ENMAX ® CPRS ® ENMAX TECHNOLOGY(SHAN GHAI) CO. • SHANGHAI, CHINA APPLICATIONS IN THE OIL INDUSTRY ENMAX ®  CPRS ®  
63

CPRS Application in the Oilfield

Feb 18, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 1/68

ENMAX® CPRS® ENMAX TECHNOLOGY(SHANGHAI) CO. • SHAN

APPLICATION

THE OIL INDUS

ENMAX ®

Page 2: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 2/68

PARAFFIN, SCALE AND CORROSION ISSUES IN THE O

Productionwells

Meteringstation

TransferStation

Joint Station

Natural GasProcessing Plant

Waste WaterPlant

PARAFFIN, SCALE AND CORROSION PROBLEMS OCCUR IN EVERY

Page 3: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 3/68

WHERE ENMAX® CPRS® CAN BE USED?

!  Downhole Units !  Flowing wells 

!  Pumping wells 

!  Gas-lifting wells 

Water injection w

!  Surface Units 

Oil/Gas productio

Oil/Gas storage &facilities

Water Injection lin

Produced Water facilities 

Page 4: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 4/68

ENMAX® CPRS® OILFIELD UNITS | DOWNHOL

Page 5: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 5/68

ENMAX® CPRS® OILFIELD UNITS | DOWNHOL

Page 6: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 6/68

ENMAX® CPRS® OILFIELD UNITS | SURFACE UN

Page 7: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 7/68

ENMAX® CPRS® OILFIELD UNITS | SURFACE UN

INLINE STYLE DISCS CANISTER

Page 8: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 8/68

ENMAX® CPRS® OILFIELD INSTALLATION | FLOWIN

CPRS

Downhole unit 

Packer  

Perforations 

Page 9: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 9/68

ENMAX® CPRS® OILFIELD INSTALLATION | PUMPING

Pump

CPRS Downhole unit

Perforations

Packer

Page 10: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 10/68

ENMAX® CPRS® OILFIELD INSTALLATION | ESP

ESP

ESP Sub

Packer

CPRS Downhole unit

Perforations

Page 11: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 11/68

ENMAX® CPRS® OILFIELD INSTALLATION | ESP

Page 12: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 12/68

ENMAX® CPRS® OILFIELD INSTALLATION | GAS LIFTIN

CPRSDownhole unit 

Packer  

Gas MandrelCPRSDownh

Packe

Gas M

Page 13: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 13/68

ENMAX® CPRS® OILFIELD INSTALLATION | OIL/GAS

PRODUCTION, STORAGE AND TRANSPORTATION F

PRODUCTION WELL CPRS

OIL/GAS S

Page 14: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 14/68

ENMAX® CPRS® OILFIELD INSTALLATION | OIL/GAS

PRODUCTION, STORAGE AND TRANSPORTATION F

CPRS

OIL TANK

WATER PIPELINE

OIL PIPELINE

NATURAL GAS

Page 15: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 15/68

ENMAX® CPRS® OILFIELD INSTALLATION | WATER I

FACILITIES 

I

CPRS

WATER TANK

WATERINJECTION

PUMP

Page 16: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 16/68

A TYPICAL ENMAX® CPRS® SURFACE UNIT INSTALLATION

!  CRUDE TRANSP!  ENMAX ®  CPRS ®

Page 17: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 17/68

A TYPICAL ENMAX® CPRS® SURFACE UNIT INSTALLATION

!  DETERMINE THE POSITION OF THEINSTALLATION 

!  WELL SITE MEETING

Page 18: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 18/68

A TYPICAL ENMAX® CPRS® SURFACE UNIT INSTALLATION

!  TRANSPORTATION AND FIRETRUCKS PREPARED

!  DRAIN THE PIPELINE

Page 19: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 19/68

A TYPICAL ENMAX® CPRS® SURFACE UNIT INSTALLATION

MOVE THE CPRS UNITTO THE LOCATION

!  REMOVE THEWRAPPING MATERIALSON PIPE LINE

Page 20: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 20/68

A TYPICAL ENMAX® CPRS® SURFACE UNIT INSTALLATION

FLAMELESS CUTTING

Page 21: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 21/68

A TYPICAL ENMAX® CPRS® SURFACE UNIT INSTALLATION

WELDING AND PRESSURE TESTEDDONE!

