Page 1
CURRENT STATUS AND SPECIFIC TECHNICAL ISSUES ON WATER INFRASTRUCTURE
AND
INFORMATION FOR WATER INFRASTRUCTURE PROJECTS IN THE NEAR FUTURE
SUBMITTED BY
Mr. SOE SI
COMMITTEE MEMBER
YANGON CITY DEVELOPMENT COMMITTEE
THE FOURTH MEETING OF
“ THE PPP COUNCIL FOR OVERSEAS WATER INFRASTRUCTURE”
The Republic of the Union of Myanmar
INTRODUCTION
YANGON
Page 2
OVERVIEW OF YANGON CITY AREA
YANGON CITY AREA : 730 Km²
POPULATION : About 6 Millions
DISTRICTS : 4 Districts
TOWNSHIPS : 33 Townships
AVERAGE ANNUAL : 2700 mm
RAINFALL
MEAN MAX: TEMP: : 33 ◌۫C
MEAN MIN: TEMP: : 21 ◌۫C
Yangon
Division
Yangon
Division
ORGANIZATION CHART OF YANGON CITY DEVELOPMENT COMMITTEE
MAYOR (Chairman Of Y.C.D.C)
Minister Of Development Affairs
(Yangon Region )
SECRETARY
COMMITTEE-3 COMMITTEE-4 COMMITTEE-7
DEPARTMENT OF ENGINEERING
(BUILDING)
DEPARTMENT OF POLLUTION CONTROL AND CLEANSINNG
DEPARTMENT OF WORK
INSPECTION
DEPARTMENT OF MOTOR
TRANSPORT AND WORKSHOP
DEPARTMENT OF MARKETS
DEPARTMENT OF REVENUE
DEPARTMENT OF PLAYGROUNG,
PARK AND GARDEN
DEPARTMENT OF ASSESSORS
DEPARTMENT OF SECURITY AND
DISCIPLINE
DEPARTMENT OF CENTRAL
STORE
HEAD OF DEPARTMENT OF
PRODUCTION UNIT
DEPARTMENT OF ENGINEERING
(WATER & SANITATION)
DEPARTMENT OF HEALTH
DEPARTMENT OF VETERINARY
AND SLAUGHTER HOUSE
DEPARTMENT OF COORDINATION
DEPARTMENT OF PUBLIC RELATION &
INFORMATION
DEPARTMENT OF ENGINEERING
(ROAD AND BRIDGE)
COMMITTEE-5
JOINT SECRETARY
HEAD OF DEPARTMENT OF
PRODUCTION UNIT
DEPARTMENT OF PRODUCTION
UNIT
DEPARTMENT OF ADMINISTRATION
DEPARTMENT OF BUDGET & ACCOUNT
DEPARTMENT OF CITY PLANNING &
LAND ADMINISTRATION
MY
POSITION
Page 3
1842 Dug Well (30) 1879 Kandawgyi lake(stop using)
1884 Innya lake(stop using) 1904 Hlawga Reservoir
1940 Gyobyu Reservoir
1992 Phugyi Reservoir
2005 Nyaunghnapin Water treatment Plant(1ST Phase)
'*Hk(aw
mif)
'*'*'*'*'*'*'***'*'**'*'***'*'*'**'*'***'***'***'*'*'**'*''' HkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHkHHHHHHHHHHH (a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(a(aa(aaa(aaaa(aaaaaaaaaaaaaaaaawwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
mimimimimimimimimiimimimimimimimiimimimimimimimimimmmmmmmmmm f)f)f)f)f)f)f)f))f)f))f)f)f)f))f)f)f)))f))))f)f)f)f)f)f)f)f)))f)f)))f)f)f)f)f)f)f)f)))f)
Gyobyu
Reservoir Ngamoeyeik
Reservoir
Phugyi
Reservoir
Hlawga
Reservoi
r
Nyaunghnapin
Water treatment
plant
Kandawgyi Lake Inya Lake
1995 Ngamoeyeik Reservoir
HISTORY OF YANGON CITY WATER SUPPLY
DATAS OF FOUR MAIN RESERVOIRS
Gyobyu Reservoir
Ngamoeyeik Reservoir Phugyi Reservoir
Hlawgha Reservoir
Page 4
Daily Water supply amount to Yangon(now)
Gyobyu 27 MGD (122,727 m³/day)
Phugyi 54 MGD (245,454 m³/day)
Hlawga 14 MGD (63,637 m³/day)
Tubewell in YCDC 20 MGD (90,910 m³/day)
Ngamoeyeik 1st Phase 45 MGD (204,545 m³/day)
