Cover Architectural Collaborative Inc. This Addendum shall form part of the Contract Documents and is to be read, interpreted and coordinated with all other parts. The following revisions supersede the information contained in the original specifications and drawings issued for the above-named project. Architectural: Drawings: A201 – Door Schedule Nurses Station: Added Card Access Reader, programmed for Automatic Opening. A201 – Construction Notes: Deleted NEW POWER DOOR OPERATORS TO BE INSTALLED Added Card Reader Programmed for Automatic Opening. A203 – Door Schedule Treatment Room: Added comment on Door D-007 to swing on both sides. A203 – Detail 5: Added double swing on Door D-007. Added Note N41 SUPPLY AND INSTALL MIRROR AS SPECIFIED Electrical: Drawings: E-300 – Detail 2: Deleted Card Reader on left side of the door. Deleted Door Opener Push Button. Added Card Reader on right side of the door, on millwork. Provide all required hardware and programming to automatically open door when valid card is swiped on card reader. ADDENDUM 02 Project Name: BDH Secure Room & BDH Security Upgrade Cover Project Number: 19021 Client Project Number: 6319003 & 6320003 Client Contact: Date: Total Pages: [email protected]February 3, 2020 4 END OF ADDENDUM 02 Source: BidCentral By: Brenda Roy of Vector Projects Group Ltd Date: Feb. 03/2020
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Cover Architectural Collaborative Inc.
This Addendum shall form part of the Contract Documents and is to be read, interpreted and coordinated with all other parts. The following revisions supersede the information contained in the original specifications and drawings issued for the above-named project.
Architectural:
Drawings:
A201 – Door Schedule Nurses Station: Added Card Access Reader, programmed for Automatic Opening.
A201 – Construction Notes: Deleted NEW POWER DOOR OPERATORS TO BE INSTALLED Added Card Reader Programmed for Automatic Opening.
A203 – Door Schedule Treatment Room: Added comment on Door D-007 to swing on both sides. A203 – Detail 5: Added double swing on Door D-007.
Added Note N41 SUPPLY AND INSTALL MIRROR AS SPECIFIED
Electrical:
Drawings:
E-300 – Detail 2: Deleted Card Reader on left side of the door. Deleted Door Opener Push Button. Added Card Reader on right side of the door, on millwork. Provide all required hardware and programming to automatically open door when valid card is swiped on card reader.
Copyright reserved. This design and drawing is the exclusive property of COVER Architectural Collaborative Inc. and cannot be used for any purpose without the written consent of the Architect. This drawing is not to be used for construction until issued for that purpose by the Architect. Prior to commencement of the Work the Contractor shall verify all dimensions, datums and levels to identify any errors and omissions; ascertain any discrepancies between this drawing and the full Contract Documents; and, bring these items to the attention of the Architect for clarification. These drawings must not be scaled. These drawings supercede previous issues.
D1 END OF COUNTER TO BE DEMOLISHEDD2 REMOVE HANDRAILD26 REMOVE CORNER GUARDD27 REMOVE ALL EXISTING TEMPERED GLASS FROM NURSING
STATION, RETAIN EXISTING MILLWORK
CONSTRUCTION KEYNOTESKey Value Keynote Text
N1 NEW DOOR TO BE INSTALLEDN2 NEW WALL TO BE CONSTRUCTEDN3 CARD READER PROGRAMMED FOR AUTOMATIC OPENINGN4 INSTALL NEW LAMINATED SAFETY GLASS FIXED PANNEL WITH
CUTOUTS FOR PASS-THRU AND SPEAKING PORTS. GLASS TO BEINSTALLED INTO EXISTING MILLWORK COUNTER.
N5 INSTALL HANDRAIL AND WALL PROTECTIONN6 NEW COUNTER END TO BE CONSTRUCTEDN20 NEW REMOTE MONITORING STATION FOR SECURE ROOMN21 NEW SECURITY CAMERAN28 PATCH AND MAKE GOOD FINISHES AFFECTED BY DEMOLITION
AND CONSTRUCTION ACTIVITIES (WALLS, FLOORS, AND CEILINGS)N29 PROVIDE NEW PAINT FINISH TO WALLSN30 PATCH AND MAKE GOOD EXISTING FLOORING AFFECTED BY
CONSTRUCTION ACTIVITIESN31 REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR EXTENT
OF WORK IN THIS AREA, AND LAYOUTS OF DEVICES ANDFIXTURES
N33 INSTALL NEW LAMINATED SAFETY GLASS FIXED PANNELSN35 PROVIDE MAG-LOCK AND ROAM ALARM UPGRADE TO EXISTING
DOUBLE DOORS
D2
D1
1 : 50
Nurses Station Pass-Thru Elevation4
Door Schedule Nurses Station
Mark Width Height Thickness Type Mark Door Material GlazingFrame
MaterialHardware
Set Comments
D-002 914 2134 44 A HM LG SF 1 W/ CARD ACCESS PROGRAMMED FORAUTOMATIC OPENING. CLOSER
D27
D27
ROOM FINISH SCHEDULE - NURSES STATION
Name NumberFloor Base
Finish Floor Finish Wall Finish Ceiling Finish
NURSES STATION 100 EXIST/P EXIST/P PLY/GWB EXIST/P
* CONFIRM ALL DIMENSIONS ON SITE
x;DN
x;DNx;?
