spoken : English, Tagalog & WarayFather’s Name : Mr. Mauricio O. Cabanillas Occupation : Master Teacher II (Bagong Diwa Elementay School, Pandacan Manila, Philippines) Mother’s Name : Mrs. Winefreda P. Cabanillas Occupation : HousewifeSiblings : Patty P. CabanillasOccupation : Sales Representative (Duty Free Mall - Dubai, United Arab Emirates)
Person to ContactIn Case of Emergency : Mr. Mauricio O. CabanillasRelationship : FatherAddress : #0435 Baltazar St., Brgy. Sto. Tomas Pasig City, PhilippinesContact No’s. : +63 949 7648465 / 7470367
* United Architects of the Philippines – Pasig ChapterThe Integrated and Accredited Professional Organization of ArchitectsPROJECT BLAD: “Blood Letting and Data Banking cum Motorcycle Event”August-26, 2012, Sunday @ Rizal High School (Main Campus) Pasig City
* United Architects of the Philippines – Pasig ChapterThe Integrated and Accredited Professional Organization of ArchitectsINDUCTION OF OFFICERS FY: 2012-2013 & New Member Architects Thanks Giving NightSeptember-20, 2012, Thursday @ CW HOME DEPOT Makati Events Hall
* AUTODESK 3DSMAX 2011 (For Architectural Design) MICROCADD TECHNOLOGIES Co., Inc. Main Branch: CubaoJuly, 2011 (9 hr. /15 hr.) @ 5th Flr., Doña Consolacion Bldg. 602 General Santos Ave., Cubao, Q. C.
* United Architects of the Philippines – Graduate Auxiliary 101 The Duly Recognized Graduate Auxiliary of the United Architects of the PhilippinesBOARDing PASS: “Destination June 2011 ALE”May-08, 2011, Sunday @ Teatro Arkitekto, UAP Headquarters, Scout Rallos, Tomas Morato, Q. C.
* Exploring the Empowering Spirit of Art and Architecture”February-03 & 04, 2009 @ P.U.P. Mabini Campus, Sta. Mesa, Manila
* “Church Architecture in Filipino Settings”Arsobispado, Intramuros, Manila
* “Creative Green Architecture and Design: The Cutting Edge”College of Engineering Theater, University of the Philippines, Diliman, Q.C.
* “The Science of Feng Shui and Architectural Design”January-28, 2004 @ College of Engineering Theater, University of the Philippines, Diliman, Q.C.
* Nestle Nido: “Munting Daliri Father & Child Art Workshop”Batch 1997, @ Museong Pambata, Roxas Boulevard, Taft Manila
* Nestle Nido: “Munting Daliri Mother & Child Art Workshop”Batch 1995, @ Fort Santiago, Intramuros, Manila
iv. TRAININGS & SEMINARS ATTENDED:
1. Software’s : Auto CAD 2014-2016 VersionSketch-Up 3D Rendering with V-Ray & i-RenderPhotoshop CS5MS Office 2010 Proficient
PlanLPG Filling Plant Layout Plan with Piping & Instrumentation Diagram (P. & I.
D.)Gasoline Service Station (S/S) Layout PlanBulilit-Station/Micro-Filling Station (MFS) & Dealer-Owned Filling Station
(DOFS)Prepared Construction/Shop Drawings by the following Drafting Disciplines:
* Architectural* Structural* Electrical* Mechanical* Sanitary/Plumbing* Driveway Concreting* Piping & Instrumentation Diagram (P. & I. D.)
