CONCEPTUAL PLAN “GOLDEN I” IT & IT Enabled Service At Plot no-11, Sector-Techzone-IV, Greater Noida, Gautam Budh Nagar, Uttar Pradesh For M/s Ocean Infraheights Pvt. Ltd. (formely U.Y. Industries Pvt Ltd.) Prepared By GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified Co.: Accredited by QCI / NABET: Approved by MoEF, GoI) F-374-375, Sector-63, Noida, U.P. Ph.: 0120- 4044630, Telefax: 0120- 2406519 Email: [email protected], [email protected] Website: http://www.grc-india.com GRC INDIA TRAINING & ANALYTICAL LABORATORY (Recognized by NABL & MoEF, GoI) A unit of GRC India
23

Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

Jul 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

CONCEPTUAL PLAN

“GOLDEN I” IT & IT Enabled Service

At

Plot no-11, Sector-Techzone-IV, Greater Noida, Gautam Budh Nagar, Uttar Pradesh

For

M/s Ocean Infraheights Pvt. Ltd. (formely U.Y.

Industries Pvt Ltd.)

Prepared By

GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified Co.: Accredited by QCI / NABET: Approved by MoEF, GoI)

F-374-375, Sector-63, Noida, U.P. Ph.: 0120- 4044630, Telefax: 0120- 2406519

Email: [email protected], [email protected] Website: http://www.grc-india.com

GRC INDIA TRAINING & ANALYTICAL LABORATORY (Recognized by NABL & MoEF, GoI)

A unit of GRC India

Page 2: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

CONCEPTUAL PLAN

INTRODUCTION

The project “GOLDEN I” IT& IT Enabled Service is to be developed by M/s Ocean

InfraheightsPvt.Ltd. (Formerly M/s U.Y. Industries Pvt. Ltd.). It is an organization of zealous

engineers and space planners, rich in experience and high on commitment. M/s Ocean

InfraheightsPvt.Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) has an accomplished team of reality

experts, with an immense understanding of the real estate business, which ensures that our

product - design, always exceeds customer needs and expectations. It offers a blend of the best of

classical Indian living environment, with modern amenities and all the trappings of a modern

lifestyle. The Project is planned to be build up at Plot no-11, Sector-Techzone-IV, Greater Noida,

GautamBudh Nagar, Uttar Pradesh on a land measuring24.719 acres.

SITE LOCATION AND SURROUNDINGS

The “GOLDEN I” IT& IT Enabled Service Project is located at Plot no. Plot no-11, Sector-

Techzone-IV, Greater Noida, GautamBudh Nagar, Uttar Pradesh. The Co-ordinates of the

project site are 28o35’23.6” N &77o26’01.3” E. Google Earth Image and Toposheetmap showing

site and surrounding within 500m and 10 & 15 km respectively are attached as Annexure I.

CONNECTIVITY

The project site is well connected through Greater Noida link road which is 1.73 km from project

site towards NNW. The nearest highway is NH-24 which is approx.5.32 km towards NE from

project site. The nearest railway station is Ghaziabad railway station, about 6.49 km (N) away

from the project site. The nearest airport is Indira Gandhi International Airport which is 20.42

km (WSW) from the project site.

Page 3: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

105 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

AREA STATEMENT

The total area of project is estimated 1,00,035.700 m2 (or approx. 24.719 acre). The detailed Area

Statement is provided below in Table 1.

Table 1: Area Statement

S. No. Particulars Area (in m2)

1. Plot Area 1,00,035.700

2. Permissible ground coverage (@ 30% of plot area) 30,010.710

3. Proposed ground coverage(@ 22.55 % of plot area) 22,558.335

4. Total Permissible FAR (@1.875of Plot Area) 1,87,566.938

5. Proposed FAR(@1.874761of Plot Area) 1,87,543.117

6. Permissible Service area (15% of PermissibleFAR) 28,135.041

7. Proposed Service area (14.84% of PermissibleFAR) 27,842.446

8. Basement Area

Basement 1

Basement 2 

76,635.02

49,383.333

27,251.687

9. Stilt Area 16,470.256

10. Non FAR (Fire Staircase, Guard Room and Meter

Room

884.853

11. Built up Area 3,09,375.692

12. Open Area 77,477.365

13. Required Green Area (@50% of open area) 38,738.683

14. Proposed Green Area (@51.15% of open area) 39,630.352

15. Maximum Height of the building (Residential Tower

H3)

