(CV-SAUFI) Page 1 CURRICULUM VITAE PROJECT MANAGER SAA ENGINEERING & MARINE SDN BHD LOT 19, TINGKAT 1, LOT KEDAI PMINT, BANDAR BARU SERI KERTEH, 24300 KERTEH, KEMAMAN, TERENGGANU DARUL IMAN TEL. NO. : 09-826 1592 FAX NO. : 09-826 1039 BRANCH OFFICE NO.77-1, JLN SUSUR LARKIN PERDANA 1, LARKIN PERDANA, 80350 JOHOR BHARU, JOHOR, MALAYSIA TEL/FAX NO.: 6-07-3883527/2365672 Personal Information Name : Mohammad Saufi Yusof I/C No. : 770421-11-5043 Date of Birth : 21 st April 1977 Address : No.2, Kampung Pinang Merah, 23100 Paka, Dungun, Terengganu Contact No. : 019-9112544 Status : Married Heir : Rozahnizam Mohd Ghazali Blood Group : O+ Academic Qualification 2002 Entrepreneurs Development Institute Diploma in Civil Engineering 1997-2000 University Of Malaya Degree in Languages and Linguistic 1996 Sijil Tinggi Pelajaran Malaysia 5 Principle 1994 Sijil Pelajaran Malaysia Gred 1
23
Embed
CURRICULUM VITAE - avhm.com.my · PDF fileproject manager saa engineering & marine sdn bhd lot 19, ... larkin perdana, 80350 johor bharu, johor, malaysia tel/fax no.:...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
(CV-SAUFI) Page 1
CURRICULUM VITAE PROJECT MANAGER
SAA ENGINEERING & MARINE SDN BHD
LOT 19, TINGKAT 1, LOT KEDAI PMINT,
BANDAR BARU SERI KERTEH, 24300 KERTEH, KEMAMAN,
TERENGGANU DARUL IMAN
TEL. NO. : 09-826 1592
FAX NO. : 09-826 1039
BRANCH OFFICE
NO.77-1, JLN SUSUR LARKIN PERDANA 1,
LARKIN PERDANA, 80350 JOHOR BHARU, JOHOR, MALAYSIA
TEL/FAX NO.: 6-07-3883527/2365672
Personal Information
Name : Mohammad Saufi Yusof
I/C No. : 770421-11-5043
Date of Birth : 21st April 1977
Address : No.2, Kampung Pinang Merah, 23100 Paka, Dungun,
Terengganu
Contact No. : 019-9112544
Status : Married
Heir : Rozahnizam Mohd Ghazali
Blood Group : O+
Academic Qualification
2002 Entrepreneurs Development Institute
Diploma in Civil Engineering
1997-2000 University Of Malaya
Degree in Languages and Linguistic
1996 Sijil Tinggi Pelajaran Malaysia
5 Principle
1994 Sijil Pelajaran Malaysia
Gred 1
(CV-SAUFI) Page 2
Safety Training / Exposure
9th
to 10th
July 2007 Effective Cash Flow Management
29th
June 2007 Developing ISO 9001:2000 QMS Documents
6th
to 7th
December 2005 Authorised Entrant & Standby Person for Confined Space
Course - NIOSH
7th
to 8th
April 2005 Occupational First Aid - TSTC
16th
to 17th
February 2005 Tender & Quotation Course – Commercedotcom & KK
16th
to 18th
August 2004 Occupational, Safety & Health Management Course - CIDB
24th
June 2004 Niosh Petronas Safety Passport (NPSP)
21–23rd
October 2003 Combined Safety Course ( Offshore ) - TSTC
8th
October 2003 Rigging and Slinging Safety Course - TSTC
9th
September 2003 Green Card – CIDB
2nd
November 2000 Introducing MS ISO 9000 In Construction Course – CIDB
Competency Course / Training
3rd
September 2002 Scaffolding Course - CIDB
MAJOR PROJECT INVOLVEMENT
1. PROJECT MANAGER – RLE (Repair Life Extension For FSO Cendor) – Project Value
7.6million started on May 11 and completed on July 11
Work scopes;
a. Monitor the ITB package starting on the tendering process for technical and commercial
part.
