Top Banner
CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON WATER INFRASTRUCTURE AND INFORMATION FOR WATER INFRASTRUCTURE PROJECTS IN THE NEAR FUTURE SUBMITTED BY Mr. SOE SI COMMITTEE MEMBER YANGON CITY DEVELOPMENT COMMITTEE THE FOURTH MEETING OF “ THE PPP COUNCIL FOR OVERSEAS WATER INFRASTRUCTURE” The Republic of the Union of Myanmar INTRODUCTION YANGON
20

CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

Oct 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON WATER INFRASTRUCTURE

AND

INFORMATION FOR WATER INFRASTRUCTURE PROJECTS IN THE NEAR FUTURE

SUBMITTED BY

Mr. SOE SI

COMMITTEE MEMBER

YANGON CITY DEVELOPMENT COMMITTEE

THE FOURTH MEETING OF

“ THE PPP COUNCIL FOR OVERSEAS WATER INFRASTRUCTURE”

The Republic of the Union of Myanmar

INTRODUCTION

YANGON

Page 2: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

OVERVIEW OF YANGON CITY AREA

YANGON CITY AREA : 730 Km²

POPULATION : About 6 Millions

DISTRICTS : 4 Districts

TOWNSHIPS : 33 Townships

AVERAGE ANNUAL : 2700 mm

RAINFALL

MEAN MAX: TEMP: : 33 ◌۫C

MEAN MIN: TEMP: : 21 ◌۫C

Yangon

Division

Yangon

Division

ORGANIZATION CHART OF YANGON CITY DEVELOPMENT COMMITTEE

MAYOR (Chairman Of Y.C.D.C)

Minister Of Development Affairs

(Yangon Region )

SECRETARY

COMMITTEE-3 COMMITTEE-4 COMMITTEE-7

DEPARTMENT OF ENGINEERING

(BUILDING)

DEPARTMENT OF POLLUTION CONTROL AND CLEANSINNG

DEPARTMENT OF WORK

INSPECTION

DEPARTMENT OF MOTOR

TRANSPORT AND WORKSHOP

DEPARTMENT OF MARKETS

DEPARTMENT OF REVENUE

DEPARTMENT OF PLAYGROUNG,

PARK AND GARDEN

DEPARTMENT OF ASSESSORS

DEPARTMENT OF SECURITY AND

DISCIPLINE

DEPARTMENT OF CENTRAL

STORE

HEAD OF DEPARTMENT OF

PRODUCTION UNIT

DEPARTMENT OF ENGINEERING

(WATER & SANITATION)

DEPARTMENT OF HEALTH

DEPARTMENT OF VETERINARY

AND SLAUGHTER HOUSE

DEPARTMENT OF COORDINATION

DEPARTMENT OF PUBLIC RELATION &

INFORMATION

DEPARTMENT OF ENGINEERING

(ROAD AND BRIDGE)

COMMITTEE-5

JOINT SECRETARY

HEAD OF DEPARTMENT OF

PRODUCTION UNIT

DEPARTMENT OF PRODUCTION

UNIT

DEPARTMENT OF ADMINISTRATION

DEPARTMENT OF BUDGET & ACCOUNT

DEPARTMENT OF CITY PLANNING &

LAND ADMINISTRATION

MY

POSITION

Page 3: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

1842 Dug Well (30) 1879 Kandawgyi lake(stop using)

1884 Innya lake(stop using) 1904 Hlawga Reservoir

1940 Gyobyu Reservoir

1992 Phugyi Reservoir

2005 Nyaunghnapin Water treatment Plant(1ST Phase)

'*Hk(aw

mif)

'*'*'*'*'*'*'***'*'**'*'***'*'*'**'*'***'***'***'*'*'**'*''' HkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHHHHHHHHHHH (a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(aa(aaa(aaaa(aaaaaaaaaaaaaaaaawwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww

mimimimimimimimimiimimimimimimimiimimimimimimimimimmmmmmmmmm f)f)f)f)f)f)f)f))f)f))f)f)f)f))f)f)f)))f))))f)f)f)f)f)f)f)f)))f)f)))f)f)f)f)f)f)f)f)))f)

