Top Banner
Renewable Energy Statistics Training Kingdom of Cambodia Nation Religion King 12-14 December 2016, Bangkok, Thailand Ministry of Mines and Energy General Department of Energy Ministry of Mines and Energy New and Renewable Energy Dept. E-mail: [email protected] Website: www.mme.gov.kh Current Status of Renewable Energy in Cambodia
18

Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

Feb 13, 2018

Download

Documents

duongthuan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

Renewable Energy Statistics Training

Kingdom of Cambodia

Nation Religion King

12-14 December 2016, Bangkok, Thailand

Ministry of Mines and Energy

General Department of Energy

Ministry of Mines and Energy

New and Renewable Energy Dept.

E-mail: [email protected]

Website: www.mme.gov.kh

Current Status of Renewable Energy in Cambodia

Page 2: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

To provide an adequate supply of energy throughoutCambodia at reasonable and affordable price,

To ensure a reliable and secured electricity supply atreasonable price, which facilitates investment in Cambodiaand development of national economy,

To encourage exploration and environmentally and sociallyacceptable development of energy resources needed forsupply to all sectors of Cambodia economy,

To encourage the efficient use of energy and to minimize thedetrimental environmental affects resulted from energysupply and consumption.

ENERGY POLICY

1

Page 3: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

CAMBODIA POWER STRATEGY

A-Development of Generation

B-Development of Transmission lines

C-Development of Rural Electrification

Increasing diversify of power supply such as Hydro, Coal power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for power generation.

Develop the national transmission line, GMS & ASEAN power grid, maximize mini-grid to rural areas, upgrading the HV, MV & LV.

Supply from the National Grid, Mini-grid, Grid extension and stand-alone system;

Renewable energy(biomass, solar, hydro)

2

Page 4: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

582 653

732 824

954

1,079

1,203

1,340

1,494

1,681

1,847

2,029

2,229

2,449

2,678

2,929

3,204

3,504

3,832

574 638

710 792

910 1,020

1,128

1,247

1,378

1,538

1,676

1,827

1,991

2,170

2,353

2,552

2,768

3,002

3,256

563 621

685 758

864 961

1,054 1,155

1,266

1,401 1,513

1,633

1,764

1,905

2,047

2,200

2,365

2,542

2,732

761 816

879 958

1,117

1,267

1,374

1,492

1,615

1,833

1,980

2,141

2,315

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

High case(GDP:8%)

Base case(GDP:7%)

Low case(GDP:6%)

WB 2006 Base (GDP:5%)

[MW][MW]

626MW(record)

3

Power Demand Forecast of National Grid

Page 5: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

4

Energy Generation from 2005 - 2015

977 1,203

1,517 1,858

2,077 2,515

2,788

3,527

4,051

4,873

5,990

906 1,106 1,378

1,625 1,818 2,242

2,564

3,319 3,689

4,512

5,709

- 500

1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

GWh

Year

Whole Country EDC

Sources: Electricite Du Cambodge (EDC)

Page 6: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

Power Development Plan

No. Generation Expansion Plan Fuel Type

Install

Capa.MW COD

1 Kamchay Hydro Power Plant Hydro 194.1 2011

2 Kirirom III Hydro power Plant Hydro 18 2013

3 Stung Atay Hydro Power Plant Hydro 120 2013

4 200 MW Coal Power Plant (I) in Sihanouk Province - Phase 1 Coal 100 2013

5 Stung Tatay Hydro Power Plant Hydro 246 2014

6 Lower Stung Russei Chrum Hydro Power Plant Hydro 338 2015

7 700 MW Coal Power Plant (II) -Phase 1 Coal 270 2014-2015

8 700 MW Coal Power Plant (II) -Phase 2 Coal 100 2017

9 700 MW Coal Power Plant (II) -Phase 3 Coal 100 2018

10 200 MW Coal Power Plant (I) in Sihanouk Province - Phase 2 Coal 135 2016

11 Lower Se San II Hydro Power Plant Hydro 400 2017

12 700 MW Coal Power Plant (II) -Phase 4 Coal 100 2018

13 Stung Chay Areng Hydro Power Plant Hydro 108 2019

14 700 MW Coal Power Plant (II) -Phase 5 Coal 100 2019

15 Sambor Hydro Power Plant Hydro 450/2600 2019

16 Coal Power Plant (III) or Gas Power Plant Coal/Natural Gas 400 2020

17 Stung Treng Hydro Power Plant Hydro 900 2020

Total4,279.1

(6,429.1)

5

Page 7: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

At least 70% of

all households in

Cambodia have

access to grid

quality electricity

by the year 2030.

100% of villages

in Cambodia have

access to any type

of electricity’s

services by 2020.

Presently, 74.80%

of villages and

65% of households

access to grid

quality electricity.

Electrification Target

6

Year 2030

Year 2020

Year 2016

Target: Improve the current level of electrification by promote electrification in

those areas not serviced yet by grid expansion, cross border supply, mini grids and

renewable energy.