Page 22: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 22/68

PARAFFIN | QI24-8 WELL, DAGANG OILFIELD

Operator: No. 5 Production Co., Dagan

!  Location: Zhouqingzhuang Oilfield

!  29 oil wells, serious paraffin issue during tproduction

!  Per the reports from 2010, Of 11 rod pumand 3 ESP wells, production has be be st8 times, 30,000 meters of pumping rod h

replaced because of paraffin buildups.!  Conventional hot oil treatment was emp

which resulted in loss circulation of hot oof low formation pressure.

!  Qi 24-8 well, serious pumping rod paraffoccurred, one hot oil treatment every 12

Page 23: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 23/68

PARAFFIN | QI 24-8 WELL, DAGANG OILFIELD

!  March 12th, 011,

Downhole unit waQi 24-8 well;

!  Till January, 2012

production for 325

without any hot oi

!  The comparison o

and Amps, the loaare in the normal totaled at a produincrease of 337 to

Page 24: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 24/68

PARAFFIN | QI 24-8 WELL, DAGANG OILFIELD

Qi 24-8 Production Curve

Page 25: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 25/68

PARAFFIN | QI 24-8 WELL, DAGANG OILFIELD

PUMP CARD AFTER THE INSTALLATION OF CPRS

Page 26: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 26/68

PARAFFIN |Q-12 WELL, ZHONGYUAN OILFIEL

Operator: No. 6 Production COil Field, Sinopec

Location: Qiaokou

Well No.: Q2-12, one of the mparaffin wells

Before the installation of CPR

2012

!  Daily Liquid 0.6 tonsDa

!  Up stroke 58 ADown str

!  One hot oil treatment ev

0.6

0.8

0.3

0.5

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

Before After

Liquid, T/D

Oil, T/D

Comparison of Production Rate before and After

Page 27: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 27/68

PARAFFIN |Q-12 WELL, ZHONGYUAN OILFIEL

58

4848

41

0

10

20

30

40

50

60

70

Before After

Up, A

Down, A

Comparison of Motor Amps before and After

One year after the insCPRS 

Up stroke 48 A, Dow41 A; 

One hot oil treatm55 days 

Daily Liquid 0.8 ton0.5 tons;

Page 28: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 28/68

Paraffin | Daqing Oilfield #7 Production Comp

!  Installation Location: Crew #710, Daqing Oilfield #7 Production Company 

!  Well # 63-72/Oct.,15, 2013; Well# 69-782/Oct.,18, 2013

DN 50 PN 2.5MPa

WeValve Group Room

Page 29: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 29/68

Paraffin | Daqing Oilfield #7 Production Comp

Onsite Installation Photos

Page 30: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 30/68

Paraffin | Daqing Oilfield #7 Production Comp

Basic Data from Well 63-72 & 69-782

Well

No. 

