CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
001 CONSTRUCCION DE PABELLON DE AULAS01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES 3,582.36
01.02 MOVIMIENTO DE TIERRAS 49,724.14
01.03 CONCRETO SIMPLE 115,413.13
01.04 CONCRETO ARMADO 782,289.45
01.05 ESTRUCTURA DE MADERA Y COBERTURA 49,026.21
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAILERIA 151,509.90
02.02 REVOQUES ENLUCIDOS Y DERRAMES 128,283.31
02.03 CIELORRASOS 49,394.40
02.04 PISOS Y PAVIMENTOS 112,918.40
02.05 ZOCALOS Y CONTRAZOCALOS 23,618.67
02.06 REVESTIMIENTOS 2,769.40
02.07 CARPINTERIA DE MADERA 18,242.75
02.08 CARPINTERIA METALICA Y HERRERIA 53,213.18
02.09 CERRAJERIA 2,698.53
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
02.10 VIDRIOS, CRISTALES Y SIMILARES 46,673.40
02.11 PINTURA 49,043.85
02.12 VARIOS, LIMPIEZA Y JARDINERIA 1,632.40
03 INSTALACIONES SANITARIAS
03.01 APARATOS Y ACCESORIOS SANITARIOS 4,872.53
03.02 SISTEMA DE DESAGUE 8,085.24
03.03 SISTEMA DE AGUA FRIA 5,671.60
03.04 SISTEMA DE AGUA DE LLUVIA 2,561.88
04 INSTALACIONES ELECTRICAS
04.01 INSTALACIONES ELECTRICAS Y MECANICAS 12,463.41
04.02 CANALIZACIONES, CONDUCTOS O TUBERIAS 6,797.94
04.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS 14,550.67
04.04 ARTEFACTOS ELECTRICOS 15,533.66
04.05 TABLEROS DE DISTRIBUCION 3,285.92
04.06 EQUIPOS ELECTRICOS Y MECANICOS 1,670.14
05 INSTALACIONES DE COMUNICACIONES
05.01 CABLES EN TUBERIAS 1,034.62
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
05.02 CANALETAS, CONDUCTOS Y/O TUBERIAS 1,462.57
05.03 SALIDAS DE COMUNICACIONES 3,583.85
05.04 SISTEMAS DE CONDUCTOS 1,476.96
002 CONSTRUCCION DEL PABELLON ADMINISTRATIVO 01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES 2,349.48
01.02 MOVIMIENTO DE TIERRAS 22,485.16
01.03 CONCRETO SIMPLE 62,136.41
01.04 CONCRETO ARMADO 309,227.33
01.05 ESTRUCTURA DE MADERA Y COBERTURA 29,192.09
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAILERIA 49,118.30
02.02 REVOQUES ENLUCIDOS Y DERRAMES 51,018.66
02.03 CIELORRASOS 18,834.39
02.04 PISOS Y PAVIMENTOS 42,818.28
02.05 ZOCALOS Y CONTRAZOCALOS 8,053.22
02.06 CARPINTERIA DE MADERA 5,863.02
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
02.07 CARPINTERIA METALICA Y HERRERIA 27,001.53
02.08 CERRAJERIA 942.23
02.09 VIDRIOS, CRISTALES Y SIMILARES 39,779.09
02.10 PINTURA 18,330.17
02.11 VARIOS, LIMPIEZA Y JARDINERIA 712.16
03 INSTALACIONES SANITARIAS
03.01 APARATOS Y ACCESORIOS SANITARIOS 2,701.03
03.02 SISTEMA DE DESAGUE 3,625.38
03.03 SISTEMA DE AGUA FRIA 2,092.14
03.04 SISTEMA DE AGUA DE LLUVIA 1,252.66
04 INSTALACIONES ELECTRICAS
04.01 INSTALACIONES ELECTRICAS Y MECANICAS 5,855.87
04.02 CANALIZACIONES, CONDUCTOS O TUBERIAS 3,875.77
04.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS 7,814.52
04.04 ARTEFACTOS ELECTRICOS 7,489.09
04.05 TABLEROS DE DISTRIBUCION 2,489.10
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
04.06 EQUIPOS ELECTRICOS Y MECANICOS 3,770.14
05 INSTALACIONES DE COMUNICACIONES
05.01 CABLES EN TUBERIAS 1,160.60
05.02 CANALETAS, CONDUCTOS Y/O TUBERIAS 2,064.63
05.03 SALIDAS DE COMUNICACIONES 9,065.06
