Energy Training Network Operator Qualification Potential Covered Tasks Draft 1 06/06/2022 Four Part Test Title/Description Covered Task Subtask O&M Task Req by 49CFR192 LDC Notes 49CFR192 Rule On Pipeline Facility Affects Op or Integ Tra n Perform on system Subpart A - General Scope of part. 192.1 N N Y N Definitions. 192.3 N N Y N Class locations. 192.5 N N Y Y 192.7 N N Y N Gathering lines. 192.9 N N Y Y 192.10 Y Y Y N 192.11 N N Y Y General. 192.13 N N Y Y 192.14 N N Y Y 192.15 N N Y N 192.16 N N Y Y Incorporation be Outer continental shelf pipelines Establishes jurisdictional Petroleum gas Conversion to service subject to Rules of regulatory construction. Customer
44

Covered Task List

Oct 27, 2014

Download

Documents

markgorman

Excel spreadsheet listing covered OQ tasks and 49CFR192 references
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

1 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Subpart A - General

Scope of part. 192.1 N N Y NDefinitions. 192.3 N N Y NClass locations. 192.5 N N Y Y

192.7 N N Y NGathering lines. 192.9 N N Y Y

192.10 Y Y Y N

Petroleum gas systems. 192.11 N N Y YGeneral. 192.13 N N Y Y

192.14 N N Y Y

192.15 N N Y N

Customer notification. 192.16 N N Y Y

Incorporation be

Outer continental shelf pipelines

Establishes jurisdictional responsibility.

Conversion to service subject to this part.

Rules of regulatory construction.

Page 2: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

2 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Subpart B - Materials

Scope. 192.51 N N Y NGeneral. 192.53 N N Y YNew steel pipe 192.55(a) N N Y YUsed steel pipe 192.55(b) N N Y Y New or used steel pipe 192.55(c) N N Y Y

192.55(d) N N Y Y

192.55(e) N N Y Y

Reserved 192.57 Not applicableNew plastic pipe 192.59(a) N N Y Y Used plastic pipe 192.59(b) N N Y Y

192.59(c) N N Y Y

Reserved 192.61 Not applicableMarking of materials. 192.63 N N Y YTransportation of pipe. 192.65 N N Y Y

Steel pipe not previously used

New steel pipe that has been cold expanded

Pipe of a diameter not listed in a specification

Page 3: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

3 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Subpart C - Pipe Design

Scope. 192.101 N N Y NGeneral. 192.103 N N Y Y

192.105 N N Y Y

192.107 N N Y Y

192.109 N N Y Y

192.111 N N Y Y

192.113 N N Y Y

192.115 N N Y Y

Reserved 192.117 Not applicable

Reserved 192.119 Not applicable

Design of plastic pipe. 192.121 N N Y Y192.123 N N Y Y

Design of copper pipe. 192.125 N N Y Y

Design formula for steel pipe.

Yield strength (S) for steel pipe.

Nominal wall thickness (t) for steel pipe.

Design factor (F) for steel pipe.

Longitudinal joint factor (E) for steel pipe.

Temperature derating factor (T) for steel pipe

Design limitations for plastic pipe.

Page 4: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

4 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Scope. 192.141 N N Y YGeneral requirements. 192.143 N N Y Y

192.144 N N Y Y

Valves 192.145 N N Y192.147 N N Y Y

Standard fittings. 192.149 N N Y Y192.150 N N Y Y

Tapping. 192.151 N N Y Y192.153 N N Y Y

192.155 N N Y Y

Extruded outlets. 192.157 N N Y YFlexibility. 192.159 N N Y Y

192.161(a) N N Y Y

192.161(b) N N Y Y

192.161(c) Main O&M Y Y Y Y Y

Subpart D - Design of Pipeline Components

Qualifying metallic components.

Flanges and flange accessories.

Passage of internal inspection devices.

Components fabricated by welding.

Welded branch connections.

Supports and anchors - Strain, forces, vibration

Supports and anchors - End force

Supports and anchors - Designed and installed

Support and anchor maintenance

Page 5: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

5 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.161(c) Transmission line O&M Y Y Y Y Y

192.161(d) N N Y Y

192.161(e) N N Y Y

192.161(f) N N Y Y

192.163 N N Y Y

192.165 N N Y Y

192.167 N N Y Y

192.169 N N Y Y

192.171 N N Y Y

192.173 N N Y Y

192.175 N N Y Y

192.177 N N Y Y

Supports and anchors - Designed and installed

Support and anchor maintenance

Supports and anchors - 50 % or more of SMYS

Supports and anchors - Fixed object

Supports and anchors - Connection to new branches

Compressor stations: Design and construction.

Compressor stations: Liquid removal.

Compressor stations: Emergency shutdown.

Compressor stations: Pressure limiting devices.

Compressor stations: Additional safety equipment.

Compressor stations: Ventilation.

Pipe-type and bottle-type holders.

Additional provisions for bottle-type holders.

Page 6: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

6 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Transmission line valves. 192.179 N N Y YDistribution line valves. 192.181 N N Y Y

192.183 N N Y Y

Vaults: Accessibility. 192.185 N N Y Y192.187 N N Y Y

192.189 N N Y Y

192.191 N N Y Y

192.193 N N Y Y

192.195 N N Y Y

192.197 N N Y Y

192.199 N N Y Y

Materials 192.199(a) N N Y YValves and valve seats 192.199(b) N N Y Y

192.199(c) Y Y Y Y Y Y

Supports 192.199(d) N N Y Y

Vaults: Structural design requirements.

Vaults: Sealing, venting and ventilation.

Vaults: Drainage and waterproofing.

Design pressure of plastic fittings.

