EvalEconAlternativa 1Alternativa 2EVALUACION ECONOMICAEVALUACION
ECONOMICAEn nuevos soles a precios socialesEn nuevos soles a
precios socialesAoInversinCostos de Operacin y MantenimientoFlujo
de CostosAoInversinCostos de Operacin y MantenimientoFlujo de
Costos01136867.221136867.2201598497.631598497.6310.001223.371223.3710.001223.371223.3720.002485.372485.3720.002485.372485.3730.004825.104825.1030.004825.104825.1040.001223.371223.3740.001223.371223.3750.002485.372485.3750.002485.372485.3760.004825.104825.1060.004825.104825.1070.001223.371223.3770.001223.371223.3780.002485.372485.3780.002485.372485.3790.004825.104825.1090.004825.104825.10100.001223.371223.37100.001223.371223.37110.002485.372485.37110.002485.372485.37120.004825.104825.10120.004825.104825.10130.001223.371223.37130.001223.371223.37140.002485.372485.37140.002485.372485.37150.004825.104825.10150.004825.104825.10160.001223.371223.37160.001223.371223.37170.002485.372485.37170.002485.372485.37180.004825.104825.10180.004825.104825.10190.001223.371223.37190.001223.371223.3720-113686.721223.37-112463.3520-159849.761223.37-158626.39VACT1141043.70VACT1594437.19C/E1154.20C/E1612.82C/E
(US$)402.16C/E (US$)561.96Tasa de Descuento:9.00%Tasa de
Descuento:9.00%
ViaDemOferVIADEMANDAOFERTABRECHACaractersticas de la Va y
PavimentoLongitud (ML)917.5917.50JR. HUAYLLAY1051050JR. JOSE
OLAYA2452450JR. MANCO INCA1081080JR. MICAELA BASTIDAS2372370PJE. J.
RIOS60600PJE. PASCO94.594.50PJE. UNION 68680rea (m2)918691860JR.
HUAYLLAY8408400JR. JOSE OLAYA294029400JR. MANCO INCA129612960JR.
MICAELA BASTIDAS284428440PJE. J. RIOS4804800PJE. PASCO3783780PJE.
UNION 4084080IMD (Veh./da)80800Velocidad de diseo (km/h)4020-20Tipo
de material de SuperficieRigido / FlexibleTIERRArea de
calzada(m2)6441.6VARIADO-6441.6JR. HUAYLLAY5880-588JR. JOSE
OLAYA20580-2058JR. MANCO INCA939.60-939.6JR. MICAELA
BASTIDAS2275.20-2275.2PJE. J. RIOS3360-336PJE. PASCO000PJE. UNION
244.80-244.8rea de veredas (m2)2671.7VARIADO-2671.7JR.
HUAYLLAY2520-252JR. JOSE OLAYA906.50-906.5JR. MANCO
INCA259.20-259.2JR. MICAELA BASTIDAS568.80-568.8PJE. J.
RIOS1440-144PJE. PASCO3780-378PJE. UNION 163.20-163.2rea de cunetas
(m2)649.6VARIADO-649.6JR. HUAYLLAY73.50-73.5JR. JOSE
OLAYA171.50-171.5JR. MANCO INCA75.60-75.6JR. MICAELA
BASTIDAS165.90-165.9PJE. J. RIOS420-42PJE. PASCO73.50-73.5PJE.
UNION 47.60-47.6Ancho de Va(m)62VARIADO-62JR. HUAYLLAY80-8JR. JOSE
OLAYA120-12JR. MANCO INCA120-12JR. MICAELA BASTIDAS120-12PJE. J.
RIOS80-8PJE. PASCO40-4PJE. UNION 60-6Ancho de
Calzada(m)41.5VARIADO-41.5JR. HUAYLLAY5.60-5.6JR. JOSE
OLAYA8.40-8.4JR. MANCO INCA8.70-8.7JR. MICAELA BASTIDAS9.60-9.6PJE.
