Top Banner
COUNTY TRANSPORTATION MASTER PLAN MOVE ANNE ARUNDEL! 1 2 Savage Jessup BWI Airport 0 1 2 0.5 Miles ± TO WASHINGTON D.C. TO COLUMBIA TO BALTIMORE § ¨ 695 Í Í Í MARYLAND —— 713 § ¨ 97 Í Í Í MARYLAND —— 295 Í Í Í MARYLAND —— 170 Í Í Í MARYLAND —— 100 Í Í Í MARYLAND —— 175 COUNCIL DISTRICT 1 Recommended Bicycle and Pedestrian Investments The walkzone boundary for Linthicum Elementary School is currently limited as students living to the west of Camp Meade Road (MD 170) are prohibited from crossing the light rail line. The Linthicum station is well designed for safe pedestrian crossings. The school walkzone would more than double in size with minor design changes such as a pedestrian crossing gate; use of a walking school bus and/or placement of a school crossing guard; and a high visibility crosswalk at Benton Avenue. The walkzone of Brooklyn Park Elementary School includes most of the neighborhood adjacent to the school. Aside from the Arundel Gardens neighborhood, only a section of Harbor Valley Drive remains outside the walkzone. Harbor Valley Drive could be incorporated into the walkzone by creating a walkway across the narrow utility corridor between Panorama Way and Valley Road or between 14th Street and Harbor Valley Drive. A similar sidewalk connects Panorama Way with Brooklyn Park Middle School. Linthicum Elementary School Brooklyn Park Elementary School B A Town Center Improvements o l m n ! LRT ( Light Rail Stops MARC Station ³ ³ ! l ! l Planned Shared Use or Protected Bike Lane Existing or Committed On Street Bicycle/Pedestrian Facility Planned On Street Bicycle/Pedestrian Facility Existing or Committed Shared Use Path or Protected Bike Lane ¹ º Safe Routes to School Investment Area 1 2 Bay Brook Park Dorsey MARC Station A B The network of shared-use paths can carry Anne Arundel County residents most of the way to many Points of Interest (POI) throughout the county. To complete the “last mile”, additional on-street bicycle path designations are recommended, connecting the trails to key destinations through low- stress routes. Does not include City of Annapolis Current or Planned Bicyle Routes.
3

COUNCIL DISTRICT 1 Council District 1 · Bowie - Odenton Town Center Crofton - Annapolis Town Centre Glen Burnie to Patapsco Plaza Riviera Beach to UMBW Medical Center Anne Arundel

Jul 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: COUNCIL DISTRICT 1 Council District 1 · Bowie - Odenton Town Center Crofton - Annapolis Town Centre Glen Burnie to Patapsco Plaza Riviera Beach to UMBW Medical Center Anne Arundel

COUNTY TRANSPORTATION MASTER PLAN

MOVE ANNE ARUNDEL!

1

2

Savage

Jessup

BWI Airport

Council District 1

0 1 20.5

Miles

±

TO WASHINGTON D.C.

TO COLUMBIA

TO BALTIMORE §̈695

ÍÍÍMARYLAND—————713

§̈97

ÍÍÍMARYLAND—————295

ÍÍÍMARYLAND—————170

ÍÍÍMARYLAND—————100

ÍÍÍMARYLAND—————175

Town Center Improvementsolmn

!LRT( Light Rail Stops

MARC Station³ ³

!l !l Planned Shared Use or Protected Bike Lane

Existing or Committed On Street Bicycle/Pedestrian Facility

Planned On Street Bicycle/Pedestrian Facility

Existing or Committed Shared Use Path or Protected Bike Lane

¹º Safe Routes to School Investment Area

COUNCIL DISTRICT 1 Recommended Bicycle and Pedestrian Investments

The walkzone boundary for Linthicum Elementary School is currently limited as students living to the west of Camp Meade Road (MD 170) are prohibited from crossing the light rail line. The Linthicum station is well designed for safe pedestrian crossings. The school walkzone would more than double in size with minor design changes such as a pedestrian crossing gate; use of a walking school bus and/or placement of a school crossing guard; and a high visibility crosswalk at Benton Avenue.

