Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.90 February 11, 2005 3F0205-03 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Subject: Crystal River Unit 3 - Supplemental Information Regarding Risk Significant Fire Zones and Fire Zone Specific Compensatory Actions for License Amendment Request #289, Revision 0, Revised Improved Technical Specifications (ITS) 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating, 3.6.6, Reactor Building Spray and Containment Cooling Systems, 3.7.8, Decay Heat Closed Cycle Cooling Water (DC) System and 3.7.10, Decay Heat Seawater System Reference: PEF to NRC letter dated January 13, 2005, Crystal River Unit 3 - License Amendment Request #289, Revision 0, Revised Improved Technical Specifications (ITS) 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating, 3.6.6, Reactor Building Spray and Containment Cooling Systems, 3.7.8, Decay Heat Closed Cycle Cooling Water (DC) System and 3.7.10, Decay Heat Seawater System Dear Sir: Florida Power Corporation, doing business as Progress Energy Florida, Inc. (PEF), hereby submits Supplemental Information and Additional Regulatory Commitments for License Amendment Request (LAR) #289, Revision 0. Attachment A to this submittal provides supplemental information concerning fire detection, suppression, ignition sources, and combustible loads. The information also includes compensatory measures for risk significant fire zones and operational controls to be practiced for the duration of the maintenance activity to return Decay Heat Seawater Pump RWP-3B to full qualification. This information fulfills a commitment made in the referenced letter. A list of regulatory commitments is included in Attachment B. CR-3 will implement the provisions described in these additional commitments during the proposed one-time extended allowed outage time (AOT). Progress Energy nlorida, Inc. Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428 A4- O (P
25

Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

Oct 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

Progress EnergyCrystal River Nuclear PlantDocket No. 50-302Operating License No. DPR-72

Ref: 10 CFR 50.90

February 11, 20053F0205-03

U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555-0001

Subject: Crystal River Unit 3 - Supplemental Information Regarding Risk Significant FireZones and Fire Zone Specific Compensatory Actions for License Amendment Request#289, Revision 0, Revised Improved Technical Specifications (ITS) 3.5.2, EmergencyCore Cooling Systems (ECCS) - Operating, 3.6.6, Reactor Building Spray andContainment Cooling Systems, 3.7.8, Decay Heat Closed Cycle Cooling Water (DC)System and 3.7.10, Decay Heat Seawater System

Reference: PEF to NRC letter dated January 13, 2005, Crystal River Unit 3 - License AmendmentRequest #289, Revision 0, Revised Improved Technical Specifications (ITS) 3.5.2,Emergency Core Cooling Systems (ECCS) - Operating, 3.6.6, Reactor Building Sprayand Containment Cooling Systems, 3.7.8, Decay Heat Closed Cycle Cooling Water(DC) System and 3.7.10, Decay Heat Seawater System

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc. (PEF), hereby submitsSupplemental Information and Additional Regulatory Commitments for License AmendmentRequest (LAR) #289, Revision 0.

Attachment A to this submittal provides supplemental information concerning fire detection,suppression, ignition sources, and combustible loads. The information also includes compensatorymeasures for risk significant fire zones and operational controls to be practiced for the duration ofthe maintenance activity to return Decay Heat Seawater Pump RWP-3B to full qualification. Thisinformation fulfills a commitment made in the referenced letter.

A list of regulatory commitments is included in Attachment B. CR-3 will implement the provisionsdescribed in these additional commitments during the proposed one-time extended allowed outagetime (AOT).

Progress Energy nlorida, Inc.Crystal River Nuclear Plant15760 W. Powerline StreetCrystal River, FL 34428

A4- O (P

Page 2: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission Page 2 of 33F0205-03

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor,Licensing and Regulatory Programs at (352) 5634883.