Residential Houses Designing and RenderingPrepared Estimate Bill of Materials (BOM) & Bill of Quantity (BOQ)Site Visiting & preparing as-Built PlansDesigning of Roads and Bridges with Typical Sections of Foundation and
Footing DetailsNorthing & Easting of Coordinates & reflect it in Google Earth as KMZ FilesDaily, Weekly & Monthly Cumulative Roads Progress Monitoring
4. Self Attributes: Good Oral & Written Communication & Interpersonal SkillsSelf-starter and self-motivatedInitiative and organizedEnsure that project deadlines are met and able to Multi TaskCapable of working under pressure to meet tight submission schedulesWilling to work overtime to meet the schedule completion datesCapable of scheduling and managing own work load plus othersA Team player
Contractor :
2nd Floor Obeikan Bookstore BuildingPrince Sultan Road, Jeddah, Kingdom of Saudi Arabia
Department : Architecture & Building Construction Division – Road Projects Department
Position : QA/QC Department Draftsman
Duration : January-29, 2014 to January-31, 2016 (2 years)
Job Description : Designing of Roads and Bridges with Typical Sections of Foundation and Footing Details for Makkah Second Ring Road Project by the following Drafting Disciplines: Architectural & Structural. Prepares Construction/Shop Drawings of QA/QC Department Mobile Laboratory for the South Border Infrastructure
v. SKILLS:
vi. HISTORY OF EMPLOYMENT & WORKING EXPERIENCE:
Project (SBIP). Provide Weekly Quantities of Road Progress Monitoring Report based on daily Request for Inspection (RFI), Request for Testing (RFT), & Test Report Submittal (TRS), etc. Provide Superpave Hot Mixed Asphalt (HMA) Actual Daily Accomplishment from the Daily QA/QC Report (DQR) of the Site Area & completed some as-builts & other miscellaneous projects.
Project-in-Charge : Engr. Nabeel H. Abu SadahQA/QC Manager for Road Projects Department
Year : 2014 Projects* QA/QC Department Mobile Laboratory for South Border Infrastructure
* QA/QC Department Mobile Laboratory for South Border Infrastructure Project with Metal Curing Tank Room (Proposed Layout Plan) - August-05, 2014
* Makkah Second Ring Road Project (Zoning, Foundation Plan, Footings, & Typical Road Section Details) - June-28, 2014
* South Border Infrastructure Project (Kingdom of Saudi Arabia) Road Progress Monitoring Report – Weekly & Monthly Cumulative & Combined Summary of Roads & Fence Activity (Microsoft Excel Files) - August-31, 2014 to the January-31, 2016.
i. Area-1 (JIZAN) Regionii. Area-2 (ASEER) Region
iii. Area-3A (NAJRAN) Region
iv. Area-3B (SHARURAH) Regionv. Area-4A (D. POINT) Regionvi. Area-4B (ARADAH) Region
* Abu Sadah Property Proposed Commercial Complex: Restaurant, Rentable Warehouses, Medical Doctor Clinic/Offices, Proposed Showroom, & Proposed Hotel2224 Ann Arbor, Oklahoma City, USA(Proposed Conceptual Land Use Plan & Proposed Conceptual Site Development Plan)- May-11, 2014
Project-in-Charge : Engr. Eric M. Guillermo, MSEPlanning Manager for Road Projects Department
Year : 2014 Projects* ±721.04 SQ. M. South Border Infrastructure Project Office As-Built Layout Plan &
Organizational Chart - April-23, 2014
Project-in-Charge : Dr. Alyass HosinTechnical Manager for Road Projects Department
Year : 2014 Projects* Kingdom of Saudi Arabia Ministry of Communications Standard Reinforced
