Welcome to the Virginia Avenue Tunnel Environmental Assessment and Section 106 Public Scoping Meeting Project representatives are on hand to receive comments and answer questions.
22

CSX Virginia Avenue Tunnel Public Meeting placards

Apr 07, 2018

Download

Documents

herrVebah
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 1/25

Welcome to theVirginia Avenue Tunnel

Environmental Assessment and

Section 106 Public Scoping Meeting

Project representatives are on hand to receivecomments and answer questions.

Page 2: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 2/25

• The purpose of this meeting is to gather early public input into the scope of the Virginia Avenue Tunnel project’s environmental assessment (EA), potentialalternatives, and areas of concern regarding the project.

• This evening’s meeting is an Open House format, during which you will be able totalk directly with members of the project team.

• Although we will be glad to answer any questions you might have, we will onlyknow your thoughts and ideas if you fill out a comment form, speak to the courtreporter stationed at this meeting, email us, or visit and leave comments at ourproject website.

• We thank you for your participation in this process.

DDOT is committed to ensuring that no person is excluded from participation in, or denied the benefits of its projects, programs, and services on the basis of race, color, national origin, or gender, as provided by Title VI of 

the Civil Rights Act of 1964 or on the basis of disability as provided by the Americans with Disabilities Act.

Tonight’s Meeting

Page 3: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 3/25

Purpose and Need

FHWA actions associated with

this project would occur duringconstruction and include potentialclosure of the I-295 on-ramp at 8thStreet SE and potential temporaryuse of air rights under I-295/11thStreet Bridge.

CSX is proposing this project to

address:• Tunnel Deficiencies

• Future Freight Demand

• Capacity Limits

I-295/11th Street Bridge I-295 On-Ramp at 8th Street SE

Page 4: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 4/25

What is the Virginia Avenue Tunnel?

• Originally constructed between 1872 and 1904

• Approximately 4,000 feet long

• Located beneath eastbound Virginia Avenue SE between 2nd and11th Streets

• Major chokepoint

• Single track tunnel

• Insufficient vertical clearance to operate double-stack intermodalcontainer freight trains

Page 5: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 5/25

Where is the Virginia Avenue Tunnel?

Page 6: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 6/25

West Portal at 2nd Street SE (Existing Conditions)

East Portal at 11th Street SE (Existing Conditions)

Page 7: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 7/25

Section 106 of the NationalHistoric Preservation Act

Section 106 of the National Historic PreservationAct as amended requires consultation with the

State Historic Preservation Officer and other

interested parties for any federal undertaking.An assessment of effect on historic properties

will be conducted and disclosed in the project’sEnvironmental Assessment.

Interested parties are invited to participate.

Page 8: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 8/25

Final Decision Document

NEPA Environmental Assessment Process

Initiate Project

Public Scoping

Purpose and Need

Alternatives Development

Historic Properties (Section 106) Evaluation

Public Review/Public Hearing

Environmental Assessment

We Are Here

Page 9: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 9/25

Environmental Issues

What we heard from previous public outreach:

• Access to interstate

• Air quality

• Claims

• Emergency Vehicle Access

• Hours of Construction• Noise and Vibration

• Parking

• Pedestrian/Bicycle Access

• Public TransportationAccess

• Safety and Security

Storm Water Drainage• Traffic

• Utility Service

Page 10: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 10/25

MILESTONE DATEPublic Meeting 1 September 14, 2011

Public Meeting 2 Fall 2011

Environmental Assessment Spring 2012

Public Meeting 3 Spring 2012

Final Decision Document Summer 2012

Project Schedule

Page 11: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 11/25

About The Virginia Avenue Tunnel Project

• The Virginia Avenue Tunnel Project is a 107year-old tunnel that has been identified asone of the most significant bottlenecks onthe East Coast in the last two Mid AtlanticRail Operations Planning Studies. The tunnelhas been in operation for over a century and

must be modernized to help meet 21st centurytransportation needs.

• This tunnel is part of the National Gateway,an $842 million multistate public-privateinfrastructure initiative that plans to upgradetracks, equipment and facilities, and provide

clearance for doublestack intermodal trains.

 

National Gateway Project

Existing Doublestack Clearance Routes

 

ChicagoNew Yor k

Boston

St. Louis

Memphis

New Or leans

Baltimor e

Wilmington

Hampton Roads

TampaTampa

Pittsburgh

ChicagoNew York

Boston

St. Louis

Memphis

New Orleans

Baltimore

Wilmington

Hampton Roads

Pittsburgh

CharlotteCharlotte

NW OhioNW Ohio

Page 12: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 12/25

The Challenge in the Washington Region

Figures according to the Federal Railroad Administration and theUS Census Bureau. 2025 population projection based on growthrate between 2000 and 2010.

4.80 5.587.00

DC Metro Area Population

(millions)

2000 2010 2025

40TONSAnnual freight

demand perperson

Pollution

Road & Rail Congestion

Logistics Cost

57MILLIONMORETONS

Annual regional freightdemand increasefrom 2010–2025

Page 13: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 13/25

Freight: Modal GreenhouseGas Comparisons

Ton of Greenhouse Gas Emissions(per million ton-miles)

100

90

80

70

60

50

40

30

20

10

0

71.61

26.88

TRUCK RAIL

• A train can move a ton of freight nearly500 miles on a single gallon of fuel.

• On average, railroads are three or moretimes more fuel-efficient than alternativesand with constant innovation freight railbecomes more efficient every day.

• The EPA estimates that moving freightby rail emits three times less nitrogenoxide and particulates per ton-mile thanhighway transportation

• Shifting 10 percent of long-haul freightfrom the highway to the railroad would

reduce annual greenhouse gas emissionsby more than 12 million tons.

Page 14: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 14/25

• Double-stack trains carry twocontainers on top of one another on asingle car. In this manner a double-stacktrain can transport up to twice theamount of freight as a single-stack trainof equal length.

• Encouraging use of double-stack trainswill result in fewer highway milestraveled, faster connecting service,and lower overall transportation costs-savings that will alleviate pressure onour highways and lower the cost of doing business in the region.

What is Double-Stack?

Page 15: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 15/25

• Intermodal transportationemploys multiple modesof transportation to movefreight in a containeror vehicle, without anyhandling of the freight itself when changing modes.

• Intermodal transportationallows shippers tocombine the long-haulefficiencies of rail withthe flexibility of short-haul trucks to achievecost-effective, efficient

and reliable freighttransportation.

What is Intermodal?

Page 16: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 16/25

How to provide comments:

Fill out a comment form available at this meeting

Speak to the court reporter stationed at this meeting

E-mail [email protected]

Visit www.VirginiaAvenueTunnel.com

How to Provide Comments

Page 17: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 17/25

Welcome

Page 18: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 18/25

Project

Overview

Page 19: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 19/25

NEPA

Page 20: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 20/25

CSX

Page 21: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 21/25

Comments

Page 22: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 22/25

ConceptAlternativeSuggestions

Page 23: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 23/25

Page 24: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 24/25

Page 25: CSX Virginia Avenue Tunnel Public Meeting placards

8/4/2019 CSX Virginia Avenue Tunnel Public Meeting placards

http://slidepdf.com/reader/full/csx-virginia-avenue-tunnel-public-meeting-placards 25/25