Sincerely,

Dale E. YoungVice PresidentCrystal River Nuclear Plant

DEY/Ivc

Attachments:A. Supplemental Information Regarding Risk Significant Fire Zones and Fire Zone

Specific Compensatory ActionsB. List of Regulatory Commitments

xc: NRR Project ManagerRegional Administrator, Region IISenior Resident Inspector

Page 3: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Page 3 of 3

STATE OF FLORIDA

COUNTY OF CITRUS

Dale E. Young states that he is the Vice President, Crystal River Nuclear Plant for

Florida Power Corporation, doing business as Progress Energy Florida, Inc. (PEF); that he is

authorized on the part of said company to sign and file with the Nuclear Regulatory

Commission the information attached hereto; and that all such statements made and matters set

forth therein are true and correct to the best of his knowledge, information, and belief.

Dale E. Young VVice PresidentCrystal River Nuclear Plant

The foregoing document was acknowledged before me this |(I day of

Fe brant, , 2005, by Dale E. Young.

g-';-. ., USA A. MORRIS*'ansNotory Pub~Ic - Steof Fldd

' . EFk .It sit44 I 20

=-em9

Signature of Notary PublicState of Florida

. /,(5 -9 /He 4t l<e (5

(Print, type, or stamp CommissionedName of Notary Public)

PersonallyKnown __

Produced-OR- Identification

Page 4: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3

DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72

ATTACHMENT A

LICENSE AMENDMENT REQUEST #289, REVISION 0

Supplemental Information Regarding Risk Significant Fire Zones and FireZone Specific Compensatory Actions

Page 5: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission Attachment A3F0205-03 Page 1 of 19

Background

The following pages list fire zones that have been identified in the Probabilistic Risk Assessmentsubmitted to the NRC in Attachment C to License Amendment Request # 289, Revision 0 datedJanuary 13, 2005, as areas that could potentially impact plant capabilities while Decay HeatSeawater Pump RWP-3B is out-of-service for an extended allowed outage time (AOT) beyond72 hours.

The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual PlantExamination of External Events (IPEEE) and the CR-3 Appendix R Fire Study. For each ofthese areas, supplemental information concerning fire detection, suppression, ignition sources,and combustible loads is hereby provided. Walkdowns will be conducted prior to beginningwork on RWP-3B in risk significant areas to identify and remove transient combustiblematerials. Specific compensatory actions that will be taken during the RWP-3B maintenanceactivity are provided for each of the fire zones listed. These actions supplement thosecompensatory actions provided in the referenced letter. These compensatory actions will reducethe risk associated with the maintenance activity to return Decay Heat Seawater Pump RWP-3Bto full qualification. Operational controls for reducing risk during RWP-3B maintenance activityare also included for each fire zone.

Reference

PEF to NRC letter dated January 13, 2005, Crystal River Unit 3 - License Amendment Request#289, Revision 0, Revised Improved Technical Specifications (ITS) 3.5.2, Emergency CoreCooling Systems (ECCS) - Operating, 3.6.6, Reactor Building Spray and Containment CoolingSystems, 3.7.8, Decay Heat Closed Cycle Cooling Water (DC) System and 3.7.10, Decay HeatSeawater System

Page 6: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 2 of 19

Fire Zone: AB-75-5 Decay Heat Pit 3ADetection Automatic Ignition Sources in Combustible Loading and Type

Suppression IPEEE ModelIonization None * Transient 1917 Btu/ft2 consistingdetectors are combustibles predominantly of the followinginstalled in the * Decay Heat Pump insitu loads:area to provide DHP-1Afor early warning t Building Spray Pump Tray cable, lubricant oil and EOPof any fire that BSP.A required materials.may occur.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* No Planned Maintenance on DHP-1A or BSP-1A* No planned or unnecessary operation of DHP-1A or BSP-1A

Fire Zone: AB-95-3AA Makeup Pump (MUP) Room 3BDetection Automatic Ignition Sources In IPEEE Combustible Loading and Type

Suppression ModelAn ionization Wet pipe * Transient combustibles 7,878 Btu/ft2 consistingdetector is sprinkler, east * MUP-1 B predominantly of the followingprovided in the corridor of the insitu loads:pump space to room in thegive early corridorwarning of any connecting the Lubricating oil.fire that may three MUPoccur. spaces.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* The makeup pump configuration will be selected based on minimizing the risk from internal

events as a result of redundancy in its cooling water source.* No Planned Maintenance on MUP-iB.

