Top Banner
Erika Hutko | June 2014 U.S. Department of Education Software Vendors Webinar CPS Update for Software Vendors
27

CPS Update for Software Vendors

Feb 23, 2016

Download

Documents

decima

CPS Update for Software Vendors. Erika Hutko | June 2014 U.S. Department of Education Software Vendors Webinar. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CPS  Update for  Software Vendors

Erika Hutko | June 2014U.S. Department of Education

Software Vendors Webinar

CPS Update for Software Vendors

Page 2: CPS  Update for  Software Vendors

The CPS Update will provide ‘heads up’ information for programmers and data processing staff about the 2015-2016 changes to the Institutional Student Information Record (ISIR) layout and the CPS enhancements.

Presenter: Erika Hutko

Page 3: CPS  Update for  Software Vendors

3

• Central Processing System (CPS) Changes• Institutional Student Information Record

(ISIR) Changes• CPS Test System• Important Dates

Page 4: CPS  Update for  Software Vendors

4

2015-2016 CPS Changes

Page 5: CPS  Update for  Software Vendors

5

2015-2016 CPS Enhancements• NSLDS Data Changes

- Subsidized Loan Eligibility Used field (SLEU) will be renamed to Subsidized Usage Period- Confirmed Loan Subsidy Status added- Subsidy Status Date added- New value of R added for Loan Limit Flags- New SAR Comments- New Program code for Direct Perkins Loan- ACG and SMART Grant data deleted- New and redefined Post screening codes

• New Foster Care SAR Comments- FOTW Foster Care screening question will be added (seen in FOTW

only)- New SAR Comments

Page 6: CPS  Update for  Software Vendors

6

Subsidized Loan Eligibility Used (SLEU) Renamed

The Subsidized Loan Eligibility Used field will be renamed to Subsidized Usage Period

Page 7: CPS  Update for  Software Vendors

7

Confirmed Loan Subsidy Status

Confirmed Loan Subsidy Status Valid Values• L = Lost Subsidy• R = Reinstated Subsidy• N = Not applicable for non-D0 loans or No change to subsidy status

for D0 loans

Page 8: CPS  Update for  Software Vendors

8

Subsidy Status Date• Valid Values• Date (Numeric)• N/A

Subsidy Status Date

Page 9: CPS  Update for  Software Vendors

9

New value of R and new SAR Comments

• A value of R will be added to the current loan limit flags. R will be defined as ‘Exceeded loan limit and reaffirmed debt’.• A SAR comment will be added for a value of R in the Undergraduate

Subsidized or Combined Loan Limit Flags.• A SAR comment will be added for a value of R in the Graduate Subsidized

or Combined Loan Limit Flags.• The SAR C flag will be set by the new comments.

Page 10: CPS  Update for  Software Vendors

10

*A new Program code for Direct Perkins Loan will be added

New Program Code

Page 11: CPS  Update for  Software Vendors

11

ACG and SMART Grant (detailed payment and aid overpayment) data will be deleted.

ACG and SMART Grant

Page 12: CPS  Update for  Software Vendors

12

• Post screening Reason Code 26 will be added for a change in Confirmed Loan Subsidy Status.

• Post screening Reason Code 27 will be added for decreases in the Subsidized Usage Period.

Post screening New Reason Codes

Page 13: CPS  Update for  Software Vendors

13

• Post screening reason codes 11 and 12 will be redefined as follows:• 11= Exceeding Subsidized loan limit resolved• 12 = Exceeding Combined loan limit resolved

• Post screening reason code 13 will be redefined as “Not in use”

Post screening Redefined Reason Codes

Page 14: CPS  Update for  Software Vendors

14

New Foster Care Comments and Screening Question

• Two new SAR comments regarding eligibility for Foster Care programs

• New FOTW Foster Care screening question added

Page 15: CPS  Update for  Software Vendors

15

New Foster Care Comments

• A SAR comment will be added for non-FOTW filers who respond Yes to the current Orphan/Foster Care/Ward of the Court dependency question; the comment text will include a URL for additional information.

• A SAR comment will be added for FOTW filers who respond Yes to the Foster Care screening question; the comment text will include a URL for additional information.

Page 16: CPS  Update for  Software Vendors

16

CPS Test System

Page 17: CPS  Update for  Software Vendors

17

2015-2016 CPS Test System

• Draft Application Processing Software Developers Specifications slated to be posted mid August

• Updates will be provided, as needed

Page 18: CPS  Update for  Software Vendors

18

2015-2016 CPS Test System

• Mechanism for you to confirm that your system – • Meets specifications for interfacing with CPS• Is calculating correct results

• Allows you to – • Test applications and corrections• Receive ISIR data

Page 19: CPS  Update for  Software Vendors

19

2015-2016 CPS Test System• Available late December and remains available through the end of

the processing cycle• User Guide will be posted to Federal Student Aid Download Web site

(FSAdownload.ed.gov) around mid October 2014• An Electronic Announcement will be posted when the test system

goes live

Page 20: CPS  Update for  Software Vendors

20

2015-2016 CPS Test System

• Test files will be available at FSAdownload.ed.gov• Separate input and output files will be posted for testing

specifications• Remember - CPS is still in test until FSA accepts the system and

production starts on January 2, 2015

Page 21: CPS  Update for  Software Vendors

21

Important Dates

Page 22: CPS  Update for  Software Vendors

22

Important Dates

• Mid-August 2014• 2015-2016 Electronic Data Exchange (EDE)

Technical Reference draft (including the ISIR Record Layout and ISIR Cross-Reference)

• Mid-August 2014• 2015-2016 Application Processing System

Specifications for Software Developers draft• End of October 2014

• 2015-2016 EFC Formula Guide on the IFAP Web site

Page 23: CPS  Update for  Software Vendors

23

Important Dates

• October 2014• 2015-2016 CPS Test System User Guide

• October 2014• 2015-2016 Electronic Data Exchange (EDE)

Technical Reference- Final • October 2014

• 2015-2016 ISIR Guide on the IFAP

Page 24: CPS  Update for  Software Vendors

24

Important Dates

• November 2014• 2015-2016 SAR Comment Codes and Text

• December 2014• The CPS Test System is made available

Page 25: CPS  Update for  Software Vendors

25

Important Dates

• January 1, 2015• 2015-2016 FAFSA on the Web site is available to

students and 2015-2016 FAA Access to CPS Online Web site

• January 2, 2015• The 2015-2016 CPS begins processing

Page 26: CPS  Update for  Software Vendors

26

Contact Information

We appreciate your feedback and comments

Erika HutkoPhone: [email protected]

Page 27: CPS  Update for  Software Vendors

See you next update!