83.3 m

Page 4: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

106 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

Table 2: Built-up Area Details

SI. No. Particulars Area (in m2)

1. Proposed FAR(@1.874761 of Plot Area) 1,87,543.117

2. Proposed Service area (14.84% of

Permissible FAR)

27,842.446

3. Basement Area

Basement 1

Basement 2 

76,635.02

49,383.333

27,251.687

4. Stilt Area 16,470.256

5. Non FAR (Fire Staircase, Guard Room and

Meter Room

884.853

Built up Area 3,09,375.692

POPULATION DENSITY

The total population of the project will be 28,620 persons. The detailed population breakup is

given below in the following Table 3.

Table 3: Population Break up

S.

No.

Unit Type DU/Area(sq.m) PPU Total

Population

1. Residential Population 1,180

(A) General 228 @4.5 1,026

(B) Visitors @10% of General Population 103

(C) Staff @5% of General Population 51

2. IT Towers

Staff (80% of IT Tower)

30% staff (3 shifts)

70% of staff (1 shift)

Visitors (20% of IT

1,40,702.083 @10 sq. m

14,070

11,256

10,130

7,879

2,814

Page 5: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

107 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

PROJECT COST

The total estimated cost of the project is Rs400Crores which includes the cost of the land as well

as the developmental cost.

WATER REQUIREMENT

The total water requirement is approx. 1,327KLD out of which total domestic water requirement

is 1,143 KLD. The fresh water requirement is approx. 399KLD. The daily water requirement

calculation is given below in Table 4:

Table 4: Calculations for Daily Water Demand

S.

No.

Description Area

(in m2)

/No. of

Dwelling

units

Total

Occupancy

Rate of

water

demand

(lpcd)

Total Water

Requirement

(KLD)

Domestic Water

A. Residential

Population

Residential 228 1,026 @ 135 lpcd 138.5

Visitor 103 @ 15 lpcd 1.54

Tower) 

3. Commercial blocks

Staff (20%)

Visitors (80%) 

18,742.428

@3 sq. m

6,247

1,249

4,998

4. Maintenance Staff

(Facility)

9,358.482 370

Grand Total (1+2+3+4) 28,620

Page 6: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

108 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

Staff 51 @ 45lpcd 2.29

B. IT Towers

Staff

Visitors 

18,009

2,814

@ 45lpcd

@15 lpcd

810.41

42.21

C. Commercial blocks

Staff

Visitors 

1,249

4,998

@ 45lpcd

@15 lpcd

56.21

74.97

D. Maintenance Staff

(Facility)

370

@ 45lpcd

16.65

Total 1,142.78

Domestic Water Demand (A+B+C+D) = 1,142.78or 1,143 KLD

E Horticulture and

Landscape

development

39,630.352

m2

3 l/sqm 119

F Filter Backwash 40

G Water Body 25

Grand Total (A+B+C+D+E+F+G) = 1,327 KLD

Table 5: Waste Water Calculations

COMMERCIAL AREA

Domestic Water Requirement 1,001 KLD

Fresh (30% of domestic water) 300 KLD

Flushing (70 % of domestic water) 701 KLD

Waste water Generated

(@ 80% of Fresh + 100% flushing)

240 + 701 = 941 KLD

Page 7: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

109 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

RESIDENTIAL AREA

Domestic Water Requirement 142 KLD

Fresh (70% of domestic water) 99KLD

Flushing (30% of domestic water) 43 KLD

Wastewater Generated

(80% fresh + 100% flushing)

79.2 + 43 = 122.2 KLD say 122 KLD

Page 8: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

110 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

Figure 1: Water Balance Diagram (Non-Rainy Season)