Page 7: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 3 of 19

Fire Zone: AB-95-3C West Hallway |Detection Automatic Ignition Sources in Combustible Loading and Type

Suppression IPEEE ModelIonization Wet-pipe * Transient 19,887 Btu/ft2 consistingdetectors are sprinkler combustibles predominantly of the following insituprovided to system, * Motor Control Center loads:give early designed to (MCC) Makeupwarning of Ordinary Valves (MUV)-23/24 Tray cable and TSI.any fire that Hazard Group * MCC MUV-25/26may occur. 11 criteria.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required

Fire Zone: AB-95-3E Makeup Pump (MUP) Ro m 3ADetection Automatic Ignition Sources in Combustible Loading and Type

Suppression IPEEE ModelAn ionization Wet pipe * Transient 6,692 Btu/ft2 consistingdetector is sprinkler, east combustibles predominantly of the following insituprovided in corridor of the * MUP-1A loads:the pump room in thespace to give corridor Lubricating oil.early warning connectingof any fire that the three MUPmay occur. spaces.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* The makeup pump configuration will be selected based on minimizing the risk from internal

events as a result of redundancy in its cooling water source.* No Planned Maintenance on MUP-1A.

Page 8: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 4 of 19

Fire Zone: AB-95-3F Make-Up Pump Room 3CDetection Automatic Ignition Sources In Combustible Loading and Type

Suppression IPEEE ModelAn ionization Wet pipe * Transient 7,965 Btuft2 consisting predominantlydetector is sprinkler, east combustibles of the following insitu loads:provided in corridor of the * MUP-jCthe pump room in thespace to give corridor Lubricating oil.early warning connectingof any fire that the three MUPmay occur. spaces.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* The makeup pump configuration will be selected based on minimizing the risk from internal

events as a result of redundancy in its cooling water source.* No Planned Maintenance on MUP-1C.

Page 9: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 5 of 19

Fire Zone: AB-95-3G Central HallwayDetection Automatic Ignition Sources in IPEEE Combustible Loading and Type

I Suppression Model IIonizationdetectors areprovided.

Wet-pipesprinklersystemthroughoutzone.

* Transient combustibles* HTCP-1 (Misc. Waste

Evap. Package ControlPanel)

* HTCP-4 (EDG-3AEmergency LoadShedding-Heat Tracing)

* HTTR-4B (480/208-120VHeat Tracing Transformer3-3B)

* MTMC-3 (480VEngineered SafeguardsMCC-3A1)

* MTMC-6 (480VEngineered SafeguardsMCC-3B2)

* MTMC-18 (480V ReactorMCC-3A2)

* MTMC-19 (480V ReactorMCC-3B2

* RMA-3 (Aux BuildingVentilation Exhaust DuctMonitor)

* Waste Disp. PNL's* WDCP-1 (Ultra Filtration

Skid Control Panel)* WDCP-2 (Variable Speed

Controller for WDP-1 1)* WDTR-1 (Transformer for

WDCP-2 Waste Disp.Control Panel)

90,548 Btu/ft2 consistingpredominantly of the followinginsitu loads:

Tray cable and TSI.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Page 10: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 6 of 19

Fire Zone: AB-95-3K Miscellaneous Radiation Waste Rooms & HallwayDetection Automatic Ignition Sources In IPEEE Combustible Loading and Type

Suppression ModelNone None * Transient combustibles 12,774 Btu/ft2 consisting

predominantly of the followinginsitu loads:

Tray cable and TSI.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Note:This is a locked high radiation area. No roving hourly fire watch will be conducted. Followinginspection for and removal of transient combustible materials, the area will be locked and entrylimited to operationally necessary activities only, and require inspection for transient combustiblematerials upon exit. Keys to the area can be obtained from Health Physics (HP).