Total 160 MGD (727,273) m3/ day
Total 205 MGD
(931,818)m3/day
After Ngamoeyeik 2nd phase
Gyobyu 27 MGD (122,727 m³/day)
Phugyi 54 MGD (245,454 m³/day)
Hlawga 14 MGD (63,637 m³/day)
Tubewell in YCDC 20 MGD (90,910 m³/day)
Ngamoeyeik 1st + 2nd Phase 90 MGD (409,090 m³/day)
DAILY WATER SUPPLY AMOUNT FOR YANGON CITY
�MGD=Million Gallons Per Day
TYPES OF WATER SUPPLY
Page 5
Intake reservoir
Low lift pump station
Water tower
Flocculator
Sedimentation tank
Rapid sand filter
Clear water tank
Pump station
PROFILE OF WATER TREATMENT PLANT
SEDIMENTATION TANKS OF WATER TREATMENT PLANT POWER SUPPLY STATION FOR W.T.P
NYAUNGHNAPIN WATER TREATMENT PLANT
Pyawbwesu Pumping Station
Yegu Pumping Station Yanshin Pumping Station
Phugyi Pumping Station
MAIN PUMPING STATIONS IN YANGON CITY WATER SUPPLY SYSTEM
Page 6
URGENT REPAIRING WORKS FOR TRANSMISSION PIPE LEAKAGES
EXCUVATION FOR PIPE REPAIRING INSTALLATION OF COLLAR
CONCRETE ANCHOR BLOCK WELDING AND PACKING WITH LEAD AND JUTE
CURRENT SOLUTION FOR WATER DEMANDS IN SUBURBAN AREA
SMALL TUBE WELL SMALL PUMP HOUSE
REHABILITATION OF LAKE WATER DISTRIBUTED BY WATER TANKER
Page 7
Old Aged
Cast Iron
Pipes
Replacement of
New Polyvinyl
Chloride Pipes
Before
Rubbing
and
Cleansing
After
Rubbing
and
Cleansing
RENOVATION OF OLD AGED SECONDARY DISTRIBUTION PIPES
URGENT SITUATION IN NEW WATER TREATMENT PLANT
(NYAUNG HNAPIN)
Page 8
Year Gallons/Capital/
Day
Average Daily
Demand
( MG/m³ )
UfW (%)
Average daily
Consumption
( MG/m³ )
Average Daily
Supply
(MG/m³)
Coverage
Ratio (%)
2010 5.11 25 128/581,818 40 79/359,091 160/727,273 62
2020 7.15 35 250/1136,364 35 192/872,727 295/1340,909 77
2030 8.91 40 356/1618,182 25 323/1468,182 430/1954,545 90
2040 11.11 40 499/2268,182 20 416/1890,909 520/2363,636 84
CHART OF AVAILABLE WATER SUPPLY STATUS FOR FUTURE
� JICA is formulating the master plan of water supply for 2040.
PLACE - MHAWBI TOWNSHIP
CAPACITY - 90 MILLION GALLON
DISTANCE TO - 19 MILES
BE CONNECTED
HLAING RIVER WATER PROJECT
Page 9
PANTAING VILLAGE
HLAINGTHARYAR
PLACE - HTANTABIN TOWNSHIP
CAPACITY - 90 MILLION GALLON
DISTANCE TO - 18 MILES
BE CONNECTED
KOKKOWA WATER PROJECT
PLACE - TONTAE TOWNSHIP
CAPACITY - 90 MILLION GALLON
DISTANCE TO - 28 MILES
BE CONNECTED
THILAWA
TOE RIVER WATER PROJECT
TONTAE TOWNSHIP
Page 10
WATER QUALITY TEST RESULTS FOR KOKKOWA & TOE RIVER
KOKKOWA RIVER TOE RIVER
PLACE - DAGON SEIKAN TOWNSHIP
CAPACITY - 30 MILLION GALLON
DISTANCE TO - 7.16 MILES
BE CONNECTED
SEIK KANTAR WATER PROJECT
Page 11
FLOW CHARTS APPLYING IN WATER DISTRIBUTION SYSTEM IN Y.C.D.C
(Aeration Process) (Aeration Process)
22
� Sanitation and sewerage for the Yangon City area is main responsibility of Engineering
Department ( Water and Sanitation) under Yangon City Development Committee.