Concrete Box Culvert (R.C.B.C.) - April-05, 2014 i. Standard Single Cell Reinforced Concrete Box Culvert (R.C.B.C.)ii. Standard Double Cell Reinforced Concrete Box Culvert (R.C.B.C.)iii. Standard Reinforced Concrete Box Culvert (R.C.B.C.) Inlet/Outlet
Project-in-Charge : Engr. Bader Maskoun, M. Sc. CSLA, USATendering Division for Road Projects Department
Year : 2014 Projects* Makkah Mass Rail Transit Project Line-B & Line–C (UG Structural Layout)
(Zoning of Tunnel Type using AutoCAD & Google Earth software) - June-04, 2014
* Makkah Public Transport Program (MPTP) (Quantitative Analysis for Volume of Excavation using Excel software) - June-24, 2014
i. MMRTC-SYS-00302-SY-417_Material Specifications for Underground Stations & ii. MMRTC-SYS-00302-SY-416_Material Specifications for Elevated & At Grade Stationsiii. MMRT-PRB-DOC-CAR-ESTA-SY-90065-B Elevated Stations Architectural Drawingsiv. MMRT-PRB-DOC-CAR-USTA-SY-90062-A Underground Stations Arch’l. Drawings - A3v. STATION TYPE-1 C03-N UNDERGROUND
* MPTP PHASE 1 – STATIONS Makkah Metro Line B & Line C Section - 1 (Architectural Design, Fit-Out & Signage Material Specifications) - November-03, 2014
i. Makkah Metro Line B* B02-E (Underground)* B01b-E(Underground)* B01-E (Elevated + Viaduct)* B01-W (At Grade)* B04-W (Underground)
ii. Makkah Metro Line C* C05-N (TBM)* C04-N (Underground)* C03-N (Underground)* C02-N (Interchange)* C01-N (Underground)* C01-S (Ramp + Viaduct)
* MPTP PHASE 1 – STATIONS Makkah Metro Line C Section - 2 (Architectural Design, Fit-Out & Signage Material Specifications) - November-03, 2014
i. Makkah Metro Line B* C02-S (Elevated)* C03-S (Elevated)* C03b-S (Elevated)* C04-S (Elevated)* C05-S (Elevated)* C06-S (Elevated)* C07-S (Elevated)* C07b-S (Elevated)* C08-S (Elevated)
Project-in-Charge : Engr. Talal TouqanProject Director for Road Projects Department
Year : 2014 Projects* ±19.78 SQ. M. South Border Infrastructure Project Conference Room As-Built Layout Plan - April-23, 2014
Year : 2015 Projects* ±193.82 SQ. M. Saudi Bin Ladin Group – Architecture & Building Construction Division: Roads & Bridges Department As-Built Office Floor Layout Plan - February-02, 2014
* ±193.82 SQ. M. Saudi Bin Ladin Group – Architecture & Building Construction Division: Roads & Bridges Department Proposed Office Floor Layout Plan (Scheme-1 & Scheme-2)- February-02, 2014
Project-in-Charge : Engr. Ashraf AbedContract Manager for Road Projects Department
Year : 2014 Projects* ±276 SQ. M. 4-Storey Family Apartment Proposed layout Plan (Scheme-1) - March-05, 2014
* ±312.5 SQ. M. TYPE-A: 2-Storey Residential with Roof Deck Proposed layout Plan(Option-1 & Option-2) - March-05, 2014
***** E N D *****
Sub-Contractor : E. T. QUIAMBAO ENGINEERING SERVICES#1 Wallnut Road, SPH Telephone No. (02) 948-6214Makiling Street, Hacienda Heights Cellphone No. 09173195087Brgy. Concepcion 2, Marikina City, Philippines
Department : Petron CTESG Design & Construction Group – Plant Engineering
Position : Design Assistant/AutoCAD Operator
Duration : July-25, 2011 to January-31, 2013
Job Description : Prepares Construction/Working Drawings of Oil Depot, Bulk Plant, & Bunkering Terminal by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, Sanitary, Driveway Concreting Plan, & Piping & Instrumentation Diagram (P. & I.D.) with necessary Bill of Quantity (BoQ) & Bill of Materials (BoM). Conduct site visit & provide as-Built Plans.