x;?
PRIVT7
OFFICE
STAFFLUNCHROOM
MEETINGROOM
PCU ROOM16
FAMILY ROOMLOUNGE
WR
WR
WR
WR
PRIVATE19
HSKP
STOR
HOSPICESOCIAL WORKER
20
STOR
WR
ELEV
MEDICATION
4 BED15
SEMI PRIV14
STOR
WR
PRIVATE18
DIALYSIS
STOR
HSKP
LAUNGE OFFICE
EMERGE
EMERGEHSKP
DOCTOR'SCHANGEROOM
WR
UTILITY
NURSE'SCHANGEROOM
STOR
OR
STAFFLUNCHROOM
MEDICATION
WR
NURSESSTATION
SOILEDUTILITY
CLEANUTILITY
ELECT
OFFICEEXAMROOM
OFFICE
TREATMENT
LAB FILESTOR
TREATMENT
PACSSTATION
SUPPLIES
CHANGEROOM
PLASTERROOM
X-RAY1
DATA
OFFICE
CHANGE CHANGE
WR
WR
4"
45" OffFloor
2.698m Ceiling Tile Height
673.1
457.2
2287.4
2" Conduitfor WallBucky(Location tobe Verified)
PN
D13
SUPPLIES
PLASTER ROOM
D14
D3
D4
D3 D9
D7D8
CHANGE ROOM
PACS STATION
D21D10
D11
D28
N10
N12
N11 N1
N8
N9
N7N7
CHANGE ROOM
N15
N18
WC
CHANGECHANGE
DA
TA
D-007
N25
N37
N28 N29
N30
N28N29
N30
WC
101A
N27
CASTING AREA
109
TREATMENT ROOM
101N31
N31
N12
N39
A2037
N40A2036
1220
N40
N41
TREATMENT ROOM
101D6
D5
PLASTER ROOM
DOOR ABREVIATIONSSTL STEEL DETENTION DOORHM HOLLOW METALSF STEEL FRAMEE EXISTING
Copyright reserved. This design and drawing is the exclusive property of COVER Architectural Collaborative Inc. and cannot be used for any purpose without the written consent of the Architect. This drawing is not to be used for construction until issued for that purpose by the Architect. Prior to commencement of the Work the Contractor shall verify all dimensions, datums and levels to identify any errors and omissions; ascertain any discrepancies between this drawing and the full Contract Documents; and, bring these items to the attention of the Architect for clarification. These drawings must not be scaled. These drawings supercede previous issues.
