AS PER CHECK LIST of SEIAA, PUNJAB FOR BUILDING, CONSTRUCTION, TOWNSHIP AND AREA DEVELOPMENT PROJECTS “CURO NORTH SQUARE” AT VILLAGE MULLANPUR GARIBDASS, DISTT. SAS NAGAR (MOHALI), PUNJAB BY M/S. CURO INDIA PVT. LTD. Sr. No. Description Reply 1. Properly filled Form 1 & 1A Form I & IA are enclosed with the application. 2. (a) In case(s) where land has already been purchased/acquired: Proof of ownership of land (b) In case where land is yet to be purchased/acquired: Proof of ownership of land (existing owner) such as copy of latest Jamabandi (not more than one month old) and credible document showing status of land acquisition w.r.t. project site as prescribed in OM dated 07.10.2014 issued by MoEF) Change of land use is enclosed as Annexure-1. Land Documents are enclosed as Annexure-2. 3. Copy of Master Plan of the area showing land use pattern of the proposed site/certificate from Competent Authority intimating land use pattern of the project site as per proposals of Master Plan of the area. Project is cover under Mullanpur Planning area; copy showing project site is enclosed as Drawing-1. 4. Layout plan duly approved by the Competent Authority / Conceptual plan of the project. Approved Layout Plan of the project is enclosed as Drawing-4. 5. Topographical map of the area showing Contour Plan. In case of Area Development Projects, the Contour Plan should reflect the true existing physical features of the site and may be prepared by the project proponent w.r.t. some permanent reference marks. Toposheet showing project site is enclosed with the application. Contour Plan is enclosed as Drawing-8. 6. Status of construction, if any, along with photographs from all the four sides. No construction has been done at site; site photographs are enclosed as Annexure-3. 7. 500 meter radius map of the area from periphery of project site clearly indicating the various industries (specifically red category industries) and structures lying in the area. Location map along with Google image showing project site & surroundings within 500 m are enclosed as Drawing-2 & Drawing-3 respectively. 8. Location plan showing the exact location of the project site w.r.t. some permanent / important features of the area and site plan of the project showing the following: i) Location of STP ii) Solid waste storage area iii) Green belt iv) Parking space v) RWH and water recharge pits vi) Fire fighting equipment layout vii) First aid room viii) Location of Tubewells Location plan showing the features such as: Location of Solid waste segregation area, Green belt, surface Parking, RWH and water recharge pits, First aid room, Tubewells, ESS (i.e. DG Sets and Transformer) is enclosed as Drawing-5. Fire hydrants are marked in Combined Services Plan which is enclosed as Drawing-6.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
AS PER CHECK LIST of SEIAA, PUNJAB FOR BUILDING, CONSTRUCTION,TOWNSHIP AND AREA DEVELOPMENT PROJECTS
“CURO NORTH SQUARE” AT VILLAGE MULLANPUR GARIBDASS, DISTT. SAS
NAGAR (MOHALI), PUNJAB BY M/S. CURO INDIA PVT. LTD.
Sr.No.
Description Reply
1. Properly filled Form 1 & 1A Form I & IA are enclosed with theapplication.
2. (a) In case(s) where land has already beenpurchased/acquired:
Proof of ownership of land(b) In case where land is yet to bepurchased/acquired:Proof of ownership of land (existing owner)such as copy of latest Jamabandi (not morethan one month old) and credible documentshowing status of land acquisition w.r.t.project site as prescribed in OM dated07.10.2014 issued by MoEF)
Change of land use is enclosed asAnnexure-1.
Land Documents are enclosed asAnnexure-2.
3. Copy of Master Plan of the area showing landuse pattern of the proposed site/certificatefrom Competent Authority intimating land usepattern of the project site as per proposals ofMaster Plan of the area.
Project is cover under Mullanpur Planningarea; copy showing project site is enclosedas Drawing-1.
4. Layout plan duly approved by the CompetentAuthority / Conceptual plan of the project.
Approved Layout Plan of the project isenclosed as Drawing-4.
5. Topographical map of the area showingContour Plan. In case of Area DevelopmentProjects, the Contour Plan should reflect thetrue existing physical features of the site andmay be prepared by the project proponentw.r.t. some permanent reference marks.
Toposheet showing project site is enclosedwith the application. Contour Plan isenclosed as Drawing-8.
6. Status of construction, if any, along withphotographs from all the four sides.
No construction has been done at site; sitephotographs are enclosed as Annexure-3.
7. 500 meter radius map of the area fromperiphery of project site clearly indicating thevarious industries (specifically red categoryindustries) and structures lying in the area.
Location map along with Google imageshowing project site & surroundings within500 m are enclosed as Drawing-2 &Drawing-3 respectively.