Gyobyu

Reservoir Ngamoeyeik

Reservoir

Phugyi

Reservoir

Hlawga

Reservoi

r

Nyaunghnapin

Water treatment

plant

Kandawgyi Lake Inya Lake

1995 Ngamoeyeik Reservoir

HISTORY OF YANGON CITY WATER SUPPLY

DATAS OF FOUR MAIN RESERVOIRS

Gyobyu Reservoir

Ngamoeyeik Reservoir Phugyi Reservoir

Hlawgha Reservoir

Page 4: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

Daily Water supply amount to Yangon(now)

Gyobyu 27 MGD (122,727 m³/day)

Phugyi 54 MGD (245,454 m³/day)

Hlawga 14 MGD (63,637 m³/day)

Tubewell in YCDC 20 MGD (90,910 m³/day)

Ngamoeyeik 1st Phase 45 MGD (204,545 m³/day)

Total 160 MGD (727,273) m3/ day

Total 205 MGD

(931,818)m3/day

After Ngamoeyeik 2nd phase

Gyobyu 27 MGD (122,727 m³/day)

Phugyi 54 MGD (245,454 m³/day)

Hlawga 14 MGD (63,637 m³/day)

Tubewell in YCDC 20 MGD (90,910 m³/day)

Ngamoeyeik 1st + 2nd Phase 90 MGD (409,090 m³/day)

DAILY WATER SUPPLY AMOUNT FOR YANGON CITY

�MGD=Million Gallons Per Day

TYPES OF WATER SUPPLY

Page 5: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

Intake reservoir

Low lift pump station

Water tower

Flocculator

Sedimentation tank

Rapid sand filter

Clear water tank

Pump station

PROFILE OF WATER TREATMENT PLANT

SEDIMENTATION TANKS OF WATER TREATMENT PLANT POWER SUPPLY STATION FOR W.T.P

NYAUNGHNAPIN WATER TREATMENT PLANT

Pyawbwesu Pumping Station

Yegu Pumping Station Yanshin Pumping Station

Phugyi Pumping Station

MAIN PUMPING STATIONS IN YANGON CITY WATER SUPPLY SYSTEM

Page 6: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

URGENT REPAIRING WORKS FOR TRANSMISSION PIPE LEAKAGES

EXCUVATION FOR PIPE REPAIRING INSTALLATION OF COLLAR

CONCRETE ANCHOR BLOCK WELDING AND PACKING WITH LEAD AND JUTE

CURRENT SOLUTION FOR WATER DEMANDS IN SUBURBAN AREA

SMALL TUBE WELL SMALL PUMP HOUSE

REHABILITATION OF LAKE WATER DISTRIBUTED BY WATER TANKER

Page 7: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

Old Aged

Cast Iron

Pipes

Replacement of

New Polyvinyl

Chloride Pipes

Before

Rubbing

and

Cleansing

After

Rubbing

and

Cleansing

RENOVATION OF OLD AGED SECONDARY DISTRIBUTION PIPES

URGENT SITUATION IN NEW WATER TREATMENT PLANT

(NYAUNG HNAPIN)

Page 8: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

Year Gallons/Capital/

Day

Average Daily

Demand

( MG/m³ )

UfW (%)

Average daily

Consumption

( MG/m³ )

Average Daily

Supply

(MG/m³)

Coverage

Ratio (%)

2010 5.11 25 128/581,818 40 79/359,091 160/727,273 62

2020 7.15 35 250/1136,364 35 192/872,727 295/1340,909 77

2030 8.91 40 356/1618,182 25 323/1468,182 430/1954,545 90

2040 11.11 40 499/2268,182 20 416/1890,909 520/2363,636 84

CHART OF AVAILABLE WATER SUPPLY STATUS FOR FUTURE

� JICA is formulating the master plan of water supply for 2040.

PLACE - MHAWBI TOWNSHIP

CAPACITY - 90 MILLION GALLON

DISTANCE TO - 19 MILES

BE CONNECTED

HLAING RIVER WATER PROJECT

Page 9: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

PANTAING VILLAGE

HLAINGTHARYAR

PLACE - HTANTABIN TOWNSHIP

CAPACITY - 90 MILLION GALLON

DISTANCE TO - 18 MILES

BE CONNECTED

KOKKOWA WATER PROJECT

PLACE - TONTAE TOWNSHIP

CAPACITY - 90 MILLION GALLON

DISTANCE TO - 28 MILES

BE CONNECTED

THILAWA

TOE RIVER WATER PROJECT

TONTAE TOWNSHIP

Page 10: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

WATER QUALITY TEST RESULTS FOR KOKKOWA & TOE RIVER

KOKKOWA RIVER TOE RIVER

PLACE - DAGON SEIKAN TOWNSHIP

CAPACITY - 30 MILLION GALLON

DISTANCE TO - 7.16 MILES

BE CONNECTED

SEIK KANTAR WATER PROJECT

Page 11: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

FLOW CHARTS APPLYING IN WATER DISTRIBUTION SYSTEM IN Y.C.D.C

(Aeration Process) (Aeration Process)

22

� Sanitation and sewerage for the Yangon City area is main responsibility of Engineering

Department ( Water and Sanitation) under Yangon City Development Committee.

