3/31/2014 1 City of Lebanon, NH CSO Contract 10 Public Meeting April 1, 2014
19

CSO 10 Public Meeting Presentation

Jul 08, 2015

Download

City of Lebanon

A presentation for the April 1, 2014 CSO 10 informational meeting at the Kilton Public Library, Lebanon, NH
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CSO 10 Public Meeting Presentation

3/31/2014

1

City of Lebanon, NHCSO Contract 10Public Meeting

April 1, 2014

Page 2: CSO 10 Public Meeting Presentation

3/31/2014

2

Contract 10 Locations

• North Main Street1,000 FeetDana to Estabrook Cir.

• Dana Street250 FeetMain to Prospect

• Highland Avenue925 FeetProspect to Green West

• Prospect Street West600 Feet

• Pearl Street600 Feet

• Winter Street West675 Feet

• Green Street West960 Feet

• Timothy Avenue500 Feet

June 15, 2013Walkabout

• Conducted site walkabout on June 15, 2013

• Discussed resident concerns

• City willing to meet resident at property in the future to discuss concerns

Page 3: CSO 10 Public Meeting Presentation

3/31/2014

3

October 23, 2013First Public Meeting

• Discussed project design and schedule

• Discussed protection of trees

• Reviewed design drawings

• Discussed resident concerns

Protection of Trees

• Walkabout with arborist will be conducted.

• Invites via mailing will be forthcoming.

• Contact City staff if you have a concern about a particular tree or planting.

Page 4: CSO 10 Public Meeting Presentation

3/31/2014

4

Schedule

• 50% Design – December 2013

• 90% Design – March 2014

• Final Construction Documents – May 2014*

• Bid Period – June 2014

• Start Construction – July 2014

• End Construction – September 2015

* Final Public Meeting

Project Contacts

• Christina Hall, City [email protected]

603.448.3112

• Mike Lavalla, Director of Public [email protected]

603.448.3112

• Ryan Wingard, Wright-Pierce Project [email protected]

603.430.3728

Page 5: CSO 10 Public Meeting Presentation

3/31/2014

5

Small Group Sessions

North Main Street

Component Existing Proposed

Width 28’ 28’

Esplanade 2’-4’ (west) no change (west) 4’-9’ (east) no change (east)

Sidewalk 3.5’-5.5’ (both) no change (both)

Drainage Vert. Curb/CBs Vert. Curb/CBs

Page 6: CSO 10 Public Meeting Presentation

3/31/2014

6

Page 7: CSO 10 Public Meeting Presentation

3/31/2014

7

Highland AvenueProspect to MapleComponent Existing Proposed

Width 20’-22’ 22’

Esplanade None None

Sidewalk None 5’ (south)

Drainage None Vert. Curb/CBs

Page 8: CSO 10 Public Meeting Presentation

3/31/2014

8

HIGHLAND AVE

Page 9: CSO 10 Public Meeting Presentation

3/31/2014

9

Highland AvenueMaple to Green Street WestComponent Existing Proposed

Width 22’-24’ 24’

Esplanade 1’-2’ (south) 2’ (south)

Sidewalk 3.5’-5.0’ (south) 5’ (south)

Drainage Vert. Curb/CBs Vert. Curb/CBs

Page 10: CSO 10 Public Meeting Presentation

3/31/2014

10

HIGHLAND AVE

Prospect Street West

Component Existing Proposed

Width 18’-29’ 22’

Esplanade 1’-5’ (east) 4’ (east)

Sidewalk 4.5’-5.5’ (east) 5’ (east)

Drainage None Vert. Curb/CBs

Page 11: CSO 10 Public Meeting Presentation

3/31/2014

11

Page 12: CSO 10 Public Meeting Presentation

3/31/2014

12

Page 13: CSO 10 Public Meeting Presentation

3/31/2014

13

Pearl Street

Component Existing Proposed

Width 21’-25’ 22’

Esplanade 1’-4’ (east) 3’ (east) 2’-4’ (west)

Sidewalk 4’-6’ (east) 5’ (east)4’-5.5’ (west)

Drainage CBs Curb/CBs

Pervious Pavement

Page 14: CSO 10 Public Meeting Presentation

3/31/2014

14

Page 15: CSO 10 Public Meeting Presentation

3/31/2014

15

Timothy Avenue

Component Existing Proposed

Width 22’-30’ 22’

Esplanade None None

Sidewalk None None

Drainage Curb/CBs Sloped Curb/CBs

TIMOTHY AVE/WINTER ST WEST

Page 16: CSO 10 Public Meeting Presentation

3/31/2014

16

TIMOTHY AVE

Winter Street West

Component Existing Proposed

Width 22’-24’ 22’

Esplanade None None

Sidewalk None None

Drainage None Sloped Curb/CBs

Pervious Pavement

Page 17: CSO 10 Public Meeting Presentation

3/31/2014

17

TIMOTHY AVE/WINTER ST WEST

WINTER ST WEST

Page 18: CSO 10 Public Meeting Presentation

3/31/2014

18

Green Street West

Component Existing Proposed

Width 19’-23’ 22’

Esplanade None None

Sidewalk None None

Drainage None Sloped Curb/CBs

Page 19: CSO 10 Public Meeting Presentation

3/31/2014

19