05.04 SISTEMAS DE CONDUCTOS 451.47
003 CONSTRUCCION DE COMEDOR, SALA DE MUSICA Y ALMACEN GENERAL01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES 1,060.38
01.02 MOVIMIENTO DE TIERRAS 13,704.69
01.03 CONCRETO SIMPLE 28,308.58
01.04 CONCRETO ARMADO 188,853.60
01.05 ESTRUCTURA DE MADERA Y COBERTURA 14,661.01
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAILERIA 26,116.19
02.02 REVOQUES ENLUCIDOS Y DERRAMES 33,872.95
02.03 CIELORRASOS 11,772.74
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
02.04 PISOS Y PAVIMENTOS 30,925.97
02.05 ZOCALOS Y CONTRAZOCALOS 6,414.99
02.06 REVESTIMIENTOS 2,479.74
02.07 CARPINTERIA DE MADERA 2,014.07
02.08 CARPINTERIA METALICA Y HERRERIA 14,577.94
02.09 CERRAJERIA 620.42
02.10 VIDRIOS, CRISTALES Y SIMILARES 15,337.91
02.11 PINTURA 12,043.20
02.12 VARIOS, LIMPIEZA Y JARDINERIA 1,828.12
03 INSTALACIONES SANITARIAS
03.01 APARATOS Y ACCESORIOS SANITARIOS 1,941.31
03.02 SISTEMA DE DESAGUE 2,363.66
03.03 SISTEMA DE AGUA FRIA 956.48
03.04 SISTEMA DE AGUA DE LLUVIA 1,159.63
04 INSTALACIONES ELECTRICAS
04.01 INSTALACIONES ELECTRICAS Y MECANICAS 3,390.90
04.02 CANALIZACIONES, CONDUCTOS O TUBERIAS 2,430.43
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
04.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS 5,242.54
04.04 ARTEFACTOS ELECTRICOS 3,326.10
04.05 TABLEROS DE DISTRIBUCION 1,188.64
04.06 EQUIPOS ELECTRICOS Y MECANICOS 1,670.14
004 CONSTRUCCIN DE CERCO PERIMTRICO01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES 1,853.57
01.02 MOVIMIENTO DE TIERRAS 15,420.30
01.03 CONCRETO SIMPLE 76,447.82
01.04 CONCRETO ARMADO 135,321.75
01.05 ESTRUCTURA DE MADERA Y COBERTURA 2,303.13
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAILERIA 25,308.88
02.02 REVOQUES ENLUCIDOS Y DERRAMES 26,795.48
02.03 ZOCALOS Y CONTRAZOCALOS 15,016.82
02.04 CARPINTERIA METALICA Y HERRERIA 72,255.08
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
02.05 CERRAJERIA 163.64
02.06 PINTURA 13,025.42
02.07 VARIOS, LIMPIEZA Y JARDINERIA 983.36
005 CONSTRUCCIN DE LOSA MULTIUSO01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES 8,583.01
01.02 MOVIMIENTO DE TIERRAS 42,097.92
01.03 CONCRETO SIMPLE 160,953.75
02 ARQUITECTURA
02.01 REVOQUES ENLUCIDOS Y DERRAMES 6,287.94
02.02 CARPINTERIA METALICA Y HERRERIA 4,355.00
02.03 PINTURA 985.53
02.04 VARIOS, LIMPIEZA Y JARDINERIA 1,545.42
006 CONSTRUCCIN DE TANQUE ELEVADO01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES 152.45
01.02 MOVIMIENTO DE TIERRAS 2,794.24
01.03 CONCRETO SIMPLE 293.09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
01.04 CONCRETO ARMADO 21,533.29
02 ARQUITECTURA
02.01 REVOQUES ENLUCIDOS Y DERRAMES 4,709.84
02.02 PISOS Y PAVIMENTOS 335.27
02.03 CARPINTERIA METALICA Y HERRERIA 2,608.22
02.04 CERRAJERIA 100.09
02.05 PINTURA 1,074.39
03 INSTALACIONES SANITARIAS
03.01 SISTEMA DE DESAGUE 587.58
03.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 2,143.16
04 INSTALACIONES ELECTRICAS
04.01 SISTEMA DE ELECTRICIDAD 981.89
007 CONSTRUCCIN DE OBRAS GENERALES 01 OBRAS PROVISIONALES TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES 41,806.02
