Top Banner
CTP – extraction CTP – extraction test summary test summary Bla summary 06/20/22 1 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009
18

CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

Jan 14, 2016

Download

Documents

Kerrie Marsh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

CTP – extraction test CTP – extraction test summarysummary

• Bla

• summary

04/21/23 1

R. Lietava, A. Jusko, J. Rak, D. KimCERN July 17th 2009

Page 2: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

• smb1jul11

• smb2jul11

• smb3jul11

• smb4jul11 synchronized Golden Sample

• smb5jul11

• smb6jul11

• smbtest7jul11 - testing

• smb1jul12

• smb2jul12

• smb2jul12_t0by6

• smb3jul12 -not in SYNCaligned: 0MSL+0, 0T0C+5, 0VGA+3, 0VBC+3,

• trigger:0SMB

• smb4jul12 -5:57, SPD shifted +3, global dedicated run

• for ZDC

• smb5jul12 parallel runs: run1: spd run2:others, all

• triggering on 0VGA

• smb6jul12 -new injections,not in sync with sps

• smb7jul12 -SMAQ triggered by 0VGA

• smb8jul12 - 12 bunches injection, no sync with SPS

• smb9jul12 -12 buches, in sync with SPS

• smb10jul12 -12 buches, in sync with SPS, T0 decreased

• voltages, trigger: 0SMB

04/21/23 2

Page 3: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 11 smb4 – distance to OrbitJuly 11 smb4 – distance to Orbit

04/21/23 3

September 10, 2008For comparison.September 10, 2008For comparison.

July 11, 2009Synchronized inj 0.4xe10 p/BC

July 11, 2009Synchronized inj 0.4xe10 p/BC

T0 zero BCSPD +7 BC (gitters)V0 +8 BCMuTr +11 BCZDC +21 BC

T0 zero BCSPD +7 BC (gitters)V0 +8 BCMuTr +11 BCZDC +21 BC

Page 4: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 11 smb4 – relative to T0July 11 smb4 – relative to T0

04/21/23 4

Page 5: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

04/21/23 5

ZDC cleanZDC clean

July 11 smb4 – sgn width (trains)July 11 smb4 – sgn width (trains)July 11 smb4 – sgn width (trains)July 11 smb4 – sgn width (trains)

Page 6: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

04/21/23 6

July 11 smb4 – sgn autocorrelJuly 11 smb4 – sgn autocorrelJuly 11 smb4 – sgn autocorrelJuly 11 smb4 – sgn autocorrel

Page 7: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb3 July 12 smb3

04/21/23 7

not in SYNC aligned: 0MSL+0, 0T0C+5, 0VGA+3, 0VBC+3

Page 8: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb3 width July 12 smb3 width

04/21/23 8

not in SYNCaligned: 0MSL+0, 0T0C+5, 0VGA+3, 0VBC+3

Page 9: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb3 auto-correl July 12 smb3 auto-correl

04/21/23 9

not in SYNCaligned: 0MSL+0, 0T0C+5, 0VGA+3, 0VBC+3

Page 10: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb9July 12 smb9

04/21/23 10

12 buches, in sync with SPS

Page 11: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb9 widthJuly 12 smb9 width

04/21/23 11

12 buches, in sync with SPS

Page 12: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb9 auto-correlJuly 12 smb9 auto-correl

04/21/23 12

12 buches, in sync with SPS

Page 13: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb10 July 12 smb10

04/21/23 13

12 buches, in sync with SPS, T0 decreased

Page 14: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb10 widthJuly 12 smb10 width

04/21/23 14

12 buches, in sync with SPS, T0 decreased

Page 15: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

July 12 smb10 auto-correl July 12 smb10 auto-correl

04/21/23 15

12 buches, in sync with SPS, T0 decreased

Page 16: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

BC-ORBITBC-ORBIT

04/21/23 16

not in SYNC aligned: 0MSL+0, 0T0C+5, 0VGA+3, 0VBC+3

12 buches, in sync with SPS

12 buches, not in sync with SP

Page 17: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

04/21/23 17

Some exoticsSome exotics

Page 18: CTP – extraction test summary Bla summary 11/23/20151 R. Lietava, A. Jusko, J. Rak, D. Kim CERN July 17th 2009.

Auto-Correl & widthAuto-Correl & width

04/21/23 18

ROW2 , smb912 buches, in sync with SPS

ROW1 , smb3not in SYNC aligned: 0MSL+0, 0T0C+5, 0VGA+3, 0VBC+3

ROW3 ,smb1012 buches, in sync with SPS, T0 decreased