Oil

 t/d 

Liquid

 t/d 

Water

 % 

Flowline

size

 mm 

Flowline

Length

 m 

Max

Back

Pressure

 MPa 

Hot O

Cyle d

63-72 2.23 25.51 91.27 60*3.5 90 3.8 30

69-782 0.69 22 96.86 60*3.5 950 3.5 30

Page 31: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 31/68

Paraffin | Daqing Oilfield #7 Production Comp

Back Pressure Comparison before and after the installation

Page 32: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 32/68

Paraffin | Daqing Oilfield #7 Production Comp

Chemical Cleaning Interval (days) Before and After the installation

30 30

60 60

150

210

0

50

100

150

200

250

Well 63-72 Well 69-782

Before th

After the

Summer

Page 33: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 33/68

Paraffin | Daqing Oilfield #7 Production Comp

Oil Pressure Comparison Before and After the installation @We

Page 34: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 34/68

Paraffin | Daqing Oilfield #7 Production Comp

Oil Pressure Comparison Before and After the installation @We

Page 35: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 35/68

Paraffin | Daqing Oilfield #7 Production Comp

Photo Comparison before (left) and After (right) the installat

Page 36: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 36/68

Scale & Corrosion | Sinopec Zhongyuan Oilfiel

!  Well#: Xinhe

Operator: NoCompany

!  Downhole issuCorrosion 

Before the installation

!  Daily Production: 1.3 tons of Liquid, 1.2 tons of crude

!  Heavy scale and corrosion on tubing string & pump

!  Averaged at a pump repair every 45 days, three times of pump failures within six

Page 37: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 37/68

Scale & Corrosion | Sinopec Zhongyuan Oilfiel

One Year after the installation

Daily Production: 2.5 tons of Liquid, 1.5 tons of crude

!  No new scale buildups on tubing string and the pump

No pump repair job within 370 days

0

0.5

1

1.5

2

2.5

3

Before

installation

A

insta

Page 38: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 38/68

SCALE | CNOOC BOHAI OIL COMPANY

Location: Well No.:SZ36-1-J10, SZ36-1Platfo

!  Operator: CNOOC Bohai Oil Company

Before installation:

!  Production started on Dec. 14, 1997 with ESP. Th

was stabilized above 100 m3/d after acidizing in

!  Since mid April, 2005, EPS failed frequently due t

!  A magnetic scale tool was run into the well, but

failed in a short time, less than 3 months

!  It was concluded that such a frequent pump in

repair was mainly caused by the downhole scaresulted pump failure and reduced production

Page 39: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 39/68

SCALE | CNOOC BOHAI OIL COMPANY 

!  Scale analysis indicated that the mai

scale is Ba0.75Sr 0.25SO4, up to 98% 

Barium(Ba) and Strontium (Sr) scale, wdifficult scale to deal with

% Imp

Ba0.7

Page 40: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 40/68

SCALE | CNOOC BOHAI OIL COMPANY 

After the installation

!  The ESP was repaired on May 4, 2006, and a CPRS downhole unit was run into the well wit

!  After the installation of Enmax CPRS downho

Enmax Shanghai was advised that the produ

been stabilized at 250 m3/d, with a crude pr

of 80 m3/d, and no more EPS failure becausebuildups

!  Till the report date, Oct. 16th, 2008, continuou

production for 892 days, no breakdown

!  Within 892 days, EPS repair related cost savin

7,700,000 RMB, Oil production increase >16,5

!  This downhole CPRS unit is still working in this w

Page 41: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 41/68

SCALE | CNOOC BOHAI OIL COMPANY 

J10

井生产曲线

050

100

150

200

250

300

350

400

2004-11-9 2005-2-17 2005-5-28 2005-9-5 2005-12-

14

2006-3-24 2006-7-2 2006-10-

10

2007-1-18 2007-4-28 2007-8-6 2007

1

日期

    产    液

电流

泵 排量

SZ36-1-J10 Production Curves before and after the installation

Page 42: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 42/68

SCALE | CNOOC BOHAI OIL COMPANY 

Scale Prevention and Removal Seminar by CNOOC in Sanya, Hainan, C

Page 43: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 43/68

SCALE | GNPOC CRUDE FLOW LINES

LocatioNE-03 &

!  Trial Perto Augu

CPRS Un

of 6”x 1units, o

Report Septem

Page 44: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 44/68

SCALE | GNPOC CRUDE FLOW LINES 

Before the CPRS

!  NE-3 & NEE-3

frequently chto scale depo

!  Scale inhibito

20 L/D for eac

!  Even with sca

injection scaldeposition

!  Flow line acid

carried out fre

Page 45: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 45/68

SCALE | GNPOC CRUDE FLOW LINES 

Scales before the CPRS installation

Page 46: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 46/68

SCALE | GNPOC CRUDE FLOW LINES 

Scales before the CPRS installation

Page 47: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 47/68

SCALE | GNPOC CRUDE FLOW LINES 

Well Name  THP  FLP 

NE-03  450  400 

NEE-03  490  410 

!  NE-3& NEE-3 ENMAX CPRS installed on 20/05/2014! 