� Existing system, conventional sewerage, consists of :-
⌂ Gravity sewers
⌂ 39 pneumatic ejector stations
⌂ Air distribution main
⌂ Two sewage force mains and outlet
EXISTING SEWERAGE SYSTEM
� At present Existing Sewerage System covers only 4.33 km2 area of CBD and serves around 350,000
peoples, 7% of the city population.
� Daily Volume of sewage disposal - 111840 gal.(508 m³)
� Major Issues in Existing Sewerage System:-
⌂ To establish proper treatment process for the existing sewerage system.
⌂ To expand and set up the existing sewerage system.
⌂ To improve urban sanitation environment in Yangon City Area
Page 12
MAP OF EXISTING SEWERAGE SYSTEM IN DOWNTOWN AREA
Layout Plan of Sewage Treatment Plant
Primary
Sedimentation Tank
Primary
Sedimentation Tank
Secondary
Sedimentation Tank
Sludge Digester
Sludge
Thickener
Beltpress
Chlorination
Tank
Final Effluent
Laboratary
Office Building
Pump
Sump
Waste
wa
ter
Influ
en
t
Design Criteria:
�Area of Plant - 5.56 acres
�Design population - 300,000
�Daily wastewater
discharge- - 14775 m3/day
�BOD influent - 600mg / l
�BOD effluent - 60 mg / l
�Suspended solid influent- 700 mg / l
�Suspended solid effluent - 40 mg / l
Establishment of Sewage Treatment Plant
�� Detail Design ��Implementation � Installation � Commissioning � Installation � Training
Programme for Sewage Treatment Project
Page 13
• Aged pipe (>100 year)in downtown area
caused the degradation of water quality.
• Saline water intrusion occured along
Yangon and Bago river bank.
• NRW rate is high (40 %-50%)
• Aging facilities in water supply and sewerage system
CURRENT ISSUES AND MAJOR CHALLENGES
1. Ngamoeyeik Reservoir Transmission pipelines
2. Hlaing river water treatment plant and transmission pipelines
3. Water Distribution Network modernization
PLANS FOR THE FUTURE WATER SUPPLY
Page 14
�River Water Treatment Plant Construction
�Transmission Pipe Laying Project
�Installation of Disinfection Facilities
�Distribution Network Transformation and NRW Reduction
�Waste Water Treatment Plant Construction
�Renovation of Existing Sewer Main
�Extension of Sewerage Network
NEW PROJECTS IN WATER SUPPLY AND SEWERAGE SECTORS
IN YANGON CITY
Thank you very much.
Page 15
For�the�Transformation�into�Modern�Water�Service�in�Yangon�City
For�the�Transformation�into�Modern�Water�Service�in�Yangon�City
TOYO ENGINEERING CORPORATIONFebruary�1,�2013�Tokyo,�Japan
� 2 �TOYO ENGINEERING CORPORATION ©2013
Contents�of�Presentation
1. Toyo�Engineering�Corporation2. Global�EPC Operation�by�Toyo�Engineering�Group3. Major�Business�Domains4. Study�of�Water�and�Waste�Water�in�Yangon�city5. Solution�with�Japanese�Public�Water�Companies6. Physical�improvement�needs�“Enabling�Activities”7. Joint�Business�approach�enables�“Share�the�Goal”8. For�Transformation�into�Modern�Water�Service
Page 16
� 3 �TOYO ENGINEERING CORPORATION ©2013
Toyo�Engineering�Corporation
