OV-1.1 CSE4939 CSE4940 CSE4939W/4940 CS & E Design Lab I/II Prof. Steven A. Demurjian Computer Science & Engineering Department The University of Connecticut 191 Auditorium Road, Box U-155 Storrs, CT 06269-3155 {steve,ssg}@engr.uconn.edu http://www.engr.uconn.edu/~steve/Cse4939W/ cse4939W.html
CSE4939W/4940 CS & E Design Lab I/II. Profs. Steven A. Demurjian and Swapna Gokhale Computer Science & Engineering Department The University of Connecticut 191 Auditorium Road, Box U-155 Storrs, CT 06269-3155. {steve,ssg}@engr.uconn.edu - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
OV-1.1
CSE4939CSE4940
CSE4939W/4940 CS & E Design Lab I/II
Prof. Steven A. DemurjianComputer Science & Engineering Department
The University of Connecticut191 Auditorium Road, Box U-155
Product Backlog is the list of tasks Purpose, Objectives, Goals Defines Product High-Level Architecture Diagram
Revise Architecture/Specification Based on Input Scrum is a Incremental Approach of Multiple Sprints Develop Initial Sprint that Contains
Section A. Sprint Backlog Section B: User Stories/Use Cases Section C: User Based Specification/Interfaces Section D: Detailed Design Section E: Test plans
Sprint is Continuously Updated Throughout Year
OV-1.5
CSE4939CSE4940
Philosophy of the Sequence
Demonstrate Ability to Work as a Group with Minimal or No Guidance
Team Organizes, Plans, Designs, Prototypes, and Delivers!
Employ an Agile Approach – see: www.engr.uconn.edu/~steve/Cse2102/finagile.pptx scrumreferencecard.com scrumreferencecard.com/ScrumReferenceCard.pdf scrumreferencecard.com//ScrumMasterChecklist.pdf
As W course, at least 15 single-spaced pages that go through editorial process
A Time-Limited (4weeks) Complete Increment that has: Evaluation/Prioritization of to-do-list of tasks Detailed Requirements Design & Analysis Implementation & Developer Testing QA/Acceptance Testing & Deployment
Sprint Document Organized as Section A. Sprint Backlog – What to do Next Section B: User Stories/Use Cases - Functionality Section C: User Based Specification/Interfaces Section D: Detailed Design – UML, ER, etc. Section E: Test plans - White-Box, Black box, etc.
This Document Evolves and Expands Throughout Year
OV-1.7
CSE4939CSE4940
Schedule – Fall 2017
Assignment Assigned First Draft Revised Version (if any)