August-23, 2012* Palawan Depot New Generator Room & MCC Shed - April-25, 2012* Palawan Depot Proposed Single Line Diagram - April-17, 2012* Iligan Depot Proposed Office Building & Tank Track Inspection Platform -
March-07, 2012
Year : 2011 Projects* Palawan Depot Proposed LPG Receiving Line - November-09, 2011* Navotas Depot Proposed Fire Hydrant Layout Plan - October-05, 2011* Navotas Depot Proposed New MCC Shed - September-15, 2011* Navotas Depot Existing & Proposed Layout Plan - September-15, 2011* Tagoloan Depot Proposed MCC Shed Expansion - July-18, 2011
Project-in-Charge : Engr. Catherine D. JoseProject Engineer
Year : 2012 Projects* San Fernando Depot Installation of New CCTV System - July-20, 2012* Batangas Terminal Proposed New Oil Spill Equipment Shed Renovation -
May-02, 2012* Batangas Terminal Proposed Sprinkler Layout Plan - March-01, 2012* Batangas Terminal Proposed Filling Plant Power & Lighting Layout Plan -
March-01, 2012* Batangas Terminal Proposed P. & I. D. for Fire Protection System -
February-16, 2012* Poro Depot Proposed P. & I. D. for Fire Protection System - February-15,
2012* Poro Depot Proposed Sprinkler Layout Plan - February-15, 2012* Poro Depot Proposed tank Truck Loading Rack Power & Lighting Layout
Department : Petron CTESG Design & Construction Group – Plant Engineering
Position : Design Assistant/AutoCAD Operator
Duration : July-25, 2012 to January-31, 2013
Job Description : Prepares Construction/Working Drawings of Mini-LPG Refilling Plant by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, Sanitary, Driveway Concreting Plan, & Piping & Instrumentation Diagram (P. & I.D.) with necessary Bill of Quantity (BoQ) & Bill of Materials (BoM). Conduct site visit & provide as-Built Plans.
Job Description : Prepares Construction/Working Drawings of PTT Gasoline Station by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, Sanitary, & Driveway Concreting Plan.
Project-in-Charge : Engr. Joel M. Tolosa Project Engineer
Mr. Gabriel M. AdanProprietor
Year : 2013 Projects* PTT Mabalacat Proposed Gasoline Station - February-11, 2013* PTT Clark Proposed Trellis Details - January-21, 2011* PTT Regalado Proposed Gasoline Station - January-07, 2013* PTT Molino-2 Proposed Extension - January-04, 2013
Year : 2012 Projects
* PTT Cabanatuan Revision-1 - December-05, 2012* PTT Bulacan Proposed Gasoline Station - October-27, 2012* PTT Villasis Proposed Gasoline Station - October-15, 2012* PTT San Marcelino Proposed Gasoline Station - September-25, 2012* PTT Taytay Proposed BSLO Layout Plan - September-25, 2012* PTT KM 18 East Service Road Proposed Gasoline Station - September-13, 2013* PTT Clark Proposed Gasoline Station - August-27, 2013* PTT San Jose Proposed Road Shoulder - August-25, 2012* PTT Magalang Proposed BSLO Layout Plan (Sch.-2) - August-16, 2012* PTT Concepcion Proposed BSLO Layout Plan (Sch.-2) - August-15, 2012* PTT Congressional Avenue Proposed BSLO Layout Plan (Sch.-2) - August-14, 2012* PTT Bantayan-2 Proposed Gasoline Station - August-08, 2012
***** E N D *****
Company/Client : EON PETROLEUM INCORPORATED 2207 TYCOON CENTER BUIILDING, PEARL DRIVE ORTIGAS, PASIG CITY
Project-in-Charge : Mr. Gabriel M. AdanProprietor
Year : 2013 Projects* EON Lite Prototype Bulilit Station (PowerPoint Files) - January-07, 2013
Year : 2012 Projects* EON Muñoz Nueva Ecija Proposed New Service Station - September-15, 2012
Client : Mr. Gigi Santos
Project-in-Charge : Mr. Gabriel M. AdanProprietor
Year : 2012 Projects* 2-Storey Residential as-Built Layout Plan - September-13, 2012
***** E N D *****
Sub-Contractor : C. JANSENTECHNICAL SERVICESMarina Ave., St. Joseph Subdivision, Bayan, Orani, Bataan – 2112 PhilippinesCP: 09999904720
Department : Petron CTESG Design & Construction Group – Design Group
Position : Junior Architect/AutoCAD Operator
Duration : March-05, 2010 to May-31, 2011
Job Description : Prepares Construction/Working Drawings of Petron Service Station, Micro-Filling Station (MFS), & Dealer-Owned Filling Station (DOFS) by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, Sanitary, & Driveway Concreting Plan with Site Visiting & provide as-Built Plans.