8. Location plan showing the exact location ofthe project site w.r.t. some permanent /important features of the area and site plan ofthe project showing the following:i) Location of STPii) Solid waste storage areaiii) Green beltiv) Parking spacev) RWH and water recharge pitsvi) Fire fighting equipment layoutvii) First aid roomviii) Location of Tubewells
Location plan showing the features such as:Location of Solid waste segregation area,Green belt, surface Parking, RWH andwater recharge pits, First aid room,Tubewells, ESS (i.e. DG Sets andTransformer) is enclosed as Drawing-5.Fire hydrants are marked in CombinedServices Plan which is enclosed asDrawing-6.
ix) DG Sets and Transformersx) Any other utilities
9. Permission of Competent Authority for;a) Water and Sewerage connectionA letter from concerned Local Body /Authority giving details about existing statusof sewer connectivity and availability ofwater supply in the area and acceptance ofLocal Body for taking the quantity of sewageto be generated by the proposed project andproviding the water supply. Existing positionof public sewer and water supply line dulymarked on the layout map / plan.b) Collection of Solid waste
NOC from CGWA regarding water supplyis enclosed as Annexure-8A.
NOC from GMADA regarding watersupply, sewerage & solid waste disposal isenclosed as Annexure-8B.
10. Water balance chart for summer, rainy andwinter seasons indicating critical requirements
Water Balance Diagrams for differentseasons i.e. Summer, Winter & Monsoonseason are shown in Conceptual Plan PageNos. 5 to 7 as Figure No. 1 to 3respectively.
11. Availability of adequate land for use oftreated sewage and plantation.
Wastewater generated from the project willbe treated in STP. Treated water will bereused for flushing, horticulture and HVACcooling and remaining will be discharged toGMADA sewer.
12. Analysis reports of ambient air, ground waterand noise levels from NABL/MoEFAccredited laboratories as per detail below:
(i) The field data sheets as prescribed bySEIAA, Punjab which are available on theofficial website of SEIAA, Punjab along withexact location of sampling / monitoring pointmarked on the layout map should be filled atthe time of sample collection/monitoring bythe Lab and should be attached with the water,air, noise & soil monitoring reports.
(ii) Water, air, noise & soil monitoring reportsmore than 6 months old or prior to date ofsigning of consent letters/agreement with theland owner shall not be accepted w.e.f. June,1st 2015 onwards.
(iii) Atleast one groundwater sample fromthe shallow / first aquifer and in casegroundwater is to be abstracted for drinkingpurposes then atleast one groundwater samplefrom the said aquifer should be monitored andreports be attached accordingly.
Test reports along with the field data sheetsare enclosed as Annexure-10A & 10Brespectively.
Layout map showing the location ofsampling is enclosed as Drawing-9.
Email stating the intimation for monitoringis enclosed as Annexure-10C.
13. Quantification of energy saved and renewableenergy devices used.
Quantification of energy saved is enclosedas Annexure-11.
14. Drawing showing plumbing systems for useof fresh, treated and hot water
Plumbing plan showing fresh water line,sewer line & treated line is shown inCombined Services Plan which is enclosedas Drawing-6.
15. Construction schedule (PERT/CPM Chart) PERT Chart is enclosed as Annexure 7.
16. Undertaking(s) for;a) Constitution of Environment MonitoringCell.b) Use of ready mix concrete or use of fly ashduring construction.c) To provide Fire Fighting System.d) To provide wind breaking curtains andwater sprinkling system to minimize dustemissions during construction phase.e) To provide adequate safety measures forthe construction workers during theconstruction phase.
Affidavit for the same is enclosed asAnnexure 12.
17. Environmental Management Planindicating the following:a) All mitigation measures for each item-wise activity to be undertaken during theconstruction, operation and the entire lifecycle to minimize adverse environmentalimpacts as a result of the activities of theproject.b) Compliance of various environmentalregulations.c) Steps to be taken in case of emergencysuch as accidents at the site including fire.d) For how long period the project proponentwill be responsible for implementation ofEMP and the name of the person(s)responsible for implementation of EMP.e) Capital & recurring cost for the EMP peryear and the details of funds for the same.f) Name of the individual persons /organization, who will be responsible forimplementation of EMP after the lapse of theperiod for which the project proponent isresponsible.
Environment Management Plan mentioningthe Mitigation measures along withcompliance of various regulations isenclosed with the application.
Mr. Abhay Garg of M/s. Curo India Pvt.Ltd. will be responsible for implementationof EMP for 5 years and after that thewelfare society of "Curo North Square" willbe responsible for the same.
Capital & recurring cost for the EMP peryear is given in Table 1 Page No. 5 ofEMP.
18. Corporate Social Responsibility indicatingvarious activities to be undertaken,provisions of funds for the same, the periodfor which the same is to be implemented andthe person(s) responsible for theimplementation of the same.