Recycled

FRESH WATER (300 +99=399 KLD) WASTEWATER

GENERATED

(1,063 KLD) STP CAPACITY 1,275 KLD

HORTICULTURE (119 KLD)

@ 80%

@ 90 % 957 KLD

@ 100%

Wastewater

119 KLD

FLUSHING (701 +43 = 744 KLD)

(70% of Domestic water)

744KLD

Fresh

FILTER BACKWASH(40KLD)

WATER BODY(25KLD)

40 KLD

25 KLD

DISCHARGE TO EXTERNAL SEWER

(29 KLD) 29 KLD

Page 9: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

111 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

Figure 2: Water Balance Diagram (Rainy Season)

Wastewater Generation & Treatment

It is expected that the project will generate approx. 1,063 KLD of wastewater. The wastewater

will be treated in the STP of 1,275 KLD capacity provided within the complex generating 957

KLD of recoverable water from STPwhich will be recycled within the project but 148 KLD and

29 KLD in rainy and non rainy season, respectively will become surplus which will be

discharged to external sewer line.

Recycled

FRESH WATER (300 + 99 = 399 KLD) WASTEWATER

GENERATED

(1,063 KLD) STP CAPACITY 1,275 KLD

@ 80%

@ 90 % 957 KLD

@ 100%

Wastewater

FLUSHING (701 + 43 = 744 KLD)

(70% of Domestic water)

744 KLD

Fresh

FILTER BACKWASH(40KLD)

WATER BODY(25KLD)

40 KLD

25 KLD

DISCHARGE TO EXTERNAL SEWER

(148 KLD) 148 KLD

Page 10: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

112 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

SEWAGE TREATMENT TECHNOLOGY

SBR TECHNOLOGY

Sewage generated from the project will be treated in sewage treatment plant of capacity as given

below. Treatment will be done to achieve treated effluent within permissible limit as per CPCB

directives to reuse for various non-domestic applications. Sequential batch reactor (SBR) is

considered for sewage treatmentdue to minimal maintenance cost and better quality of treated

water.

S.No. Parameter Unit Inlet Post

Equalization

Post

SBR

Post

Filtration1 pH 6.5-8.5 6.5-8.5 6.5-8.5 6.5-8.5 2 BOD mg/l 250-300 175-225 <20 <10 3 COD mg/l 600-800 400-500 <50 <20 4 TSS mg/l 300-400 <200 <20 <10 5 Oil and Grease mg/l Up to100 <10 <5 <2

Treatment Technology

In order to ensure quality of treated effluent for various uses, Sewage Treatment Plant has

been designed to ensure that the treated sewage (water) is well below the permissible limits,

even under the varying flow conditions which are typical for such developments. The main

components of the process adopted for the STP include the following:

� Incoming sewage before collecting in the equalization tank, trash and oil will be removed

through screen chamber and oil & grease trap. Coarse Bubble Diffusers will be provided in

Equalization tank to avoid anaerobic condition.

� The sewage from the equalization tank will be lifted by pumps to the Sequential

Batch Reactor (SBR). These pumps will have enough capacity to pump the entire batch in one

hour, as per the time cycle.

Page 11: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

113 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

� Aeration in SBR tank will be done by fine bubble diffusers with the help of air blower. After

filling the SBR tank with sewage, blower will start and once biodegradation has taken place,

blower will be shut off for some time to allow settling ofthe sludge. After settling, the decanting

process will start. Decanter is well designed to decant one batch in 0.5 Hrs. Moving type

decanter will be designed to obtain the desired efficiency. Decanter will be provided with scum

guard.

� Aeration system and decanting system will be automated for smooth operation. Level sensor

is mounted in SBR tank to prevent overloading and under loading.

� Decanted water will be stored in intermediate storage tank. Decanted water will be first fed

in Multi-grade sand filter for removing any suspended particles, followed by UV

Sterilization and Activated carbon filter for color and odor removal. Filtered water will be good

enough for irrigation and flushing of toilets and urinals. This water will be further treated

through a softener to reduce hardness to use in DG cooling tower if required. There are chances

of redeveloping microbial organism in treated water due to absence of residual disinfectant.

