CSLS Renovations Summer 2012 Virginia M. Scott Academic Director
Jan 13, 2016
CSLS RenovationsSummer 2012
Virginia M. ScottAcademic Director
Overall
Overall
Student lounge
Large seminar room
Workstations
Dates and details
1) The doors will shut at 6 pm on Monday, April 30. 2) Packing and moving from May 1 – May 10.3) Construction begins on Monday, May 14.4) Projected opening is on Monday, August 13. 5) Between May 1 and August 13 we will exist virtually.
(Todd and Feli will be working from off campus.)– We will NOT have access to the server.– We will NOT be able to digitize films or create materials during.– We WILL be reachable by e-mails and available to meet to talk about
all things of interest and concern.