Fire Zone: AB-95-3L Waste EvaporatorDetection Automatic Ignition Sources In Combustible Loading and Type

Suppression IPEEE ModelNone None * Transient 18,189 Btu/ft2 consisting

combustibles predominantly of the following insitu* ASP-2A/2B (Waste loads:

EvaporatorCondensate Return Tray cable.

______________________ Pumps)_________________Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Note:* The Waste Evaporator is not used.

Page 11: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 7 of 19

Fire Zone: AB-95-3M Waste Evaporator RoomDetection Automatic Ignition Sources in Combustible Loading and Type

Suppression IPEEE ModelNone None * Transient 18,664 Btu/fVe consisting

combustibles predominantly of the following insituloads:

Tray cable, lubricating oil, plastic andwood.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Note:No roving hourly fire watch will be conducted. Following inspection for and removal of transientcombustible materials, the area will be secured and entry limited to operationally necessary activitiesonly, and require inspection for transient combustible materials upon exit. Keys to the area can beobtained from HP.

Fire Zone: AB-95-3N Reactor Coolant Evaporator RoomDetection Automatic Ignition Sources in Combustible Loading and Type

Suppression IPEEE ModelNone None * Transient 20,769 Btu/ft2 consisting

combustibles predominantly of the following insituloads:

Tray cable, lubricating oil, and rubbermaterial.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Note:No roving hourly fire watch will be conducted. Following inspection for and removal of transientcombustible materials, the area will be locked and entry limited to operationally necessary activitiesonly, and require inspection for transient combustible materials upon exit. Keys to the area can beobtained from HP.

Page 12: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 8 of 19

Fire Zone: AB-95-3P Waste & Recycle Pump RoomsDetection Automatic Ignition Sources in IPEEE Combustible Loading and Type

Suppression ModelNone None * Transient combustibles 19,007 Btu/ft2 consisting

* WDP-12A/B predominantly of the following(Concentrated insitu loads:Radioactive Liquid WastePumps) Tray cable and grease.

* WDP-13A/B (Boric AcidRecycle Pumps)

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* No Planned Maintenance on WDP-12A/B orWDP-13A/B.* No planned or unnecessary operation of WDP-1 2AB or WDP-1 3AIB.Note:WDP-12A/B and WDP-13A/B will only be operated when there is a qualified fire watch in theimmediate vicinity of the operating pump equipped with a radio and fire extinguisher.

Fire Zone: AB-95-3Q Concentrate Tank RoomDetection Automatic Ignition Sources in Combustible Loading and Type

Suppression IPEEE ModelNone None * Transient 9,074 Btu/ft2 consisting predominantly

combustibles of the following insitu loads:

Tray cable and rubberCompensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Note:This is a locked high radiation area. No roving hourly fire watch will be conducted. Followinginspection for and removal of transient combustible materials, the area will be locked and entrylimited to operationally necessary activities only, and require inspection for transient combustiblematerials upon exit. Keys to the area can be obtained from HP.

Page 13: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 9 of 19

Fire Zone: AB-95-3R Waste Gas RoomsDetection Automatic Ignition Sources in IPEEE Combustible Loading and Type

Suppression ModelNone None * Transient combustibles 23,141 Btu/ft2 consisting

* HAYES CAB predominantly of the following* HTDP-1A (208-120V insitu loads:

Heat Tracing DistributionPanel) Tray cable and rubber.

* HTDP-1 B (208-120V HTDistribution Panel)

* HTDP-4A (208-120V HTDistribution Panel)

* HTTR-1 A (480/208-120VHeat Tracing Transformer3-1A)

* HTTR-1 B (480/208-120VHeat Tracing Transformer3-1 B)

* HTTR-4A (480/208-120VHeat Tracing Transformer3-4A)

* WDP-1 B (Waste GasCompressor)

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Page 14: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 10 of 19

Fire Zone: AB-95-3T Reactor Coolant Bleed Tank RoomDetection Automatic Ignition Sources In Combustible Loading and Type

Suppression IPEEE ModelNone Wet-pipe * Transient 1,053 Btu/ft2 consisting

sprinkler combustibles predominantly of the following insitusystem loads:installed alongthe length of Cable tray.the entryhallway.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* The portion of the zone that cannot be locked will be observed by the roving fire watch.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Note:Much of this area is a locked high radiation area. The portion of the fire zone that can be lockedwill be locked and the keys will be administratively controlled. Entries will be limited to onlyoperationally necessary activities and require inspection for transient combustible materials uponexit. The portion of the zone that cannot be locked will be observed by the roving fire watch. Keysto the area can be obtained from HP.

