    SITE REPORTConstruction Technology (QSB 1514)

    Dixon Cheong (0310356)

  • 8/13/2019 CT Site Report

    2/11

    Objective

    1. To let us experience how an environment of a construction site going to be like and

    learn to face hot condition of the weather when we start working.

    2. To let us know the importance of taking care of our safety at site, to follow all safety

    precaution that is been mentioned so that accident or injury happen during the

    building construction can be avoided. The top priority before going in a site is safety

    helmet must be wore at all time during the site visit.

    3. To increase our knowledge about construction that we didnt learn in class

    4. To let us identify various types of building materials that is used in construction like

    concrete, timber, metal and etc. Not only had that, knowing the technology and the

    method used to build the building and to talk to the superior to know more about the

    construction of the building.

    5. To collect more information for this project and to observe the usage of the

    machinery plant at the construction site like the bar bending machine can be seen at

    the site

    6. To be able to identify the items measurable for sub-structure and superstructure

    works.

  • 8/13/2019 CT Site Report

    3/11

    CONTENT/TECHNICAL OBSERVATION

    On the 29thNovember 2013, we had a site visit to a construction site near the UEM

    Sunrise Berhad, Symphony Hills Clubhouse, Persiaran Simfoni Cyber9, 6300 Cyberjaya,

    Selangor. The Senior Project Manager and engineer that welcomed us is call Mr Umar

    Sabtu and Mr Zul Repectively. At 9.30a.m., we have been brought to the office first to give a

    slight briefing and information about the site before we entered. The site that we are visiting

    is constructing a 46 unit Terrace house. At 10 a.m., we have been brought into the site and

    ongoing our tour around the site.

    First, Mr Umar and Mr Zul brought us to a place to show us the foundation that is

    used in these Terrace house. The foundation that are used for these Terrace house is quite

    unique because is a combination of pad footing and raft foundation. Based on Mr Umar, the

    purpose of doing that is because the load cant take it if raft foundation is been fixed only

    because it the load will be too concentrated on a spot only. So with a combination pad

    footing the load will be separated evenly and it will make the building firm and stable.

    After that, we have been brought to the bar bending yard where all the cutting and

    bending of bars happen at that area. There are many different types of bars and different

    diameter of it too. Not only that, we saw few men bending bars and cutting bars using a bar

    bending and bar cutting machine which is not a easy job to do because the bars are thick

    and a lot of strength is needed to do it.

    After that, we have been brought to a 1stfloor area that will be building a beautiful

    elevated garden there which is similar with the one at Desa Park City that is mentioned by

    Mr Umar. Lastly, after the tour around the site is done, we are been given chances to ask Mr

    Umar and Mr Zul more information about the site project so that we can compile all the

    information to put into our site report.

  • 8/13/2019 CT Site Report

    4/11

    Information that was provided by Mr Umar Sabtu and Mr Zul

    Project title

    Cadangan membina 46 unit rumah teres strataYang mengandungi :

    Rumah teres tiga (3) tingkat (jenis A)10 unit

    Rumah teres tiga (3) tingkat (jenis B)36 unit

    Rumah sampah1 unit

    Link Deck

    Tangga Luar3 unit

    Kerja-kerja infrastruktur

    Di blok perumahan 1 (stage 1), 8.08 ekar, zon flagship, cyberjaya,

    Mukim dengkil, daerah sepang, Selangor darul ehsan

    The size of the land is around 8.08 acre

    The senior project manager is call Mr Umar Sabtu

    The Engineer in charge is call Mr Zul

    The 1ststage of the production cost around 21 million

    The estimated cost of the overall production is around 1 billion

    One unit of the terrace house cost 1.3 million

    The foundation used is a combination of pad footing and raft foundation

    The lean concrete used are 50mm or 25mm

    The drains are all pre-cast while the others are all in- situ

    The concrete used are Grade 30

    The type of cement used is Portland

    English bond is been used for partition wall

    Stretcher bond is been used for external wall/ Load-bearing wall

    Completion date is in 2 years time ( no specific date is mentioned)

    1 unit of the terrace house is around 9 meters high

  • 8/13/2019 CT Site Report

    5/11

    LEARNING OUTCOMES/CONCLUSION

    After the site visit, I had gain a lot of knowledge and experiences from the real

    working environment on the site. Working at the contruction site is not an essay job as the

    weather is usually hot. I was very tired and exhausted after the tour around the site visit is

    done but It was worth it. As a quantity surveyor, I have to get suit of this hot environment

    working place because this is what I am going to face in the future.

    Not only that, I have also gain more knowledge about construction that I didntlearn it

    in class. Through this site visit, I am able to recognise various types of building materials

    used at the construction site. But the most important thing that I learn throughout the site

    visit is safety always come first. Ive learn to always wear my safety helmet to prevent

    injuries happen. It is also important to follow the safety guidelines that is mentioned by the

    supervisor.

    Besides that, I have also gain a better understanding and clearer picture on the

    basic construction process like we saw how bar-bending works and production of spacer

    blocks are carried out, how orderly the reinforcement bars are stacked and kept at site. I also

    have a better understanding on the sequence of work. Not only that, I am also able to

    communicate with the construction team member during the site visit.

    Lastly. I am honor to have this opportunity to go to the site to experience things that I

    cant learn in class. The most important thing is that, this visit had enhanced my knowledge

    about construction and with that I will understand more and clearer on how to do taking off.

    Will hope that we can have the chance to visit more site.

  • 8/13/2019 CT Site Report

    6/11

    PHOTOS AND DESCRIPTION

    This Is Mr Umar Sabtu the Senior Project Manager

    Hollow Blocks

    This are drain cells for the drainage

    systems

  • 8/13/2019 CT Site Report

    7/11

    This is a Hydraulic Excavator Crane

    This is the plan view of the whole area

    Formwork applied for column

  • 8/13/2019 CT Site Report

    8/11

    This is an example of erected scaffoldings

    Various type and size of Reinforcement bars

    This machine is use to cut reinforcement bars to

    any specific length

  • 8/13/2019 CT Site Report

    9/11

    This is a spacer bar. The purpose of

    it is to prevent the reinforcement

    bars to rust

    This is a bar bending machine

    Various type and size of stirrups and

    links

  • 8/13/2019 CT Site Report

    10/11

    The reinforced bars sticking out so that later can join

    the other structures together.

    Pre-cast walkway slab

    This is the floor plan of the whole area

  • 8/13/2019 CT Site Report

    11/11

    This is concrete bricks

    This is clay bricks

    This is the Project Signboard