Chemical injection stopped after ENMAX installed as requested by Enmax

!  NE-3 &NEE-3 Parameters after ENMAX installation were steady

Page 48: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 48/68

SCALE | GNPOC CRUDE FLOW LINES 

!  NE-3 tripped on 8

downhole reasonperformance eva

done at this mom

!  NE-3 flow line inspno scale deposit flowline and valve

!  NE-3 test line and

line, which was noCPRS, was almost

blocked90% blo

!  NE-3 blocked test

production line cfabricated anoth

Page 49: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 49/68

SCALE | GNPOC CRUDE FLOW LINES 

!  NE-3 started back on 18/8and well parameters stea

!  NEE-3 evaluation confirmthe same conclusion, the

line with CPRS installed, thpressure stays stable and

scale deposit was noticedand the the test line withoCPRS ended up with high

pressure and scale blocka

Page 50: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 50/68

SCALE | GNPOC CRUDE FLOW LINES 

NO SCALE DEPOSIT THREE MONTHS AFTER CPRS INSTALLATION

Page 51: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 51/68

SCALE | GNPOC CRUDE FLOW LINES 

50 UNITS PURCHASED BY GNPOC

WITHIN 6 MONTHS AFTER THE EVALU

NO SCALE DEPOSIT THREE MONTHS AFTER CPRS INSTALLATION

Page 52: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 52/68

SCALE | DAQING #1 PRODUCTION COMPAN

!  Located at

the country! 

Heaters arenecessary ecrude gath

transportat

Very hard p> 4000 mg/scale prob

heaters

Over 10 yeproductionhave been

CPRS for heissues.

Page 53: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 53/68

SCALE | DAQING #1 PRODUCTION COMPAN

!  Zhongxin 201 transfer sta

capacity of 14000 m3/dmetering stations and 15

!  High hardness producedmg/L, higher than the av4000 mg/L;

!  High composition of Ca2

CO3

2- in the produced wscale;

!  Chemicals were used fobut scale buildup has be

issue all the time.

Page 54: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 54/68

SCALE | DAQING #1 PRODUCTION COMPAN

Three CPRS units were

Jan., 5, 2006 at the inle

!  Chemicals stopped on

!  Before the final evalua2016, CPRS units had b

for 10 months without a

For evaluation of the sprevention performan

locations (2#4# heawater mixing pump) w

for inspection points;

Two inspections done August, 2006. 

Page 55: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 55/68

SCALE | DAQING #1 PRODUCTION COMPAN

Inspection

points

Before

installation

June 13, 2006 Aug. 30, 2006 88 days

w/o

chemicals

165

w

che

4# Heater

tubes

6 mm Hard 1mm Crispy

2# Heater

tubes

6 mm Hard 3mm Crispy -3

Water

Mixing

pump filter

2 mm Hard

to

knock

off

Can be scraped off easily Easy to clea

Scale Deposit Evaluation before and after CPRS installation

Page 56: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 56/68

SCALE | DAQING #1 PRODUCTION COMPAN

Before the installa

CPRS units, the hebe acid cleanedscale cleaning;

After the installati

units, the scale ca

off within 1 hour, nthe surface. 

Page 57: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 57/68

SCALE | ZHONGYUAN OILFIELD NATURAL GAS STA

!  Locat

WeiqiGatheNatur

Compexcha

!  OperaNo.3 P

Comp

!  Main

hardnwater

Scalethe sy

plugg

year

Page 58: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 58/68

SCALE | ZHONGYUAN OILFIELD NATURAL GAS STA

Before the installation

Page 59: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 59/68

SCALE | ZHONGYUAN OILFIELD NATURAL GAS STA

One year after the installation

Page 60: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 60/68

SCALE | ZHONGYUAN OILFIELD NATURAL GAS STA

One year after the insta

Two CPRS surface unit

Weiqi-1& Weiqi-11 NatGathering Station, onestation

No scale buildup on thcap, heat exchanger

!  No maintenance for o

65000 RMB saving on h

 jet clean cost every ye!  Stable discharging tem

|

Page 61: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 61/68

SCALE | TARIM OILFIELD CRUDE FLOW LINES

!  Serious scale buildOilfield, for exampleproduct ion l ine

averagely 3 cm scale3 months.