Fire Zone: AB-95-3U Decant and Slurry Pump RoomDetection Automatic Ignition Sources in Combustible Loading and Type

Suppression IPEEE ModelNone None * Transient 58,467 Btu/ft2 consisting

combustibles predominantly of the following insituloads:

Tray cable and lubricant oil.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* The portion of the zone that cannot be locked will be observed by the roving fire watch.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required

Note:Much of this area is a locked high radiation area. The portion of the fire zone that can be lockedwill be locked and the keys will be administratively controlled. Entries will be limited to onlyoperationally necessary activities and require inspection for transient combustible materials uponexit. The portion of the zone that cannot be locked will be observed by the roving fire watch. Keysto the area can be obtained from HP.

Page 15: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 11 of 19

Fire Zone: AB-95-3W Waste Transfer Pump RoomsDetection Automatic Ignition Sources in IPEEE Combustible Loading and Type

Suppression 'ModelNone None * Transient combustibles 102,236 Btu/ft2 consisting

* WDP-5A/5B/5C (Waste predominantly of the followingTransfer Pumps) insitu loads:

Tray cable, PVC lubricant oil andTSI.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* No Planned Maintenance on WDP-5A/5B/5C* No unnecessary operation of WDP-5A/5B/5C

Note:The Waste Transfer Pumps will only be operated when there is a qualified fire watch in theimmediate vicinity of the operating pump equipped with a radio and fire extinguisher.

Fire Zone: AB-95-3Y RCP Seal Injection Filter RoomDetection Automatic Ignition Sources In Combustible Loading and Type

Suppression IPEEE ModelNone None * Transient 32,166 Btu/ft2 consisting

combustibles predominantly of the following insitu* ES CAB 3A4 loads:

Tray cable, TSI, rubber, plastics andfiberglass.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Note:No roving hourly fire watch will be conducted. Following inspection for and removal of transientcombustible materials, the area will be secured and entry limited to operationally necessary activitiesonly, and require inspection for transient combustible materials upon exit. Keys to the area can beobtained from HP.

Page 16: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 12 of 19

Fire Zone: AB-95-3Z Nuclear Services Seawater (RW) and Nuclear ServicesClosed Cycle Cooling Water (SW) Pump Room

Detection Automatic Ignition Sources in IPEEE Combustible Loading and TypeSuppression Model

Ionization Wet-pipe * Transient combustibles 3,438 Btu/ft2 consistingdetectors sprinkler * AHF-15B (Decay Heat predominantly of the following

system Closed Cycle Air Handling insitu loads:covering the Fan)entire zone, * RWP-2B Tray cable, TSI, lubricant oil,except for the * RWP-3A grease, rubber, plastics andheat * SWP-1A fiberglass.exchanger * SWP-1 Barea.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted on equipment other than RWP-3B related

work.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* See Note.

Note:This is the area where work will predominantly take place for RWP-3B. Personnel will generally bein the area around the clock while in the action statement and hot work will be conducted inaccordance with station procedures.

Page 17: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 13 of 19

Fire Zone: AB-119-6A North HallwayDetection Automatic Ignition Sources in Combustible Loading and

Suppression IPEEE Model TypeIonization Wet-pipe sprinkler * Transient 282,350 Btulft2 consistingdetectors system. The combustibles predominantly of the following

sprinklers are * Small Hydrogen Line insitu loads:located at twoelevations; in the Tray cable, TSI, andoverhead and fiberglass.under the cabletrays.