b. Contractor project focal person for any communication, correspondent, work planning,
safety and site execution work.
c. Responsible for the overall CONTRACTOR operation under the contract particularly on
safety, management and contractual aspect and the welfare of the CONTRACTOR
personnel.
d. Monitor daily work progress and weekly progress meeting
e. Direct reporting and discussion about the work progress and status to RLE Management
Team i.e. Petrofac Sdn Bhd,MISC Sdn Bhd and FSO Ventures Sdn Bhd.
f. Monitor daily support vessel movement,daily fuel and water state,daily provision and safety
onboard MV Tanjong Gelang.
g. Liase with Client Reps on all the matters pertaining to the WORK
h. Strategize,develop,control and review RLE project work execution plan to meeting with
client expectation and work duration
i. Monitor procurement activities to compliant with Client procurement guidelines
j. Monitor material inspection to ensure goods supply by supplier is meeting with
specification,material certificate and body printed shall tally with mill cert.
k. Monitor and involved in developing of project manual,workpack,details work list procedure
and JHA.
(CV-SAUFI) Page 3
l. Lead in financial matters like invoicing,DO,project closed out report and etc.
2. PROJECT MANAGER – TERM CONTRACT FOR SCAFFOLDING,INSULATION
AND PAINTING WORK UNDER PGB PRICE AGREEMENT 2 +1+1 – NOV 08 TILL
NOV 10 GPPA & ET,March 11 till March 2013 GPP B & ET
a. Monitor the ITB starting on the tendering process technical and commercial part.
b. Contractor project focal person for any communication, correspondent, work planning,
safety and site execution work.
c. Responsible for the overall CONTRACTOR operation under the contract particularly on
safety, management and contractual aspect and the welfare of the CONTRACTOR
personnel.
d. Monitor daily work progress and monthly progress meeting
e. Direct reporting and discussion about the work progress and status PGB Client
Represantative
f. Liase with Client Reps(INSA,INSB and Inspector) on all the matters pertaining to the
WORK
g. Based on work batch received,Strategize, develop, control and review project work
execution plan to meeting with client expectation and work duration
h. Monitor procurement activities to compliant with Client procurement guidelines
i. Monitor material inspection to ensure goods supply by supplier is meeting with
specification,material certificate and body printed shall tally with mill cert.
j. Monitor site material supply to ensure it enough at all the time against with no of work
batch received.
k. Responsible in all manual invoicing process submission to INSA/INSB
l. Monitor all the procurement aspect in e-procurement i.e Petronas e-PO,e-Service
Notification,e-Delivery Order,e-Invoice
m. Monitor and involved in developing of project manual,workpack,details work list procedure
and JHA.
m. References;
i. En Khairul
ii. En Ir Hj Khairl
iii. En Shahrulizam Sahid - GPPA
iv. En Faizul Ruhani -ET
3. PROJECT MANAGER – PRICE AGREEMENT FOR JETTY MAINTENANCE AND
ASSOCIATES WORK FOR KPSB – 2009 TILL
WITH 1 YEAR CONTRACT EXTENSION.
a. CONTRACTOR representative for each task involved to the work
b. Responsible for the overall CONTRACTOR operation under the CONTRACT particularly
on safety,project management and contractual aspects and the welfare of the
CONTRACTOR personnel.
c. Liaise with COMPANY on all matters pertaining to the WORK and to ensure that the
WORK is done in the most effective and safe manner without undue delay to any part of the
project execution plan.
(CV-SAUFI) Page 4
d. To review Project Execution Plan proposed by CONTRACTOR Engineers prior submission
to COMPONY for approval.
e. Thoroughly conversant and familiar with critical path method.
f. Monitor all the procurement aspect in e-procurement i.e Petronas e-PO,e-Service
Notification,e-Delivery Order,e-Invoice
g. Monitor and involved in developing of project manual,workpack,details work list procedure
and JHA.
