Creative Planning Solutions Pty Limited Level 3, 397 Riley Street, Surry Hills NSW 2010 – PO Box 1074 Broadway NSW 2007 +61 2 8039 7461 | [email protected]| www.cpsplanning.com.au Creative Planning Solutions Pty Limited – ABN: 70 135 093 926 29 August 2019 The General Manager Waverley Council PO Box 9 Bondi Junction 1355 ATTN: Kylie Lucas, Senior Assessment Planner RE: 2019ECI019 (DA-125/2012/B) – 20 ILLAWONG AVENUE, TAMARAMA – AMENDED PLANS ----------------------------------------------------------------------------------------------------------------------------------------- We refer to the decision of the Sydney Eastern City Planning Panel (SECPP) to defer the abovementioned application in line with our request made at the public meeting of 15 August 2019. Amended architectural plans and an amended Traffic Impact Assessment (TIA) have been prepared in line with the position put forward in our correspondence of 14 August 2019 (“the deferral request”), as well as representations made to the SECPP during the public meeting. The purpose of this correspondence is to detail the changes and outline provide a discussion on matters that are relevant to the assessment of the application. Design Amendments As indicated within the deferral request, the proposed third level of the development is no longer feasible, and the owners have decided that they do not wish to proceed with this additional level. The amended plans provide for the deletion of the third level, but provides for additional parking within the basement levels and at the ground floor. The changes to the existing approved basement and ground floor levels are described below (note that for simplicity the changes are primarily described relative to the application currently before Council, but additional commentary is provided on the changes relative to the current approval): Ground Floor • Two additional car parking spaces are proposed adjacent to the car parking ramp, perpendicular to the approved ground floor spaces. • The new parking spaces are to be visitor spaces, with two of the visitor spaces adjacent to the building being converted to resident parking spaces. Upper Basement Carpark (B1) • Reduction in the size of the shared laundry to accommodate two additional resident parking spaces. • Reduction in the dimensions of the stairwells to the minimum dimensions permitted by the BCA. • Deletion of the storage cage behind R.31. Note that this space was previously proposed to be converted to a motorcycle space, based on the circulation area around this space. However, the
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
PL-02 ENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCH PL-01 PL-01 PL-01 PL-01 PL-01 PL-01PL-02 PL-02 PL-02E H E E E E EH H H H
PL-02 ENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCH PL-01 PL-01 PL-01 PL-01 PL-01 PL-01PL-02 PL-02 PL-02E H E E E E EH H H H
PL-02 ENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCH PL-01 PL-01 PL-01 PL-01 PL-01 PL-01PL-02 PL-02 PL-02E H E E E E EH H H H
PL-02 ENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCH PL-01 PL-01 PL-01 PL-01 PL-01 PL-01PL-02 PL-02 PL-02E H E E E E EH H H H
PL-02 ENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCH PL-01 PL-01 PL-01 PL-01 PL-01 PL-01PL-02 PL-02 PL-02E H E E E E EH H H H
PL-02 ENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCHENTRY PORCH PL-01 PL-01 PL-01 PL-01 PL-01 PL-01PL-02 PL-02 PL-02E H E E E E EH H H H
FHFH
75.865RL.
75.865RL.
75.865RL.
OUTLINE OF EXISTING BUILDING TO BE RETAINED AT GROUND FLOOR LEVEL
PROPOSED FFL. + 49.200
RL 49.615
RL 49.200
LOWER BASEMENT PARKING (B2) - 48CAR SPACES[26 CAR SPACES INCLUDING STORAGE & PROVISION FOR BICYCLES AT THE BACK OF EACH CAR SPACE][22 CAR SPACES WITH ALLOCATED STORAGE & PROVISION FOR BICYCLES IN DESIGNATED AREAS]
e
e
e
e
NEW FIRE HYDRANT &SPRINKLER CONNECTIONINTO EXISTING TOWN MAINS
e
e
e
e
NEW FIRE HYDRANT &SPRINKLER CONNECTIONINTO EXISTING TOWN MAINS
3
0
.