Valve installation in plastic pipe.

Protection against accidental over-pressure.

Pressure of gas, high-pressure distribution systems.

Requirements for design of pressure relief and limiting devices.

Installed for ready operation and testing

Pressure relief & limiting device maintenance

Page 7: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

7 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.199(e) N N Y Y

192.199(f) Y Y Y Y Y Y

192.199(g) Y Y Y Y Y Y

192.201

Installation and set point 192.201(a) Y Y Y Y Y Y

192.201(b) N N Y Y

192.201(c) N N Y Y

192.203 N N Y Y

Applicability 192.203(a) N N Y YMaterials and design 192.203(b) N N Y Y

Discharge stacks, vents, or outlet ports

Installed to prevent hammering and impairment of relief capacity

Pressure relief & limiting device maintenance

Designed and installed to prevent any single incident

Pressure relief & limiting device maintenance

Required capacity of pressure relieving and limiting stations

Pressure control device maintenance

More than one pressure regulating or compressor station

Low pressure distribution system

Instrument, control, sampling pipe and components

Page 8: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

8 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Scope 192.221 N N Y NWelding - General. 192.225

192.225(a) Welding Y Y Y Y Y Y

Record of procedures 192.225(b) N N Y YQualification of welders. 192.227 N N Y YLimitations on welders. 192.229

192.229(a) N N Y Y

192.229(b) N N Y Y

192.229(c) N N Y Y

192.229(d) N N Y Y

Protection from weather. 192.231 Welding Y Y Y Y Y YMiter joints. 192.233 Welding Y Y Y Y Y YPreparation for welding. 192.235 Welding Y Y Y Y Y Y

192.241

Visual inspection of welds 192.241(a) Y Y Y Y Y Y

NDE of welds 192.241(b) Welding - NDE Y Y Y Y Y YAcceptability of welds 192.241(c) Welding - NDE Y Y Y Y Y Y

Subpart E - Welding of Steel in Pipelines

Welding by qualified welder with qualified procedures

Qualifications based on NDE

Engaged in welding in proceeding 6 months

A welder qualified under 192.227(a)

A welder qualified under 192.227(b)

Inspection and test of welds.

Welding - Visual inspection

Page 9: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

9 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Acceptability of welds 192.241(c) Y Y Y Y Y Y

Nondestructive testing. 192.243 Welding - NDE Y Y Y Y Y Y192.245

192.245(a) Welding Y Y Y Y Y Y

192.245(b) Welding Y Y Y Y Y Y

192.245(b) Y Y Y Y Y Y

192.245(b) Welding - NDE Y Y Y Y Y Y

192.245(c) Welding Y Y Y Y Y Y

192.245(c) Y Y Y Y Y Y

192.245(c) Welding - NDE Y Y Y Y Y Y

Welding - Visual inspection

Repair or removal of defects.

Removal & repair of unacceptable welds

Repair process & inspection

Repair process & inspection

Welding - Visual inspection

Repair process & inspection

Repair in a previously repaired area

Repair in a previously repaired area

Welding - Visual inspection

Repair in a previously repaired area

Page 10: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

10 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Scope 192.271 N N Y NGeneral. 192.273

192.273(a) N N Y

192.273(b) Joining Y Y Y Y Y Y

Joint inspection 192.273(c) Joining inspection Y Y Y Y Y YCast iron pipe. 192.275 Joining cast iron pipe Y Y Y Y Y YDuctile iron pipe. 192.277 Joining ductile iron pipe Y Y Y Y Y YCopper pipe. 192.279 Joining copper pipe Y Y Y Y Y Plastic pipe. 192.281

192.281(a) Joining plastic pipe Y Y Y Y Y Y

Solvent cement joints 192.281(b) Y Y Y Y Y Y

Heat-fusion joints 192.281(c) Y Y Y Y Y Y

Adhesive joints 192.281(d) Y Y Y Y Y Y

Mechanical joints 192.281(e) Y Y Y Y Y Y

Subpart F - Joining of Materials Other Than by Welding

Pipeline design & installation

YYYY

Joining in accordance with written procedures

Disturbance of plastic pipe joints

Joining plastic pipe - solvent cement joints

Joining plastic pipe - heat-fusion joints

Joining plastic pipe - adhesive joints

Joining plastic pipe - mechanical joints

Page 11: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

11 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.283 N N Y Y

192.285 N N Y Y

192.287 N N Y Y

Plastic pipe: qualifying joining procedures.

Plastic pipe: qualifying persons to make joints.

Plastic pipe: inspection of joints.

Page 12: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

12 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Scope 192.301 N N Y N192.303 Main O&M Y Y Y Y Y

192.303 Transmission line O&M Y Y Y Y Y

Inspection: General 192.305 Main O&M - Inspection Inspection Y Y Y Y YInspection: General 192.305 Inspection Y Y Y Y Y

Inspections of materials. 192.307 Main O&M - Inspection Y Y Y Y Y Y

Inspections of materials. 192.307 Y Y Y Y Y Y

Repair of steel pipe. 192.309 Main O&M Y Y Y Y Y Repair of steel pipe. 192.309 Transmission line O&M Y Y Y Y YRepair of steel pipe. 192.309 Welding Y Y Y Y Y YRepair of steel pipe. 192.309 Welding - NDE Y Y Y Y Y YRepair of plastic pipe. 192.311 Main O&M Y Y Y Y YRepair of plastic pipe. 192.311 Transmission line O&M Y Y Y Y YBends and elbows. 192.313 Main O&M Y Y Y Y Y Bends and elbows. 192.313 Transmission line O&M Y Y Y Y Y

Subpart G - General Construction Requirements for Transmission Lines and Mains

Compliance with specifications and standards.