h. References
i.En Saudi Mohd Noor
ii.En Ahmad Syukri Syafiee
iii.En Ahmad Muhaimin
iv.En Khairul
4. PROJECT MANAGER ; TERM CONTRACT FOR DESIGN, FABRICATE AND
INSTALL NEW UPGRADING BOAT FENDER SYSTEM FOR 12 UNITS PLATFORM
FOR PETRONAS CARIGALI(PENINSULAR) SDN BHD.
a. CONTRACTOR representative for each task involved to the work
b. Responsible for the overall CONTRACTOR operation under the CONTRACT particularly
on safety,project management and contractual aspects and the welfare of the
CONTRACTOR personnel.
c. Review work design proposed by internal designer
d. Develop current boat landing condition report to match with new proposed boat fender
system
e. Liaise with COMPANY on all matters pertaining to the WORK and to ensure that the
WORK is done in the most effective and safe manner without undue delay to any part of the
project execution plan.
f. To review Project Execution Plan proposed by CONTRACTOR Engineers prior submission
to COMPONY for approval.
g. Thoroughly conversant and familiar with critical path method.
h. Monitor all the procurement aspect in e-procurement i.e Petronas e-PO,e-Service
Notification,e-Delivery Order,e-Invoice
i. Monitor and attending Factory acceptances test for ensuring material supply accordance to
specification given
(CV-SAUFI) Page 5
Company Working Experiences
Employer : SAA Engineering & Marine Sdn Bhd
Position : General Manager
Period/Year : To Date
Duties : Project management at site as well as project documentation such
as planning, scheduling and control project execution.
Manage and good keep project administration team and records.
Control project Execution Phases.
Employer : Hamdan Abdullah Sdn Bhd
Position : Tendering and Contract Manager / Project Manager
Period/Year : September 2003 till 2011
Duties : Project management at site as well as project documentation such
as planning , scheduling and control project execution.
Manage and good keep project administration team and records.
Control project Execution Phases.
Employer : Nam Fatt Construction Bhd
Position : QA/QC Executive & Site Supervisor
Period/Year : June 2001 to September 2003
Duties : QA/QC implementation, supervise and monitoring construction
work.
Preparing daily inspection and work planning
Monitoring submission work – sample, technical data, shop
drawing & method statement.
To handle technical testing & sample preparation
Liaise with client, consultant, supplier and sub-cont.
Scaffolding inspector
Review and checking progress claim by sub-contractor.
Employer : Nam Fatt Construction Bhd
Position : QA/QC Executive
Period/Year : April 1999 to June 2001
Duties : QA/QC implementation, supervise and monitoring work progress
Preparing daily inspection and work planning
Monitoring submission work – sample, technical data, shop
drawing & method statement.
To handle technical testing & sample preparation
Liaise with client, consultant, supplier and sub-cont.
Document controller
(CV-SAUFI) Page 6
Project Experience
Client : Toyo (M) Sdn Bhd
Project : MEOG Plant Build-up
Position : QA/QC Officer
Date : 2000 to 2003
Client : FPG Oleochemicals Sdn Bhd
Project : Shutdown Tank Cleaning
Position : Asst. Project Manager
Date : September 2003
Client : Petronas Carigali Sdn Bhd
Project : Tandem Offloading Hose Change Out
Position : Asst. Project Manager
Date : September 2003
Client : Sarawak Shell Berhad
Project : SBM Expansion Joint Change Out
Position : Asst. Project Manager
Date : April 2004 – May 2004
Client : FPG Oleochemical Sdn.Bhd.
Project : Tank Cleaning During Shutdown 2004
Position : Project Manager
Date : April 2004
Client : HL Engineering (M) Sdn Bhd
Project : Provision of Overhaul Buoy & Hoses Change Outs and Specialist
Services for Single Buoy Moorings (SBMs)
Position : Asst. Project Manager
Date : April 2004
Client : Kerteh Terminal Sdn.Bhd.
Project : : PVRV,PSV and PRV Servicing
Position : Project Manager
Date : Mei – Jun 2004
Client : Petronas Carigali Sdn.Bhd.