01.02 TRABAJOS PRELIMINARES 76,184.99
01.03 SEGURIDAD Y SALUD 20,229.80
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS 40,181.33
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
02.02 CONCRETO SIMPLE 96,648.77
03 ARQUITECTURA
03.01 REVOQUES ENLUCIDOS Y DERRAMES 2,956.46
03.02 PISOS Y PAVIMENTOS 86,288.16
03.03 CARPINTERIA METALICA Y HERRERIA 9,027.29
03.04 PINTURA 1,469.39
03.05 VARIOS, LIMPIEZA Y JARDINERIA 26,393.85
04 INSTALACIONES SANITARIAS
04.01 SISTEMA DE DESAGUE 7,614.43
04.02 SISTEMA DE AGUA FRIA 2,904.12
05 INSTALACIONES ELECTRICAS
05.01 INSTALACIONES ELECTRICAS Y MECANICAS 65.25
05.02 CANALIZACIONES, CONDUCTOS O TUBERIAS 2,202.62
05.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS 18,559.17
05.04 SISTEMAS DE CONDUCTOS 6,926.91
05.05 ARTEFACTOS ELECTRICOS 12,370.72
05.06 TABLEROS DE DISTRIBUCION 893.64
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
05.07 EQUIPOS ELECTRICOS Y MECANICOS 9,771.18
06 INSTALACIONES DE COMUNICACIONES
06.01 CABLES EN TUBERIAS 715.36
06.02 CANALETAS, CONDUCTOS Y/O TUBERIAS 1,127.51
06.03 SALIDAS DE COMUNICACIONES 241.22
06.04 SISTEMAS DE CONDUCTOS 155.46
06.05 IMPACTO AMBIENTAL 3,865.70
008 CONSTRUCCIN DE CASETA DE VIGILANCIA01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES 97.85
01.02 MOVIMIENTO DE TIERRAS 4,357.32
01.03 CONCRETO SIMPLE 1,050.00
01.04 CONCRETO ARMADO 6,252.69
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAILERIA 1,112.07
02.02 REVOQUES ENLUCIDOS Y DERRAMES 1,050.35
02.03 CIELORRASOS 235.89
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
02.04 PISOS Y PAVIMENTOS 353.48
02.05 CARPINTERIA DE MADERA 1,211.47
02.06 CARPINTERIA METALICA Y HERRERIA 104.50
02.07 CERRAJERIA 166.36
02.08 VIDRIOS, CRISTALES Y SIMILARES 126.83
02.09 PINTURA 339.15
02.10 VARIOS, LIMPIEZA Y JARDINERIA 53.20
009 EQUIPAMIENTO INTEGRAL DE LOS AMBIENTES01 EQUIPAMIENTO INTEGRAL DE LOS AMBIENTES
01.01 EQUIPAMIENTO INTEGRAL DE LOS AMBIENTES 54,535.00
010 DOTACION DE MATERIAL VISUAL MULTIMEDIA01 DOTACION DE MATERIAL VISUAL MULTIMEDIA
01.01 DOTACIN DE MATERIAL VISUAL MULTIMEDIA 75,000.00
011 FLETE TERRESTRE 01 FLETE
01.01 FLETE TERRESTRE 260,029.31
AVANCE MENSUAL (%) P= PROGRAMADO E= EJECUTADO
AVANCE ACUMULADO (%) P= PROGRAMADOE= EJECUTADO
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
EJECUTA M.D. de HUACHOCOLPA
FECHA 01/07/2103
N PARTIDAS Presupuesto
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO HUACHOCOLPA, TAYACAJA, HUANCAVELICA
COSTO DIRECTO DE OBRA PRESUPUESTADO S/. 4,414,607.93
TRANSFERENCIAS FECHA TRAMITE FECHA RECEPCION
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
001 CONSTRUCCION DE PABELLON DE AULAS
2,042.02 S/. 935.96 935.97 170.0957.00% E
3,582.36 P 3,582.3621,697.71 S/. 4,068.32 4,068.32 4,068.32 4,068.32 2,712.21 2,712.22
43.64% E49,724.14 P 16,574.71 16,574.71 16,574.72
7,695.65 S/. 1,924.01 1,924.00 1,923.826.67% E
115,413.13 P 28,853.28 28,853.28149,854.47 S/. 38,902.10
19.16% E782,289.45 P 65,190.79 65,190.79
0.00 S/.0.00% E
49,026.21 P
0.00 S/.0.00% E
151,509.90 P0.00 S/.
