Top Banner
CTA Reunion de groupe LAPP, 01-12-2014
13

CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

Dec 14, 2015

Download

Documents

Princess Earle
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

CTA

Reunion de groupe

LAPP, 01-12-2014

Page 2: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

23/09/2014 Catania Meeting G. Lamanna 2

Prototypes waiting for test slot @MPI

CSS / dish interface part

Prototypes built by LorimaArrived @MPI since May

Consecutive tube junction

Waiting for test slot

Each month lost is less time forimprovements in case on non positive test

conclusion ?

Page 3: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

23/09/2014 Catania Meeting G. Lamanna 3

Les surprises du prototype manchon

Pincement du manchon lors de son ouverture• Largeur de rainure longitudinale insuffisante• Au serrage contact sur lèvres du manchon

Pincement du manchon lors de son ouverture

Un petit usinage maison grâce à Laurent et hop dans la caisse !

Page 4: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

CSS / dish interface part

Page 5: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

Consecutive tube junction

Page 6: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

23/09/2014 Catania Meeting G. Lamanna 6

Final definition of details

Cables and pipes supports defined

• Glass fiber part glued on CSS

• Electrical cables fixation

• Cooling pipes fixation

Teflon plate supports defined

• Glass fiber part glued on Camera frame

• 400mm x 600 mm reflector foreseen

Page 7: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

> 3140 mm

3140 mm800 mm

Camera frame : Key values

Camera frame deformation(@ parking position)

Shiming(@ parking position)

Rails mounting(@ parking position)

Page 8: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

1 - Turn to focus

2- Turn to clamp in desired position

Carlos’ slide (Padova)

Carlos Diaz’s rail system

La définition de la fixation de la camera dans le frame a convergé

Page 9: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

Carbon fibers structure are very sensitive to shocks :•CF tubes are monolithic and thick : limited worry•CF ropes are 10mm Φ and of prime importance : be careful !•Camera frame CF skins are extremely thin : be very careful !!

Extreme care & protections are needed during maintenance !

Worries about shocks on CF parts

Possibilité de réaliser des test expérimentaux à l’étude actuellement

Page 10: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

23/09/2014 Catania Meeting G. Lamanna 10

Mounting : Civil work & tooling Installation procedure on site will require :

CSS elements assembly on ground

Lifting of complete CSS

Installation on dish

Mounting area close enough to mounted dishIndeed : crane cannot move once CSS is lifted !

crane crane

Civil work to be foreseen for trestel fixation

LAPP is going to start studying transportation and mounting tooling end of this year

Page 11: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

23/09/2014 Catania Meeting G. Lamanna 11

Access tower definition

Mounting area close enough to mounted dishIndeed : crane cannot move once CSS is lifted !

LAPP is going to start studying transportation and mounting tooling end of this year

Page 12: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

23/09/2014 Catania Meeting G. Lamanna 12

Access tower definition

Page 13: CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test slot @MPI CSS / dish interface part Prototypes.

23/09/2014 Catania Meeting G. Lamanna 13

Access tower definition