Corporate Social Responsibility mentioningvarious activities are mentioned in Page No.5 & 6 of EMP.
19. Traffic Circulation System and connectivitywith a view to ensure adequate parking,conflict free movements, Energy efficientPublic Transport.
Site Plan showing surface parking andbasement plan showing parking is enclosedas Drawing 5 & 7 respectively.
20. Disaster/Risk Assessment and ManagementPlan
Risk Assessment is enclosed with theapplication.
21. Copy of Memorandum of Article &Association / partnership deed / undertakingof sole proprietorship / list of Directors andnames of other persons responsible formanaging the day-to-day affairs of the
Copy of Memorandum of Article &Association is enclosed as Annexure 13.
project.22. In case of expansion projects, compliance
report of earlier granted environmentalclearance conditions verified by NorthernRegional Office of Ministry of Environment,Forests & Climate Change, Chandigarh.
This point is not applicable as this is thefresh application for the EnvironmentalClearance.
23. Copy of presentation to be made before theSEAC at the time of appraisal in PDF formathaving size less than 25 MB.
Agreed
24. Soft copy of all documents in compliance toMinistry of Environment & Forests, NewDelhi Office Memorandum No. J-11-013/19/2012-IA-II(I) dated 31st May, 2012having size less than 25 MB.
Agreed.
25 For expansion projects:i. All the columns in the application formmay be got filled in three parallel columnsi.e. Existing, Proposed and Total.ii. In case of increase in no. of storeys,Structural Safety/ Stability Certificate may berequired from the Approved Engineer.iii. The existing building plan may be gotsuper imposed with the proposed buildingplan and be marked in different colors.iv. Specify the adequacy of internal watersupply system, sewer line and STP for theproposed expansion/revision.
This point is not applicable as this is thefresh application for the EnvironmentalClearance.
This is to acknowledge that a proposal seeking prior approval of Central Government under theForest (Conservation) Act 1980 as per the details given below has been successfully uploadedon the portal of the Ministry of Environment, Forests and Climate Change Government ofIndia.
1. Proposal No. : FP/PB/Others/682/2016
2. Proposal Name : Curo North Square
3. Category of the Proposal : Others
4. Date of Submission : 22/04/2016
5. Name of the Applicant with Contact Details
Name : A K
Mobile No. : 9876210555
State : Chandigarh
District : Chandigarh
Pincode : 160009
6. Protected Area (ha.) : 0
The proposal will be examined by Wild Life Warden, Forest (Conservation) Act, 1980 toassess its completeness.
(System Administrator)
*** This is a system generated email, please do not reply. ***
(iv). Short narrative of the Project : “Curo North Square” at Village Mullanpur Garibdass, Distt. SASNagar (Mohali), Punjab by M/s. Curo India Pvt. Ltd.
(v). State : Punjab
(vi). Category of the Project : Others
(vii). Shape of project land : Linear
(viii). Distance of the project from the boundary of the Protected Area (in km.): 5.4
(ix). Estimated cost of the Project(Rupees in lacs) : 0
(x). Total period for which clearance is required (in year): 7
(xi). Total Project Area(in ha.): 4.1197
(xii). Project Area under Protected Area (in ha.): 0
(xiii). Project Area under NonProtected Area (in ha.): 4.12
Details of User AgencyA2.
Wild Life Report
Form for seeking recommendation of Standing Committee of NBWL/SBWL.
(xvi). Upload a copy of documents in support of the competence/authority of the person making thisapplication to make application on behalf of the User Agency: Annexure copy of documents insupport of the competence
S.no Component Project Area underProtected Area(ha.)
Project Area under NonProtected Area(ha.)
NIL
Maps of protected areaC.
Division 1. : SAS Nagar
(i). Project Area under Protected Area (in ha.) : NIL
(ii). Nature of the Project : Linear
(iii). No. of Segments : One
Patch/Segment wise details
Segments Protected Area ofsegment(in ha.)
KML file of protectedarea of segment
1. 0 View File
(iv). copy of Survey of India Toposheet indicating boundary of protected area:Annexure Survey of India Toposheet
(v). scanned copy of the Georeferenced map of the protected area prepared byusing DGPS or Total Station: Annexure scanned copy of the Georeferenced map
Justification for locating the Project in protected area and details of alternatesexamined :D.
(i). copy of note containing justification for locating the Project in protected area: AnnexureJustification
(ii). Whether a copy of map indicating location of alternative examined is required to be provided:No
(a). Reason for not providing such map There is no alternative examined.