J. RIOS5.60-5.6PJE. PASCO000PJE. UNION 3.60-3.6Ancho de Veredas
(m)11.95VARIADO-11.95JR. HUAYLLAY1.20-1.2JR. JOSE
OLAYA1.850-1.85JR. MANCO INCA1.20-1.2JR. MICAELA
BASTIDAS1.30-1.3PJE. J. RIOS1.20-1.2PJE. PASCO40-4PJE. UNION
1.20-1.2Ancho de cunetas2.1VARIADO-2.1JR. HUAYLLAY0.30-0.3JR. JOSE
OLAYA0.30-0.3JR. MANCO INCA0.30-0.3JR. MICAELA BASTIDAS0.30-0.3PJE.
J. RIOS0.30-0.3PJE. PASCO0.30-0.3PJE. UNION 0.30-0.3Radio mnimo
(m)40400Pendiente Mxima (%)13130Bombeo (%)220Sealizacin
(und)26NINGUNO0000Alcantarillado Pluvial000. Alcantarillado
(m)0NINGUNO0 Tubera UPVC U/F S-25 D=8"00. Buzones (Und)0NINGUNA0
BuznH=1.51-2.00m00. Sumideros (und)0NINGUNA0 Sumideros000Sistema de
Agua 000. Tuberas ( m)EXISTEEXISTE0 Tubera DN 90 mm y 25 mmDN 90 mm
y 25 mm0Sistema de Desage000. Tuberas (m) remplazo328EXISTE0
TuberasPVC -UF ISO 4435PVC -UF ISO 44350
PresupObrPRESUPUESTO DE OBRA DE LA ALTERNATIVA 1En nuevos soles
a precios privados
ConceptoAlternativaPAVIMENTACION FLEXIBLE876225.10CONSTRUCCION
DE VEREDAS338337.67
Costos Directos1214562.77Gastos Generales10%121456.28Sub Total
General1336019.05
Presupuesto de Obra1336019.05Supervisin de Obra2%24291.26Estudio
Definitivo2%21862.13Total de Inversin1382172.43PRESUPUESTO DE OBRA
DE LA ALTERNATIVA 1En nuevos soles a precios sociales
ConceptoAlternativaPAVIMENTACION FLEXIBLE731717.83CONSTRUCCION
DE VEREDAS267286.76
Costos Directos999004.59Gastos Generales10%99900.46Sub Total
General1098905.05
Presupuesto de Obra1098905.05Supervisin de Obra2%19980.09Estudio
Definitivo2%17982.08Total de Inversin1136867.22PRESUPUESTO DE OBRA
DE LA ALTERNATIVA 2En nuevos soles a precios privados
ConceptoAlternativaPAVIMENTACION FLEXIBLE1439706.90CONSTRUCCION
DE VEREDAS338337.67
Costos Directos1778044.57Gastos Generales10%177804.46Sub Total
General1955849.03
Presupuesto de Obra1955849.03Supervisin de Obra2%35560.89Estudio
Definitivo2%32004.80Total de Inversin2023414.72PRESUPUESTO DE OBRA
DE LA ALTERNATIVA 2En nuevos soles a precios sociales
ConceptoAlternativaPAVIMENTACION FLEXIBLE1137368.45CONSTRUCCION
DE VEREDAS267286.76
Costos Directos1404655.21Gastos Generales10%140465.52Sub Total
General1545120.73
Presupuesto de Obra1545120.73Supervisin de Obra2%28093.10Estudio
Definitivo2%25283.79Total de Inversin1598497.63
MatrImpAmbCUADRO N 01MATRIZ DE IMPACTOS AMBIENTALES
FASES DE PROYECTOCOMPONENTES AMBIENTALESTOTAL
GENERALAIREAGUASUELOFLORAFAUNASALUD1. INICIO DE OBRA00100012.