The stairwayopening in the floorin the northeastportion of the zoneis protected byclose-spacedsprinklers and draftcurtains located inthe fire zone below.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Page 18: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 14 of 19

Fire Zone: AB-119-6E East HallwayDetection Automatic Ignition Sources in Combustible Loading and Type

Suppression IPEEE ModelIonization Wet-pipe * Transient 179,008 Btu/ft2 consistingdetectors sprinkler combustibles predominantly of the following insitu

system * Small Hydrogen Line loads:covering the * MTMC-4 (480Ventire zone. Engineered Tray cable, TSI, and snubber oil.

Safeguards MCC-3A2)

* MTMC-21 (480VEngineeredSafeguards MCC-3A3)

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Fire Zone: CC-1 08-102 Hallway And Remote Shutdown RoomDetection Automatic Ignition Sources in IPEEE Combustible Loading and Type

Suppression ModelIonization None * Transient combustibles 110,707 Btu/ft2 consistingdetectors * AHF-69 (Room Cooler principally of cable insulation and

Fan) Thermo-Lag material, with small* Remote Shutdown Panel amounts of rubber, plastic and

fiberglass.

compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* A Fire Brigade Qualified individual will be stationed on the 108 Elevation.* The individual's turnout gear will be available on the 108 Elevation. A fire hose station is also

located in the 108 Elevation equipped with an electrically safe fog nozzle.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Page 19: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 15 of 19

Fire Zone: CC-1 08-104 Plant Battery Room 3ADetection Automatic Ignition Sources In IPEEE Combustible Loading and Type

Suppression ModelIonization None Transient combustibles 116,779 Btu/ft2 consistingdetectors principally of cable insulation and

Thermo-Lag material, with smallamounts of rubber, plastic andbattery cases.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* A Fire Brigade Qualified individual will be stationed on the 108 Elevation.* The individual's turnout gear will be available on the 108 Elevation. A fire hose station is also

located in the 108 Elevation equipped with an electrically safe fog nozzle.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Fire Zone: CC-108-106 Battery Charger Room 3ADetection Automatic Ignition Sources In Combustible Loading and Type

Suppression IPEEE ModelIonization None * Transient 157,463 Btu/ft2 ft2 consistingdetectors combustibles principally of cable insulation and

* DPBC-1A (Battery Thermo-Lag material, with smallCharger) amounts of rubber, plastic and

* DPBC-1C (Battery fiberglass.Charger)

* DPBC-1 E (BatteryCharger)

* DPDP-1A

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* A Fire Brigade Qualified individual will be stationed on the 108 Elevation.* The individual's turnout gear will be available on the 108 Elevation. A fire hose station is also

located in the 108 Elevation equipped with an electrically safe fog nozzle.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Page 20: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 16 of 19

Fire Zone: CC-1 08-108 4160 ES Switchgear Bus Room 3ADetection Automatic Ignition Sources in IPEEE Combustible Loading and Type

Suppression ModelIonization None * Transient combustibles 90,036 Btu/ft2 consistingdetectors are * 4160V bus and principally of cable insulation andinstalled switchgear Thermo-Lag material, with smallthroughout the * DC distribution panel amounts of rubber, plastic andarea to provide * Relay panels fiberglass.for early * MTTR-4 (37.5 KVAwarning of fire. 480-240/120V

Transformer)* AHF-72 - Cooling Coil

Fan motor (1/10 HP,115V, 60Hz)

* CAIT-1 (Pass ComputerInverter)

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* A Fire Brigade Qualified individual will be stationed on the 108 Elevation.* The individual's turnout gear will be available on the 108 Elevation. A fire hose station is also

located in the 108 Elevation equipped with an electrically safe fog nozzle.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Note:Switchgear for 4160V Engineered Safeguards components make this room significant since it isrequired for support of numerous internal events and post-fire safe shutdown safety functions.

Page 21: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 17 of 19

Fire Zone: CC-108-110 Inverter Room 3ADetection Automatic Ignition Sources in Combustible Loading and Type

ISuppression IPEEE Model IIonizationdetectors areinstalledthroughoutthe area toprovide forearly warningof fire.