4
8
1
0
0
°
0
2
'
3
0
"
1
2
.
1
9
7
°
5
2
'
0
0
"
3
.
0
6
1
0
0
°
0
2
'
3
0
"
1
2
.
2
2
5
8
°
4
2
'
0
0
"
1
7
.
8
4
5
1
0
0
°
2
2
'
3
0
"
3
3
.
1
1
8
°
4
3
'
3
0
"
2
6
.0
1
5
1
3
4
°
0
9
'3
0
"
20.115
141°30'30"
15.495
51°30'0
0"
25.805
141°44'30"
34.2
65
243° 3
6' 3
0"
13.715
236°46'3
0"
1
1
.
2
6
2
0
3
°
4
7
'
5
5
"
4.5
7
235°1
8'3
0"
1
2
.8
8
2
5
2
°
5
9
'3
0
"
9
.
1
1
2
7
9
°
2
8
'
3
0
"
8
.
1
4
5
1
8
8
°
3
1
'
3
0
"
2
0
.
2
5
2
7
8
°
1
1
'
0
0
"
1
9
.
9
1
5
7
°
3
7
'
3
0
"
4.295
322°27'30"
2
7
.
5
8
5
2
7
9
°
3
0
'
3
0
"
1
2
.
1
9
8
°
2
8
'
0
0
"
A
P
(
M
.
B
I
T
U
M
E
N
G
R
A
S
S
G
R
A
S
S
S
P
1
7
3
1
4
3
5
3
m
2
LAUNDRY
ST2ST2ST2ST2ST2ST2ST2ST2ST2ST2ST2 ST2
ST3
14 ST2+14 ST3 [ 3.15 m³/each]WASTE ROOM [24 BINS]
SPACEFOR BINTRAILER
L.02 L.01
ST1
RAMP 1:4.5
RAMP 1:8
ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1
ST1 ST1 ST1 ST1 ST1
ST1
ST1
ST1
ST1
ST1
ST1
ST1
T
FW
FH
HYD. PIT
NOMINAL1:100 FALL
HYD. PIT
NOMINAL1:100 FALL
HYD. PIT
NOMINAL1:100 FALL
HYD. PIT
NOMINAL1:100 FALL
HYD. PITNOMINAL1:100 FALL
1000
200
AISL
ECA
RSPA
CE
HYD. PIT
NOMINAL1:100 FALL
DP
DP
DP
HYD. PITNOMINAL1:100 FALL
SUB-SOIL
PUMP ST.
SUB-SOIL
PUMP ST.
E/A
1665
1745
1600
1600
1600
2500 2500 2500TYPICAL
AISLE
200
2540
700
150
ST2
G
R
G
R
G G G G G G G G
G RRRRRRRRRR
MOTORBIKE SPACE
G
ST2
G 2890
2215
RAMP 1:4.5
ST1
7200GRATED DRAIN @ BOTTOM OF RAMP
150 GD
R.47 R.48 R.49
M.08
M.07
M.09
M.10
R.50 R.51 R.52 R.53 R.54 R.55 R.56 R.57 R.58
R.59
R.60
R.61
R.62
R.63
R.64
R.65
R.66R.67R.68R.69R.71R.72
R.83
R.82
R.81
R.80
R.79 R.70R.73R.74R.75R.76R.77R.78
R.84
R.85
R.86
4225
DP
CP EXRISER
WM
WM
WM
WM
WM
SHAREDLAUNDRY
WM
ST.02
FH