CONSTRUCCION10100133. OPERACIN00000004. TERMINO DE OBRA0000000TOTAL
PARCIAL1020014Fuente : Equipo Tcnico
CrongFisFinan
Cronograma
financieroDESCRIPCINMESESAOS01234562468101214161820ConceptoFASE I:
PRE INVERSIN01234Expediente tcnicoPAVIMENTO
FLEXIBLE231556.28231556.28231556.28231556.28Aprobacin de bases y
proceso de adjudicacin de la obraCONSTRUCCION DE
VEREDAS84584.4284584.4284584.4284584.42FASE II:
INVERSINPAVIMENTACIN FLEXIBLECONSTRUCCIN DE VEREDASGastos
Generales31614.0731614.0731614.0731614.07Gastos Generales
Supervisin de Obra6322.816322.816322.816322.81Supervisin de
ObraEstudio Definitivo22762.13FASE III: POST INVERSINOperacin y
mantenimiento del camino vecinal
IngresosINGRESOSCUADRO N 5GRADO DE INSTRUCCININGRESOS
S/.MONTO%GRADO DE INSTRUCCIN N HABITANTES%DE 1 a
5001537.50%NINGUNA76%DE 501 A 10002050.00%INICIAL11%DE 1001 A
1500512.50%PRIMARIA2521%DE 1501 A
200000.00%SECUNDARIA5748%TOTAL40100.00%TCNICO76%SUPERIOR2118%Fuente
: Equipo TcnicoTOTAL118100%Fuente: Equipo Tcnico
IMDsCUADRO N 06IMDs
Tipo de VehculoTrfico Vehicular en dos Sentidos por
DaTOTALIMDSFCIMDaLunesMartesMircolesJuevesViernesSbadoDomingoSEMANAAutomvil6760656879595845665.140.96996163Camioneta
rural89105988578.140.9699618Bus Mediano58991025486.860.9699617Bus
Grande2323232172.430.9699612Camin de 2E000000000.000.9699610Camin
de 3E000000000.000.9699610Articulado000000000.000.9699610TOTAL
8280868510072735788380Fuente: Equipo Tcnico
CuadN07CUADRO N 07DEMANDA ACTUALTRAFICO ACTUAL DEL TRANSITO
VEHICULAR Y TIPO DE VEHICULO
TIPO DE VEHICULOIMDDISTRIBUCIN %Automvil6378.75Camioneta
rural810.00Bus Mediano78.75Bus Grande22.50Camin de 2E00.00Camin de
3E00.00Articulado00.00TOTAL 80100.00Fuente: Estudio de Trfico
Vehicular - Conteo Vehicular 2014
Cuad09CUADRO N 09DEMANDA PROYECTADAPROYECCIN DE TRFICO CON
PROYECTOTRFICO NORMALAOSTIPO DE
VEHICULO20112012201320142015201620172018201920202021Automovil6364666768707172747576Camioneta
Rural888899999910Bus Mediano77777778888Bus Grande22223333333Camin
de 2E00000000000Camin de 3E00000000000Articulado00000000000TOTAL
TRFICO NORMAL8081838487899092949597
TRFICO GENERADOAutomovil019202020212122222323Camioneta
Rural01111111111Bus Mediano05666666666Bus Grande02223333333Camin de
2E00000000000Camin de 3E00000000000Articulado00000000000TOTAL
TRFICO GENERADO027292930313132323333IMD
TOTAL80108112113117120121124126128130Fuente: equipo tcnico
Pt a estimar
Ao
Poblacin08991916293439524970598961008710288104891068101088111109121131131153141175151198161221171244181268191293201318Total1096Fuente:
equipo tcnico
Cuad16CUADRO N 16DETERMINACION DEL TRANSITO ACTUALTipo de
VehculoTrfico Vehicular en dos Sentidos por DaTOTAL SEMANALunes
MartesMircolesJuevesViernesSbadoDomingoAutomovil67606568795958456Camioneta
8910598857C.R.5899102548Micro00000000Bus Grande232323217Camin
2E00000000Camin 3E00000000TOTAL828086851007273578Fuente: Trabajo de
campo realizado por el proyectista
Cuad17CUADRO N 17CLCULO DEL NDICE MEDIO ANUALTipo de
VehculoTrfico Vehicular en dos Sentidos por DaTOTAL SEMANAFCLunes
MartesMircolesJuevesViernesSbadoDomingoAutomovil67606568795958456651.0017843865Camioneta
891059885781.001784388C.R.589910254871.001784387Micro0000000001.001784380Bus
