Top Banner
16

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

Mar 06, 2018

Download

Documents

voduong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence
Page 2: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 2291 DAVIDSONVILLE ROAD DATE: JULY 19, 2017 GAMBRILLS, MD 21114 PAGE 1 OF 5

GWWO, INC./ARCHITECTS 800 WYMAN PARK DRIVE, SUITE 300 BALTIMORE, MARYLAND 21211 410-332-1009 GWWO PROJECT NO. 16014 GENERAL INFORMATION: This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated June 5, 2017, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to acknowledge addendum may disqualify Bidder. Changes to Specifications: All revisions are noted below. Where a change to a specification is limited, it is described as text only in the document below. Where a change to a specification is extensive, the section is reissued. Reissued sections are noted as such in the document below. Changes to Drawings: Revisions which modify scope and/or provide additional information to the contractor are clouded, marked with delta 4 on the drawing, and additionally noted in the document below. CHANGES TO SPECIFICATIONS:

Addendum Item No.

Description

AD4.001 SECTION: 01 3119 – PROJECT MEETINGS, paragraph 4.1 ADD the following sentence to the end of the second paragraph of 4.1: “All Primes are advised that, in addition to a prime’s failure to attend the project meetings (contractor progress meetings, superintendent’s meetings, etc.) possibly resulting in the full or partial withholding of certification of payment per Article 9.5.1.7 of the Supplemental Conditions of the Contract, each Prime must have a Schedule of Values line item and dollar amount assigned to Project Meeting Attendance (separate line item from any General Conditions line item should the prime have such a line item), which can billed with each monthly payment application, with the line item dollar amount as negotiated with the rest of the SOV between the prime & the CM at the start of the project. Prime meeting attendance will be tracked throughout the work and the line item may be billed monthly accordingly. Should the prime fail to attend any percent of the project meetings, then a corresponding percentage of the Project Meeting Attendance SOV line item shall be credited back to the Owner via Change Order prior to any retainage reduction or Final Payment.”

AD4.002 SECTION: 01 5000 – TEMPORARY FACILITIES AND CONTROLS REVISE the site access plan for Phase A for reduced amount of stone laydown area. See attached SA Plan A – Revised. ADD the following sentence to paragraph 2.6.2:”Refer to drawing C11.3 for additional traffic control signage at the traffic circle on Underwood Road.”.

Page 3: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 2291 DAVIDSONVILLE ROAD DATE: JULY 19, 2017 GAMBRILLS, MD 21114 PAGE 2 OF 5

AD4.003 SECTION: 01 1010 – SCOPES OF WORK, Part 1, 2A Scope item 2A-73 ADD the following sentences to the end of scope item 2A-73: “Refer to new drawing C12.1 for removal of the existing striping and re-striping of Davidsonville Road (state road) and additional signage. Also refer to new drawings C11.1-C11.3 regarding tying into the existing traffic circle on Underwood Road (county road).”.

AD4.004 SECTION 33 1000 – WATER UTILITIES REVISE paragraph 3.3.B.2 to read as follows: 4 inches to 8 inches PVC C-900, fire hydrant leads shall be class 250 ductile iron pipe, ductile iron compact fittings and mechanical joints with retainer glands.

CHANGES TO DRAWINGS:

Addendum

Item No.

Sheet Description

AD4.005 C7.4 ADD: Event parking striping to bus loop as shown on SKC014.

AD4.006 C7.6 ADD: Double yellow lane striping to entrance as shown on SKC015.

AD4.007 C7.1 ADD: Double yellow and turn lane striping to entrance as shown on SKC016.

AD4.008 C9.5 ADD: Additional super silt fence as shown on SKC017. REVISE: Limit of disturbance and grading as shown on SKC017.

AD4.009 C11.1 REMOVED: Signage and striping as shown on sheet C11.1.

AD4.010 C11.2 ADD: New drawing to set.

AD4.011 C11.3 ADD: New drawing to set.

AD4.012 C12.1 REVISE: Paving detail as shown in SKC.018.