Compliance with specifications and standards.

Compliance with specifications and standards.

Compliance with specifications and standards.

Transmission Line O&M - Inspection

Inspection of materials

Transmission Line O&M - Inspection

Inspection of materials

Page 13: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

13 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.315 Main O&M Y Y Y Y Y

192.315 Transmission line O&M Y Y Y Y Y

Protection from hazards. 192.317 Main O&M Y Y Y Y Y Protection from hazards 192.317 Transmission line O&M Y Y Y Y Y

192.319(a) Transmission line O&M Y Y Y Y Y

Backfilling 192.319(b) Main O&M Y Y Y Y Y Backfilling 192.319(b) Transmission line O&M Y Y Y Y YInstallation of offshore pipe 192.319(c) Offshore pipeline O&M Y Y Y Y YInstallation of plastic pipe. 192.321 Main O&M Y Y Y Y Y Installation of plastic pipe. 192.321 Transmission line O&M Y Y Y Y YCasings. 192.323 Main O&M Y Y Y Y Y Casings. 192.323 Transmission line O&M Y Y Y Y YUnderground clearances. 192.325

192.325(a) Transmission line O&M Y Y Y Y Y

Main clearances 192.325(b) Main O&M Y Y Y Y Y192.325(c) Main O&M Y Y Y Y Y

192.325(c) Transmission line O&M Y Y Y Y Y

Wrinkle bends in steel pipe.

Wrinkle bends in steel pipe.

Transmission lines hoop stress of 20% or more of SMYS

Transmission line clearances

Plastic transmission lines & mains, protection from heat

Plastic transmission lines & mains, protection from heat

Page 14: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

14 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.325(d) Main O&M Y Y Y Y Y

192.325(d) Transmission line O&M Y Y Y Y Y

Cover. 192.327 Transmission line cover 192.327(a) Transmission line O&M Y Y Y Y Y Abnormal operating conditionMain cover 192.327(b) Main O&M Y Y Y Y Y Abnormal operating condition

192.327(c) Main O&M Y Y Y Y Y Abnormal operating condition

192.327(c) Transmission line O&M Y Y Y Y Y Abnormal operating condition

192.327(d) Main O&M Y Y Y Y Y Abnormal operating condition

192.327(e) Main O&M Y Y Y Y Y Abnormal operating condition

192.327(e) Transmission line O&M Y Y Y Y Y Abnormal operating condition

192.327(f) Y Y Y Y Y Abnormal operating condition

192.327(g) Y Y Y Y Y Abnormal operating condition

Pipe-type and bottle-type holder clearances

Pipe-type and bottle-type holder clearances

Protection when minimum cover not met

Protection when minimum cover not met

Main cover less than 24 inches

Pipe installed in navigable river, stream or harbor

Pipe installed in navigable river, stream or harbor

Pipe installed offshore, except in the Gulf of Mexico

Offshore pipeline installation

Pipelines installed in the Gulf of Mexico and its inlets

Offshore pipeline installation

Page 15: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

15 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Scope 192.351 N N Y N192.353 Meter installation Y Y Y Y Y Y

192.355 Meter installation Y Y Y Y Y Y

192.357 Meter installation Y Y Y Y Y Y

192.359 N N Y Y

Service lines: Installation. 192.361 Depth 192.361(a) Service line O&M Y Y Y Y Y Construction versus O&MSupport and backfill 192.361(b) Service line O&M Y Y Y Y Y Construction versus O&MGrading for drainage 192.361(c) Service line O&M Y Y Y Y Y Construction versus O&M

192.361(d) Service line O&M Y Y Y Y Y Construction versus O&M

Installation in buildings 192.361(e) Service line O&M Y Y Y Y Y Construction versus O&M192.363 N N Y Y

192.365 Service line O&M Y Y Y Y Y

Subpart H - Customer Meters, Service Regulators, and Service Lines

Customer meters and regulators: Location.

Customer meters and regulators: Protection from damage.

Customer meters and regulators: Installation.

Customer meter installations: Operating pressure.

Protection against strain and external loading

Service lines: Valve requirements.

Service lines: Location of valves.

Page 16: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

16 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.367 Service line O&M Y Y Y Y Y

192.369 Service line O&M Y Y Y Y Y

Service lines: Steel. 192.371 N N Y Y192.373 Service line O&M Y Y Y Y Y

Service lines: Plastic. 192.375 Service line O&M Y Y Y Y YService lines: Copper 192.377 Service line O&M Y Y Y Y Y

192.379 Service line O&M Y Y Y Y Y

192.381

Industry specification 192.381(a) N N Y YExternal protective coating 192.381(b) N N Y Y

192.381(c) Service line O&M Y Y Y Y Y

Contaminants 192.381(e) N N Y Y192.381(d) Service line O&M Y Y Y Y Y

192.383 N N Y N

Service lines: Requirements for connections to main piping.

Service lines: Connections to cast iron or ductile iron.

Service lines: Cast iron and ductile iron.

New service lines not in use.

Service lines: Excess flow valve performance standards.

Identification of excess flow valves

Location of excess flow valves

Excess flow valve customer notification

Page 17: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

17 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Scope 192.451 N N Y N192.452 N N Y Y Specification

General. 192.453 N N Y Y Personnel qualification192.455

192.455(a)

192.455(a)(1) Y Y Y Y Y Y

192.455(a)(2) Y Y Y Y Y Y

192.455(b) Y Y Y Y Y Y

192.455(c) Y Y Y Y Y Y

Externally coated pipeline 192.455(d) Y Y Y Y Y Y

Use of aluminum 192.455(e) N N Y Y Specification

Subpart I - Requirements for Corrosion Control

Applicability to converted pipelines.

