Top Banner
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005
31

Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Dec 24, 2015

Download

Documents

Jasper Cobb
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Cummins ISBTest Development Task Force

Cummins Surveillance Panel

Mark Sarlo, SwRI

January 11, 2005

Page 2: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

ISB Test Development Progress

• Labs and Engines

• Procedure

• Special Parts and Cam Measurement

• Modifications to Hardware and or Procedure

• Move Forward to Matrix

Page 3: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

ISB Engine

• 5.9L ISB MY04, CPL 8123. This engine is certified at

2.0 g NOx/bhp-hr

• Fuel system Common Rail

• CPL 8123

• Low idle 800 RPM (ECM 750 RPM)

• High idle 3,000 RPM

• Rated 300 hp @ 2,600 RPM

• Torque peak 600 lbf-ft @ 1,600 RPM

Page 4: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

ISB Engines at Labs

• SwRI @ San Antonio, Completed 830-2 and 1004-3

• PE @ San Antonio, Completed two 830-2 and one 1004-3

• Lubrizol @ Wickliffe, Completed 1004-3

• ExxonMobil @ Paulsboro, Preparing to Run Reference Oil

• Valvoline, Ashland, May Run Older Engine Configuration

• Afton, Richmond, Waiting on Engine, Waiting on Cell Space

Page 5: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

ISB Procedure Highlights

• 350 Total Hours, (100-hr Stage A, 250-hr Cyclic Stage B)• First 100 Hours at 1,600 RPM & 20 kg/hr, 107 kPa abs EBP, 110 C

Oil Temp, 99 C Coolant Out, 68 C Int Man• Retard Timing 14-16° to Generate Soot (use NGET)• Soot Window of 3.25 +/- 0.25% at 100 Hours• Charge Engine with 14.5kg Oil Total (Some into Filter)• Two Flushes• External Oil Adder System, External Tube & ShellOil Cooler• Oil Sample @ 25, 50, 75, & 100 Hr, 1,000 g Forced Add• Return Timing to “Native Timing” for Final 250 hr Stage B• Run Multi-step Valvetrain Wear Cycle for next 250 hr• Oil Sample @ 150, 200, 250, 300, & 350 hr with No Additional Oil

Adds

Page 6: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

ISB Procedure Highlights

• Coolant Out Temperature 99 Degrees C

• Engine Oil Sump Temperature 110 Degrees C

• Fuel Temperature 40 Degrees C

• Intake Manifold Air Temperature 68 Degrees C, 114mm

• Estimate 8,000 L Fuel per Test

• Use Cummins Complete PG Coolant

• 107 kPa Absolute Exhaust Back Pressure Set in Stage A, Open for Stage B

Page 7: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Cummins ISB Stages A & B

Page 8: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

ISB Test Numbering

• 64-001-57216596-0000 (Example)

• First Number is Lab’s Cell Number (64)

• Second Number is Run Number for that Cell (001)

• Third Number is Cummins Engine SN (57216596)

• Fourth and Final Number is Hours on Engine After 80-

hour Break-in Procedure

Page 9: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Cummins ISB, Typical Soot

Page 10: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Cummins ISB Soot, Stage A

Page 11: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Cummins ISB Soot, Stage B

Page 12: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Cummins ISB Cyclic Stage B

Page 13: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Cummins ISB Stage B Cycle

Page 14: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Special Parts

• CPD to Maintain and Etch Critical Parts

• Parts to be Etched in Sets and Sequentially, 1 Through 12

• CPD to Maintain Inventory of Three New Engines

• New Engine Will Require 80 hr Break-in

• Engine Life Dependent on Lubricants Evaluated

• Estimate Up-to Ten Tests per Engine Block

• Points of Wear Include Camshaft & Tappet Bores in Block

Page 15: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Camshaft Wear Measurements

• Camshaft Lobes are Flat (Not Tapered)

• Most Wear Occurs on Ramps, Not Nose

• Use Adcole Gage to Measure

• Cam Supplier to Measure

• Investigating Alternate Measurement

• Investigate Cam Shipping to Assure Safety

• Matrix-Related Cams Shipped to Warren

• Candidate Cams Directly to Cam Supplier

Page 16: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Camshaft Measurements

• Batch of Cams Pre-measured by Adcole

• CPD Maintains BOT Data

Page 17: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Special Parts Measurements for Matrix?

• Crosshead Weightloss (mg)

• Tappet Weightloss (mg) AFTER EnSolve® Cleaning

• Tappet Heightloss (mm)

• Tappet Stem OD wear (mm)

• Tappet Slider Surface Profile Wear in Two Planes @ 90°

• Valve Adjusting Screw Weightloss (mg)

• Valve Rocker Lever Socket Weightloss (mg)

• Valve Rocker Shaft Weightloss (mg)

• Valve Push Rod Weighloss (mg)

Page 18: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Special Parts Measurements for Matrix?

• Camshaft Lobe Wear, Conventional (mm)

• Camshaft Lobe Wear, Adcole Method

• Camshaft Bearing Journal Wear, Conventional (mm)

• Camshaft Bearing Journal Wear, Adcole Method

• Tappet Bore Wear in Parent Block (mm)

• Cam Bore Wear in Parent Block (mm)

• Valve Lash Change (mm)

• Sludge Rating for Rocker Cover with and without Baffle

• Sludge Rating for Oil Pan

Page 19: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Tappet Face Wear, Center and Maximum

Page 20: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Tappet Face Wear, Center and Maximum

Page 21: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Tappet Face Wear, Center and Maximum

Page 22: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

New Generation Engineering Tool (NGET)®

• Latest Version not as User-Friendly While Logging

• Parameters to Measure Sent Out as ISBParameter.lay File

• NGET® is Used to Adjust Timing for First 100 hr

Page 23: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Summary

• Warren to Supply Updated Procedure in ASTM Format

• Discrimination Proven with Mini-Matrix?

• Matrix Design

• Industry Participation, Stand Installation, Timing????

Page 24: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Mini-Matrix Data

Page 25: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Mini-Matrix Data

Page 26: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Mini-Matrix Data

Page 27: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Mini-Matrix Data

Page 28: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Mini-Matrix Data

Page 29: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Mini-Matrix Data

Page 30: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Mini-Matrix Data

Page 31: Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.

Cummins ISB Pan Fitting Locations for External Oil Adder System