Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL
7

Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement) INITIAL MANAGEMENT SCREENING AND WASTE MANAGEMENT Rock Dam Filters

Aug 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement) INITIAL MANAGEMENT SCREENING AND WASTE MANAGEMENT Rock Dam Filters

Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL

Page 2: Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement) INITIAL MANAGEMENT SCREENING AND WASTE MANAGEMENT Rock Dam Filters

INVASIVE SPECIESCrassula helmsii

Crassula helmsii at New Abbey

HES 2019 (Site Visit) BSBI 2020 (bsbi.org/maps?taxonid=2cd4p9h.g2z)

UK Distribution

Page 3: Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement) INITIAL MANAGEMENT SCREENING AND WASTE MANAGEMENT Rock Dam Filters

SEPA & HES INTERACTION

WHOLE PROCESS METHOD STATEMENT

1. Aims

2. Measures

3. Regulations –registrations or GBRs with links to other information

Timeline – short, medium and long Roles and responsibilities Allowed iterative consultation across

SEPA and HES Options explored and consensus

reached Resilient to staff change Able to support funding

applications/budget allocations Trackable Lodged with SEPA

Page 4: Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement) INITIAL MANAGEMENT SCREENING AND WASTE MANAGEMENT Rock Dam Filters

SITENEW ABBEY CORN MILL, DUMFRIES AND GALLOWAY

Aerial View Lade & Pond System

HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement)

Page 5: Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement) INITIAL MANAGEMENT SCREENING AND WASTE MANAGEMENT Rock Dam Filters

INITIAL MANAGEMENTSCREENING AND WASTE MANAGEMENT

Rock Dam Filters & Sluice Screens

HES 2019 (Site Visit)

HE

S 2

019

(Meth

od S

tate

ment)

HES 2019 (Method Statement)HES 2019 (Site Visit)

Page 6: Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement) INITIAL MANAGEMENT SCREENING AND WASTE MANAGEMENT Rock Dam Filters

TREATMENTMANUAL WEEDING, SHEETING & CHEMICAL CONTROL

Geotextile Lining

HES 2019 (Method Statement)

HES 2019 (Method Statement)

North Yorkshire Moors National Park 2017(https://northyorkmoorsnationalpark.wordpress.com

/tag/yorkshire-water/)

Mill Pond Stage Fish Pond Stage

Page 7: Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement) INITIAL MANAGEMENT SCREENING AND WASTE MANAGEMENT Rock Dam Filters

MONITORINGCONTINUED SCREENING AND ASSESSMENT