0.00% E128,283.31 P
0.00 S/.0.00% E
49,394.40 P0.00 S/.
0.00% E112,918.40 P
0.00 S/.0.00% E
23,618.67 P0.00 S/.
0.00% E2,769.40 P
0.00 S/.0.00% E
18,242.75 P0.00 S/.
0.00% E53,213.18 P
0.00 S/.0.00% E
2,698.53 P
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
0.00 S/.0.00% E
46,673.40 P0.00 S/.
0.00% E49,043.85 P
0.00 S/.0.00% E
1,632.40 P
0.00 S/.0.00% E
4,872.53 P0.00 S/.
0.00% E8,085.24 P
0.00 S/.0.00% E
5,671.60 P0.00 S/.
0.00% E2,561.88 P
0.00 S/.0.00% E
12,463.41 P0.00 S/.
0.00% E6,797.94 P
0.00 S/.0.00% E
14,550.67 P0.00 S/.
0.00% E15,533.66 P
0.00 S/.0.00% E
3,285.92 P0.00 S/.
0.00% E1,670.14 P
0.00 S/.0.00% E
1,034.62 P
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
0.00 S/.0.00% E
1,462.57 P0.00 S/.
0.00% E3,583.85 P
0.00 S/.0.00% E
1,476.96 P
002 CONSTRUCCION DEL PABELLON ADMINISTRATIVO
1,227.70 S/. 613.85 613.8552.25% E
2,349.48 P 2,349.482,826.44 S/. 1,413.22 1,413.2212.57% E
22,485.16 P 7,495.05 7,495.050.00 S/.
0.00% E62,136.41 P36,038.71 S/. 9,009.68 9,009.68
11.65% E309,227.33 P
0.00 S/.0.00% E
29,192.09 P
0.00 S/.0.00% E
49,118.30 P0.00 S/.
0.00% E51,018.66 P
0.00 S/.0.00% E
18,834.39 P0.00 S/.
0.00% E42,818.28 P
0.00 S/.0.00% E
8,053.22 P0.00 S/.
0.00% E
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
5,863.02 P0.00 S/.
0.00% E27,001.53 P
0.00 S/.0.00% E942.23 P
0.00 S/.0.00% E
39,779.09 P0.00 S/.
0.00% E18,330.17 P
0.00 S/.0.00% E712.16 P
0.00 S/.0.00% E
2,701.03 P0.00 S/.
0.00% E3,625.38 P
0.00 S/.0.00% E
2,092.14 P0.00 S/.
0.00% E1,252.66 P
0.00 S/.0.00% E
5,855.87 P0.00 S/.
0.00% E3,875.77 P
0.00 S/.0.00% E
7,814.52 P0.00 S/.
0.00% E7,489.09 P
0.00 S/.0.00% E
2,489.10 P
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
0.00 S/.0.00% E
3,770.14 P
0.00 S/.0.00% E
1,160.60 P0.00 S/.
0.00% E2,064.63 P
0.00 S/.0.00% E
9,065.06 P0.00 S/.
0.00% E451.47 P
003 CONSTRUCCION DE COMEDOR, SALA DE MUSICA Y ALMACEN GENERAL
554.09 S/. 238.47 238.48 77.1452.25% E
1,060.38 P 1,060.386,789.27 S/. 3,394.63 3,394.6449.54% E
13,704.69 P 4,568.23 4,568.233,402.81 S/. 1,701.40 1,701.4112.02% E
28,308.58 P49,893.86 S/. 16,631.28
26.42% E188,853.60 P
0.00 S/.0.00% E
14,661.01 P
0.00 S/.0.00% E
26,116.19 P0.00 S/.