Therefore, minimal chlorination will be done.

� Total sludge generated from SBR will be stored in a sludge holding tank for further

digestion. Diffused air will be supplied through aerators to increase the consistency in sludge

holding tank. Digested and thickened sludge will be pumped to a centrifuge to de-water.

Polyelectrolyte will be added if necessary.

Filtrate from centrifuge will be pumped back to the equalization tank and dewatered sludge will

be used as manure after drying.

RAIN WATER HARVESTING

The storm water disposal system for the premises will be self-sufficient to avoid any

collection/stagnation and flooding of water. The amount of storm water run-off depends upon

many factors such as intensity and duration of precipitation, characteristics of the tributary area

Page 12: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

114 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

and the time required for such flow to reach the drains. The drains will be located near the

carriage way along either side of the roads. Taking the advantage of road camber, the rainfall run

off from roads will flow towards the drains. Storm water from various building is connected to

adjacent drain by a pipe through catch basins. Therefore, it has been calculated to provide 3

Rainwater harvesting pits at selected locations, which will catch the maximum run-off from the

area.

1) Since the existing topography is congenial to surface disposal, a network of storm water

pipe drains is planned adjacent to roads. All building roof water will be brought down

through rain water pipes.

2) Proposed storm water system consists of pipe drain, catch basins and seepage pits at

regular intervals for rain water harvesting and ground water recharging.

3) For basement parking, the rainwater from ramps will be collected in the basement storm

water storage tank. This water will be pumped out to the nearest external storm water

drain.

4) Peak Hourly rainfall of 50 mm/hrwill be considered for designing the storm water

drainage system.

Rain water harvesting has been catered to and designed as per the guideline of CGWA. Peak

hourly rainfall has been considered as 50 mm/hr. The recharge pit of radius 2.5m & height 5m is

constructed for recharging the water. Inside the recharge pit, a recharge bore is constructed

having adequate diameter with PVC slotted pipe up to a layer where sandy aquifers/ deeper

aquifer permeable layers exist. The bottom of the recharge structure will be kept 5 m above this

level. At the bottom of the recharge well, a filter media is provided to avoid choking of the

recharge bore. Design specifications of the rain water harvesting plan are as follows:

Catchments/roofs would be accessible for regular cleaning.

The roof will have smooth, hard and dense surface which is less likely to be damaged

allowing release of material into the water. Roof painting has been avoided since most

paints contain toxic substances and may peel off.

All gutter ends will be fitted with a wire mesh screen and a first flush device would be

installed. Most of the debris carried by the water from the rooftop like leaves, plastic bags

and paper pieces will get arrested by the mesh at the terrace outlet and to prevent

Page 13: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

115 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

contamination by ensuring that the runoff from the first 10-20 minutes of rainfall is

flushed off.

No sewage or wastewater would be admitted into the system.

No wastewater from areas likely to have oil, grease, or other pollutants has been

connected to the system.

Calculations for storm water load

Roof-top area = Ground Coverage = 22,558.335 m2

Green Area = 39,630.352 m2

Paved Area = Plot Area – (Roof-top Area + Green Area)

= 1,00,035.700– (22,558.335 + 39,630.352)

= 37,847.013m2

Runoff Load

Roof-top Area = 22,558.335 × 0.050 × 0.8

= 902.33 m3 /hr

Green Area = 39,630.352 × 0.050 × 0.2

= 396.30 m3/hr

Paved Area = 5,321 × 0.050 × 0.75

= 1,419.26 m3/hr

Total Runoff Load = 902.33+ 396.30+ 1,419.26 m3/hr

= 2,717.89m3/hr

Taking 15minutes retention time, volume of storm water = 2,717.89 /4

= 679.47m3

Capacity of Recharge pit = π r2h = 3.14 × 2.× 2.5 × 5 = 98.125 m3

Hence No. of pits required = 679.47/98.125 = 6.92 pits say 7 pits

Total of 7Rain Water Harvesting pits are proposed for artificial ground water recharge.