ST.04
M.11 M.12
FH
ST.03
1280
R.87
R.88
R.89
R.90
R.91
R.92
ST3ST3ST3ST3ST3ST3ST3ST3ST3ST3ST3ST3ST3
ST1ST1ST1ST1ST4ST4ST4
R.93
R.94
ST4ST4
ST4ST4
ST4
ST4
ST4
e
e
NEW FIRE HYDRANT &SPRINKLER CONNECTIONINTO EXISTING TOWN MAINS
T
ST1ST1 ST1 ST1 ST1
COMMSEXHAUST
FAN ROOM
MECH - AIRFAN ROOM
L.02 L.01
UPPER BASEMENT PARKING (B1) - 44 CAR SPACES[28 CAR SPACES INCLUDING STORAGE & PROVISION FOR BICYCLES AT THE BACK OF EACH CAR SPACE][16 CAR SPACES WITH ALLOCATED STORAGE & PROVISONS FOR BICYCLES IN DESIGNATED AREAS]
WASTE ROOM [24 BINS]G G G G G G G G G G G
RR R P
VALVE ROOM(PUMPS)
R R PPPP
OUTLINE OF EXISTING BUILDING TO BE RETAINED AT GROUND FLOOR LEVEL
FH
G
G ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1
ST1
ST1
ST1
ST1
ST1
ST1
ST1
R5R3
T13
T13
SRZ
CANOPY DRIPLINE
FW
FH
1000
AISL
ECA
RSPA
CECA
RSPA
CE
MOTORBIKE SPACE
CP EX RISERFROM BELOW
CP A/S DROPPERBELOW
E/A
100mm x 100mm EDGE RECESSAROUND PERIMETER FORSTRIP DRAIN
BINROOMEXHAUST
CARPARKEXHAUST
KERB
KERB
OUTLINE OF TERRACES OVER SHOWN DASHED
OUTLINE OF TERRACES OVER SHOWN DASHED
MAINSWITCHROOM
TELCOROOM B
G
3
0
.
4
8
1
0
0
°
0
2
'
3
0
"
1
2
.
1
9
7
°
5
2
'
0
0
"
3
.
0
6
1
0
0
°
0
2
'
3
0
"
1
2
.
2
2
5
8
°
4
2
'
0
0
"
1
7
.
8
4
5
1
0
0
°
2
2
'
3
0
"
3
3
.
1
1
8
°
4
3
'
3
0
"
2
6
.0
1
5
1
3
4
°
0
9
'3
0
"
20.115
141°30'30"
15.495
51°30'0
0"
25.805
141°44'30"
34.2
65
243° 3
6' 3
0"
13.715
236°46'3
0"
1
1
.
2
6
2
0
3
°
4
7
'
5
5
"
4.5
7
235°1
8'3
0"
1
2
.8
8
2
5
2
°
5
9
'3
0
"
9
.
1
1
2
7
9
°
2
8
'
3
0
"
8
.
1
4
5
1
8
8
°
3
1
'
3
0
"
2
0
.
2
5
2
7
8
°
1
1
'
0
0
"
1
9
.
9
1
5
7
°
3
7
'
3
0
"
4.295
322°27'30"
2
7
.
5
8
5
2
7
9
°
3
0
'
3
0
"
1
2
.
