Top Banner
OUR FACILITIES
10

CTSI Logistics Supply Chain Centers 2017

Apr 11, 2017

Download

Services

marianazarea
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CTSI Logistics Supply Chain Centers 2017

OUR FACILITIES

Page 2: CTSI Logistics Supply Chain Centers 2017

NEXTPREVIOUSwww.ctsi-logistics.com

2

• CTSI Logistics is a certified member of the US Customs-Trade Partnership Against Terrorism (C-TPAT) program maintaining a comprehensive security profile to enhance security both internally and among its partners across the supply chain.

• Conducted Supply Chain Survey• Became a member since May 2003• Adopted measures towards a

secured chain• First Logistics Provider to be

validated by the US customs by April 2000

Page 3: CTSI Logistics Supply Chain Centers 2017

NEXTPREVIOUSwww.ctsi-logistics.com

3

Building 1, 278 Guerrero Drive, P.O. Box 6067

GUAM, TAMUNING

• Concrete building with CMU wall and concrete post tension roof

• Building 1: 26 feet eave high• Warehouse flooring: 9 feet above street

level• 100% back-up generator and water

supply

• 6 Stainless Steel 10’ X 16’ Roll-up Doors

• 13 Container Slots Loading Dock • 45 Cars Parking Area for

Warehouse 1• 12 Cars Parking for Warehouse 2• CFS bonded Facility• Equipped with CCTV

Total Area (25,575 sq. ft.) • Floor Area (90’ X 260’) – 23,400 sq. ft. • Overhang / Loading Dock (15’ X 145’) – 2,175 sq. ft.

Page 4: CTSI Logistics Supply Chain Centers 2017

NEXTPREVIOUSwww.ctsi-logistics.com

4

Building 2, 278 Guerrero Drive, P.O. Box 6067

GUAM, TAMUNING

• Concrete building with CMU wall and concrete post tension roof

• Building 2 is 22 feet eave high• Warehouse flooring five feet above

street level• 100% back-up generator and water

supply

• Subdivided into seven warehouse units each measuring 40’ X 50’ for floor area

• of 2,000 sq. ft. each unit. • Each unit with rear stainless steel

roll-up door measuring to 14’ X 14’ and individual front entry door

Total Area : 15,400 sq. ft. • Floor Area (50’ X 280’) : 14,000 sq. ft. • Entrance sidewalk (5’ X 280’) : 1,400 sq. ft.

Page 5: CTSI Logistics Supply Chain Centers 2017

NEXTPREVIOUSwww.ctsi-logistics.com

5

Block 2, Area One, 135 O Street, East Sunset Boulevard, Airport Industrial

ParkGUAM, TIYAN

• TSA approved facility• 8 loading docks 2 of which 1 ramp

entrance for vehicles • Ground and second floor office

spaces• About 1,552 +/- pallet positions

room temperature warehouse space• Equipped with fire sprinkler system

• 7 enclosed temperature controlled storage with provision for additional units

• 2 enclosed cold or freezer room for perishables

• 100% back-up generator and water supply

• Equipped with CCTV

Floor Area 35,600 +/- sq. ft.

Page 6: CTSI Logistics Supply Chain Centers 2017

NEXTPREVIOUSwww.ctsi-logistics.com

6

2917 West Rosecrans Avenue, Compton, CA 90221

COMPTON, CA USA

• 7 dock doors• 54,060 sq ft• 3,000 pallet positions

Page 7: CTSI Logistics Supply Chain Centers 2017

NEXTPREVIOUSwww.ctsi-logistics.com

7

Km 14, West Service Road, Merville, Paranaque City

PHILIPPINES

1st Floor• Storage Area: 7,400 sq.m.• Racks: 4,500 Pallet Positions• Clear height: 4.8m• Pest and Termite Control• 4 Temperature-controlled Storage

rooms• Consolidation point for CTSI

Freight

2nd Floor• Floor Area: 7,400 sq.m.• Loading/Unloading Ramp• Roof insulation• Pest and Termite Control• 4 Temperature-controlled storage rooms  • 3000 Pallet positions

18,000 sq.m. covered area (3 Floors) • 7,000 sq.m. open area

Page 8: CTSI Logistics Supply Chain Centers 2017

NEXTPREVIOUSwww.ctsi-logistics.com

8

Unit #8-10, Pakna-an Central Warehouse Complex, S.E. James St., Zone Tamates,

Pakna-an, Mandaue City, CebuPHILIPPINES

• 2,840 sq. m. facility• 1,850 pallet positions• 5 docking doors

• 12m working height• 2 temperature-controlled storage

rooms

Page 9: CTSI Logistics Supply Chain Centers 2017

NEXTPREVIOUSwww.ctsi-logistics.com

9

PHILIPPINES

CAGAYAN DE ORO• 2,370 sq m facility• 1,320 pallet position• 2 docking doors• 6m working height• 1 Temperature-controlled storage

rooms

DAVAO• 2,100 sq m facility• 1,200 pallet position• 2 docking doors• 6m working height• 2 Temperature-controlled

storage rooms

Page 10: CTSI Logistics Supply Chain Centers 2017

THANK YOU!

[email protected]

Tel. No: (63-2) 323.6253www.ctsi-logistics.com

CTSILogistics