CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
CPV DCS STATUS REPORT
Mikhail Bogolyubsky (IHEP, Protvino)Serguei Sadovsky (IHEP, Protvino)
CERN, DCS meeting, 30 January, 2007.
2006 DCS planning, CPV
DCS planning meeting 13.03.2006:
Detector CPV: D = 01.12.07 => D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)
CPV FSM Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when?– Integrate all sub-systems in the DETECTOR FSM A.M., M.B. 01.07.07– Implement software interlocks (if required) A.M., M.B. 01.07.07 – Implement operations panels A.M., M.B. 01.07.07
• < D-4 weeks
• Commissioning at P2 – Hand-over PVSS project to ACC for verific.& integration S.S., M.B., A.M. D-4 weeks – Install PVSS project in server at P2 ACC D-2– Commission with sub-systems at P2 A.M., M.B. D-2– Commission the DETECTOR DCS with PHOS A.M., M.B. D– Commission together with other detectors A.M., M.B.,VO +All D+?
2006 DCS planning, CPV (2)
LV PS Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when?– Implement a “Lab setup”: PVSS-OPC-device M.B., A.M. 01.07.07– Implement FSM M.B., A.M. 01.07.07
– Implement the PVSS configuration, archival and alarms M.B., A.M. 01.07.07– Implement software interlocks (if required) M.B., A.M. 01.07.07 – Implement operations panels M.B., A.M. 01.07.07
• < D-4 weeks• Commissioning at P2• Hand-over PVSS project to ACC for verific.& integrat. S.S., M.B, A.M. D-4 weeks
– Install PVSS project in server at P2 ACC D-2– Install, cable & commission the LV PS devices at P2 V.V. D-2– Commission the LV PS devices with detector M.B., A.M. D
D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)
2006 DCS planning, CPV (3)
HV PS Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when?– Implement a “Lab setup”: PVSS-OPC-device M.B., V.O. 01.07.06– Implement FSM M.B., V.O. 01.07.06
– Implement the PVSS configuration, archival and alarms M.B., V.O. 01.07.06– Implement software interlocks (if required) M.B., V.O. 01.07.06 – Implement operations panels M.B., V.O. 01.07.06
• < D-4 weeks• Commissioning at P2• Hand-over PVSS project to ACC for verific.& integrat. S.S., M.B, V.O. D-4
weeks– Install PVSS project in server at P2 ACC D-2– Install, cable & commission the HVPS devices at P2 V.V. D-2– Commission the HV PS devices with detector M.B., V.O. D
D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)
2006 DCS planning, CPV (4)
Temperature Monitor Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when?– Implement a “Lab setup”: CRW-DAQ A.M., M.B. 01.08.07– Implement FSM A.M., M.B. 01.08.07
– Implement the PVSS configuration, archival and alarms A.M., M.B. 01.08.07– Implement software interlocks (if required) A.M., M.B. 01.08.07 – Implement operations panels A.M., M.B. 01.08.07
• < D-4 weeks• Commissioning at P2• Hand-over PVSS project to ACC for verific.& integration S.S., A.M., M.B. D-4 weeks
– Install PVSS project in server at P2 ACC D-2– Install, cable & commission the COOLING plant at P2 V.V. D-2– Commission the COOLING plant with detectorV.V., A.M., M.B. D
D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)
GAS (Ar+CO2) Commissioning at P2 Who responsible Ready When? -- Hand-over PVSS project to ACC for verific. & integration GWG 1.08.06 -- Install PVSS project in server at P2 ACC 1.08.06 -- Install, cable & commission the GAS system at P2 GWG 1.08.06 -- Commission the GAS system with detector S.S., V.V., M.B. D < D-4 weeks
Detector
PVSS II PVSS II
Detector
Ethernet
Database(s)
OPCclient
DIMclient
3020
Detector(Ni100 sensors)
32
High Voltage Low Voltage Temp. Monitor
User interface
PVSS II
HV LV
PHOS-CPVC
on
tro
l ro
om
(A
CR
)[UI node]
ELMB
27/10/05
CR4-Y10
SY2527(2*A18833P)
Ethernet
E
CR3
CAEN OPCserver
PVSS IIOPC client
1
UX-C16
Wiener
E
CR3
Wiener OPCserver
PVSS IIOPC client
3
CR3
PCI-CAN
ELMB OPCserver
PVSS IIOPC client
C
1ACC
1
CR3
SG2
CR5
SG2
Gas system
PLC
Gas
E
Detector
PVSS IIDIP
[GWG]
Gas
GasPVSS
1
2 2 2
Wiener Crate State Diagram
Wiener Channel State Diagram
Wiener Control State Diagram
Wiener State Diagrams
What is Ready & in Progress
• CPV FSM – in a good progress (the first prototype exists)
• LV Power supplies of the Wiener type – almost ready
• HV Power supplies of the CAEN type – TBD (the same as in HMPID)
• Temperature monitoring (ELMB) – TBD (the same as in PHOS)
• Gas system – almost ready (GWG)
• Connection of top the CPV Level with the top PHOS Level – TBD