•Established� : May�1,�1961•Listed :� The�first�section�of�Tokyo�Stock�Exchange�•Location/Address<Head�Office> : 2�8�1�Akanehama�Narashino�shi,�Chiba�275�0024,�Japan[�TEL�]� : +81�47�451�1111[�FAX�]� : +81�47�454�1800
<Tokyo�Head�Office> : Shin�Marunouchi�Building�11th Floor,�5�1�Marunouchi�1�chome,�Chiyoda�ku,�Tokyo�100�6511,�Japan�
[�TEL�]� : +81�3�6268�6611[�FAX�]� : +81�3�3214�6011
•Net�Sales�(Y2011) : US$1.92�Billion•Backlog�of�Contracts�(Y2011) : US$4.37�Billion•Number�of�Employees : 2,339�
Global�10,080 Head�Office:��Chiba,�Japan
Tokyo�Head�Office:Tokyo,�Japan
President�and�CEO�Katsumoto�Ishibashi
<http://www.toyo�eng.co.jp/>� Client�Value�Enhancement��
(including�818�Domestic�Groups)�
As�of�December�2012
� 4 �TOYO ENGINEERING CORPORATION ©2013
Global�EPC Operation�by�Toyo�Engineering�Group
USA11
Est.�1986
India2,300
Est.�1976
Thailand1,795Est.�1985
Malaysia216
Est.�1986
Mexico765
Est.�1990
Canada263
Est.�1976
Indonesia1,177
Est.�1982
Est.�1961
JAPAN2,339
Korea335
Est.�1987
Brazil222
Est.�1998
China650
Est.�2004�
(including Domestic Groups 818)
Total�10,080
As�of��December�2012
Page 17
� 5 �TOYO ENGINEERING CORPORATION ©2013
Major�Business�Domains
Process�PlantsProcess�Plants Non�Process�PlantsNon�Process�Plants
• Oil�&�Gas�Exploration�&�Production• FPSO/Offshore�Platform• Oil�&�Gas�Treatment• Gas�Processing• LNG• Gas�to�Liquid• Refinery• Aromatics• Petrochemicals• Polymers• Fertilizers�&�Chemicals
•Power• Gas�Firing• Coal�Firing• IGCC
•Transportation�System• Rail�Systems• Monorail• Automatic�People�Mover�(APM)
•Infrastructure• Airport�System
•Pipeline•Water
• Raw�Water�Treatment• Desalination• Waste�Water�Treatment
•Utility�Facilities
•Industrial�Systems• Pharmaceuticals�&�Fine�Chemicals• Food�Processing• Supply�Chain�&�Logistics�Solution• Microelectronics�&�Semiconductor• Mechatronics• Business�Consulting�and�Solution
•Information�Technology• ERP�Solution�Systems�(SAP,�MC�Frame)• Manufacturing�&�Logistics�Execution�Systems• Network�&�Multimedia�Systems
•Environment• Water�and�Off�Gas�Treatment• Waste�Disposal• CDM�Projects
� 6 �TOYO ENGINEERING CORPORATION ©2013
Study�of�Water�and�Waste�Water�in�Yangon�city
We have executed “Study on the improvement of water supply and waste water
treatment in Yangon, the republic of the union of Myanmar” sponsored by METI
Japan, from March to November 2012 and resulted as follows.
1. Japan Study Team investigated the current situation of the water supply and
sewerage system and their operation in Yangon city though physical survey and
interview with YCDC/ Water and Sanitation Department.
2. Extracted the required Projects to improve the problematic situations in water and
sewerage facilities in Yangon city, prioritized and selected the most urgently required
5 Projects.
3. Investigated the cause of existing problems, studied the technical solutions, and
defined the Projects’ Scope for the practical execution and budgeting.