1
9
8
°
2
8
'
0
0
"
B
I
T
U
M
E
N
G
R
A
S
S
G
R
A
S
S
S
P
1
7
3
1
4
3
5
3
m
2
LAUNDRY
OSD TANK
OPENINGS PROTECTED INACCORDANCE WITH BCACLAUSE C3.2 & C3.4
OUTLINE OF EXISTING BUILDING TO BE RETAINED AT GROUND FLOOR LEVEL
PROPOSED FFL. + 49.200
RL 49.615
RL 49.200
LOWER BASEMENT PARKING (B2) - 48CAR SPACES[26 CAR SPACES INCLUDING STORAGE & PROVISION FOR BICYCLES AT THE BACK OF EACH CAR SPACE][22 CAR SPACES WITH ALLOCATED STORAGE & PROVISION FOR BICYCLES IN DESIGNATED AREAS]
T
A
M
A
R
A
M
A
S
T
R
E
E
T
ILLA
W
O
N
G
A
V
E
N
U
E
ST2ST2ST2ST2ST2ST2ST2ST2ST2ST2ST2 ST2
ST3
14 ST2+14 ST3 [ 3.15 m³/each]WASTE ROOM [24 BINS]
SPACEFOR BINTRAILER
L.02 L.01
ST1
RAMP 1:4.5
RAMP 1:8
ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1
ST1 ST1 ST1 ST1 ST1
ST1
ST1
ST1
ST1
ST1
ST1
ST1
T
FW
FH
1000
200
AISL
ECA
RSPA
CE
E/A
2500 2500 2500TYPICAL
AISLE
ST2
G
R
G
R
G G G G G G G G
G RRRRRRRRRR
MOTORBIKE SPACE
G
ST2
G 2890
2215
RAMP 1:4.5
ST1
7200GRATED DRAIN @ BOTTOM OF RAMP
150 GD
R.47 R.48 R.49
M.08
M.07
M.09
M.10
R.50 R.51 R.52 R.53 R.54 R.55 R.56 R.57 R.58
R.59
R.60
R.61
R.62
R.63
R.64
R.65
R.66R.67R.68R.69R.71R.72
R.83
R.82
R.81
R.80
R.79 R.70R.73R.74R.75R.76R.77R.78
R.84
R.85
R.86
4225
CP EXRISER
WM
WM
WM
WM
WM
SHAREDLAUNDRY
WM
ST.02
FH
ST.04
M.11 M.12
FH
ST.03
1280
R.87
R.88
R.89
R.90
R.91
R.92
ST3ST3ST3ST3ST3ST3ST3ST3ST3ST3ST3ST3ST3
ST1ST1ST1ST1ST4ST4ST4
R.93
R.94
ST4ST4
ST4ST4
ST4
ST4
ST4
T
A
M
A
R
A
M
A
S
T
R
E
E
T
ILLA
W
O
N
G
A
V
E
N
U
E
3
0
.
4
8
1
0
0
°
0
2
'
3
0
"
1
2
.
1
9
7
°
5
2
'
0
0
"
3
.
0
6
1
0
0
°
0
2
'
3
0
"
1
2
.
2
2
5
8
°
4
2
'
0
0
"
1
7
.
8
4
5
1
0
0
°
2
2
'
3
0
"
3
3
.
1
1
8
°
4
3
'
3
0
"
2
6
.0
1
5
1
3
4
°
0
9
'3
0
"
20.115
141°30'30"
15.495
51°30'0
0"
25.805
141°44'30"
34.2
65
243° 3
6' 3
0"
13.715
236°46'3
0"
1
1
.
2
6
2
0
3
°
4
7
'
5
5
"
4.5
7
235°1
8'3
0"
1
2
.8
8
2
5
2
°
5
9
'3
0
"
9
.
1
1
2
7
9
°
2
8
'
3
0
"
8
.
1
4
5
1
8
8
°
3
1
'
3
0
"
2
0
.
2
5
2
7
8
°
1
1
'
0
0
"
1
9
.
9
1
5
7
°
3
7
'
3
0
"
4.295
322°27'30"
2
7
.
5
8
5
2
7
9
°
3
0
'
3
0
"
1
2
.
1
9
8
°
2
8
'
0
0
"
A
P
P
R
O
X
.
T
R
U
E
N
O
R
T
H
(
M
.
G
.
A
.
)
1
D
.
P
.
2
0
5
6
7
3
2
D
.
P
.
2
0
5
6
7
3
2
D
.
P
.
5
0
3
4
2
4
1
S
.
P
.
1
4
6
2
4
S
.
P
.
5
1
0
3
3
D
.
P
.
1
5
8
9
3
5
4
D
.
P
.
5
9
4
3
5
9
1
2
D
.
P
.
1
1
5
3
3
5
8
1
1
D
.
P
.