Buried or submerged pipelines installed after July 31, 1971

Protection from external corrosion

External coating meeting 192.461

Corrosion control - external

External coating O&M

Cathodic protection system designed to meet this subpart

Corrosion control - external

Cathodic protection system O&M

Exemption from 192.455(a)

Corrosion control - external

Monitor for corrosion

Exemption from 192.455(a): Copper & temporary pipelines

Corrosion control - external

Monitor for corrosion

Corrosion control - external

Cathodic protection system O&M

Page 18: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

18 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.455(f) N N Y N Specification

192.457

Transmission lines 192.457(a) Y Y Y Y Y

192.457(b) Y Y Y Y Y Y

192.457(b) Y Y Y Y Y Y

Active corrosion 192.457(c) N N Y Y Definition192.459 Y Y Y Y Y Y

192.459 Remedial action Y Y Y Y Y Y

192.461

Application of coating 192.461(a) Y Y Y Y Y Y

192.461(b) N N Y Y Specification

Coating inspection 192.461(c) Y Y Y Y Y Y

Applicability to metal alloy fittings on plastic pipelines

External corrosion control: Buried or submerged pipelines

Corrosion control - external

Cathodic protection system O&M

Active corrosion pipelines other than cast and ductile iron

Corrosion control - external

Catodic protection system O&M

Active corrosion pipelines other than cast and ductile iron

Corrosion control - external

Monitor for corrosion

Examination of buried pipeline when exposed.

Corrosion control - external

Monitor for corrosion

Examination of buried pipeline when exposed.

Corrosion control - external

External corrosion control: Protective coating.

Corrosion control - external

External coating O&M

Electrically insulating type coating

Corrosion control - external

External coating inspection

Page 19: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

19 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Protection from damage 192.461(d) Y Y Y Y Y Y

Protection from damage 192.461(e) Y Y Y Y Y Y

192.463 N N Y Y Specification

192.465

192.465(a) Y Y Y Y Y Y

192.465(b) Y Y Y Y Y Y

192.465(c) Y Y Y Y Y Y

192.465(d) Y Y Y Y Y Y

192.465(e) Y Y Y Y Y Y

192.465 (e) Y Y Y Y Y Y

192.467

Electrical isolation 192.467(a) N N Y Y Specification

Corrosion control - external

External coating O&M

Corrosion control - external

External coating O&M

External corrosion control: Cathodic protection.

External corrosion control: Monitoring.

Testing at intervals not exceeding 15 months

Corrosion control - external

Monitor for corrosion

Inspection of rectifiers or other impressed current power source

Corrosion control - external

Monitor for corrosion

Reverse current switch, diode, and interface bond check

Corrosion control - external

Monitor for corrosion

Remedial action to correct deficiencies

Corrosion control - external

Cathodic protection system O&M

Reevaluation of unprotected pipelines

Corrosion control - external

Monitor for corrosion

Reevaluation of unprotected pipelines

Corrosion control - external

Cathodic protection system O&M

External corrosion control: Electrical isolation.

Page 20: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

20 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Insulating devices 192.467(b) Y Y Y Y Y Y

192.467(c) Y Y Y Y Y Y

192.467(c) Y Y Y Y Y Y

192.467(d) Y Y Y Y Y Y

192.467(e) Y Y Y Y Y Y Specification

Proximity to fault currents 192.467(f) N N Y Y Specification192.469 N N Y Y Specification

192.471

Test lead connection 192.471(a) Y Y Y Y Y Y

192.471(b) Y Y Y Y Y Y

Corrosion control - external

Cathodic protection system O&M

Electrical isolation from metallic casings

Corrosion control - external

Cathodic protection system O&M

Electrical isolation from metallic casings, other measures

Corrosion control - external

Cathodic protection system O&M

Inspection and electrical tests

Corrosion control - external

Cathodic protection system O&M

Installation of insulating device

Corrosion control - external

Cathodic protection system O&M

External corrosion control: Test stations.

External corrosion control: Test leads.

Corrosion control - external

Corrosion control - external

Cathodic protection system O&M

Test lead attached to minimize adverse affects

Corrosion control - external

Cathodic protection system O&M

Page 21: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

21 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.471(c) Y Y Y Y Y Y

192.473

Stray current program 192.473(a) N N Y Y Program192.473(b) Y Y Y Y Y Y

192.475

Minimize internal corrosion 192.475(a) Corrosion control - internal Pipeline O&M Y Y Y Y Y192.475(b) Corrosion control - internal Y Y Y Y Y Y

Adjacent pipe 192.475(b)(1) Corrosion control - internal

Replacement 192.475(b)(2) Corrosion control - internal Pipeline O&M Y Y Y Y Y Y192.475(b)(3) Corrosion control - internal Pipeline O&M

192.475(c) N N Y Y Specification

192.477 Corrosion control - internal Y Y Y Y Y Y

Bared test lead and bared metallic area coating

Corrosion control - external

Cathodic protection system O&M

External corrosion control: Interference currents.

Impressed current type cathodic protection system installation

Corrosion control - external

Cathodic protection system O&M

Internal corrosion control: General provisions.

Inspection of removed pipe

Monitor for corrosion

Monitor for corrosion

Steps to minimize internal corrosion

Storage of gas containing hydrogen sulfide in holders

Internal corrosion control: Monitoring.

Monitor for corrosion

Evaluation of the coupons is not a covered task. However, activities to be able to insert and retrieve the coupons may be covered tasks.