(H5).Whether any matter related to the project is sub judice in any court of law?: No
Documents
S.No Uploaded Additional Info. Files Remarks
NIL
Print page
a
Typewritten text
ANNEXURE-5B
a
Typewritten text
ANNEXURE-6
a
Rectangle
S. No Description
1 Purchase of Land
(10.17 acres)
2 Approvals
including CLU, layout approval,
Environment Clearence
3 Levelling, dresssing of land
4 Layout of Land
5 Excavation
6 PCC
7 Raft Casting
8 Comlition upto Plinth level
9 Slab Casting G.F. to 22nd Floor
10 Brick Work
11 Electric and Plumbing work
12 Internal Plaster
13 External Plaster
14 Flooring and POP Work
15Wood work, painting, Finishing andHand over
PERT/CPM CHART OF CURO NORTH SQUARESep.2016 to Nov.2016 Dec.2016 to Feb.2017 Mar. to May 2017 June to Aug2017 Sept to Nov. 2017 Dec.2017 to Feb 2018 Mar to May 2018 June to Aug 2018 Sept to Nov. 2018July 2005 to Oct 2014 Mar2016 to May 2016 June 2016 to Aug.2016 Dec.2018 to Feb. 2019 Mar. to May 2019 June to Aug. 2019 Sept to Nov. 2019 Dec. to Feb. 2020
a
Typewritten text
ANNEXURE-7
a
Typewritten text
ANNEXURE-8A
a
Typewritten text
ANNEXURE-8B
DEMOGRAPHIC DETAILS
MOHALI:DISTRICT AT GLANCE
S.A.S. Nagar District has been carved out of areas falling in Ropar and Patiala District as 18th District of
Punjab on 14th April, 2006. Because of its contiguous with the union territory of Chandigarh. The district has
been formed to achieve growth of development as this area is emerging as major I.T.hub of Nothern India.
The district includes Mohali, Kharar and Dera Bassi Teshils. It is located in theNorth Eastpart of Punjab.
And is part of Patiala division The District includes 414 villages. The important township in the district are
Kharar, Kurali, Mohali, Zirakpur & Dera Bassi. Kharar tehsil is the largest administrative unit of the New
district with 154 villages followed by Dera Bassi Tehsil with 44villages.
GEOGRAPHICAL AREA:
The district is spread over geographical area of 1092.64sq. kms. The rural areaconstitutes1021.77
sq.kms. as compared to urban area of 70.87 sq.kms.
POPULATION
As per statistical abstract of the Punjab2011the population of the districtis 9,94,628out of which the rural
population is 450017& population of urban area is544611.The male population of the district is529253
out of which rural male population is240984whereas urban male population is288269. The total female
population of the district is465375out of which the rural female population is209033whereas urban
females are256342. The S.C. population of the district is216231out of which rural S.C. population is
132713& S.C. in urban area is83518.
EDUCATION INTITUTIONS
Mohali District has emerged as a major center of technical education. There are 8 engineering colleges
which offer variety of technical course. The Punjab School Education Board isalso operating in the district.
NIPER: A pioneer institute of pharmaceutical & education research is situated at Mohali.
a
Typewritten text
ANNEXURE-9
Educational Institutions in the District
Nursing College 4Colleges of Engineering and Architect 4Govt. Sr. Sec. Schools 29Govt. High Schools 50Govt. Primary Schools 434
HEALTH SERVICES
There are number ofrenowed hospitals in the district which are equipped with latest technical know how.
The FORTIS Hospital is one of its kinds with multi specialty facilities.
SPORTS
World class CRICKET STADIUM of international fame is situated at Mohali International tournaments are
held from time to time and the people get an opportunity to watch the international cricket in action.
MISCELLANEOUS
District Mohali is emerging as an I.T Hub of North India. Some big companies like QUARCKS DELL & TCS
is already in business and having its establishments whereas others are in the process for opening their
offices.
Community Development Blocks in the District
KHARAR BLOCK
This block consists of 154 villages and 2 towns namely S.A.S. Nagar and Kharar and there 4 un-inhabited
villages. As per2011census the total population of the block is 369798. The rural population of the block is
196044 out of which there are 106688 males and 89356 females. The total S.C. Population in the rural area
is 55544.
The block is having totalarea of 411.32 sq.kms. Out of which the rural area covers 383.26 sq.kms.
Under the service area approach, all the villages havebeen allocated among 17 branches of commercial
banks and 4 branches of RPBs. There are Total 86 branches are functioning in the block which comprises
The Member Secretary,SEIAA/SEAC, Punjab,C/o Punjab Pollution Control BoardVatavaran Bhawan, Nabha Road, PatialaE-mail: [email protected]
Subject :- Intimation for Environmental monitoring
Sir,
As per proceedings of 6th combined meeting of SEIAA & SEAC held on 17.10.2014, it is tobring to your kind notice that we will be starting sampling for EIA purpose of Group HousingProject by M/s Curo India Pvt. Ltd. located at Village Mullanpur Garibdas, Distt. SAS Nagar,Punjab on 22nd December, 2015 Tuesday.