D3 REMOVE WALL CABINETD4 REMOVE BASE CABINET AND COUNTERD5 PATIENT LIFT TO REMAIND6 REMOVE CURTAIN TRACKD7 REMOVE BASE CABINET AND SHELVESD8 BEDHEAD TO REMAIND9 REMOVE CRUTCHES HOOKSD10 REMOVE ALL SHELVING AND COUNTERD11 SINK TO REMAIND13 REMOVE EXISTING DOOR AND FRAMED14 ENLARGE DOOR OPENINGD21 REMOVE EXISTING SINKD28 END OF COUNTER TO BE DEMOLISHED (PART OF
ALTERNATE PRICE 01)
CONSTRUCTION KEYNOTESKey Value Keynote Text
N1 NEW DOOR TO BE INSTALLEDN7 INSTALL CEILING EQUIPMENT THAT WAS REMOVED FROM
PREVIOUS TREATMENT RMN8 INSTALL MONITOR AND KEYBOARD RACK, WALL MOUNTEDN9 FILE ORGANIZERS TO BE MOUNTED ON WALLN10 INSTALL NEW TOILET AS SPECIFIEDN11 INSTALL NEW VANITYN12 INSTALL NEW HAND HYGIENE STATION. REPAIR GABLE END
AND MATCH FINISH WITH EXISTING PLASTIC LAMINATE.REPAIR DAMAGED WALL AND FLOORING AS A RESULT OFTHE DEMOLITION (PART OF ALTERNATE PRICE 01)
N15 INSTALL NEW HAND HYGIENE STATIONN18 INSTALL BOOM LIGHT SO AS NOT TO INTERFERE WITH
PATIENT LIFTN25 ADD A PLASTER TRAP TO THE EXISTING SINKN27 INSTALL NEW WASHROOM ACCESSORIES AS SPECIFIEDN28 PATCH AND MAKE GOOD FINISHES AFFECTED BY
DEMOLITION AND CONSTRUCTION ACTIVITIES (WALLS,FLOORS, AND CEILINGS)
N29 PROVIDE NEW PAINT FINISH TO WALLSN30 PATCH AND MAKE GOOD EXISTING FLOORING AFFECTED
BY CONSTRUCTION ACTIVITIESN31 REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR
EXTENT OF WORK IN THIS AREA, AND LAYOUTS OFDEVICES AND FIXTURES
N37 INSTALL HAND SANITIZERN39 INSTALL WALL PROTECTION (PART OF ALTERNATE PRICE
01)N40 INSTALL WALL PROTECTIONN41 SUPPLY AND INSTALL MIRROR AS SPECIFIED
1 : 50
RCP (Const.) - Treatment Room31 : 50
RCP (Demo.) - Treatment Room2
Door Schedule Treatment Room
Mark Width HeightThickne
ssTypeMark
DoorMaterial Glazing
FrameMaterial Hardware Set Comments
D-007 915 2032 51 C STL - SF 5 To swing on both sides
CONTRACTOR TO VERIFY CIRCUITS SHOWN ARE CORRECT.IF AS FOUND CONDITIONS DIFFER FROM THOSE SHOWNON THE DRAWING THE CONTRACTOR SHALL MAKEADJUSTMENTS TO SUIT THE INTENT OF THE WORK.
1 INTERCOM TO BE 2-WAY. VOLUME MAY BE LOWERED BUT NOT TURNED OFF. VOLUME IN SECLUSION ROOM TO BE ADJUSTED TO OWNERS LIKING NOT MODIFIABLE BY THE PATIENT. LOCATE IN EMERGENCY ROOM AS PER OWNERS REQUEST.
CCTV MONITOR TO BE VISIBLE TO STAFF ONLY. MONITORS LOCATED IN EMERGENCY ROOM AS PER OWNERS REQUEST. CCTV SYSTEM TO BE OPERATED AS A STAND ALONE SYSTEM BY THE NURSES AND CONNECTED TO THE HOSPITAL CCTV SYSTEM. HOSPITAL CCTV SYSTEM TO BE SET TO DO NOT RECORD. PROVIDE PRIVACY SCREEN FOR CCTV MONITOR.
PUSH BUTTON IN OWNER DESIGNATED LOCATION. PUSH BUTTON TO REMOTELY UNLOCK SECLUSION ROOM DOOR. PROVIDE LENEL EXIT PUSH BUTTON. ADD LAMICOLD LABEL 'SECLUSION'.
HANDICAP DOOR OPENER PUSH BUTTON. PROVIDE A CIRCUIT FROM PANEL UE TO POWER DOOR OPENER. UE-65
NEW ROAMALERT DOOR CONTROLLER ABOVE T-BAR CEILING. PROVIDE EXCITER MOUNTED BESIDE DOOR. PROVIDE RS-485 TO EXISTING ROAMALERT NETWORK. PROVIDE POWER SUPPLY CONNECTED TO EMERGENCY CIRCUIT. PROVIDE KEYPAD ON EITHER SIDE OF THE DOOR TO TEMPORARILY DISABLEROAMALERT SYSTEM. SYSTEM TO ALARM WHEN PATIENT WALKS THROUGH.
PROVIDE ALL REQUIRED HARDWEAR AND PROGRAMMING TO AUTOMATICALLY OPEN DOOR WHEN VALID CARD IS SWIPED ON CARD READER.
2
3
4
5
6
CR
DPES
CR DPES
ML
ML
DP
DP
5
CR
PWD
RE
N
Copyright reserved. This design and drawing is the exclusive property of COVER Architectural Collaborative Inc. and cannot be used for any purpose without the written consent of the Architect. This drawing is not to be used for construction until issued for that purpose by the Architect. Prior to commencement of the Work the Contractor shall verify all dimensions, datums and levels to identify any errors and omissions; ascertain any discrepancies between this drawing and the full Contract Documents; and, bring these items to the attention of the Architect for clarification. These drawings must not be scaled. These drawings supercede previous issues.