Page 14: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDE At Plot NGreater N

M/s.Ocean

VEHICL

Adequate

adequate

movemen

PARKIN

As per M

For Com

=

=

For IT/IT

= 1

= 2

For Resid

EN I”IT & No-11, SectoNoida, Uttar

nInfraheights

LE PARKIN

e provision

e parking pr

nt at the site

NG REQUIR

MoEF&CC

mmercial

= 18,742

= 374.84

TES =

,40,702.083/

,814.04 ECS

dential

IT Enabled or-Techzoner Pradesh

Pvt. Ltd.(For

Figure 3: T

NG FACILI

will be mad

rovisions fo

.

RED:

norms

=

2.428/50

4 ECS say 3

1 ECS/50

/50

S say 2,814

=

d Services e-IV

rmerly M/s U.Y

Typical Rain

ITIES

de for car/ve

or visitors s

1 ECS/

375 ECS

m2 of propo

ECS

1 ECS/

Y. Industries

n Water Ha

ehicle parkin

so as not to

/50 m2 of pro

osed FAR

/100 m2 of pr

Pvt. Ltd.)

rvesting Pit

ng at the pro

o disturb th

oposed FAR

roposed FAR

CONCEP

t Design

oject site. Th

he traffic an

R

R

PTUAL PLA

here will als

nd allow sm

AN

116

so be

mooth

Page 15: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

117 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

= 18,740.124/100

= 87.40 ECS say 188 ECS

For Facility = 1 ECS/100 m2 of proposed FAR

= 9,358.432/100

= 93.58 ECS say 94 ECS

Total Parking Required as per MoEFCC = 375 + 2,814 + 188 + 94

= 3471 ECS

As per Greater Noida Bye-Laws

For Commercial = 1 ECS/50 m2 of permissible FAR

= 18,756.694/50

= 374.84 ECS say 375 ECS

For IT/ITES = 1 ECS/50 m2 of permissible FAR

= 1,40,675.203/50

= 2,813.5 ECS say 2,814 ECS

For Residential = 1 ECS/100 m2 of permissible FAR

= 18,756.694/100

= 187.5 ECS say 188 ECS

For Facility = 1 ECS/100 m2 of permissible FAR

= 9,378.347/100

= 93.78 ECS say 94 ECS

Total Parking Required as per Greater Noida Bye Laws = 375 + 2,814 + 188 + 94

= 3,471 ECS

Parking Proposed

Area proposed for I basement parking = 47,073.532 m2

Area required for 1 ECS of basement parking = 30 m2

Parking proposed for I basement parking = 1,569 ECS

Area proposed for II basement parking = 23,440.487 m2

Area required for 1 ECS of basement parking = 30 m2

Page 16: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

118 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

Parking proposed for II basement parking = 781 ECS

Area proposed for surfaceparking = 11,022.160 m2

Area required for 1 ECS of surface parking = 20 m2

Parking proposed for surface parking = 551 ECS

Area proposed for podiumparking = 16,431.756 m2

Area required for 1 ECS of podium parking = 30 m2

Parking proposed for podium parking = 547 ECS

Area proposed for Stiltparking = 884.853 m2

Area required for 1 ECS of stilt parking = 30 m2

Parking proposed for Stilt parking = 24 ECS

Total Parking proposed = 1,569 + 781 + 551 + 547 + 24

= 3,472 ECS

POWER REQUIREMENT

The power supply will be supplied by NPCL.Total Connected Load is around 12,496.00 KW and

the Expected Maximum Demand is 9,426KVA at 0.9 power factor, considering 10% provision

for future provision and 85% all day efficieny of the transformer the demand load is 12,000

KVA.

Details of D.G Sets

There is provision of 14 no. of DG sets of total capacity 12,000 KVA (i.e. 8 x 1,000 KVA + 2 x

500 KVA + 4 x 750 KVA) for power back up in the Golden I Project. The DG sets will be

equipped with acoustic enclosure to minimize noise generation and adequate stack height for

proper dispersion.