1
1
5
3
3
4
2
A
D
.
P
.
3
7
9
2
6
6
S
.
P
.
6
5
7
7
1
D
.
P
.
3
0
1
1
4
0
6
D
.
P
.
9
5
1
0
2
3
9
D
.
P
.
9
5
1
0
2
3
A
D
.
P
.
4
4
3
2
5
3
B
D
.
P
.
4
4
3
2
5
3
THESE DRAWINGS ARE NOT FOR CONSTRUCTION UNLESSOTHERWISE INDICATED
DO NOT SCALE OFF THESE DRAWINGS. WRITTEN DIMENSION TOTAKE PRECEDENCE OVER SCALED DIMENSIONS. BUILDER TOCHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR TOCONSTRUCTION. CONTACT ARCHITECT IF DISCREPANCIESOCCUR BETWEEN ARCHITECTURAL AND CONSULTANTSDOCUMENTS.
THIS DRAWING TO BE READ IN CONJUNCTION WITH THE FINISHES& FIXTURES, FITTINGS AND EQUIPMENT SCHEDULE.
THIS DRAWING TO BE READ IN CONJUNCTION WITH MECHANICAL,HYDRAULIC AND ELECTRICAL DESIGN DOCUMENTATIONPROVIDED BY THE PROJECT ENGINEERS.
FINAL COORDINATION TO OCCUR WITH SERVICESSUB-CONTRACTORS PRIOR TO COMMENCEMENT OF WORKS.
G E N E R A L I T E M S
ALLOW FOR TEMPORARY SHORING FOR TOP LAYERSOTHER THAN ROCK. REFER TO GEOTECHNICAL ENGINEERSREPORT, DOUGLAS PARTNERS DATED NOVEMBER 2018.
ROCK EXCAVATION SHALL BE CARRIED OUT STRICTLY INACCORDACE WITH THE GEOTECHNICAL ENGINEERSREPORT, DOUGLAS PARTNERS DATED NOVEMBER 2018.
BASEMENT SETOUT DIMENSIONS ALLOW FOR A 20MMOFFSET FROM THE OUTSIDE FACE OF STRUCTURE.
PARKING SPACESON-GRADE PARKING:
10 VISITOR CARSPACES [ON-GRADE]
10 TOTAL VISITOR CARSPACES2 TOTAL RESIDENTIAL CARSPACES
UPPER BASEMENT PARKING (B1): 28 STANDARD RESIDENTIAL CARSPACES
+ STORAGE & BICYCLE CAGE 16 STANDARD RESIDENTIAL CARSPACES
44 TOTAL RESIDENTIAL CARSPACES06 MOTORCYCLE SPACES
LOWER BASEMENT PARKING (B2): 30 STANDARD RESIDENTIAL CARSPACES
+ STORAGE & BICYCLE CAGE 18 STANDARD RESIDENTIAL CARSPACES 48 TOTAL RESIDENTIAL CARSPACES
06 MOTORCYCLE SPACES
94 TOTAL RESIDENT CARSPACES10 TOTAL VISITOR CARSPACES12 TOTAL MOTORCYCLE SPACES
BICYCLE PARKING & STORAGEBICYCLE PARKING - CLASS 3:
UPPER BASEMENT PARKING (B1) - 44 CAR SPACES[28 CAR SPACES INCLUDING STORAGE & PROVISION FOR BICYCLES AT THE BACK OF EACH CAR SPACE][16 CAR SPACES WITH ALLOCATED STORAGE & PROVISONS FOR BICYCLES IN DESIGNATED AREAS]
WASTE ROOM [24 BINS]G G G G G G G G G G G
RR R P
VALVE ROOM(PUMPS)