The walkzone of Brooklyn Park Elementary School includes most of the neighborhood adjacent to the school. Aside from the Arundel Gardens neighborhood, only a section of Harbor Valley Drive remains outside the walkzone. Harbor Valley Drive could be incorporated into the walkzone by creating a walkway across the narrow utility corridor between Panorama Way and Valley Road or between 14th Street and Harbor Valley Drive. A similar sidewalk connects Panorama Way with Brooklyn Park Middle School.

Linthicum Elementary School

Brooklyn Park Elementary School

B

A

1

2

Savage

Jessup

BWI Airport

Council District 1

0 1 20.5

Miles

±

TO WASHINGTON D.C.

TO COLUMBIA

TO BALTIMORE §̈695

ÍÍÍMARYLAND—————713

§̈97

ÍÍÍMARYLAND—————295

ÍÍÍMARYLAND—————170

ÍÍÍMARYLAND—————100

ÍÍÍMARYLAND—————175

Town Center Improvementsolmn

!LRT( Light Rail Stops

MARC Station³ ³

!l !l Planned Shared Use or Protected Bike Lane

Existing or Committed On Street Bicycle/Pedestrian Facility

Planned On Street Bicycle/Pedestrian Facility

Existing or Committed Shared Use Path or Protected Bike Lane

¹º Safe Routes to School Investment Area

1

2

Bay Brook Park Dorsey MARC StationA B

The network of shared-use paths can carry Anne Arundel County residents most of the way to many Points of Interest (POI) throughout the county. To complete the “last mile”, additional on-street bicycle path designations are recommended, connecting the trails to key destinations through low-stress routes.

Does not include City of Annapolis Current or Planned Bicyle Routes.

Page 2: COUNCIL DISTRICT 1 Council District 1 · Bowie - Odenton Town Center Crofton - Annapolis Town Centre Glen Burnie to Patapsco Plaza Riviera Beach to UMBW Medical Center Anne Arundel

COUNTY TRANSPORTATION MASTER PLAN

MOVE ANNE ARUNDEL!

210

215

201

75

69

202

Savage

Jessup

BWI Airport

Council District 1

0 1 20.5

Miles

±

TO WASHINGTON D.C.

TO COLUMBIA

TO BALTIMORE §̈695

ÍÍÍMARYLAND—————713

§̈97

ÍÍÍMARYLAND—————295

ÍÍÍMARYLAND—————170

ÍÍÍMARYLAND—————100

ÍÍÍMARYLAND—————175

Recommended Transit InvestmentsCommuter Routes Local Routes

Mid-County - Capital Beltway

Annapolis - Capital Beltway

Annapolis - Fort Meade - Columbia

Severna Park - Annapolis - New Carrollton

úûP&RP Park and Ride

Bowie - Odenton Town Center

Crofton - Annapolis Town Centre

Glen Burnie to Patapsco Plaza

Riviera Beach to UMBW Medical Center

Anne Arundel 202

RTA Transit Routes

MTA Transit Routes

201 MTA

201 RTA

502

501

Existing Transit Routes

201 MTA

!LRT( Light Rail Stop

MARC Station

PatapscoPlaza

ÍÍÍMARYLAND—————10

UMBW

OdentonTown Center

210

215

201

75

69

202

Savage

Jessup

BWI Airport

Council District 1

0 1 20.5

Miles

±

TO WASHINGTON D.C.

TO COLUMBIA

TO BALTIMORE §̈695

ÍÍÍMARYLAND—————713

§̈97

ÍÍÍMARYLAND—————295

ÍÍÍMARYLAND—————170

ÍÍÍMARYLAND—————100

ÍÍÍMARYLAND—————175

Recommended Transit InvestmentsCommuter Routes Local Routes

Mid-County - Capital Beltway

Annapolis - Capital Beltway

Annapolis - Fort Meade - Columbia

Severna Park - Annapolis - New Carrollton

úûP&RP Park and Ride

Bowie - Odenton Town Center

Crofton - Annapolis Town Centre

Glen Burnie to Patapsco Plaza

Riviera Beach to UMBW Medical Center

Anne Arundel 202

RTA Transit Routes

MTA Transit Routes

201 MTA

201 RTA

502

501

Existing Transit Routes

201 MTA

!LRT( Light Rail Stop

MARC Station

PatapscoPlaza

ÍÍÍMARYLAND—————10

UMBW

OdentonTown Center

COUNCIL DISTRICT 1 Recommended Transit Investment Priorities

Page 3: COUNCIL DISTRICT 1 Council District 1 · Bowie - Odenton Town Center Crofton - Annapolis Town Centre Glen Burnie to Patapsco Plaza Riviera Beach to UMBW Medical Center Anne Arundel