SOLID WASTE GENERATION

Solid waste would be generated both during the construction as well as during the operation

phase. The solid waste expected to be generated during the construction phase will comprise of

Page 17: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

119 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

Solid Waste

Construction Waste

Construction waste,

Broken Bricks, Waste Plaster

Empty Cement

Bags

Used in re-filling, raising site level

Used in road making

Excavated Soil

Top soil conserved for landscaping,

balance used in re-filling

excavated materials, used bags,bricks, concrete, MS rods, tiles, wood etc. The following steps

are proposed to be followed for the management solid waste:

Construction yards are proposed for storage of construction materials.

The excavated material such as topsoil and stones will be stacked for reuse during later

stages of construction

Excavated top soil will be stored in temporary constructed soil bank and will be reused for

landscaping of the “GOLDEN I” IT & IT Enabled Service project.

Remaining soil will be utilized for refilling / road work / rising of site level at locations/

selling to outside agency for construction of roads etc.

Figure 4: Solid Waste Management Scheme (Construction Phase)

During the operation phase, waste will comprise domestic in nature. The solid waste generated

from the project will be mainly domestic waste and estimated quantity of the waste will be

approx. 6,730 kg per day (@ 0.5 kg per capita per day for residents, @ 0.15 kg per capita per day

for the visitor, 0.25 kg per capita per day for the staff members and landscape wastes @ 0.2

kg/acre/day). Following arrangements will be made at the site in accordance to Municipal Solid

Wastes (Management and Handling) Rules, 2000.

Page 18: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

120 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

Table 6: Calculation of Solid Waste Generation

S. No. Category Occupancy Per Capita

Generation

(kg/day)

Waste

Generated

(kg/day)

A. Residential, IT &Commercial Building

Residents 1,026 0.5 513

Staff 19,679 0.25 4,919.75

Visitor 7,915 0.15 1,187.25

B. Landscape Waste 9.79acre 0.2kg/acre/day 1.958

C. STP Sludge 107.89

TOTAL SOLID WASTE GENERATED (A+B+C)

6729.848 say

6,730 kg/day

(Source: For Waste Collection, Chapter 3, Table 3.6, Page no. 49, Central Public Health &

Environment Engineering Organization, Ministry of Urban Development, (Government of India,

May 2001)

Collection and Segregation of waste

1. A door to door collection system will be provided for collection of domestic waste in colored

bins from household units.

2. The local vendors will be hired to provide separate colored bins for dry recyclables and Bio-

Degradable waste.

3. For waste collection, adequate number of colored bins (Green and Blue & dark grey bins–

separate for Bio-degradable and Non Bio-degradable) are proposed to be provided at the

strategic locations of the project area.

4. Litter bin will also be provided in open areas like parks etc.

Page 19: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDE At Plot NGreater N

M/s.Ocean

Trea

Bio-D

1. Bio-d

used as m

2. STP s

3. Horti

Recy

i. Grass

after deco

ii. Recy

Dispo

Recyclab

the Muni

Solid Wa

depicted

EN I”IT & No-11, SectoNoida, Uttar

nInfraheights

atment of wa

Degradable w

degradable w

manure.

sludge is pro

icultural Wa

yclable waste

s Recycling

omposition.

yclable waste

osal

ble and non-

icipal Solid

astes (Mana

in the follow

Figur

IT Enabled or-Techzoner Pradesh

Pvt. Ltd.(For

aste

wastes

waste will be

oposed to be

ste is propos

es

– The cropp

es like paper

-recyclable w

Waste Man

agement and

wing figure f

re 5: Solid W

d Services e-IV

rmerly M/s U.Y

e subjected

e used for ho

sed to be com

ped grass wi

r, plastic, me

wastes will b

nagement wi

Handling) R

for the “GOL

Waste Mana

Y. Industries

to organic w

orticultural pu

mposted and

ill be spread

etals etc. will

be disposed

ill be condu

Rules, 2000

LDEN I” IT

agement Sch

Pvt. Ltd.)

waste conver

urposes as m

d will be use

d on the gree

l be sold off

through Go

ucted as per

0. A Solid w

& IT Enable

heme (Oper

CONCEP

rtor and the

manure.

