Top Banner
1 www.scottwilson.com passionate | ambitious | collaborative | knowledgeable Location | London Date | 6th May 09 Crossrail - Case study BS1192:2007 Adrian Burgess Group Collaboration Manager – Scott Wilson Ltd
21

Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

Sep 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

1

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Location | London

Date | 6th May 09

Crossrail - Case study BS1192:2007

Adrian BurgessGroup Collaboration Manager – Scott Wilson Ltd

Page 2: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

2

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Agenda

• Introduction to Scott Wilson plc

• What is BS1192 

• BIM – Building Information Modelling

• BS1192 on Crossrail

Page 3: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

3

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Scott Wilson Group plc

• Scott Wilson Group plc is a global integrated design and engineering consultancy for the built and natural environments.

Environment &

Natural Resources

21%

Buildings &Infrastructure

30%

Railways

14%

StrategicConsultancy

14%

Roads

21%

Note: Percentage show proportion of H1 2008/09 revenue

Page 4: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

4

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Scott Wilson Ltd

• Staff – Approximately 6,000 staff

• Offices – Network of 80 offices worldwide

• Regions – UK, Asia Pacific, Europe, India and Middle East

• Floated – The business floated in 2006 on the London Stock Exchange

• Doubled in size over past few years

• Ranked 9th largest UK owned engineering consultancy(NCE 2008)

• Revenue ‐ £360m

Page 5: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

5

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

BS1192

BS1192-5:2007 is a code of practise for managing the production, distribution and quality of construction Information.

Traditional Common Data Environment

Page 6: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

6

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

BS1192

.

• Defined Naming conventions & standard codes[ Project Ref] – [Originator code]‐ [Zones / Asset ref] – [ Doc type]– [ Role ] – [ Number ]

• Standard ‘ Suitability Codes’ & Revision Codes[ Suitability Codes S1 –S4, D1‐ D4, A AB] & [rev seq P1 ‐99 C1 – 99 minor version for WIP] 

• Common origins and Orientation[ Models to use common origin and orientation, use Cartesian axis, common units be at 1:1]

• Layer conventions  [ ISO compatible, layer naming and coding strategy, to minimize the no of diff layers used ] 

• Data exchange principals[Common interoperable format]

Page 7: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

7

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

BS1192 – Common Data Environment

Page 8: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

8

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

BS1192

• Objectives• Manage disparate engineering teams & data centrally.

• Improve the control of information.

• Increase productivity and efficiency of engineering workflow

• Easily share data with 3rd party organisations

• Spatially Coordinate design information

• Improve the accuracy/currency and quality of AEC information

• Reduce the amount of re work on site.

• De risk projects. 

Page 9: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

9

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Building Information Modeling (BIM)

Building Information Modeling (BIM) is the process of generating and managing building information during its life cycle.

Page 10: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

10

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Building Information Modeling (BIM)

2D 3D

BIMs

iBIM

AIM

BS

IM

FIMSIM

BR

IM

CPICAVANTI

BS1192: 2007User Guides CPIC, Avanti, BSI

ISO BIM

Drawings, lines arcs text etc. Models, objects, collaboration

IFCIDM

IFD

Integrated, Interoperable Data

Bui

ldin

gLi

fecy

cle

Man

agem

ent

Bew - Richards 2008

SWG in April 2009

Page 11: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

11

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Building Information Modeling (BIM)

BIM Tools BS1192

Page 12: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

12

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail - Case Study

Page 13: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

13

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail - Case Study

• Largest Infrastructure Project In Europe

• £16 Billion  

• Up to 100 mph over groundUp to 60mph underground

• Service ready – 2017

• Trains carry 1500 people

• 24 trains per hour at peak

• 160,000 passengers in morning rush hour

Page 14: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

14

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail – Case study

Tools

1 Configured common data environment

Processes

2 Wrote specific Crossrail procedures

People

For Every One

Course 1)

Introductions to Bs1192 ProcessesProject Wise & ProjectSpace

For Document Controllers :

Course 2)

Upload & Issue to Business Collaborator

Managing TQsManaging Change Requests EWN etc

For CAD Coordinators:

Course 3)

Spatial CoordinationQA Complance Checking

3 Designed and delivered training

Page 15: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

15

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail – Tools

Bentley ProjectWiseEDMS

Business CollaboratorProject Extranet

Tools

Page 16: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

16

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail – Tools

Tools

Internal Data Environment( IDE) – Bentley ProjectWiseProject Data Environment ( PDE) – Business Collaborator

Page 17: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

17

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail – Processes

Processes

Wrote specific Crossrail procedures

• Managing production, validation and Publishing of Model files

• Process of Managing In‐bound 3rd Party Models

• Process of Production, Validating and Publishing Drawings

• Process of Production, Validating and Sharing of Engineering Document Components

• Process of Managing In‐bound 3rd Party Engineering Document Components

• Process of Production, Validation and Publishing of Engineering Reports 

Page 18: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

18

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail – Case study

1 2

3

1.Engineering Check2.Spatial Coordination Check3. Remove XREFs4. QA Check

1. Upload & Issue to PDE

1. Automatic Notifications

2. Check download into your WIP area

processes

Page 19: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

19

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail – Training

People• Developed and are delivering  3 courses

– Introduction ( 500 people)  

– Document controllers ( 10 )

– CAD Coordinators ( 4 people )

For Every One

Course 1)

Introductions to Bs1192 ProcessesProject Wise & ProjectSpace

For Document Controllers :

Course 2)

Upload & Issue to Business Collaborator

Managing TQsManaging Change Requests EWN etc

For CAD Coordinators:

Course 3)

Spatial CoordinationQA Complance Checking

Page 20: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

20

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Crossrail – Benefits Overall

• Manage disparate engineering teams & data centrally.

• Improve the control of information.

• Increase productivity and efficiency of engineering workflow

• Easily share data with 3rd parties

• Spatially Coordinate design information

• Improve the accuracy/currency andquality of AEC information

• Reduce the amount of re work on site.

• De risk projects. 

Page 21: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC

21

www.scottwilson.com

passionate | ambitious | collaborative | knowledgeable

Location | London

Date | 6th May 09

Crossrail - Case study BS1192:2007

Adrian BurgessGroup Collaboration Manager – Scott Wilson Ltd