Page 22: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

22 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.479

192.479(a) Y Y Y Y Y Y

192.479(b)

192.479(b)(1) Y Y Y Y Y Y

Take remedial action 192.479(b)(2) Pipeline O&M Y Y Y Y Y Y

Clean and coat or jacket 192.479(b)(3) Y Y Y Y Y Y

Pipeline reevaluation 192.481 Y Y Y Y Y Y

Remedial action 192.481 Y Y Y Y Y Y

192.483

Protective coating 192.483(a) Y Y Y Y Y Y

Cathodic protection 192.483(b) Y Y Y Y Y Y

Repaired pipe 192.483(c) Y Y Y Y Y Y

Atmospheric corrosion control: General.

Pipelines installed after July 31, 1971

Corrosion control - atmospheric

External coating - O&M

Pipelines installed before August 1, 1971

Determine areas of atmospheric corrosion

Corrosion control - atmospheric

Monitor for corrosion

Corrosion control - atmospheric

Corrosion control - atmospheric

External coating - O&M

Corrosion control - atmospheric

Monitor for corrosion

Corrosion control - atmospheric

Remedial measures: General.

Corrosion control - external

External coating O&M

Corrosion control - external

Cathodic protection system O&M

Corrosion control - external

Cathodic protection system O&M

Page 23: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

23 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.485

192.485(a) Corrosion control Y Y Y Y Y

192.485(a) Corrosion control Pressure control Y Y Y Y Y

192.485(b) Corrosion control Y Y Y Y Y

192.485(b) Corrosion control Pressure Control Y Y Y Y Y

Strength of pipe 192.485(c) N N Y Y Specification192.487

192.487(a) Corrosion control Y Y Y Y Y

192.487(a) Corrosion control Pressure control Y Y Y Y Y

Localized corrosion pitting 192.487(b) Corrosion control Y Y Y Y Y

192.489

General graphitization 192.489(a) Corrosion control Y Y Y Y Y

Localized graphitization 192.489(b) Corrosion control Y Y Y Y Y

Corrosion control records. 192.491 Y Y Y N Specification

Remedial measures: Transmission lines.

General corrosion: Transmission lines

Transmission line - O&M

Localized corrosion pitting: Transmission lines

Localized corrosion pitting: Transmission lines

Transmission line - O&M

Localized corrosion pitting: Transmission lines

Remedial measures: Distribution lines

General corrosion - except cast iron or ductile iron

Distribution line - O&M

General corrosion - except cast iron or ductile iron

Distribution line - O&M

Remedial measures: Cast-iron and ductile-iron pipelines.

Distribution line - O&M

Distribution line - O&M

Page 24: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

24 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Page 25: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

25 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Scope. 192.501 N N Y NGeneral Requirements. 192.503 N N Y N

192.503(a) N N Y Y Introduction

192.503(a)(1) Pressure test Y Y Y Y

Potentially hazardous leak 192.503(a)(2) Leak repair Y Y Y Y Y YTest medium 192.503(b) N N Y N Test medium specificationHoop stress limitations 192.503(c) N N Y N

Tie in joints 192.503(d) N N Y Y

192.505 N N Y N

192.505(a) Pressure test Y Y Y Y Y Y

192.505(b) Pressure test Y Y Y Y Y Y

Test duration 192.505(c) Pressure test Y Y Y Y Y Y 192.505(d) N N Y Y

Subpart J - Test Requirements

Operate a new segment or return to service a segmentTested to substantiate MAOP

Test hoop stress limitation specification

Specifies tie in joints that do and do not require testing

Steel pipeline, hoop stress of 30 percent or more of SMYS.

Strength testing in accordance with this section

Compressor station, regulator station and measuring station

Manufacturer certified component other than pipe

Page 26: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

26 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.505(e) N N Y Y

192.507 Pressure test Y Y Y Y Y Y

192.507(a) Leak repair Y Y Y Y Y Y

192.507(b) N N Y Y Introduction

Leak test 192.507(b)(1) Leak repair Y Y Y Y Y YLeak survey 192.507(b)(2) Leak survey Y Y Y Y Y YTest duration 192.507(c) Pressure test Y Y Y Y Y Y

192.509 Pressure test Y Y Y Y Y

192.509(a) Leak repair Y Y Y Y Y Y

Test pressure 192.509(b) Pressure test192.511

Leak test 192.511(a) Pressure test Y Y Y Y Y192.511(b) Pressure test Y Y Y Y Y

Preinstallation strength test

Hoop stress less than 30 percent of SMYS, and at or above 100 p.s.i.

Potentially hazardous leaks

Test medium, 20 percent or more of SMYS

Test requirements for pipelines to operate below 100 p.s.i.g.

Potentially hazardous leaks

Test requirements for service lines.

Service line intended to be operated at a pressure of at least 1 p.s.i. but not more than 40 p.s.i.

Page 27: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

27 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.511(c) Pressure test Y Y Y Y Y

192.513 Pressure test

192.513(a) Pressure test Y Y Y Y Y

192.513(b) Leak repair

Test pressure 192.513(c) Pressure test192.513(d) N N Y Y Specification

192.515

Safety requirements 192.515(a) Y Y Y N 192.515(b) Y Y Y N

Records. 192.517 Y Y Y N

Service line intended to be operated at a pressure of more than 40 p.s.i.

Test requirements for plastic pipelines.

Tested in accordance with this section

Potentially hazardous leaks

Temperature of thermoplastic material

Environmental protection and safety requirements.