Grande23232321721.001784382Camin 2E0000000001.001784380Camin
3E0000000001.001784380TOTAL8280868510072735788382Fuente: Trabajo de
campo realizado por el proyectista
Cuad18CUADRO N 18ANLISIS DE LA DEMANDA ACTUAL
TIPO DE VEHICULOIMDDISTRIBUCIN %Automvil6378.75Camioneta
rural810.00Bus Mediano78.75Bus Grande22.50Camin de 2E00.00Camin de
3E00.00Articulado00.00TOTAL 80100.00Fuente: Estudio de Trfico
Vehicular - Conteo Vehicular 2014Fuente: Trabajo de campo realizado
por el proyectista
Cuad19CUADRO N 19DEMANDA PROYECTADA SIN PROYECTOProyeccin de
Trfico - Situacin Sin ProyectoTipo de VehculoAo 0Ao 1Ao 2Ao 3Ao 4Ao
5Ao 6Ao 7 Ao 8Ao 9Ao 10Trfico
Normal8282838384848586878989Automovil65.0065.0066.0066.0067.0067.0068.0069.0069.0070.0070.00Camioneta8.008.008.008.008.008.008.008.009.009.009.00C.R.7.007.007.007.007.007.007.007.007.008.008.00Micro0.000.000.000.000.000.000.000.000.000.000.00Bus
Grande2.002.002.002.002.002.002.002.002.002.002.00Camin
2E0.000.000.000.000.000.000.000.000.000.000.00Camin
3E0.000.000.000.000.000.000.000.000.000.000.00Fuente: Trabajo de
campo realizado por el proyectista
Cuad20CUADRO N 20DEMANDA PROYECTADA CON PROYECTOTipo de
VehculoAo 0Ao 1Ao 2Ao 3Ao 4Ao 5Ao 6Ao 7 Ao 8Ao 9Ao 10Trfico
Normal8282838384848586878989Automovil65.0065.0066.0066.0067.0067.0068.0069.0069.0070.0070.00Camioneta8.008.008.008.008.008.008.008.009.009.009.00C.R.7.007.007.007.007.007.007.007.007.008.008.00Micro0.000.000.000.000.000.000.000.000.000.000.00Bus
Grande2.002.002.002.002.002.002.002.002.002.002.00Camin
2E0.000.000.000.000.000.000.000.000.000.000.00Camin
3E0.000.000.000.000.000.000.000.000.000.000.00Trfico
Generado0.000.009.009.009.009.009.009.009.009.009.00Automovil0.000.007.007.007.007.007.007.007.007.007.00Camioneta0.000.001.001.001.001.001.001.001.001.001.00C.R.0.000.001.001.001.001.001.001.001.001.001.00Micro0.000.000.000.000.000.000.000.000.000.000.00Bus
Grande0.000.000.000.000.000.000.000.000.000.000.00Camin
2E0.000.000.000.000.000.000.000.000.000.000.00Camin
3E0.000.000.000.000.000.000.000.000.000.000.00IMD
TOTAL82.0082.0092.0092.0093.0093.0094.0095.0096.0098.0098.00Fuente:
Trabajo de campo realizado por el proyectista
Cuad21CUADRO N 21INVENTARIO VIAL EN LA SITUACION SIN
PROYECTOCUADRO N 21DEMANDA EN LA SITUACION CON PROYECTO VIATRAMO
VIATRAMO Caractersticas de la Va y PavimentoCaractersticas de la Va
y PavimentoLongitud (Ml)917.5Longitud (Ml)917.5JR. HUAYLLAY105JR.
HUAYLLAY105JR. JOSE OLAYA245JR. JOSE OLAYA245JR. MANCO INCA108JR.
MANCO INCA108JR. MICAELA BASTIDAS237JR. MICAELA BASTIDAS237PJE. J.
RIOS60PJE. J. RIOS60PJE. PASCO94.5PJE. PASCO94.5PJE. UNION 68PJE.
UNION 68rea (m2)9186rea (m2)9186JR. HUAYLLAY840JR. HUAYLLAY840JR.
JOSE OLAYA2940JR. JOSE OLAYA2940JR. MANCO INCA1296JR. MANCO
INCA1296JR. MICAELA BASTIDAS2844JR. MICAELA BASTIDAS2844PJE. J.
RIOS480PJE. J. RIOS480PJE. PASCO378PJE. PASCO378PJE. UNION 408PJE.
UNION 408IMD (Veh./da)80IMD (Veh./da)80Velocidad de diseo
(km/h)20Velocidad de diseo (km/h)40Tipo de material de
SuperficieTIERRATipo de material de SuperficieRigido / Flexiblerea
de calzada(m2)VARIADOrea de calzada(m2)6,441.60JR. HUAYLLAY0JR.