6000
7335
1500
1500
6440
4940
33301500
1500
1500
2025
R R PPPP
OUTLINE OF EXISTING BUILDING TO BE RETAINED AT GROUND FLOOR LEVEL
FH
G
G ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1ST1
ST1
ST1
ST1
ST1
ST1
ST1
ST1
2000
R5R3
T13
T13
SRZ
CANOPY DRIPLINE
1000
5400
5400
1000
AISL
ECA
RSPA
CECA
RSPA
CE
5400 CARSPACE
6100 AISLE
MOTORBIKE SPACE
5150
1600
100mm x 100mm EDGE RECESSAROUND PERIMETER FORSTRIP DRAIN
BINROOMEXHAUST
CARPARKEXHAUST
KERB
KERB
OUTLINE OF TERRACES OVER SHOWN DASHED
OUTLINE OF TERRACES OVER SHOWN DASHED
MAINSWITCHROOM
TELCOROOM B
G
OSD TANK
1000
1000
4150
4150
5400
6000
CARSPACE
5400CARSPACE
AISLE
OPENINGS PROTECTED INACCORDANCE WITH BCACLAUSE C3.2 & C3.4
1095
3065
3140
3030 LOUVRED SCREEN
1165
25007500 2500 2500
800
5180
5000
2320
1500
EXISTING SEWERDIVERSION
SHOWN DOTTED
5400
6000
5400CARSPACE
2500
1550
ST1
3600
3600
500
RAMP UP TO GROUND FLOOR
RAMP DOWN TO B2 BASEMENT
KERB
KERB
300
150 GD
ST.02
RAMP 1:4.5
2275
2245
PROPOSED FFL. + 52.170
RAMP 1:8
RL 52.585
RL 52.170
ST1
150 GD
R.03 R.04 R.05 R.06
FH
R.07 R.09R.08 R.10
R.11
R.13
R.12
R.14
R.15
R.16
R.20
R.17
R.18R.19R.21R.22R.23R.24R.25R.26R.27R.28R.41
R.40
R.39
R.38
R.37
R.36
R.29R.30R.31
R.32
R.33
R.34
R.35
4 MOTORBIKESPACES
M.01
M.02M.03
M.04
ST1 ST1
WM
WM
WM
WM
SHAREDLAUNDRY
WM
TELCOROOM A
R.42
R.44
2550ST.04 1550
ST.03
R.43
2200
M.05
3625
R.46
1675
ST4ST4
ST4
ST4
M.06
R.45
ST4
T
A
M
A
R
A
M
A
S
T
R
E
ILLA
W
O
N
G
A
V
E
N
U
E
3
0
.
4
8
1
0
0
°
0
2
'
3
0
"
1
2
.
1
9
7
°
5
2
'
0
0
"
3
.
0
6
1
0
0
°
0
2
'
3
0
"
1
2
.
2
2
5
8
°
4
2
'
0
0
"
1
7
.
8
4
5
1
0
0
°
2
2
'
3
0
"
3
3
.
1
1
8
°
4
3
'
3
0
"
2
6
.0
1
5
1
3
4
°
0
9
'3
0
"
20.115
141°30'30"
15.495
51°30'0
0"
25.805
141°44'30"
34.2
65
243° 3
6' 3
0"
13.715
236°46'3
0"
1
1
.
2
6
2
0
3
°
4
7
'
5
5
"
4.5
7
235°1
8'3
0"
1
2
.8
8
2
5
2
°
5
9
'3
0
"
9
.
1
1
2
7
9
°
2
8
'
3
0
"
8
.
1
4
5
1
8
8
°
3
1
'
3
0
"
2
0
.
2
5
2
7
8
°
1
1
'
0
0
"
1
9
.
9
1
5
7
°
3
7
'
3
0
"
4.295
322°27'30"
2
7
.
5
8
5
2
7
9
°
3
0
'
3
0
"
1
2
.
1
9
8
°
2
8
'
0
0
"
A
P
P
R
O
X
.
T
R
U
E
N
O
R
T
H
(
M
.
G
.
A
.
)
1
D
.
P
.
2
0
5
6
7
3
2
D
.
P
.