4. Established the close relationship with YCDCfor further improvement of water and
sewerage infrastructure. (leading to the training program on water distribution
management and NRW reduction for YCDC, executed in Japan in December 2012 by
HIDA/METI)
Page 18
� 7 �TOYO ENGINEERING CORPORATION ©2013
Solution�with�Japanese�Public�Water�Companies
Toyo provides the comprehensive solutions
with Japanese Public Water Companies
Issues in Water Supply Services
�EHigh�rate�NRW�(UFW)�ELow�pressure�of�supply�water�ERapid�increase�of�the�population�EWater�demand�increase�by�modernization�ERaw�water�quality�Declining
�EHigh�rate�NRW�(UFW)�ELow�pressure�of�supply�water�ERapid�increase�of�the�population�EWater�demand�increase�by�modernization�ERaw�water�quality�Declining
�EImprovement�of�income� Improvement�of�work�efficiency� Effective�investment�/�Asset�Management
�EOrganization�enhancement� Long�term�human�resource�development
�EFinance�Arrangement
�EImprovement�of�income� Improvement�of�work�efficiency� Effective�investment�/�Asset�Management
�EOrganization�enhancement� Long�term�human�resource�development
�EFinance�Arrangement
Issues in Water Business Operation
• Not�only�WTP�but�also�Distribution�Network�planning�and�improvement• Not�only�NRW�Reduction�but�also�Distribution�optimization�and�control• Not�only�technical�but�also�commercial�enhancement�through�Joint�Business�
establishment• Not�the�limited�duration�project�but�the�long�term�business�relationship
• Not�only�WTP�but�also�Distribution�Network�planning�and�improvement• Not�only�NRW�Reduction�but�also�Distribution�optimization�and�control• Not�only�technical�but�also�commercial�enhancement�through�Joint�Business�
establishment• Not�the�limited�duration�project�but�the�long�term�business�relationship
� 8 �TOYO ENGINEERING CORPORATION ©2013
Physical�improvement�needs�“Enabling�Activities”
Network�Planning�&�Modeling,�Data�Acquisition�and�Analysis,�Asset�Management,�Financial�enhancement,�Long�term�HR�development�program,�etc.Network�Planning�&�Modeling,�Data�Acquisition�and�Analysis,�Asset�Management,�Financial�enhancement,�Long�term�HR�development�program,�etc.
Efficient�Distribution�in�Trunk�MainsEfficient�Distribution�in�Trunk�Mains
NRW�reduction�in�Service�linesNRW�reduction�in�Service�lines
�EWTP & Reservoir Management
�EDistribution Reservoir Management
�EMain line Management
�EDistribution Control etc.
�ESupply�Service�Management�ELeakage�survey,�Repair�ENetwork�planning etc.
Efficient�Management�of�WTP
Enabling�Activities�(Program�Management)Enabling�Activities�(Program�Management)
Physical�Improvement�/�Management�Work
Page 19
� 9 �TOYO ENGINEERING CORPORATION ©2013
Joint�Business�approach�enables�“Share�the�Goal”
�Conventional�Contract�Work�
Goal�can�not�be�shared�in�the�Consignment.
Water�Co.Water�Co.
Leakage�SurveyLeakage�Survey
Pipe�Repair�WorksPipe�Repair�Works
Mapping�SystemNetwork�ModelingMapping�SystemNetwork�Modelingconsignment
�NRW�Reduction�Project�Contract�
• Limited�Scope�and�fixed�term• Finance�shall�be�arranged�by�Water�Co.• Present�NRW�shall�be�re�defined�as�a�baseline
Water�Co.Water�Co.
Project�Co.Leakage�Survey
Pipe�Repair�WorksMapping�System
Network�Modeling
Project�Co.Leakage�Survey
Pipe�Repair�WorksMapping�System
Network�ModelingContract
�Joint�Business�Operation�
• Financial�Strengthening• Long�term�relation�incl.�HR�development• “Share�the�Goal” in�Technical�and�Commercial
Water�Co.Asset
Work�ForceRelations
Water�Co.Asset
Work�ForceRelations
All�physical�and�enabling�worksAll�physical�and�enabling�works
Japan�TeamTechnology
FinanceTraining
Japan�TeamTechnology
FinanceTraining
� 10 �TOYO ENGINEERING CORPORATION ©2013
For�Transformation�into�Modern�Water�Service
Although YCDC/ Water Sanitation would be capable to execute the projects through the
operation of historic water facilities, following points should be strengthened.
1. Experience of design and operate the modern WTP.
2. Water Network Management / Water distribution control
3. Water Quality control
4. Computerization, field data acquisition and analysis, Customer data management, etc.
5. Modern design organization with engineering standardization
6. Labor safety management
The�Way�Forward�
Yangon’s water service facilities are entering the stage of
transformation into a modern water service.
Project should be executed with sufficient Technical Guidance, Project
Management guidance for execution, adequate safety education and
instruction from Japan team, through the joint organization with Japan.
Page 20
� 11 �TOYO ENGINEERING CORPORATION ©2013
Thank you for your attention.
TOYO ENGINEERING CORPORATION