AD4.013 C12.1 REVISE: Callout for heavy duty paving as shown in SKC.019. ADD: Paving tie-in callout as shown in SKC.019.

Page 4: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 2291 DAVIDSONVILLE ROAD DATE: JULY 19, 2017 GAMBRILLS, MD 21114 PAGE 3 OF 5

RESPONSES TO BIDDERS’ QUESTIONS: AD4.014 Question:

Response:

All photos are professionally edited and uploaded to a portal with a download feature. Will this require re-edits or does the initial editing meet the requirements? Since viewing and downloading is available from the gallery, would we still have to send 5 photos via the FTP and a CD? Can we crop for print without approval on the crop? Or will that need to be a back and forth to approve the crops for printing? Can prints be sent at the completion of the job rather than per job? Is a DVD a requirement? And is that only at the completion of the job? Is this a CD or a slideshow? Refer to 2A scope item #2A-86.

AD4.015

Question: Response:

Will there be a structure schedule for the storm drain? See utility schedules on drawing C4.5.

AD4.016

Question: Response:

Sheet L3.15 shows "screen fence" along the back of the bleachers and says to see the Civil Plans, but it is not shown on the Civil plans. Is this fence required? If so, what detail is to be used? This fencing is by BP 2B, refer Specification 01 10 10, 2A scope item 2A-98 added by Addendum #1 item AD1.019 and Addendum #2 item AD2.001.

AD4.017

Question: Response:

Is the 2A Contractor responsible for the conduit installation? If so, what page is it on in the 2A contractor scope? Do we refer to T0.1 and TY0.1 drawings? Electrical conduit and BGE gas sleeves/conduit are by BP 16A, refer to Specification 01 10 10, 2A scope items 2A-49 and 2A-71. Any conduit required by Specification 32 8400 for the irrigation system is by 2A.

AD4.018 Question: Response:

Addendum #2, revised plan sheet C12.1 shows striping in the existing Davidsonville Road. Please confirm there is no requirement to mill and overlay Davidsonville Road. Heavy duty asphalt has been called out for the decel & accel lanes; there is no mill/overlay on Davidsonville Rd. Asphalt tie-in detail along the entire length of the new decel & acel lanes & Davidsonville Rd. has been added/called out. See Addendum #4 sketch SKC.019.

AD4.019 Question: Response:

What is the paving spec for the SHA paving area on plan sheet C2.1? SHA paving area to use "Heavy Duty" paving section as shown on SKC-018. Section has been revised to use 3" surface course, 6" base course, & 6" G.A.B.

Page 5: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 2291 DAVIDSONVILLE ROAD DATE: JULY 19, 2017 GAMBRILLS, MD 21114 PAGE 4 OF 5

AD4.020 Question: Response:

Plan sheet L3.5 shows Typical Walls that attach to the building and are stated as "Wall Typ. - See Arch Drawings". What contract is responsible for these walls? The seat walls are by 2A in their entirety as per Specification 01 10 10, 2A scope items 2A-62 and 2A-63. The seat wall go under the "bridges" that link the two building sections as noted on L3.5, also refer to the elevation provided on drawing L3.7 for a clear view of the bridges with the seat walls running underneath of them.

AD4.021 Question: Response:

Will the building trade contract be required to export foundation and utility spoils or will these spoils remain on site? Yes the other trades are responsible for their own spoils, refer to Specification 01 10 10, Part 1 General scope item G28 and 2A scope item 2A-41.

AD4.022 Question: Response:

Addendum 2 response to AD1.043 confirms that the entire Phase 1 portion of the site is to be completely covered in 4" of #57 stone and is to be used as laydown. Is this correct? 25 acres? 24,000 Tons of stone? Seems excessive. Who will be responsible for the replacement and maintenance of the extensive laydown area(s)? Who will be responsible to manage each Prime as they distribute their stored materials? What happens when utilities need to be installed through a stoned laydown area? Is it necessary to stone the ballfields for laydown? Why not just use one or all the very large Light Duty Parking Lots for staging? Upon reconsideration, we will reduce the amount of temporary stone laydown as shown on the revised access plan for Phase 1 (A), refer to Specification Revision AD4.002 (above). This response supersedes the previous response per Addendum #2 item AD2.043. We must stress that the Sediment Control District requires that all areas be stabilized with stone, topsoil/seed, or permanent finishes before building footings are allowed to start, with all of these options having serious cost and/or schedule implications, we are choosing to cover as much of the site as possible with stone to in an attempt to mitigate any potential sediment control related stop work orders. 2A will be solely responsible to ensure that the reduced stone laydown area is “stabilized” at all times. As a reminder, NO STONE is required or allowed on top of all SWM facilities, which make up a significant amount of the overall acreage shown on the site access plans for the laydown/temp lot areas, which show stone over the SWM areas for the sake of clarity. Refer to Specification 01 10 10 2A Scope item 2A-44 for 2A's maintenance responsibilities of the temporary roads and lots. In regards to other BP's installing their utilities through the temporary roads and lots, refer to Specification 01 1010, Part 1, item G28.

Page 6: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 2291 DAVIDSONVILLE ROAD DATE: JULY 19, 2017 GAMBRILLS, MD 21114 PAGE 5 OF 5

AD4.023 Question: Response:

Please have the engineer clarify the Water Pipe Material Type to be used, there are conflicting language in the Specification: Section 33 1000: Part 1.1 “B” Refers to AA Co DPW Part 2.2 “A” referencing Part 3 contradicts above Part 2.2 “B” & “D” refers to both DIP Mechanical Joint Type and PVC None Restrained Joint Part 3.3 “A” Refers back to Part 2 Part 3.3 “B” Does not refer to C900 PVC Part 3.5 “A” & “D” refer to both DIP and C900 PVC Gasketed Joints Refer to Note #6 on Drawing C4.2: All water piping, tubing, fittings, and joining methods shall be according to the following applications, 4 inches to 8 inches PVC C-900, fire hydrant leads shall be class 250 ductile iron pipe, ductile iron compact fittings and mechanical joints with retainer glands. See also Specification revision #AD4.003 above.

AD4.024 Question: Response:

Scope item 2A-36 call for undercut of Area A and B building noting to stockpile the material and place back into the undercut hole. This also states that if the quantity should be less, then the 2A contractor shall credit back the quantity based on unit price 2A-01. Unit Price 2A-01 states to include hauling and lawful disposal of all resultant spoils. Is unit price 2A-01 stating that the spoils are to be hauled offsite? If so, this would not match the direction of scope Item 2A-36 Please clarify. Yes, Allowance 2A-01 does say to export unsuitable soil spoils. Scope item 2A-36 does not say “not” to export unsuitable soils as per the allowance unit rate.

Page 7: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence
LorenzE
Text Box
SA PLAN per Spec 01 5000 - General Notes: 1. Install driven post chain link fence and block/panel fencing as shown along entire LOD. "Construction Area No Trespassing" signs to be placed every 50LF. 2. Provide "Construction Entrance" Signs & Stop signs at each driveway entry (total of 3). 3. Provide 2 "Construction Entrance Ahead" signs at each entry on Davidsonville Road and on Underwood Rd. 4. Provide 3 hosebibs, one at each entrance, one for the Mason (location tbd). 5. Hook up water to Owners Construction Trailer. 6. No materials, equipment, or driving on Forest Conservation, Tree Protection, and SWM Facility areas.
LorenzE
Text Box
SITE ACCESS PLAN PHASE A - Revised
kchesla
Polygon
kchesla
Callout
No stone laydown in this area. ADDENDUM #4, item AD4.002
LorenzE
Rectangle
Page 8: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

4

Page 9: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

4

Page 10: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

4

Page 11: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

4

Page 12: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

4

Page 13: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

4

Page 14: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence
Page 15: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

4

Page 16: CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004bids.urbanzink.com/croftonhs/Addendum 4/18CN-008-001_Addendum_… · CROFTON AREA HIGH SCHOOL ADDENDUM NO. 004 ... ADD the following sentence

4