HUAYLLAY588JR. JOSE OLAYA0JR. JOSE OLAYA2,058.00JR. MANCO INCA0JR.
MANCO INCA939.6JR. MICAELA BASTIDAS0JR. MICAELA
BASTIDAS2,275.20PJE. J. RIOS0PJE. J. RIOS336PJE. PASCO0PJE.
PASCO0PJE. UNION 0PJE. UNION 244.8rea de veredas (m2)VARIADOrea de
veredas (m2)2671.7JR. HUAYLLAY0JR. HUAYLLAY252JR. JOSE OLAYA0JR.
JOSE OLAYA906.5JR. MANCO INCA0JR. MANCO INCA259.2JR. MICAELA
BASTIDAS0JR. MICAELA BASTIDAS568.8PJE. J. RIOS0PJE. J. RIOS144PJE.
PASCO0PJE. PASCO378PJE. UNION 0PJE. UNION 163.2rea de cunetas
(m2)VARIADOrea de cunetas (m2)649.6JR. HUAYLLAY0JR. HUAYLLAY73.5JR.
JOSE OLAYA0JR. JOSE OLAYA171.5JR. MANCO INCA0JR. MANCO INCA75.6JR.
MICAELA BASTIDAS0JR. MICAELA BASTIDAS165.9PJE. J. RIOS0PJE. J.
RIOS42PJE. PASCO0PJE. PASCO73.5PJE. UNION 0PJE. UNION 47.6Ancho de
Va(m)VARIADOAncho de Va(m)62JR. HUAYLLAY0JR. HUAYLLAY8JR. JOSE
OLAYA0JR. JOSE OLAYA12JR. MANCO INCA0JR. MANCO INCA12JR. MICAELA
BASTIDAS0JR. MICAELA BASTIDAS12PJE. J. RIOS0PJE. J. RIOS8PJE.
PASCO0PJE. PASCO4PJE. UNION 0PJE. UNION 6Ancho de
Calzada(m)VARIADOAncho de Calzada(m)41.5JR. HUAYLLAY0JR.
HUAYLLAY5.6JR. JOSE OLAYA0JR. JOSE OLAYA8.4JR. MANCO INCA0JR. MANCO
INCA8.7JR. MICAELA BASTIDAS0JR. MICAELA BASTIDAS9.6PJE. J.
RIOS0PJE. J. RIOS5.6PJE. PASCO0PJE. PASCO0PJE. UNION 0PJE. UNION
3.6Ancho de Veredas (m)VARIADOAncho de Veredas (m)11.95JR.
HUAYLLAY0JR. HUAYLLAY1.2JR. JOSE OLAYA0JR. JOSE OLAYA1.85JR. MANCO
INCA0JR. MANCO INCA1.2JR. MICAELA BASTIDAS0JR. MICAELA
BASTIDAS1.3PJE. J. RIOS0PJE. J. RIOS1.2PJE. PASCO0PJE. PASCO4PJE.
UNION 0PJE. UNION 1.2Ancho de cunetasVARIADOAncho de cunetas2.1JR.
HUAYLLAY0JR. HUAYLLAY0.3JR. JOSE OLAYA0JR. JOSE OLAYA0.3JR. MANCO
INCA0JR. MANCO INCA0.3JR. MICAELA BASTIDAS0JR. MICAELA
BASTIDAS0.3PJE. J. RIOS0PJE. J. RIOS0.3PJE. PASCO0PJE. PASCO0.3PJE.
UNION 0PJE. UNION 0.3Radio mnimo (m)40Radio mnimo (m)40Pendiente
Mxima (%)13Pendiente Mxima (%)13Bombeo (%)2Bombeo (%)2Sealizacin
(und)NINGUNOSealizacin (und)26
Alcantarillado PluvialAlcantarillado Pluvial. Alcantarillado
(m)NINGUNO. Alcantarillado (m)0Tubera Tubera UPVC U/F S-25 D=8".