Project : : MISC – FPSO Hose Installation
Position : Assistance Project Manager
Date : Mei – Jun 2004
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose Emergency Repair for FPSO Bunga Kertas
Position : Assistance Project Manager
Date : August 2004 – September 2004
(CV-SAUFI) Page 7
Client : Petronas Carigali Sdn Bhd
Project : Transfer of Marine Cargo Hose from Yard to Warehouse
Position : Assistance Project Manager
Date : September 2004 – October 2004
Client : FPG Oleochemicals Sdn Bhd
Project : Tank Cleaning
Position : Project Manager
Date : November 2004 - December 2004
Client : Petronas Carigali Sdn Bhd
Project : Offloading Hose Inspection and Testing Warehouse 20, KSB
Position : Assistance Project Manager
Date : November 2004 - December 2004
Client : Petronas Carigali Sdn Bhd
Project : SCPA Structure Deck Extension Platform
Position : Assistant Project Manager
Date : September 2004 – January 2005
Client : Petronas Carigali Sdn Bhd
Project : Fabrication of Riser Guard
Position : Project Manager
Date : April 2005 – July 2005 (Completed Installation)
Client : FPG Sdn.Bhd.
Project : Tank Cleaning Of RWST
Position : Project Manager
Date : Jun 2005 – July 2005
Client : Petronas Carigali Sdn Bhd
Project : Marine Hose And Ancillaries Repair, Maintenance and Disposal
Position : Supervisor
Date : June 2005
Client : FPG Oleochemicals Sdn Bhd
Project : Tank Internal Cleaning of Rain Water Surge
Position : Project Manager
Date : June 2005
Client : Petronas Carigali Sdn Bhd
Project : Service Platform Reinstatement at Bekok-A
Position : Project Manager
Date : October 2005
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose Stringing, Towing and Installation Work for FPSO
Puteri Dulang
Position : Assistant Project Manager
(CV-SAUFI) Page 8
Date : October 2005
Client : Shell Refining Berhad
Project : Upgrading of Berth No.1 at SRC Jetty, Port Dickson ( Installation of
Fenders )
Position : Assistant Project Manager
Date : November 2005
Client : Felda Bulkers Sdn. Bhd.
Project : Tank Internal Services
Position : Project Manager
Date : December 2005
Client : MTBE Malaysia Sdn Bhd
Project : Blasting & Painting Work to ½”, ¾”, 1”, 1 ½”, 2”, 4” and 6” pipe
Position : Project Manager
Date : January 2006
Client : Felda Bulkers Sdn. Bhd.
Project : Tank Internal Services
Position : Project Manager
Date : February 2006
Client : Kertih Terminals Sdn. Bhd.
Project : VCM Spheres PSV Instrument Service
Position : Project Manager
Date : February 2006
Client : Petronas Carigali Sdn Bhd
Project : Tank & Vessel Internal Coating at Pulai A Platform
Position : Asst.Project Manager
Date : May 2006
Client : Felda Bulkers Sdn Bhd
Project : Tank Internal Cleaning
Position : Project Manager
Date : June 2006
Client : Perwaja Steel Sdn Bhd
Project : Vessel Special Coating
Position : Project Manager
Date : June 2006
Client : Kertih Terminals Sdn Bhd
Project : Servicing, Overhaul, Repainting of 106 Unit XCV/ERV at KTSB
Position : Project Manager
Date : July 2006
(CV-SAUFI) Page 9
Client : Petronas Gas Berhad
Project : Fabrication, Installation and Painting Works of Auto Lubrication for
Fin Fan Cooler
Position : Project Manager
Date : July 2006
Client : Kerteh Terminals Sdn Bhd
Project : Servicing, Overhaul, Repainting of 106 Unit XCV/ERV at KTSB
Position : Project Manager
Date : July 2006
Client : MTBE Malaysia Sdn Bhd
Project : Supply, Fabrication & Site Installation of Piping System for Spent
Caustic Circulation at PDH
Position : Project Manager
Date : August 2006
Client : Felda Bulkers Sdn Bhd
Project : Tank Manual Cleaning
Position : Project Manger
Date : September 2006
Client : Alam Maritim (M) Sdn Bhd
Project : Assembling Hose for Cendor Project
Position : Asst. Project Manager
Date : September 2006
Client : Alam Hidro (M) Sdn Bhd
Project : Installation Hose at FSO Cendor PM304 Project