Top Banner
4

Curriculum Vitae of Ade l Groenewald - Eskom...Curriculum Vitae of Ade l Groenewald Environmental Consultant Personal Profile Name: Me. Adél Groenewald Gender: Female Nationality:

Jul 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Curriculum Vitae of Ade l Groenewald - Eskom...Curriculum Vitae of Ade l Groenewald Environmental Consultant Personal Profile Name: Me. Adél Groenewald Gender: Female Nationality:
Page 2: Curriculum Vitae of Ade l Groenewald - Eskom...Curriculum Vitae of Ade l Groenewald Environmental Consultant Personal Profile Name: Me. Adél Groenewald Gender: Female Nationality:
Page 3: Curriculum Vitae of Ade l Groenewald - Eskom...Curriculum Vitae of Ade l Groenewald Environmental Consultant Personal Profile Name: Me. Adél Groenewald Gender: Female Nationality:

Curriculum Vitae of Ade l Groenewald Environmental Consultant

Personal Profile

Name: Me. Adél Groenewald

Gender: Female

Nationality: South African

Email: [email protected]

Relevant Qualifications

B.Sc. Honours Environmental Management – University of South Africa (in progress)

B.Sc. Geography – University of the Free State (2012)

Business Administration – CTU Training Solutions Bloemfontein (2012)

Affiliation Membership Member of the International Association for Impact Assessors (IAIA) South Africa

Experience

March 2016 – Present Environmental Consultant at Doug Jeffery Environmental Consultants

Experience in applying the principles of Integrated Environmental Management (IEM), and in applying the

NEMA Environmental Impact Assessment (EIA) Regulations to a number of development projects and

initiatives in South Africa that trigger the National Environmental Management Act and/ or the National

Environmental Management: Waste Act.

Facilitation, co-ordination and management of all aspects of the EIA process.

Liaising with specialists and all members of the project team to ensure a full understanding of the scope of

work required throughout the process;

The compilation of reports: Constraints Analysis, Basic Assessment Reports, Scoping and Environmental

Impact Assessment Reports, and Damage Assessment Reports(24G Applications);

Liaising with interested and affected parties and facilitating the public participation process required in

terms of the EIA Regulations.

June 2013 – February 2016 Environmental Consultant at Enviroworks

Preparation of an Environmental Scoping Assessment for the proposed development of a solar facility on

Bloemdustria, Bloemfontein, Free State Province;

Preparation of an Environmental Sensitivity Map for the proposed Solar Facility on Bloemdustria 2963,

Bloemfontein, Free State Province;

ECO for the construction of a 132kV substation and associated power lines in Botshabelo, Bloemfontein,

Free State Province;

EAP for the conducting of a Scoping and Full Environmental Impact Assessment for the proposed Solar Farm

Thabong Development in Welkom, Free State Province;

EAP for the conducting of a Scoping and Full Environmental Impact Assessment for the proposed Solar Farm

Lebone Development in Welkom, Free State Province;

EAP for the conducting of a Basic Assessment process for the proposed Centlec, Cecilia 132kv substation and

132kV power line, Kwaggafontein, Bloemfontein, FS Province;

Conducting of a Basic Assessment process for the proposed Hartswater Retail and Commercial Centre,

Hartswater, Northern Province;

Page 4: Curriculum Vitae of Ade l Groenewald - Eskom...Curriculum Vitae of Ade l Groenewald Environmental Consultant Personal Profile Name: Me. Adél Groenewald Gender: Female Nationality:

Preparation of an Environmental Baseline Assessment Report for the Proposed Wastewater Treatment

Works in Kroonstad, Free State Province.

Conducting of Basic Assessment processes for several proposed cellular base stations in the City of Cape

Town, Western Cape Province;

Conduction of a Basic Assessment Process for the proposed Neotel Optic Fibre Cable Route along the R102

and R328 from George through Hartenbos to Oudtshoorn, Western Cape Province;

Conducting of Proposed development of a Dinosaur Interpretation Centre within Golden Gate Highlands

National Park, Free State Province;

EAP for the conducting of a Basic Assessment process for the Proposed borrow pit on Portion 1 of the Farm

Groot Eerstegeluk No. 2884, Bloemfontein, Free State Province;

ECO for the Repairs of Slip, Downchutes and Drainage at Theekloofpass near Fraserburg (Phase 2) on behalf

of the client, Department of Roads and Public Works, Northern Cape Province;

ECO for the Maintenance and Repairs of Roads in the Witzenberg Valley and Wolseley, Western Cape

Province;

Project management for a Mining Permit; and

GIS & mapping.