� Existing system, conventional sewerage, consists of :-

⌂ Gravity sewers

⌂ 39 pneumatic ejector stations

⌂ Air distribution main

⌂ Two sewage force mains and outlet

EXISTING SEWERAGE SYSTEM

� At present Existing Sewerage System covers only 4.33 km2 area of CBD and serves around 350,000

peoples, 7% of the city population.

� Daily Volume of sewage disposal - 111840 gal.(508 m³)

� Major Issues in Existing Sewerage System:-

⌂ To establish proper treatment process for the existing sewerage system.

⌂ To expand and set up the existing sewerage system.

⌂ To improve urban sanitation environment in Yangon City Area

Page 12: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

MAP OF EXISTING SEWERAGE SYSTEM IN DOWNTOWN AREA

Layout Plan of Sewage Treatment Plant

Primary

Sedimentation Tank

Primary

Sedimentation Tank

Secondary

Sedimentation Tank

Sludge Digester

Sludge

Thickener

Beltpress

Chlorination

Tank

Final Effluent

Laboratary

Office Building

Pump

Sump

Waste

wa

ter

Influ

en

t

Design Criteria:

�Area of Plant - 5.56 acres

�Design population - 300,000

�Daily wastewater

discharge- - 14775 m3/day

�BOD influent - 600mg / l

�BOD effluent - 60 mg / l

�Suspended solid influent- 700 mg / l

�Suspended solid effluent - 40 mg / l

Establishment of Sewage Treatment Plant

�� Detail Design ��Implementation � Installation � Commissioning � Installation � Training

Programme for Sewage Treatment Project

Page 13: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

• Aged pipe (>100 year)in downtown area

caused the degradation of water quality.

• Saline water intrusion occured along

Yangon and Bago river bank.

• NRW rate is high (40 %-50%)

• Aging facilities in water supply and sewerage system

CURRENT ISSUES AND MAJOR CHALLENGES

1. Ngamoeyeik Reservoir Transmission pipelines

2. Hlaing river water treatment plant and transmission pipelines

3. Water Distribution Network modernization

PLANS FOR THE FUTURE WATER SUPPLY

Page 14: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

�River Water Treatment Plant Construction

�Transmission Pipe Laying Project

�Installation of Disinfection Facilities

�Distribution Network Transformation and NRW Reduction

�Waste Water Treatment Plant Construction

�Renovation of Existing Sewer Main

�Extension of Sewerage Network

NEW PROJECTS IN WATER SUPPLY AND SEWERAGE SECTORS

IN YANGON CITY

Thank you very much.

Page 15: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

For�the�Transformation�into�Modern�Water�Service�in�Yangon�City

For�the�Transformation�into�Modern�Water�Service�in�Yangon�City

TOYO ENGINEERING CORPORATIONFebruary�1,�2013�Tokyo,�Japan

� 2 �TOYO ENGINEERING CORPORATION ©2013

Contents�of�Presentation

1. Toyo�Engineering�Corporation2. Global�EPC Operation�by�Toyo�Engineering�Group3. Major�Business�Domains4. Study�of�Water�and�Waste�Water�in�Yangon�city5. Solution�with�Japanese�Public�Water�Companies6. Physical�improvement�needs�“Enabling�Activities”7. Joint�Business�approach�enables�“Share�the�Goal”8. For�Transformation�into�Modern�Water�Service

Page 16: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

� 3 �TOYO ENGINEERING CORPORATION ©2013

Toyo�Engineering�Corporation

•Established� : May�1,�1961•Listed :� The�first�section�of�Tokyo�Stock�Exchange�•Location/Address<Head�Office> : 2�8�1�Akanehama�Narashino�shi,�Chiba�275�0024,�Japan[�TEL�]� : +81�47�451�1111[�FAX�]� : +81�47�454�1800