!  The production linesacid cleaned period

not as well as expinfluenced the produc

increased the produc

SCA | A M O C OW N S

Page 62: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 62/68

SCALE | TARIM OILFIELD CRUDE FLOW LINES 

!  An Enmax 4”X6” CPRwas in installed on TZ1line, in Sept, 2013

!  CPRS unit was instaproduction lines unde

SCALE | TARIM OILFIELD CRUDE FLOW LINES

Page 63: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 63/68

SCALE | TARIM OILFIELD CRUDE FLOW LINES 

!  Inspection & Performance

100 days after the CPRShad been producing wproblems.

O n J a n . , 3 r d , 2 0 1 4

connections at 5 metemeters away after the CPopened for inspection

deposits at all.

!  Conclusion 

After three month trial

CPRS did prevent scasuccessfully , which reaexceeded the oilfield exp

SCALE | TARIM OILFIELD CRUDE FLOW LINES

Page 64: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 64/68

SCALE | TARIM OILFIELD CRUDE FLOW LINES 

On the bin TZ163 Wconfirm t

repeataperforma

units wasinstalled which is

the wors

SCALE | TARIM OILFIELD CRUDE FLOW LINES

Page 65: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 65/68

SCALE | TARIM OILFIELD CRUDE FLOW LINES 

!  At the end of triaperiodOn theafternoon of May

2015, the CPRS unwas opened on

TZ4-755 well forinspection. 

SCALE | TARIM OILFIELD CRUDE FLOW LINES

Page 66: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 66/68

SCALE | TARIM OILFIELD CRUDE FLOW LINES 

!  Again, no scale buildups,clean as shown in the photo.

!  The Chief Engineer, Mr. YaWenbin, witnessed these t

trial test inspection.

!  Tarim Oil Field made adecision to only use Enmax

CPRS for Tarim scale issue,because this oilfield tried

some other method withouany success.

MAJOR OIL COMPANIES USING ENMAX® CPR

Page 67: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 67/68

MAJOR OIL COMPANIES USING ENMAX® CPR

GNPOC

MAJOR CHINESE OILFIELDS USING ENMAX® C

Page 68: CPRS Application in the Oilfield

7/23/2019 CPRS Application in the Oilfield

http://slidepdf.com/reader/full/cprs-application-in-the-oilfield 68/68

MAJOR CHINESE OILFIELDS USING ENMAX® C

PETROCHINA XINJIANG OILFIELD 

!  PETROCHINA TARIM OILFIELD 

!  PETROCHINA HAINAN FUSHAN OIL

!  SINOPEC SHENGLI OILFIELD 

!  SINOPEC ZHONGYUAN OILFIELD 

!  SINOPEC HENAN OILFIELD 

!  SINOPEC JIANGSU OILFIELD 

!  SINOPEC HUABEI OIL GAS DIVISION

!  CNOOC NAIHAI WEST OILFIELD 

!  CNOOC NANHAI EAST OILFIELD 

!  CNOOC BOHAI OILFIELD 

PETROCHINA DAQING OILFIELD 

!  PETROCHINA LIAOHE OILFIELD

!  PETROCHINA JILIN OILFIELD 

!  PETROCHINA JIDONG OILFIELD 

!  PETROCHINA DAGANG OILFIELD 

!  PETROCHINA HUABEI OILFIELD 

!  PETROCHINA SICHUAN OILFIELD 

!  PETROCHINA CHANGQING OILFIELD 

!  PETROCHINA YUMEN OILFIELD 

!  PETROCHINA QINGHAI OILFIELD 

!  PETROCHINA TUHA OILFIELD