Environmental requirements

Page 28: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

28 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Subpart K - Uprating

Scope. 192.551 N N Y NGeneral requirements. 192.553 Pressure increases 192.553(a) Pressure Control Y Y Y Y Y Y Check for leaks 192.553(a)(1) Leak survey Y Y Y Y Y YRepair of leaks 192.553(a)(2) Leak repair Y Y Y Y Y YRecords 192.553(b) N N Y N Record keepingWritten plan 192.553(c) N N Y Y Procedure

192.553(d) N N Y Y Specification

192.555

192.555(a) N N Y Y

192.555(b)(1) N N Y Y

192.555(b)(2) Main O&M Y Y Y Y Y Y

192.555(b)(2) Transmission Line O&M Y Y Y Y Y Y

192.555(c) N N Y Y

192.555(d)(1) Pressure test Y Y Y Y Y Y

Limitation on increase in MAOP

Hoop stress of 30 percent or more of SMYS in steel pipelines.

Requirements of this section

Review of design, operating, and maintenance and testing

Repairs, replacements or alterations

Repairs, replacements or alterations

Pipeline constructed before September 12, 1970Not qualified under paragraph (c)

Page 29: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

29 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.555(d)(2) N N Y Y

Increase in increments 192.555(e) Pressure control Y Y Y Y Y Y192.557

192.557(a) N N Y

192.557(b)(1) N N Y Y

Leakage survey 192.557(b)(2) Leak survey Y Y Y Y Y YLeakage survey 192.557(b)(2) Leak repair Y Y Y Y Y Y

192.557(b)(3) Main O&M Y Y Y Y Y Y

192.557(b)(3) Service Line O&M Y Y Y Y Y Y

192.557(b)(3) Transmission Line O&M Y Y Y Y Y Y

192.557(b)(4) Main O&M Y Y Y Y Y Y

192.557(b)(4) Transmission Line O&M Y Y Y Y Y Y

Isolation 192.557(b)(5) Pressure control Y Y Y Y Y Y

Not qualified under paragraph (c)

Hoop stress less than 30 percent of SMYS

Requirements of this section

YYYY

Review of design, operating, and maintenance history

Repairs, replacements, or alterations

Repairs, replacements, or alterations

Repairs, replacements, or alterations

Reinforce or anchor offsets, bends and dead ends

Reinforce or anchor offsets, bends and dead ends

Page 30: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

30 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Service regulators 192.557(b)(6) Service line O&M Y Y Y Y YIncrease in increments 192.557(c) Pressure control Y Y Y Y Y Y

192.557(d)(1) N N Y Y

Measure actual cover 192.557(d)(2) Cast and ductile iron O&M Y Y Y Y Y Y

Determine wall thickness 192.557(d)(3) Cast and ductile iron O&M Y Y Y Y Y Y

192.557(d)(4) N N Y Y Specification

Incomplete records for cast iron or ductile iron pipelines

The act of taking or making the measurement is not a covered task. However, activities to be able to take or make the measurement may be covered tasks.

The act of determining the wall thickness is not a covered task. However, activities to be able to take the measurement may be covered tasks.

Cast iron bursting tensile strength

Page 31: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

31 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Subpart L - Operations

Scope. 192.601 N N Y NGeneral provisions. 192.603

192.603(a) N N Y Y

Records 192.603(b) Y Y Y N 192.603(c) Y Y N N

Procedural manual 192.605 General. 192.605(a) Y N Y N

192.605(b)(1) N N Y N

192.605(b)(2) N N Y N

192.605(b)(3) N N Y N

192.605(b)(4) Y N Y N

192.605(b)(5) Y Y Y Y Y Y

192.605(b)(6) Y Y Y Y Y

Operation in accordance with this subpart

Required amendment to plan

Operating, maintaining and repairing the pipeline

Controlling corrosion in accordance with Subpart I

Availability of construction records, maps, operating history

Gathering data for incident reporting

Starting up and shutting down any part of the pipeline

Pipeline startup and shutdown

Maintaining compressor stations, including isolation and purging

Compressor station maintenance

Page 32: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

32 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.605(b)(7) Y Y Y Y Y

192.605(b)(8) Y N Y Y

192.605(b)(9) Y Y Y N

192.605(b)(10)

Y Y Y Y Y Y

192.605(b)(ii) Corrosion control - internal Y Y Y Y Y Y

Pressure limiting devices 192.605(b)(iii) Y Y Y Y Y Y

192.605(c) Y Y Y Y Y

192.605(d) Emergency response Y Y Y Y Y Y

192.605(e) N N Y Y See 192.613(a), 192.615, 192.617

Reserved 192.607

Starting, operating and shutting down compressor units

Compressor units: starting, operating and shutting down

Periodic review of work done by operating personnel

Precautions in excavated trenches

Testing and inspection of pipe-type and bottle-type holders

Detection of external corrosion

192.605(b)(10)(i)

Corrosion control - external

Monitor for corrosion

Sampling and testing of gas

Monitor for corrosion

Determination of dew point is not a covered task. However, activities to obtain the sample may be covered tasks.

Pressure control device maintenance

Abnormal operation, transmission lines

Abnormal operations remedial action

Recognition of potential safety-related conditions

Surveillance, emergency response, and accident investigation

Page 33: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

33 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.609 N N Y Y

192.611

192.611(a) N N Y Y

192.611(a)(1) N N Y Y

192.611(a)(2) N N Y Y 192.611(a)(3) N N Y Y

Establishing MAOP 192.611(a)(3) N N Y Y 192.611(b) N N Y Y

192.611(c) N N Y Y

192.611(d) N N Y Y

192.612

192.612(a) Y Y N Y

192.612(b) Offshore remedial action N N Y Y Y

Change in class location: Required study

Confirmation or revision of MAOP

Hoop stress not commensurate with present class location

MAOP if segment previously tested in place

Corresponding hoop Testing in accordance with Subpart J

Confirmed or revised MAOP may not exceed previous MAOP

Application of 192.553 & 192.555

Confirmation or revision of MAOP with 18 months

Pipelines in the Gulf of Mexico and its inlets.