2
0
5
6
7
3
5
0
3
4
2
4
B
.
1
1
0
3
6
9
S
.
P
.
1
4
6
2
4
S
.
P
.
5
1
0
3
3
D
.
P
.
1
5
8
9
3
5
4
D
.
P
.
5
9
4
3
5
9
1
2
D
.
P
.
1
1
5
3
3
5
8
1
1
D
.
P
.
1
1
5
3
3
4
2
A
D
.
P
.
3
7
9
2
6
6
S
.
P
.
6
5
7
7
1
D
.
P
.
3
0
1
1
4
0
6
D
.
P
.
9
5
1
0
2
3
9
D
.
P
.
9
5
1
0
2
3
A
D
.
P
.
4
4
3
2
5
3
B
D
.
P
.
4
4
3
2
5
3
PARKING SPACESON-GRADE PARKING:
10 VISITOR CARSPACES [ON-GRADE]
10 TOTAL VISITOR CARSPACES2 TOTAL RESIDENTIAL CARSPACES
UPPER BASEMENT PARKING (B1): 28 STANDARD RESIDENTIAL CARSPACES
+ STORAGE & BICYCLE CAGE 16 STANDARD RESIDENTIAL CARSPACES
44 TOTAL RESIDENTIAL CARSPACES06 MOTORCYCLE SPACES
LOWER BASEMENT PARKING (B2): 30 STANDARD RESIDENTIAL CARSPACES
+ STORAGE & BICYCLE CAGE 18 STANDARD RESIDENTIAL CARSPACES 48 TOTAL RESIDENTIAL CARSPACES
06 MOTORCYCLE SPACES
94 TOTAL RESIDENT CARSPACES10 TOTAL VISITOR CARSPACES12 TOTAL MOTORCYCLE SPACES
BICYCLE PARKING & STORAGEBICYCLE PARKING - CLASS 3:
WASTE ALLOCATION WITHIN BASEMENTLOCATION BIN TYPELVL 1 BASEMENT
MGB's - GARBAGEMGB's - RECYCLING
LVL 2 BASEMENTMGB's - GARBAGEMGB's - RECYCLING
TOTAL MGB's - GARBAGEMGB's - RECYCLING
No.
1311
1410
2721
No.
80
2
m³/unit
5.00(min)10.00
NOTE:STORAGE WILL BE PROVIDED TOUNITS THROUGH STORAGE TYPESNOMINATED. THIS ALLOCATION OFVOLUME WILL FACILITATE STORAGE FORA BICYCLE - CLASS 1.
TYPESST1 - 2400Lx1000Wx2100HST2 - 1500Lx1000Wx2100HST3 - 1270Lx1170Wx2100H [BIKE LOCKER]ST4 - VARIOUS UP TO 3m³
No.581414
15
m³/st5.003.153.12
WASTE STORAGE
STORAGE ALLOCATION THESE DRAWINGS ARE NOT FOR CONSTRUCTION UNLESSOTHERWISE INDICATED
DO NOT SCALE OFF THESE DRAWINGS. WRITTEN DIMENSION TOTAKE PRECEDENCE OVER SCALED DIMENSIONS. BUILDER TOCHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR TOCONSTRUCTION. CONTACT ARCHITECT IF DISCREPANCIESOCCUR BETWEEN ARCHITECTURAL AND CONSULTANTSDOCUMENTS.
THIS DRAWING TO BE READ IN CONJUNCTION WITH THE FINISHES& FIXTURES, FITTINGS AND EQUIPMENT SCHEDULE.
THIS DRAWING TO BE READ IN CONJUNCTION WITH MECHANICAL,HYDRAULIC AND ELECTRICAL DESIGN DOCUMENTATIONPROVIDED BY THE PROJECT ENGINEERS.
FINAL COORDINATION TO OCCUR WITH SERVICESSUB-CONTRACTORS PRIOR TO COMMENCEMENT OF WORKS.