0.00% E33,872.95 P
0.00 S/.0.00% E
11,772.74 P0.00 S/.
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
0.00% E30,925.97 P
0.00 S/.0.00% E
6,414.99 P0.00 S/.
0.00% E2,479.74 P
0.00 S/.0.00% E
2,014.07 P0.00 S/.
0.00% E14,577.94 P
0.00 S/.0.00% E620.42 P
0.00 S/.0.00% E
15,337.91 P0.00 S/.
0.00% E12,043.20 P
0.00 S/.0.00% E
1,828.12 P
0.00 S/.0.00% E
1,941.31 P0.00 S/.
0.00% E2,363.66 P
0.00 S/.0.00% E956.48 P
0.00 S/.0.00% E
1,159.63 P
0.00 S/.0.00% E
3,390.90 P0.00 S/.
0.00% E
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
2,430.43 P0.00 S/.
0.00% E5,242.54 P
0.00 S/.0.00% E
3,326.10 P0.00 S/.
0.00% E1,188.64 P
0.00 S/.0.00% E
1,670.14 P
004 CONSTRUCCIN DE CERCO PERIMTRICO
968.57 S/. 484.28 484.2952.25% E
1,853.57 P0.00 S/.
0.00% E15,420.30 P
0.00 S/.0.00% E
76,447.82 P0.00 S/.
0.00% E135,321.75 P
0.00 S/.0.00% E
2,303.13 P
0.00 S/.0.00% E
25,308.88 P0.00 S/.
0.00% E26,795.48 P
0.00 S/.0.00% E
15,016.82 P0.00 S/.
0.00% E72,255.08 P
0.00 S/.
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
0.00% E163.64 P
0.00 S/.0.00% E
13,025.42 P0.00 S/.
0.00% E983.36 P
005 CONSTRUCCIN DE LOSA MULTIUSO
4,543.33 S/. 2,271.66 2,271.6752.93% E
8,583.01 P4,774.34 S/. 1,191.49 1,191.50 1,195.67 1,195.68
11.34% E42,097.92 P 21,048.96 21,048.96
0.00 S/.0.00% E
160,953.75 P
0.00 S/.0.00% E
6,287.94 P0.00 S/.
0.00% E4,355.00 P
0.00 S/.0.00% E985.53 P
0.00 S/.0.00% E
1,545.42 P
006 CONSTRUCCIN DE TANQUE ELEVADO
0.00 S/.0.00% E152.45 P
0.00 S/.0.00% E
2,794.24 P0.00 S/.
0.00% E293.09 P
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
0.00 S/.0.00% E
21,533.29 P
0.00 S/.0.00% E
4,709.84 P0.00 S/.
0.00% E335.27 P
0.00 S/.0.00% E
2,608.22 P0.00 S/.
0.00% E100.09 P
0.00 S/.0.00% E
1,074.39 P
0.00 S/.0.00% E587.58 P
0.00 S/.0.00% E
2,143.16 P
0.00 S/.0.00% E981.89 P
007 CONSTRUCCIN DE OBRAS GENERALES
41,700.42 S/. 4,651.08 4,651.08 16,199.13 16,199.1399.75% E
41,806.02 P52,046.84 S/. 26,023.42 26,023.42
68.32% E76,184.99 P19,683.05 S/. 19,500.80 182.25
97.30% E20,229.80 P
0.00 S/.0.00% E
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
40,181.33 P0.00 S/.
0.00% E96,648.77 P
0.00 S/.0.00% E
2,956.46 P0.00 S/.
0.00% E86,288.16 P
0.00 S/.0.00% E
9,027.29 P0.00 S/.
0.00% E1,469.39 P
0.00 S/.0.00% E
26,393.85 P
0.00 S/.0.00% E
7,614.43 P0.00 S/.
0.00% E2,904.12 P
0.00 S/.0.00% E65.25 P
0.00 S/.0.00% E
2,202.62 P0.00 S/.
0.00% E18,559.17 P
0.00 S/.0.00% E
6,926.91 P0.00 S/.