Buzones (Und)NINGUNA. Buzones (Und)0BuznBuznH=1.51-2.00m. Sumideros
(und)NINGUNA. Sumideros (und)0sumiderossumideros0Sistema de Agua
Sistema de Agua . Tuberas ( m)EXISTE. Tuberas ( m)EXISTETubera DN
90 mm y 25 mmTubera DN 90 mm y 25 mmSistema de DesageSistema de
Desage. Tuberas (m)EXISTE. Tuberas (m) remplazo328TuberasPVC -UF
ISO 4435TuberasPVC -UF ISO 4435Fuente: Trabajo de campo realizado
por el proyectista
Cuad22CUADRO N 22OFERTA EN LA SITUACION SIN PROYECTO
VIATRAMO Caractersticas de la Va y PavimentoLongitud
(Ml)917.5JR. HUAYLLAY105JR. JOSE OLAYA245JR. MANCO INCA108JR.
MICAELA BASTIDAS237PJE. J. RIOS60PJE. PASCO94.5PJE. UNION 68rea
(m2)9186JR. HUAYLLAY840JR. JOSE OLAYA2940JR. MANCO INCA1296JR.
MICAELA BASTIDAS2844PJE. J. RIOS480PJE. PASCO378PJE. UNION 408IMD
(Veh./da)80Velocidad de diseo (km/h)20Tipo de material de
SuperficieTIERRArea de calzada(m2)VARIADOJR. HUAYLLAY0.00JR. JOSE
OLAYA0.00JR. MANCO INCA0.00JR. MICAELA BASTIDAS0.00PJE. J.
RIOS0.00PJE. PASCO0.00PJE. UNION 0.00rea de veredas (m2)VARIADOJR.
HUAYLLAY0JR. JOSE OLAYA0JR. MANCO INCA0JR. MICAELA BASTIDAS0PJE. J.
RIOS0PJE. PASCO0PJE. UNION 0rea de cunetas (m2)VARIADOJR.
HUAYLLAY0JR. JOSE OLAYA0JR. MANCO INCA0JR. MICAELA BASTIDAS0PJE. J.
RIOS0PJE. PASCO0PJE. UNION 0Ancho de Va(m)VARIADOJR. HUAYLLAY0JR.
JOSE OLAYA0JR. MANCO INCA0JR. MICAELA BASTIDAS0PJE. J. RIOS0PJE.
PASCO0PJE. UNION 0Ancho de Calzada(m)VARIADOJR. HUAYLLAY0JR. JOSE
OLAYA0JR. MANCO INCA0JR. MICAELA BASTIDAS0PJE. J. RIOS0PJE.
PASCO0PJE. UNION 0Ancho de Veredas (m)VARIADOJR. HUAYLLAY0JR. JOSE
OLAYA0JR. MANCO INCA0JR. MICAELA BASTIDAS0PJE. J. RIOS0PJE.
PASCO0PJE. UNION 0Ancho de cunetasVARIADOJR. HUAYLLAY0JR. JOSE
OLAYA0JR. MANCO INCA0JR. MICAELA BASTIDAS0PJE. J. RIOS0PJE.
PASCO0PJE. UNION 0Radio mnimo (m)40Pendiente Mxima (%)13Bombeo
(%)2Sealizacin (und)NINGUNO
Alcantarillado Pluvial. Alcantarillado (m)NINGUNOTubera .
Buzones (Und)NINGUNABuzn. Sumideros (und)NINGUNAsumiderosSistema de
Agua . Tuberas ( m)EXISTETubera DN 90 mm y 25 mmSistema de Desage.
Tuberas (m)EXISTETuberasPVC -UF ISO 4435
Cuad23CUADRO N 23BALANCE OFERTA DEMANDA DEL PROYECTO
VIADEMANDAOFERTABRECHACaractersticas de la Va y
PavimentoLongitud (ML)917.5917.50JR. HUAYLLAY1051050JR. JOSE
OLAYA2452450JR. MANCO INCA1081080JR. MICAELA BASTIDAS2372370PJE. J.
RIOS60600PJE. PASCO94.594.50PJE. UNION 68680rea (m2)918691860JR.
HUAYLLAY8408400JR. JOSE OLAYA294029400JR. MANCO INCA129612960JR.
MICAELA BASTIDAS284428440PJE. J. RIOS4804800PJE. PASCO3783780PJE.