Inspection between October 3, 1989 and November 16, 1992

Notification, marking and placement

Page 34: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

34 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Continuing surveillance. 192.613 Procedure for surveillance 192.613(a) N N Y Y

192.613(b) N N Y Y Y Y

192.614

192.614(a) N N Y Y

Written program contents 192.614(c) 192.614(b) N N Y Y

Identification of excavators 192.614(c)(1) N N Y YGeneral notification 192.614(c)(2) N N Y Y

192.614(c)(3) N N Y Y

192.614(c)(4) N N Y Y

192.614(b)(5) Locate pipe Y Y Y Y Y Y

Inspection for damage 192.614(b)(6)(i) Y Y Y Y Y Y

Leak survey 192.614(b)(6)(ii) Leak survey Y Y Y Y Y Y

Program to recondition, phase out, or reduce the MAOP

Damage prevention program.

Implementation of written damage prevention program

Participation in one call system

Receiving and recording notification of planned excavations

Notification of type of temporary markings and how to identify

Temporary marking of buried pipelines in area of excavation

Inspect third party excavation

Page 35: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

35 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.614(d) N N Y N

192.614(e) N N Y N

Emergency plans. 192.615 Written procedures 192.615(a)

192.615(a)(1) N N Y Y

192.615(a)(2) N N Y N

192.615(a)(3) Y Y Y Y Y Y

192.615(a)(4) N N Y Y

192.615(a)(5) Y Y Y N

192.615(a)(6) Pressure control Y Y Y Y Y Y

192.615(a)(7) N N Y N

192.615(a)(8) Y N Y N

Damage prevention program not required

Pipelines operated by persons other than municipalities

Receiving, identifying and classifying notices of events

Establishing and maintaining communication

Prompt and effective response to a notice

Response to a notice of emergency

Availability of personnel, equipment, tools, and materials

Protecting people first and then property

Emergency shutdown and pressure reduction

Making safe any actual or potential hazard

Notification and coordination with public safety officials

Page 36: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

36 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.615(a)(9) Service restoration Y Y Y Y Y Y

Action under 192.617 192.615(a)(10) N N Y N192.615(b) N N Y Y

Liaison with public officials 192.615(c) N N Y YPublic education. 192.616 N N Y YInvestigation of failures. 192.617 N N Y Y

192.619

MAOP 192.619(a) Pressure control Y Y Y Y Y Y192.619(b) N N Y Y

192.619(c) Pressure control Y Y Y Y Y Y

192.621

MAOP 192.621(a) Pressure control Y Y Y Y Y192.621(b) N N Y Y

192.623

192.623(a) Pressure control Y Y Y Y Y

192.623(b) Pressure control Y Y Y Y Y

Safely restoring any service outage

Furnish procedures, training and review of emergency response

MAOP: steel or plastic pipelines.

Over-pressure protective devices

Highest actual operating pressure

MAOP: high pressure distribution systems

Over-pressure protective devices

Low-pressure distribution systems.

Maximum allowable operating pressure

Minimum allowable operating pressure

Page 37: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

37 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Odorization of gas. 192.625 Distribution lines 192.625(a) Odorization Y Y Y Y Y

192.625(b) Odorization Y Y Y Y Y

Odorant requirements 192.625(c) N N Y YOdorant solubility 192.625(d) N N Y YEquipment for odorization 192.625(e) N N Y Y Y YPeriodic sampling 192.625(f) Odorization Y Y Y Y Y Y

192.627 Tapping pipelines Y Y Y Y Y Y

Purging of pipelines. 192.629 Purging Y Y Y Y Y Y

Transmission lines in Class 3 or Class 4 location

Tapping pipelines under pressure.

Page 38: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

38 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Subpart M - Maintenance

Scope. 192.701 N N Y NGeneral. 192.703

192.703(a) N N Y N

192.703(b) Main O&M Y Y Y Y Y

192.703(b) Transmission Line O&M Y Y Y Y Y

192.703(c) Leak repair Y Y Y Y Y Y

192.705

192.705(a) Y Y Y Y

Patrol frequency 192.705(b) N N Y YPatrol methods 192.705(c) Transmission line patrols Y Y Y Y Y

192.706 Y Y Y Y Y

192.707 Main O&M Y Y Y Y Y

192.707 Transmission Line O&M Y Y Y Y Y

Maintenance in accordance with this Subpart

Repair, replacement or removal of unsafe pipeline segments

Repair, replacement or removal of unsafe pipeline segments

Prompt repair of hazardous leaks

Transmission lines: Patrolling

Transmission lines: patrol program

Transmission Line Patrolling

Transmission lines: Leakage surveys.

Leak survey - Transmission Line

Line markers for mains and transmission lines.

Line markers for mains and transmission lines.

Page 39: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

39 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.709 Y Y Y N

192.711 Transmission Line O&M Y Y Y Y Y

192.713 Transmission Line O&M Y Y Y Y Y

192.715 Welding Y Y Y Y Y

192.717 Leak repair Y Y Y Y Y

192.719

192.719(a) Pressure test Y Y Y Y

192.719(a) N N Y Y

192.719(b) Y Y Y Y Y

192.719(b) Welding - NDE Y Y Y Y Y

192.721

Transmission lines: Record keeping.

Transmission lines: General requirements for repair procedures.

Transmission lines: Field repair of imperfections and damages.

Transmission lines: Permanent field repair of welds.

Transmission lines: Permanent field repair of leaks.

Transmission lines: Testing of repairs.

Testing of replacement pipe in place

Testing of replacement pipe, prior to installation

Testing of repairs made by welding

Welding - Visual inspection

Testing of repairs made by welding

Distribution system: Patrolling.

