Top Banner
The future is not a place we are going. It is a place we are making. The paths to the future are made, not found. And the process of making them changes both us and our final destination.
19

Curriculum team staff meet120813

Dec 04, 2014

Download

Education

Denise Lofts

Staff Consultation aout Curriculum Changes at UHS
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Curriculum team staff meet120813

The future is not a place we are going. It is a place we are making. 

The paths to the future are made, not found. And the process of making them changes both

us and our final destination.

The future is not a place we are going. It is a place we are making. 

The paths to the future are made, not found. And the process of making them changes both

us and our final destination.

Page 2: Curriculum team staff meet120813

Curriculum team Update

Curriculum team Update

We want your feedback and Consultationwe view this as a once in a lifetime opportunity to experiment to do things differently, ideas are the

guinea pig!

We want your feedback and Consultationwe view this as a once in a lifetime opportunity to experiment to do things differently, ideas are the

guinea pig!

Page 3: Curriculum team staff meet120813

Curriculum Team optionsfor Consultation with Staff

As a result of the ideas that were coming through from the brainstorming with staff around the big picture & Long term visions of what we want learning to look like, we have a plan

Step 1: What can we realistically achieve and consult on for 2014

Page 4: Curriculum team staff meet120813

Two themes are coming through in all consultations with staff, students and parentsFlexibility in structure is what was

identified.

Structures to support flexibility, team teaching, PBL, new technologies, toward 21st century skills, the beginning of the bigger picture.

Page 5: Curriculum team staff meet120813
Page 6: Curriculum team staff meet120813

Learning Structures to support new ways of doing and learning

Page 7: Curriculum team staff meet120813

No 1. Project based learning to help move

toward our student aims

No 2. Integrated sport

No 1. Project based learning to help move

toward our student aims

No 2. Integrated sport

Page 8: Curriculum team staff meet120813

12th August Curriculum Team present ideas

Integrated sport outline & PBL outline

SwOT analysis on 12th August

Based on SWOT analysis, team addresses concerns of integrated sport

Feedback and further consultation on 2nd September, voting follows 60/40 majority.

Time Line for staff Consult

Page 9: Curriculum team staff meet120813

Project Based Learning

Project Based Learning

Page 10: Curriculum team staff meet120813

No 1. Project based learning to help move toward our student aims

How? year 9, 2 periods to support the curriculum through product based learning, innovative teaching ideas, strategies, team teaching the list. etc

No impact on school structure, just willing participants ( year 9 teachers)

We will need willing participants

Page 11: Curriculum team staff meet120813

Ideas and structures Periods to support this; (FOL, and scripture to be negotiated). 2 periods fortnight to support, embed, authentically build PBL.

2 lines of Year 9. 4 +Classes each side of the TT. Will not take from curriculum but deepen.

Volunteer teachers(preferably teach year 9)

Page 12: Curriculum team staff meet120813

how do we see it?how do we see it?

Page 13: Curriculum team staff meet120813

Needed to develop specification of structure and protocol, but not the detail of the project, this will be with the team

Follow on with year 8 skills, teams and Stage 4 collaboration.

Professional learning Term 4, year 8 as creators in the programming for year 9 2014

Page 14: Curriculum team staff meet120813

Staff need to understand the impacts.. desire to keep flexible

tutorial style, to individual learning to open group learning

Spaces... could be places where 12o students, 4 teachers in the MPC or some larger space, could be personalised individual learning alfresco (blank canvas)

Page 15: Curriculum team staff meet120813

structure supports..

Volunteers

Committed to developing 21st student skills

Commitment to PL

Integrated into each curriculum area, programs projects are built before the stage of the classroom

Toward deeper authentic learning

Team teaching focus within KLA and across KLAS

Committed Volunteers

Page 16: Curriculum team staff meet120813

2 periods in addition, allocated to support a KLA, which may rotate, it works in with the other work, it is not an add on, its a deeper learning of what may be happening in the other classes

Focus on project, collaboration etc. Again this needs to be nutted out.

StrucProjects-Tutorials/ seminars/ brain buzzes ???

How will it look?

Page 17: Curriculum team staff meet120813

Structure, 2 periods, could be 4 if teacher takes 2 groups may look like: Projects-Tutorials/ seminars/ brain buzzes/ whatever ???

Allocations: could balance with sport.. TT will need to outline the way it works on the TT.

Set around a strict set of educational protocols.

Curriculum of every year 9 would have, we may call it “opportunity learning” as support of their learning.

Page 18: Curriculum team staff meet120813
Page 19: Curriculum team staff meet120813

Integrated Sport outline

Integrated Sport outline