Page 8: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

7

1) Endeavor to provide access to reliable, safe electricity services, with insignificant impact

on the environment and at an affordable price for rural communities;

2) Provide effective legal, regulatory frameworks and various to an encouragements and

train the private sector to participate in providing electricity services by renewable

energy in the rural areas;

3) Act as a market enable, through various incentives, for enabling equity in access to

reliable and safe electricity services, with insignificant impact on the environment, at an

affordable price for the rural communities;

4) Encourage the efficient generation, transmission and distribution of electricity using the

renewable energy technologies, through tariffs, which are in conformity with the

Electricity Authority of Cambodia (EAC)’s regulation;

5) Promote electricity systems by renewable energy at least cost for rural communities,

through research and pilot development, as part of RGC’s portfolio on grid and off-grid

technologies; and

6) Ensure adequate resources, appropriate institutional mechanisms and training to

empower the poor involving in rural electrification to participate.

National Policy on Rural Electrification by

Renewable Energy

Page 9: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

8

EACOil

Customs

GDPInternet

EDC

IPPGDE

Computer

EAC = Electricity Authority of Cambodia, EDC = Electricité du Cambodge,

GDE = General Department of Energy, GDP = General Department of Petroleum,

IPP = independent power producer, OGF = off-grid factory,

REE = rural electricity enterprise

Stakeholders of Energy Data

OGF

EDC

Oil

Company

Customs

Office

GDP

REE

IPP

EAC

GDE

Central Energy Database System

in GDE

Connection-3 (REE-IPP, OGF, EDC, EAC to

Connection-1(EDC to GDE)

Connection-2(GDP to GDE)

Connection-5(GDE to Energy Database

Connection-4

(GDE to GDE)

Energy Data Collection Flow

Data Collection Flow of Existing Data

Page 10: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

RE Potentials and ongoing activities Project

9

the average sunshine duration of 6-9 hours per day, giving an average

of 5 kWh/day. thus, considerable potential of solar energy.

Solar Energy

Description 2013 2014 2015 2016

SHS-50Wp 9,890 4,000 9,240 12,500

SHS-30Wp 2,110 -- -- --

SHS-5Wp -- -- 11,240 --

Total (kW) 557.8 200 518.2 625

Table 1: Province wise information on number of SHS installed to ruralhousehold or under Installation.

Table 2: Status of Solar project investment in Cambodia

Developer Status Project Name City/Province Online

Date

Capacity

(MW)

IFEC Under Development Solar Photovoltaic Kompong Spur Present 10

Global Purity Power Co., Ltd

Under Development Solar Photovoltaic

- Kom Pong Chhanng

- Kom Pong Spur

- Takeo

Present

10

Sunseap International Pte., LtdUnder Development

A bidding on Solar

Farm

Bavet City, Svay Rieng

ProvincePresent

10

SOMA Energy Under Development Solar Photovotaic Kompong Thom province Present 5

Page 11: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

10

The southern part of the great lake Tonle Sap, the mountainous

districts in the southwest and the coastal regions, such as

Sihanoukville, Kampot,Kep and Koh Kong have the annual average

wind speed of 5m/s or greater. The total area around 5%.

Wind Energy

(Wind Water Pump) Pump cost between $800-1500,

can pump 6 -12 m3 per hour and 50 meters deep.

Start pumping by 2m/s.

Wind Turbine has installed in Sihanoukville Autonomous Port,

RE Potentials and ongoing activities Project (Cont.)

Page 12: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

11

The Hydropower potential is approx. 10.000 MW, but currently

contribution to electricity production less than 1,000 MW and other

projects are under development & feasibility studies.

Hydro Power

RE Potentials and ongoing activities Project (Cont.)

Sources: Department of Hydro power, MME

Page 13: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

The report prepared by NEDO on “the Assistance Project for the

Establishment of an Energy Master Plan” identified significant

biomass energy resources from a variety of agricultural residues such

as rice husk, acacia , Cassava, Luscenia, Coconut, ..

12

Biomass

RE Potentials and ongoing activities Project (Cont.)

Sources: Department of Energy Development, MME

Page 14: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

13

The effectiveness of small scale biogas has been demonstrated in

Cambodia by a number of different projects. The use of animal wastes

to generate high quality gas for lighting and cooking have significant

economic, social and environment benefits for poor rural households.

Biogas

RE Potentials and ongoing activities Project (Cont.)

Sources: National Bio-digester program, Ministry of Agriculture

Page 15: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

14

Available Generation Capacity in 2015

-

500

1,000

1,500

2,000

2,500

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Coal Oil Based Hydro Solar Biomass other

MW

Page 16: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

15

Lack of an RGC renewable energy/generation target

The on-grid RE regulatory environment is unclear

Lack of fair value paid for excess generation sent to grid

Access to finance

Taxation issues

High cost of electricity from RE other than big hydro

Limitation of potential of other RE

High upfront investment cost of RE

Challenges of adoption RE in Cambodia

Page 17: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

Cambodia need to develop the renewable energy and enhance energy efficiency

regulation and activities to reduce energy intensity for long-term energy

security,

Recent years , power generation from solar energy significantly reduce, the first

solar farm 10 MW in Bavet be connected to the grid in 2017 is a good signal to

scaling solar energy development,

Capacity building, technology transfer is the need .

Developing Database on Renewable Energy

16

Conclusion

Page 18: Current Status of Renewable Energy in Cambodiairena.org/eventdocs/Cambodia presentation.pdf · Renewable Energy Statistics Training ... 1 Kamchay Hydro Power Plant Hydro 194.1 2011

Thank you for your attention !