<Tokyo�Head�Office> : Shin�Marunouchi�Building�11th Floor,�5�1�Marunouchi�1�chome,�Chiyoda�ku,�Tokyo�100�6511,�Japan�

[�TEL�]� : +81�3�6268�6611[�FAX�]� : +81�3�3214�6011

•Net�Sales�(Y2011) : US$1.92�Billion•Backlog�of�Contracts�(Y2011) : US$4.37�Billion•Number�of�Employees : 2,339�

Global�10,080 Head�Office:��Chiba,�Japan

Tokyo�Head�Office:Tokyo,�Japan

President�and�CEO�Katsumoto�Ishibashi

<http://www.toyo�eng.co.jp/>� Client�Value�Enhancement��

(including�818�Domestic�Groups)�

As�of�December�2012

� 4 �TOYO ENGINEERING CORPORATION ©2013

Global�EPC Operation�by�Toyo�Engineering�Group

USA11

Est.�1986

India2,300

Est.�1976

Thailand1,795Est.�1985

Malaysia216

Est.�1986

Mexico765

Est.�1990

Canada263

Est.�1976

Indonesia1,177

Est.�1982

Est.�1961

JAPAN2,339

Korea335

Est.�1987

Brazil222

Est.�1998

China650

Est.�2004�

(including Domestic Groups 818)

Total�10,080

As�of��December�2012

Page 17: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

� 5 �TOYO ENGINEERING CORPORATION ©2013

Major�Business�Domains

Process�PlantsProcess�Plants Non�Process�PlantsNon�Process�Plants

• Oil�&�Gas�Exploration�&�Production• FPSO/Offshore�Platform• Oil�&�Gas�Treatment• Gas�Processing• LNG• Gas�to�Liquid• Refinery• Aromatics• Petrochemicals• Polymers• Fertilizers�&�Chemicals

•Power• Gas�Firing• Coal�Firing• IGCC

•Transportation�System• Rail�Systems• Monorail• Automatic�People�Mover�(APM)

•Infrastructure• Airport�System

•Pipeline•Water

• Raw�Water�Treatment• Desalination• Waste�Water�Treatment

•Utility�Facilities

•Industrial�Systems• Pharmaceuticals�&�Fine�Chemicals• Food�Processing• Supply�Chain�&�Logistics�Solution• Microelectronics�&�Semiconductor• Mechatronics• Business�Consulting�and�Solution

•Information�Technology• ERP�Solution�Systems�(SAP,�MC�Frame)• Manufacturing�&�Logistics�Execution�Systems• Network�&�Multimedia�Systems

•Environment• Water�and�Off�Gas�Treatment• Waste�Disposal• CDM�Projects

� 6 �TOYO ENGINEERING CORPORATION ©2013

Study�of�Water�and�Waste�Water�in�Yangon�city

We have executed “Study on the improvement of water supply and waste water

treatment in Yangon, the republic of the union of Myanmar” sponsored by METI

Japan, from March to November 2012 and resulted as follows.

1. Japan Study Team investigated the current situation of the water supply and

sewerage system and their operation in Yangon city though physical survey and

interview with YCDC/ Water and Sanitation Department.

2. Extracted the required Projects to improve the problematic situations in water and

sewerage facilities in Yangon city, prioritized and selected the most urgently required

5 Projects.

3. Investigated the cause of existing problems, studied the technical solutions, and

defined the Projects’ Scope for the practical execution and budgeting.

4. Established the close relationship with YCDCfor further improvement of water and

sewerage infrastructure. (leading to the training program on water distribution

management and NRW reduction for YCDC, executed in Japan in December 2012 by

HIDA/METI)

Page 18: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

� 7 �TOYO ENGINEERING CORPORATION ©2013

Solution�with�Japanese�Public�Water�Companies

Toyo provides the comprehensive solutions

with Japanese Public Water Companies

Issues in Water Supply Services

�EHigh�rate�NRW�(UFW)�ELow�pressure�of�supply�water�ERapid�increase�of�the�population�EWater�demand�increase�by�modernization�ERaw�water�quality�Declining

�EHigh�rate�NRW�(UFW)�ELow�pressure�of�supply�water�ERapid�increase�of�the�population�EWater�demand�increase�by�modernization�ERaw�water�quality�Declining

