Top Banner
2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water 2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water INNOVATIVE VAPOR INTRUSION MITIGATION DESIGN FOR COMPLEX BUILDING FOUNDATIONS
21
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

INNOVATIVE VAPOR INTRUSION

MITIGATION DESIGN FOR COMPLEX

BUILDING FOUNDATIONS

Page 2: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

PRESENTATION OUTLINE

Vapor Intrusion

How to Mitigate

What is SSDS?

SSDS versus SVE

Components of a SSDS Design

SSDS Design Challenges

Case Study – Manhattan, New York

Case Study – Wayne, New Jersey

Lessons To Be Learned

Page 3: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

VAPOR INTRUSION Migration of volatile chemicals from contaminated groundwater or

soil into buildings above

Indoor Air Quality

Chronic and acute health/safety hazards

Page 4: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

HOW TO MITIGATE

Passive Venting Systems

Impermeable Membrane Liners

Sub-Slab Depressurization Systems

HVAC/Ventilation System Modifications

http://www.nj.gov/dep/srp/guidance/vaporintrusion/subsurface.htm

Page 5: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

WHAT IS A SSDS?

Active venting system consisting of:

Fan/Blower

Well Network

Vacuum/Air Flow Rate Instrumentation

Control Panel

Telemetry System

Emission Controls

Page 6: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

SSDS VERSUS SVE

Differences: Purpose

MITIGATION versus REMEDIATION

Capture versus Extraction

Similarities: Principals

Active Pneumatic Systems

Dependent on intrinsic permeability

Page 7: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

Mitigation vs. Remediation

Depressurization System SVE System

Objective:

Create a differential pressure barrier between

subsurface and buildings

Design Basis:

Vacuum Gradient = 0.004 – 0.025 IWC

Objective:

Remove contaminants from the vadose zone

Design Basis:

Pore Volume (PV) Exchanges

Sands = 500 PV/year

Silts = 1,500 PV/year

Silty Clays/Clays = 2,500 PV/year

Page 8: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

DESIGN COMPONENTS OF A SSDS DESIGN

Pilot Testing

Modeling

Design Criteria

Air Flow Rate

Vacuum

ROI

Page 9: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

SSDS DESIGN CHALLENGES

Equipment Limitations

Vacuum Limitations:

• Industrial fan: 3 to 4 IWC

• Compact radial blower: 10 to 14 IWC

• Regenerative blower: 90 IWC (6.5” Hg)

• PDB: 220 IWC (16” Hg)

• LRP: 350 IWC (28” Hg)

Site Challenges

Slab-on-grade

Low permeability sub-slab material

Shallow water table

Subsurface heterogeneity

Below-grade structures

Non-confining leaky surface layer

Space limitations

Varying partial pressures/Henry’s Law constants

of complex soil gas mixtures

Page 10: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

CASE STUDY – MANHATTAN, NEW YORK

Page 11: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

SITE BACKGROUND

Operated until June 2013 as an active dry cleaning facility

Residential dwellings located on floors two through five.

Indoor air assessment - PCE and TCE in exceedance of NYSDOH

Vapor Intrusion Guidance Matrix.

Page 12: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

SITE CONSTRAINTS

2 - 6 inch thick concrete slab with granite bedrock beneath

Limited space for implementation/Manual drilling required

Possible demolition of building during application period

Page 13: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

PILOT TESTING

5 Vapor Recovery Wells (VP)

3 Shallow Vapor Probes (SVP)

Understand the site-specific sub-surface parameters

(i.e., permeability) to design the full-scale SSDS.

Page 14: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

Outputs:

Ki , ROI, FD, PV

exchanges

Benefits:

More cost-effective design

Valuable tool for SVE and VI Mitigation systems

Helps to ensure efficient and effective vapor mitigation

PNEUMATIC MODELING MDFIT – Computer Pneumatic Modeling Program

Page 15: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

Existing Vapor Recovery Well Network

Process Equipment:

• Blower

• AMS

• Control panel/Instrumentation and auto-dialer

• VGAC

SYSTEM DESIGN

DESIGN AIR FLOW RATE = 200 SCFM AT 80 IWC WELLHEAD VACUUM

Page 16: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

FULL-SCALE RESULTS SSDS was meeting the required minimum sub-slab vacuum of 0.004

inches of water column (as recommended by USEPA)

SVE and SSDS can be implemented efficiently and cost effectively, even at complex sites, if we understand and consider the constraints of the site when designing the system. Importance of pilot testing and pneumatic modeling when designing/installing a SVE / SSDS at complex sites

SVE Mass Removal Rate =

1.25 lbs VOC / day

Page 17: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

CASE STUDY – WAYNE, NEW JERSEY

Page 18: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

SYSTEM IMPLEMENTATION – MARCH 2013

Design air flow rate = 500 scfm

Design wellhead vacuum = 35 IWC

Remote telemetry system

Operational sub-slab vacuums >> 0.004 IWC

Initial VOC mass removal rate = 0.25 lbs./day

Design and Operational Key Features:

Page 19: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

STRATEGY BENEFITS

Effective Vapor Intrusion Mitigation

Source Mass Removal

Cost Savings

Reduced Remedial Timeframes

Design and Operational Key Features:

Page 20: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

LESSONS LEARNED Importance of pilot testing and pneumatic modeling when designing/installing an

SVE/SSDS at complex sites

If designed correctly, SVE and SSDS can be implemented efficiently and cost effectively,

even at complex sites.

Integrated SVE and VM Approach – Effective Optimization Strategy

Effective Vapor Intrusion Mitigation

Source Mass Removal

Benefits:

Cost Savings

Reduced Remedial Timeframes

Page 21: Csm 2014 vapor intrusion mitigation for complex buildings - revised  kl - pdf

2014 – Contaminated Site Management (CSM-2014) Sustainable Remediation & Management of Soil, Sediment and Water

QUESTIONS?