0.00% E12,370.72 P
0.00 S/.0.00% E
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
893.64 P0.00 S/.
0.00% E9,771.18 P
0.00 S/.0.00% E715.36 P
0.00 S/.0.00% E
1,127.51 P0.00 S/.
0.00% E241.22 P
0.00 S/.0.00% E155.46 P
0.00 S/.0.00% E
3,865.70 P
008 CONSTRUCCIN DE CASETA DE VIGILANCIA
0.00 S/.0.00% E97.85 P
0.00 S/.0.00% E
4,357.32 P0.00 S/.
0.00% E1,050.00 P
0.00 S/.0.00% E
6,252.69 P
0.00 S/.0.00% E
1,112.07 P0.00 S/.
0.00% E1,050.35 P
0.00 S/.0.00% E235.89 P
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
0.00 S/.0.00% E353.48 P
0.00 S/.0.00% E
1,211.47 P0.00 S/.
0.00% E104.50 P
0.00 S/.0.00% E166.36 P
0.00 S/.0.00% E126.83 P
0.00 S/.0.00% E339.15 P
0.00 S/.0.00% E53.20 P
009 EQUIPAMIENTO INTEGRAL DE LOS AMBIENTES
0.00 S/.0.00% E
54,535.00 P
010 DOTACION DE MATERIAL VISUAL MULTIMEDIA
0.00 S/.0.00% E
75,000.00 P
011 FLETE TERRESTRE
33,803.81 S/. 3,250.36 3,250.37 3,250.37 3,250.37 5,200.58 5,200.5813.00% E
260,029.31 P 8,125.91 8,125.91 8,125.92 8,125.92 8,125.91 8,125.91
P= PROGRAMADO 2.50 11.433.79 6.17
P= PROGRAMADO 2.50 13.923.79 9.96
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
M.D. de HUACHOCOLPA PROYECTO CDIGO SNIP No
01/07/2103 MONTO TOTAL DEL PRESUPUESTO :
AvancePERIODO
1 MES 2 MES
1.00 2.00 3.00 4.00 5.00 6.00
COSTO DIRECTO PROGRAMADO S/. 4,414,607.93
FECHA RECEPCION MONTOFECHA DE INICIO DE OBRA
PLAZO DE EJECUCIONFECHA DE TERMINO
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
1,923.82
28,853.28 28,853.2955,476.18 55,476.19
65,190.79 65,190.79 65,190.79 65,190.79 65,190.79 65,190.79 65,190.79
37,877.48 37,877.48
32,070.83
12,348.60
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
2,695.08 2,695.08
1,890.53 1,890.53
4,154.47 4,154.47
2,265.98 2,265.98
4,850.22 4,850.22
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
7,495.06
15,534.10 15,534.10 15,534.10 15,534.119,009.68 9,009.67
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
4,568.23
7,077.14 7,077.14 7,077.15 7,077.1516,631.29 16,631.29
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
1,853.57
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
40,238.43 40,238.44 40,238.44 40,238.44
3,143.97 3,143.97
4,355.00
985.53
1,545.42
152.45
2,794.24
293.09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
10,766.64 10,766.65
2,354.92 2,354.92
335.27
2,608.22
100.09
1,074.39
587.58
2,143.16
981.89
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
5,200.59 5,200.59
8,125.92 8,125.92 8,125.91 8,125.91 8,125.92 8,125.92 8,125.91
11.43 15.04 15.646.17 0.00 0.00
13.92 28.97 44.619.96 9.96 9.96
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PROYECTO CDIGO SNIP No 166627
MONTO TOTAL DEL PRESUPUESTO : 4,868,052.00
PERIODO2 MES 3 MES 4 MES
7.00 8.00 9.00 10.00 11.00 12.00 13.00
AMPLIACIONES DE PLAZO
FECHA N DIAS01-05-13 45.00
24026/12/2013
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
65,190.78 65,190.78 65,190.78
24,513.11 24,513.10
37,877.47 37,877.47
32,070.83 32,070.83 32,070.82
12,348.60 12,348.60 12,348.60
28,229.60 28,229.60 28,229.60 28,229.60
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
2,695.08
1,890.54
2,561.88
4,154.47
2,265.98
4,850.23
3,285.92
1,670.14
1,034.62
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
1,462.57
3,583.85
1,476.96
25,768.94 25,768.94 25,768.94 25,768.94
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
1,208.46
697.38
1,951.96
1,291.92
2,604.84
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
15,737.80 15,737.80 15,737.80 15,737.80
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
787.88
318.82
1,130.30
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
810.14
1,747.51
5,140.10 5,140.10 5,140.10