None * Transientcombustibles

* AHHE-54 (Room ACooling)

* AHHE-55 (Room ACooling)

* VBDP-12 (120 VOLTRegulated DistributionPnils)

* VBDP-13 (12 (120VOLT RegulatedDistribution Pnls)

* VBIT-1A (Dual InputInverter 3A (30 KVA))

* VBIT-1C (Dual InputInverter 3C (30 KVA))

* VBTR-2A(Transformer)

* VBTR-2C(Transformer)

* VBTR-3A(Transformer)

* VBTR-3C(Transformer)

* VBXS-1A (TransferSwitch)

* VBXS-1C (TransferSwitch)

* VBXS-3A (TransferSwitch)

* VBXS-3C (TransferSwitch)

60,096 Btu/ft2 consisting principally ofcable insulation and Thermo-Lagmaterial, with small amounts ofrubber, plastic and fiberglass.

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* A Fire Brigade Qualified individual will be stationed on the 108 Elevation.* The individual's turnout gear will be available on the 108 Elevation. A fire hose station is also

located in the 108 Elevation equipped with an electrically safe fog nozzle.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Page 22: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 18 of 19

Fire Zone: CC-124-111 CRD & Communication Equip RoomDetection Automatic Ignition Sources In Combustible Loading and Type

Suppression IPEEE ModelIonization Wet-pipe * Transient - 25,031 Btu/ft2 consisting principally ofdetectors are sprinkler Combustibles cable insulation and Thermo-Laginstalled system * Miscellaneous Control material, with small amounts ofthroughout covering the Rod Drive (CRD) rubber, plastic and fiberglass.the area to entire zone. electrical equipment:provide for CRD Voltage Reg,early warning CR0 Breakerof fire. Cabinets, CRDM

Group Power SupplyCabinets, ControlCabinets, LogicCabinets, Etc.

* AHF-54A (RoomCooler)

* Distribution Panels* Lighting Transformers* MUX Cabinets

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

(

Page 23: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment APage 19 of 19

Fire Zone: CC-124-117 480V ES Switchgear Bus Room 3ADetection Automatic Ignition Sources In IPEEE Combustible Loading and Type

Suppression ModelIonization None * Transient combustibles 46,528 Btulfte consistingdetectors are * AHF-74 (Room Cooler) principally of cable insulation,installed to * AHF-75 (Room Cooler) with small amounts of rubber andprovide for * Distribution Panels plastic.early warning * ES MCC 3AB/TSof fire * MTSW-3F

* MTSW-3F R1, R2, R3* RC RCITS-A & C* TRANS-117-A - G

Compensatory Measures:* Transient combustibles will be minimized.* No hot or spark producing work will be conducted.* Roving hourly fire watches will be conducted.

Operational Controls for Reducing Risk During RWP-3B Refurbishment Activity:* None Required.

Page 24: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3

DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72

ATTACHMENT B

LICENSE AMENDMENT REQUEST #289, REVISION 0

List of Regulatory Commitments

Page 25: Crystal River Unit 3 - Supplemental Information Regarding ... · The fire zones listed herein were identified from the Crystal River Unit 3 (CR-3) Individual Plant Examination of

U.S. Nuclear Regulatory Commission3F0205-03

Attachment BPage 1 of 1

List of Regulatory Commitments

The following table identifies those actions committed to by Progress Energy Florida (PEF) in thisdocument. Any other actions discussed in the submittal represent intended or planned actions byPEF. They are described to the NRC for the NRC's information and are not regulatorycommitments. Please notify the Supervisor, Licensing and Regulatory Programs of any questionsregarding this document or any associated regulatory commitments.

Commitment Due Date

Specific compensatory actions that will be taken during the RWP-3B During one-timemaintenance activity are provided for each of the fire zones listed. These extended (greateractions supplement those compensatory actions provided in the than 72 hours)referenced letter. These compensatory actions will reduce the risk RWP-3Bassociated with the maintenance activity to return Decay Heat Seawater maintenancePump RWP-3B to full qualification.