d for garden

en area. It w

f to recyclabl

ovt. approved

the guidelin

waste manage

ed Servicepr

ration Phase

PTUAL PLA

compost w

ning purpose

will act as ma

les.

d agency. H

nes of Muni

ement Schem

roject.

e)

AN

121

ill be

s.

anure

Hence,

icipal

me is

Page 20: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDE At Plot NGreater N

M/s.Ocean

Organic

A waste

material.

pasteuriz

pulveriza

Benefits

1. Large

EN I”IT & No-11, SectoNoida, Uttar

nInfraheights

Waste Con

converter is

A converte

zation of org

ation of refus

of organic w

e quantity of

IT Enabled or-Techzoner Pradesh

Pvt. Ltd.(For

nverter

s a machine

er is a self-co

ganic waste

se into unrec

Fig

waste conve

f solid waste

d Services e-IV

rmerly M/s U.Y

used for th

ontained sys

; sterilizatio

cognizable o

gure 6: Orga

erter:

e is converted

Y. Industries

he treatment

stem capable

on of pathog

output; trash

anic Waste

d to fertilize

Pvt. Ltd.)

and recyclin

e of perform

genic or bio

compaction

Converter

er in a very s

CONCEP

ng of solid

ming the foll

ohazard was

n; dehydratio

hort period

PTUAL PLA

and liquid r

lowing funct

ste; grinding

on.

AN

122

refuse

tions:

g and

Page 21: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

123 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

2. Fertilizers can be sold as compost to farmers, or used for gardening

3. Machine requires less space and the efficiency is high.

4. Manpower and maintenance is very less.

5. This is one of the latest techniques of managing solid waste.

GREEN AREA

Total green area measures 39,630.352 m2(@51.15% of the open area) which will be area under

tree plantation within the plots and along the roads. Evergreen tall and ornamental trees like

Neem and Gulmoharand ornamental trees like Bottle Palm and Bamboo have been proposed to

be planted inside the premises. Parks will also be developed by the project proponent.

Table 7: Plant List

Evergreen Trees Ornamental Trees

Botanical Name Common Name Botanical Name

Delonixregia Gulmohar Areca palm

Azadirachtaindica Neem Prunusarmeniaca

Callistemon lanceolatus Bottle Brush Bougainvillea torch glow

Cassia fistula Amaltas Cleredendroninerme

Gravelliarobusta Silver Oak Cycascircinalis

Ficusbengalensis Bargad Euphorbia carcasana

DETAILS OF CONSTRUCTION MATERIALS

List of building materials being used at site:

1. Coarse sand

2. Fine sand

3. Stone aggregate

4. Stone for masonry work

Page 22: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDEN I”IT & IT Enabled Services At Plot No-11, Sector-Techzone-IV CONCEPTUAL PLAN Greater Noida, Uttar Pradesh

124 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.)

5. Cement

6. Reinforcement steel

7. Pipe scaffolding (cup lock system)

8. Bricks

9. CLC fly ash blocks

10. Crazy (white marble) in grey cement

11. P.V.C. conduit

12. MDS, MCBs

13. PVC overhead water tanks

14. 2 1/2'’ thick red colour paver tiles

15. PPR (ISI marked)

16. PVC waste water lines

17. S.W. sewer line up to main sewer

18. PVC rain water down take

19. Stainless steel sink in kitchen

20. Joinery hardware- ISI marked

Page 23: Cover page-Form 1 1 - Copy...Greater Noida, Uttar Pradesh 104 M/s.OceanInfraheights Pvt. Ltd.(Formerly M/s U.Y. Industries Pvt. Ltd.) CONCEPTUAL PLAN INTRODUCTION The project “GOLDEN

“GOLDE At Plot NGreater N

M/s.Ocean

MATER

EN I”IT & No-11, SectoNoida, Uttar

nInfraheights

RIALS USED

IT Enabled or-Techzoner Pradesh

Pvt. Ltd.(For

D FOR CO

d Services e-IV

rmerly M/s U.Y

NSTRUCT

Y. Industries

ION & THE

Pvt. Ltd.)

EIR U VAL

CONCEP

LUES

PTUAL PLAAN

125