�EImprovement�of�income� Improvement�of�work�efficiency� Effective�investment�/�Asset�Management

�EOrganization�enhancement� Long�term�human�resource�development

�EFinance�Arrangement

�EImprovement�of�income� Improvement�of�work�efficiency� Effective�investment�/�Asset�Management

�EOrganization�enhancement� Long�term�human�resource�development

�EFinance�Arrangement

Issues in Water Business Operation

• Not�only�WTP�but�also�Distribution�Network�planning�and�improvement• Not�only�NRW�Reduction�but�also�Distribution�optimization�and�control• Not�only�technical�but�also�commercial�enhancement�through�Joint�Business�

establishment• Not�the�limited�duration�project�but�the�long�term�business�relationship

• Not�only�WTP�but�also�Distribution�Network�planning�and�improvement• Not�only�NRW�Reduction�but�also�Distribution�optimization�and�control• Not�only�technical�but�also�commercial�enhancement�through�Joint�Business�

establishment• Not�the�limited�duration�project�but�the�long�term�business�relationship

� 8 �TOYO ENGINEERING CORPORATION ©2013

Physical�improvement�needs�“Enabling�Activities”

Network�Planning�&�Modeling,�Data�Acquisition�and�Analysis,�Asset�Management,�Financial�enhancement,�Long�term�HR�development�program,�etc.Network�Planning�&�Modeling,�Data�Acquisition�and�Analysis,�Asset�Management,�Financial�enhancement,�Long�term�HR�development�program,�etc.

Efficient�Distribution�in�Trunk�MainsEfficient�Distribution�in�Trunk�Mains

NRW�reduction�in�Service�linesNRW�reduction�in�Service�lines

�EWTP & Reservoir Management

�EDistribution Reservoir Management

�EMain line Management

�EDistribution Control etc.

�ESupply�Service�Management�ELeakage�survey,�Repair�ENetwork�planning etc.

Efficient�Management�of�WTP

Enabling�Activities�(Program�Management)Enabling�Activities�(Program�Management)

Physical�Improvement�/�Management�Work

Page 19: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

� 9 �TOYO ENGINEERING CORPORATION ©2013

Joint�Business�approach�enables�“Share�the�Goal”

�Conventional�Contract�Work�

Goal�can�not�be�shared�in�the�Consignment.

Water�Co.Water�Co.

Leakage�SurveyLeakage�Survey

Pipe�Repair�WorksPipe�Repair�Works

Mapping�SystemNetwork�ModelingMapping�SystemNetwork�Modelingconsignment

�NRW�Reduction�Project�Contract�

• Limited�Scope�and�fixed�term• Finance�shall�be�arranged�by�Water�Co.• Present�NRW�shall�be�re�defined�as�a�baseline

Water�Co.Water�Co.

Project�Co.Leakage�Survey

Pipe�Repair�WorksMapping�System

Network�Modeling

Project�Co.Leakage�Survey

Pipe�Repair�WorksMapping�System

Network�ModelingContract

�Joint�Business�Operation�

• Financial�Strengthening• Long�term�relation�incl.�HR�development• “Share�the�Goal” in�Technical�and�Commercial

Water�Co.Asset

Work�ForceRelations

Water�Co.Asset

Work�ForceRelations

All�physical�and�enabling�worksAll�physical�and�enabling�works

Japan�TeamTechnology

FinanceTraining

Japan�TeamTechnology

FinanceTraining

� 10 �TOYO ENGINEERING CORPORATION ©2013

For�Transformation�into�Modern�Water�Service

Although YCDC/ Water Sanitation would be capable to execute the projects through the

operation of historic water facilities, following points should be strengthened.

1. Experience of design and operate the modern WTP.

2. Water Network Management / Water distribution control

3. Water Quality control

4. Computerization, field data acquisition and analysis, Customer data management, etc.

5. Modern design organization with engineering standardization

6. Labor safety management

The�Way�Forward�

Yangon’s water service facilities are entering the stage of

transformation into a modern water service.

Project should be executed with sufficient Technical Guidance, Project

Management guidance for execution, adequate safety education and

instruction from Japan team, through the joint organization with Japan.

Page 20: CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON …pe-jougesui.sakura.ne.jp/home/2016myanmar/images/... · Office Building Pump Wastewater Influent Sump Design Criteria: Area of Plant

� 11 �TOYO ENGINEERING CORPORATION ©2013

Thank you for your attention.