19,111.95 19,111.95 19,111.96 19,111.96
33,830.43 33,830.44 33,830.44 33,830.44
2,303.13
6,327.22 6,327.22 6,327.22 6,327.22
6,698.87 6,698.87 6,698.87 6,698.87
3,754.20 3,754.20 3,754.21 3,754.21
36,127.54 36,127.54
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
163.64
6,512.71 6,512.71
983.36
4,291.50 4,291.51
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
8,125.91 8,125.92 8,125.92 8,125.91 8,125.91 8,125.92 8,125.92
15.64 14.800.00 0.00
44.61 59.429.96 9.96
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO4 MES 5 MES
14.00 15.00 16.00 17.00 18.00 19.00 20.00
AMPLIACIONES DE PLAZO
PLAZO VIGENCIA FIN DE OBRA OBSERVACIONES
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
11,809.34 11,809.33
2,769.40
18,242.75
53,213.18
2,698.53
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
25,768.94 25,768.94 25,768.94 25,768.95 25,768.95 25,768.95 25,768.95
12,279.57 12,279.57 12,279.58
12,754.66 12,754.66
4,708.59 4,708.60
10,704.57
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
1,208.46
697.38
1,951.96
1,291.92
2,604.84
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
15,737.80 15,737.80 15,737.80 15,737.80 15,737.80 15,737.80 15,737.80
6,529.05 6,529.05 6,529.05
8,468.24 8,468.24
2,943.19 2,943.19
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
7,731.49
787.89
318.83
1,130.30
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
810.14
1,747.51
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
20,903.01 20,903.01
19,046.25 19,046.25 19,046.25 19,046.24
20,229.80
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
20,090.67 20,090.66
24,162.19 24,162.19 24,162.19 24,162.20
2,956.46
43,144.08 43,144.08
9,027.29
7,614.43
2,904.12
65.25
2,202.62
9,279.58 9,279.59
6,926.91
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
893.64
715.36
1,127.51
241.22
155.46
97.85
4,357.32
1,050.00
6,252.69
1,112.07
1,050.35
235.89
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
353.48
1,211.47
104.50
166.36
126.83
8,125.91 8,125.91 8,125.92 8,125.92 8,125.91 8,125.92 8,125.92
13.63 14.590.00 0.00
73.05 87.639.96 9.96
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO6 MES 7 MES
21.00 22.00 23.00 24.00 25.00 26.00 27.00
AMPLIACIONES DE PLAZO
OBSERVACIONES
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
23,336.70 23,336.70
24,521.93 24,521.92
1,632.40
4,872.53
7,766.83 7,766.83
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
25,768.95
29,192.09
12,279.58
12,754.67 12,754.67
4,708.60 4,708.60
10,704.57 10,704.57 10,704.57
8,053.22
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
5,863.02
27,001.53
942.23
39,779.09
9,165.08 9,165.09
712.16
2,701.03
1,208.46
697.38
1,252.66
1,951.95
1,291.93
2,604.84
3,744.54 3,744.55
2,489.10
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
3,770.14
1,160.60
2,064.63
9,065.06
451.47
15,737.80
14,661.01
6,529.04
8,468.24 8,468.23
2,943.18 2,943.18
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
7,731.49 7,731.49 7,731.50
6,414.99
2,479.74
2,014.07
14,577.94
620.42
15,337.91
6,021.60 6,021.60
1,828.12
1,941.31
787.89
318.83
1,159.63
1,130.30
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
810.15
1,747.52
1,663.05 1,663.05
1,188.64
1,670.14
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
1,469.39
26,393.85
12,370.72
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
9,771.18
3,865.70
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
339.15
53.20
54,535.00
75,000.00
8,125.92 8,125.92 8,125.92 8,125.92 8,125.92
14.59 12.370.00 0.00
87.63 100.009.96 9.96 4,854,151.02
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
PERIODO7 MES 8 MES
28.00 29.00 30.00 31.00 32.00
Crono. Valor. Junio