2010* Proposed Service Station Major Rehab, Intramuros, Manila - July-23, 2010* Proposed New Dealer-Owned Filling Station: San Carlos, Pangasinan -
June-28, 2010* Proposed New Service Station EDSA-NIA, Quezon City - May-24, 2010* Micro Filling Station (Petron Bulilit) Enhancement - April-21, 2010
i. MFS Type - 1: MFS-1a & MFS-1bii. MFS Type - 2: MFS-2a & MFS-2biii. MFS Type - 3: MFS-3a & MFS-3biv. MFS Type - 4zv. MFS Type - 5vi. MFS Type - 6vii. MFS Type - Gasbar
***** E N D *****
Consultant : ALEJANDRO SO MANOTA & ASSOCIATESARCHITECTS CONSULTANTSBLK. 8 LOT 31, SAN PEDRO SUBDIVISION 7 TEL. 4261379SAN BARTOLOME, NOVALICHES, Q.C. PHILS. CELL. 0920-5965347
Department : In-House Design Office Address:Blk. 8 Lot-31, San Pedro Subdivision 7, San Bartolome, Novaliches, Q.C.
Philippines
Position : AutoCAD Operator
Duration : August, 2009 to January, 2010
Job Description : Prepares Construction/Working Drawings of Standard Bank Layout Plan of Banco de Oro (BDO), Bank of the Philippine Island (BPI), & EastWest Bank by the following Drafting Disciplines: Architectural, Structural, Electrical, Mechanical, & Sanitary. Conduct site visit & provide as-Built Plans.
Company/Client : BDO Corporate Center7899 Makati Avenue,Makati City, Philippines
Project-in-Charge : Arch. Alejandro So ManotaArchitect/Proprietor
Year : 2010 Projects* BDO - San Pablo Branch Interior Renovation - January, 2010
Project-in-Charge : Arch. Alejandro So ManotaArchitect/Proprietor
Year : 2009 Projects* EastWest Bank West Avenue Branch Iterior Renovation - August-10, 2009* EastWest Bank T. Alonzo Branch Interior Construction - June, 2009
Company/Client : Mr. & Mrs. Fortaleza
Year : 2009 Projects* Two Storey Residence Renovation & Expansion - August, 2009
***** E N D *****
Reference No.1 :
2nd Floor Obeikan Bookstore BuildingPrince Sultan Road, Jeddah, Kingdom of Saudi Arabia
Contact Person : Engr. Nabeel H. Abu SadahQA/QC Manager for Road Projects DepartmentP.O. Boxn11789 Jeddah 21463 Saudi ArabiaTel.: 6927105 Ext.Fax: 6922198Mobile: +966 540925900E-mail: [email protected] & [email protected]
Contact Person : Engr. Eric M. Guillermo, MSEPlanning Manager for Road Projects DepartmentP.O. Box 11789 Jeddah 21463 Saudi ArabiaTel.: 012-6927105 Ext. 256Fax: 012-6163979 Ext. 8135Mobile: +966 569056350E-mail: [email protected]
Reference No.2 : E. T. QUIAMBAO ENGINEERING SERVICES#1 Wallnut Road, SPH Telephone No. (02) 948-6214Makiling Street, Hacienda Heights Cellphone No. 09173195087Brgy. Concepcion 2, Marikina City, Philippines
Contact Person : Engr. Edelino T. QuiambaoProprietor/Owner