7/28/2019 Cs09 Detroit Water Sewage District Psug 2012
The Detroit Water and Sewerage Department (DWSD), one of the largestwater and sewer utilities in the United States, has a rich history as a publicutility dating back to 1836.
Serves 35% of Michigan’s Population including Detroit and 76 other communities.Fresh Water System - 5 water treatment plants pump an average of 596 million gallons of clean drinking water each day. Maximum capacity1.2BGD
Wastewater System - Treats an average of 707 million gallons of flowper day. Maximum capacity 1.65BGD
7/28/2019 Cs09 Detroit Water Sewage District Psug 2012
Multitude of HMI solutions:Ovation, Wonderware, Ifix, RSView32
Large variety of systems integration implementationsDisparate process control implementationsUsually only hardware platform specifiedPLC Code developed using only written narrativesNo standard control software strategies
No standard graphics, other than color standardImplementation varies by Contractor/SI/Programmer
5
7/28/2019 Cs09 Detroit Water Sewage District Psug 2012
Reduce the engineering time requiredto create standard, repeatable process applicationsYou can focus your energies on the custom aspects of your applications.
Increase control system quality and reliability .The reuse of well tested code conforming to industry standards reduces the likelihood of
code bugs.Drive logical and visual consistency
The Process Library aids in producing standard Graphics formats that increase theconsistency of your HMI thus reducing the need for Operator Training.
Superior diagnostics
Built in process diagnostics will make applications easier for operators and maintenance totroubleshoot and debug without requiring PAC programming tools
Scalability – You can build ever larger systems using the same reusable modules.
7/28/2019 Cs09 Detroit Water Sewage District Psug 2012
• An Accelerator provides a package of tools, which significantly simplifies theDesign, Manufacturing, Start-Up andSupport of Rockwell Automationcontrol systems.
• An Accelerator CD provides the – selection tools and – basic panel layout, – wiring diagrams, – Logix program,
– HMI screens and – Quick Start manual
7/28/2019 Cs09 Detroit Water Sewage District Psug 2012
Hubbell-Southfi eld CSO RTBThe Hubbell-Southfield CSO RTB is one of DWSD’s most active, longest operating CSO facilities and the largest on theRouge River. Since August 1999, it has been effectively capturing and treating combined sewage through screening,settling and disinfection to meet discharge permit requirements that protect public health. Sized to fit into the available
land and site constraints, the basin has a 22 million gallon storage capacity. Located next to the Tournament PlayersChampionship Golf Course (TPC) in Dearborn, this RTB serves as an example of how these facilities can be goodneighbors and blend in with the surrounding environment. The facility features an innovative design component thatenables three different operational modes within the RTB and prevents resuspension of solids during large storms withhigh flow rates.
7/28/2019 Cs09 Detroit Water Sewage District Psug 2012
Results-Total construction costssignificantly below estimate
Reduced Deployment Time• Resulted in a 50 percent reduction in design time, contract oversight, and post-contract
documentation and support.• Provided process control with advanced networking and diagnostic capabilities• Increased access to process data for better preventive and predictive maintenance
Reduced Engineering Hours and Costs• Saved estimated $120,000 in configuration and systems integration time• Saved $90,000 in factory-acceptance testing and Startup/commissioning
Drove standardization for DWSD wide graphics FTViewSE/ME platform
Advanced HMI without the associated development cost
Software configuration that is fully documented and tested
7/28/2019 Cs09 Detroit Water Sewage District Psug 2012