Page 40: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

40 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

Patrol frequency 192.721(a) N N Y Y Y

Patrolling 192.721(a) Y Y Y Y Y

192.721(b ) Y Y Y Y Y

192.723

192.723(a) Leak survey Y Y Y Y Y

192.723(b)(1) Leak survey - Distribution Y Y Y Y Y

192.723(b)(2) Leak survey Y Y Y Y Y

192.725

192.725(a) Pressure test Service lines Y Y Y Y Y

192.725(b) Pressure test Y Y Y Y Y Y

192.727

Distribution system: Patrolling

Distribution system: Patrolling

Anticipated movement patrolling

Distribution system: Patrolling

Distribution system: Leakage surveys.

Provision for periodic leakage surveys

Business district leakage surveys

Leakage surveys outside business districts

Test requirements for reinstating service lines

Testing of disconnected service lines before reinstatement

Testing of temporarily disconnected services lines before reinstatement

Abandonment or deactivation of facilities.

Page 41: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

41 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.727(a) N N Y Y

Abandonment in place 192.727(b) Transmission line O&M Y Y Y Y Y

Abandonment in place 192.727(b) Service line O&M Y Y Y Y Y

Abandonment in place 192.727(b) Main O&M Y Y Y Y Y

192.727(c) Main O&M Y Y Y Y Y

192.727(c) Transmission line O&M Y Y Y Y Y

Service discontinuance 192.727(d) Service line O&M Y Y Y Y Y

Purging with air 192.727(e) Purging Y Y Y Y Y YAbandoned vaults 192.727(f) Y Y Y N

192.731

192.731(a) Y Y Y Y Y

192.731(b) Y Y Y Y Y

Abandonment or discontinuance in accordance with this section

Abandonment in place

Abandonment in place

Abandonment in place

Inactive pipelines, except service lines

Inactivation of main

Inactive pipelines, except service lines

Inactivation of transmission line

Service discontinuance

Compressor stations: Inspection and testing of relief devices.

Inspection and testing of pressure-relieving devices

Pressure control device maintenance

Repair or replacement of defective or inadequate equipment

Pressure control device maintenance

Page 42: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

42 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.731(c) Y Y Y Y Y

192.735

192.735(a) N N Y N

192.735(b) N N Y N

192.736

192.736(a) Y N Y Y

192.736(b) Y N Y Y

192.736(c) Y Y Y Y Y

192.739 Y Y Y Y Y Y

192.741

Inspection and testing of remote control shutdown devices

Pressure control device maintenance

Compressor stations: storage of combustible material.

Limits on quantity of flammable and combustible material stored

Above ground oil and gasoline storage

Compressor buildings: Gas detection.

Requirement for fixed gas detection and alarm system

Continuous monitoring and warning

Gas detection system maintenance and performance test

Maintain gas detection system

Pressure limiting and regulating stations: Inspection and testing.

Pressure control device maintenance

Telemetry or recording gauges.

Page 43: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

43 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.741(a) N N Y Y

192.741(b) N N Y Y

192.741(c) Y Y Y Y Y Y

Testing of relief devices 192.743 Testing in place, if feasible 192.743(a) Y Y Y Y Y Y Only if gauge or telemeter

Testing not feasible 192.743(b) N N Y Y192.743(c) Y Y Y Y Y Y

192.745 Y Y Y Y Y

192.747 Y Y Y Y Y

Vault maintenance. 192.749 Inspection 192.749(a) Vault maintenance Y Y Y Y Y Y

192.749(b) Y Y Y Y Y Y

192.749(c) Vault maintenance Y Y Y Y Y Y

Vault cover inspection 192.749(d) Y Y Y N 192.751

Distribution system more than one district pressure regulating station

Distribution system single district pressure regulating station

Abnormally high or low pressure

Pressure control device maintenance

Pressure control device maintenance

Insufficient capacity of relieving device

Pressure control device maintenance

Valve maintenance: Transmission lines.

Valve maintenance - transmission

Valve maintenance: Distribution systems.

Valve maintenance - distribution

Inspection of equipment if gas found

Pressure control device maintenance

Ventilation equipment inspection

Prevention of accidental ignition.

Page 44: Covered Task List

Energy Training Network Operator Qualification Potential Covered Tasks Draft

44 04/07/2023

Four Part Test

Title/Description 49CFR192 Rule Covered Task Subtask

On

Pip

elin

e F

aci

lity

O&

M T

ask

Re

q b

y 4

9C

FR

19

2

Aff

ect

s O

p o

r In

teg

LDC Tran

Pe

rfo

rm o

n s

yste

m

Notes

192.751 Y Y Y Y Y Y

Gas vented into open air 192.751(a) Purging Y Y Y Y Y Y192.751(b) Welding Y Y Y Y Y Y

Warning signs 192.751(c) Y Y Y Y Y Y

192.753

192.753(a) Joining cast iron pipe Y Y Y Y Y

192.753(b) Joining cast iron pipe Y Y Y Y Y

192.755

192.755(a) Support of cast iron pipe Y Y Y Y Y Y

192.755(b) Support of cast iron pipe Y Y Y Y Y Y

Steps to minimize accidental ignition of gas

Prevention of accidental ignition.

Split Mains, Service, Trans

Gas or electric welding and cutting

Prevention of accidental ignition.

Split Mains, Service, Trans

Caulked bell and spigot joints.

Sealing when pressure is more than 25 p.s.i.g.

Sealing of exposed joints subject to pressure of 25 p.s.i.g. or less

Protecting cast-iron pipelines.

Protection during disturbance

Permanent protection for disturbed segment