G E N E R A L I T E M S
ALLOW FOR TEMPORARY SHORING FOR TOP LAYERSOTHER THAN ROCK. REFER TO GEOTECHNICAL ENGINEERSREPORT, DOUGLAS PARTNERS DATED NOVEMBER 2018.
ROCK EXCAVATION SHALL BE CARRIED OUT STRICTLY INACCORDACE WITH THE GEOTECHNICAL ENGINEERSREPORT, DOUGLAS PARTNERS DATED NOVEMBER 2018.
BASEMENT SETOUT DIMENSIONS ALLOW FOR A 20MMOFFSET FROM THE OUTSIDE FACE OF STRUCTURE.
Issue
Amendments
Description Date
This drawing is the copyright of Group GSA Pty Ltd and
may not be altered, reproduced or transmitted in any
form or by any means in part or in whole without the
written permission of Group GSA Pty Ltd.
All levels and dimensions are to be checked and verified
on site prior to the commencement of any work, making
PROFILE OF ROCK CLIFFFACE AT GRID 03 TBC.REFER GEOTECH SURVEY.
2970
2970
O.S.D
ABCDE
15845
1750 1350 10545 2200
FG
12250
8500 3750
ABCDE
15845
1750 1350 10545 2200
FG
12250
8500 3750
ABCDE
15845
1750 1350 10545 2200
FG
12250
8500 3750
THESE DRAWINGS ARE NOT FOR CONSTRUCTION UNLESSOTHERWISE INDICATED
DO NOT SCALE OFF THESE DRAWINGS. WRITTEN DIMENSION TOTAKE PRECEDENCE OVER SCALED DIMENSIONS. BUILDER TOCHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR TOCONSTRUCTION. CONTACT ARCHITECT IF DISCREPANCIESOCCUR BETWEEN ARCHITECTURAL AND CONSULTANTSDOCUMENTS.
THIS DRAWING TO BE READ IN CONJUNCTION WITH THE FINISHES& FIXTURES, FITTINGS AND EQUIPMENT SCHEDULE.
THIS DRAWING TO BE READ IN CONJUNCTION WITH MECHANICAL,HYDRAULIC AND ELECTRICAL DESIGN DOCUMENTATIONPROVIDED BY THE PROJECT ENGINEERS.
FINAL COORDINATION TO OCCUR WITH SERVICESSUB-CONTRACTORS PRIOR TO COMMENCEMENT OF WORKS.
G E N E R A L I T E M S
CODE DESCRIPTION
FIN.01 FINISHED CONCRETE: LIGHT PALE TONE - CLASS 2FIN.02 PAINTED RENDER: OVER CONCRETE/MASONRYFIN.03.T COMPOSITE TIMBER: DECKING & SOFFIT CLADDINGFIN.04.B PAINTED STAINLESS STEEL: BALUSTRADEFIN.04.G GLASS BALUSTRADE: BASE MOUNTED
(AXION-METROPOLIS RANGE)FIN.05.S PAINTED STRUCTURAL STEEL:FIN.06.R ROOF CLADDING: METAL ROOF SHEETINGFIN.07 FLAT ROOF: PEBBLESFIN.08.C COLUMN CLADDING: PRE-FINISHED FC SHEETING
(EQUITONE - TECTIVA)FIN.09.T STONE PAVING: 600 x 300 x 10mmPL-01 PRECAST TROUGH PLANTERS:
2200 L x 1000 W x 800 H (QUATRO DESIGN)PL-02 PRECAST SQUARE PLANTERS:
1100 SQ. x 700 H (QUATRO DESIGN)
Issue
Amendments
Description Date
This drawing is the copyright of Group GSA Pty Ltd and
may not be altered, reproduced or transmitted in any
form or by any means in part or in whole without the
written permission of Group GSA Pty Ltd.
All levels and dimensions are to be checked and verified
on site prior to the commencement of any work, making