UNION 4084080IMD (Veh./da)80800Velocidad de diseo (km/h)4020-20Tipo
de material de SuperficieRigido / FlexibleTIERRArea de
calzada(m2)6441.6VARIADO-6441.6JR. HUAYLLAY5880-588JR. JOSE
OLAYA20580-2058JR. MANCO INCA939.60-939.6JR. MICAELA
BASTIDAS2275.20-2275.2PJE. J. RIOS3360-336PJE. PASCO000PJE. UNION
244.80-244.8rea de veredas (m2)2671.7VARIADO-2671.7JR.
HUAYLLAY2520-252JR. JOSE OLAYA906.50-906.5JR. MANCO
INCA259.20-259.2JR. MICAELA BASTIDAS568.80-568.8PJE. J.
RIOS1440-144PJE. PASCO3780-378PJE. UNION 163.20-163.2rea de cunetas
(m2)649.6VARIADO-649.6JR. HUAYLLAY73.50-73.5JR. JOSE
OLAYA171.50-171.5JR. MANCO INCA75.60-75.6JR. MICAELA
BASTIDAS165.90-165.9PJE. J. RIOS420-42PJE. PASCO73.50-73.5PJE.
UNION 47.60-47.6Ancho de Va(m)62VARIADO-62JR. HUAYLLAY80-8JR. JOSE
OLAYA120-12JR. MANCO INCA120-12JR. MICAELA BASTIDAS120-12PJE. J.
RIOS80-8PJE. PASCO40-4PJE. UNION 60-6Ancho de
Calzada(m)41.5VARIADO-41.5JR. HUAYLLAY5.60-5.6JR. JOSE
OLAYA8.40-8.4JR. MANCO INCA8.70-8.7JR. MICAELA BASTIDAS9.60-9.6PJE.
J. RIOS5.60-5.6PJE. PASCO000PJE. UNION 3.60-3.6Ancho de Veredas
(m)11.95VARIADO-11.95JR. HUAYLLAY1.20-1.2JR. JOSE
OLAYA1.850-1.85JR. MANCO INCA1.20-1.2JR. MICAELA
BASTIDAS1.30-1.3PJE. J. RIOS1.20-1.2PJE. PASCO40-4PJE. UNION
1.20-1.2Ancho de cunetas2.1VARIADO-2.1JR. HUAYLLAY0.30-0.3JR. JOSE
OLAYA0.30-0.3JR. MANCO INCA0.30-0.3JR. MICAELA BASTIDAS0.30-0.3PJE.
J. RIOS0.30-0.3PJE. PASCO0.30-0.3PJE. UNION 0.30-0.3Radio mnimo
(m)40400Pendiente Mxima (%)13130Bombeo (%)220Sealizacin
(und)26NINGUNO0000Alcantarillado Pluvial000. Alcantarillado
(m)0NINGUNO0Tubera UPVC U/F S-25 D=8"00. Buzones
(Und)0NINGUNA0BuznH=1.51-2.00m00. Sumideros
(und)0NINGUNA0sumideros000Sistema de Agua 000. Tuberas (
m)EXISTEEXISTE0Tubera DN 90 mm y 25 mmDN 90 mm y 25 mm0Sistema de
Desage000. Tuberas (m) remplazo328EXISTE0TuberasPVC -UF ISO 4435PVC
-UF ISO 44350Fuente: Elaborado por el proyectista
Cuad25CUADRO N 25MANTENIMIENTO EN SITUACION SIN PROYECTO PRECIOS
PRIVADOS Y SOCIALES
DescripcinPrecios de Mercado S/.Precios Sociales S/.
Sin ProyectoMant. Rutinario3313.822,485.37Mant.
Peridico4996.493,747.36Fuente: Ministerio de Transportes y
Comunicaciones - MTC
DescripcinPrecios de Mercado S/.Precios Sociales S/.
Con ProyectoMant. Rutinario6627.654,970.74Mant.
Peridico9747.297,310.46Fuente: Ministerio de Transportes y
Comunicaciones - MTC
AnalSensib
Variacin en % de Costos de InversinN de
Beneficiarios1.309891.259891.209891.159891.109891.059891.009890.959890.909890.859890.809890.759890.70989