COUNTY TRANSPORTATION MASTER PLAN

MOVE ANNE ARUNDEL!COUNCIL DISTRICT 1 Recommended Road Investment Priorities

Savage

Jessup

BWI Airport

Council District 1

0 1 20.5

Miles

±

TO WASHINGTON D.C.

TO COLUMBIA

TO BALTIMORE §̈695

ÍÍÍMARYLAND—————713

§̈97

ÍÍÍMARYLAND—————295

ÍÍÍMARYLAND—————170

ÍÍÍMARYLAND—————100

ÍÍÍMARYLAND—————175

Safety Focus AreaRoadway Investments

1Recommended

Low Priority

úûP&RP Park and Ride

Town Center Improvementsolmn

201

MARC Station

!LRT( Light Rail Stop

Savage

Jessup

BWI Airport

Council District 1

0 1 20.5

Miles

±

TO WASHINGTON D.C.

TO COLUMBIA

TO BALTIMORE §̈695

ÍÍÍMARYLAND—————713

§̈97

ÍÍÍMARYLAND—————295

ÍÍÍMARYLAND—————170

ÍÍÍMARYLAND—————100

ÍÍÍMARYLAND—————175

Safety Focus AreaRoadway Investments

1Recommended

Low Priority

úûP&RP Park and Ride

Town Center Improvementsolmn

201

MARC Station

!LRT( Light Rail Stop

Summary of Major Projects MD 713 between MD 175 and Arundel Mills Blvd. to address increasing traffic congestion and traffic safety issues and provide additional bicycle and pedestrian facilities As MD 295 (Baltimore-Washington Parkway) experiences recurring congestion, it is expected that additional traffic will use MD 713 as an alternate north-south travel route to access points-of-interest in the area. A recent study evaluated alternatives to improve traffic operations and safety and improve compatibility for pedestrian and bicycle travel. Road widening to allow for turn lanes and intersection improvements is necessary. A new continuous sidewalk is proposed on at least one side of MD 713 from MD 175 to Dorsey Road and continuous on-street bike lanes in both directions are recommended. Congestion at MD 713 and MD 175 could rise to the level of needing a grade-separated interchange although at-grade alternatives may exist to handle future traffic volumes.

MD 295 – Protecting Maryland’s Scenic Parkway and Managing CongestionThe Baltimore-Washington Parkway is an environmental “crown jewel” of Maryland’s transportation system and is listed on the National Register of Historic Places. General widening of MD 295 is to be discouraged to protect sensitive environmental areas. The County supports traffic management improvements that are pinpointed at hot spots along MD 295. Strategies such as ramp metering and longer exit ramps should be considered. The County’s priority improvement area for MD 295 is between MD 175 and I-195; the interchange of MD 295 and MD 100 is a major bottleneck that must be addressed. A potential interchange at Hanover Road should carefully weigh the possible benefit to alleviating some congestion at MD 100 relative to the potential environmental impacts.

More broadly, a multimodal approach is needed to managing traffic growth. MDOT MTA should aggressively implement the MARC Growth and Investment Plan to allow for more service on the Camden Line. Until that occurs, MDOT MTA should initiate commuter bus service to Washington, DC to serve commuters coming from the eastern part of the County.

Linthicum/Ferndale Community Connectors B&A Boulevard (MD 648), Camp Meade/Belle Grove Road (MD 170) and Andover Road are important community connectors within the northern part of the County and require reinvestment in roadway quality and attention to safety improvements, traffic calming and bicycle and pedestrian facilities to support neighborhood quality of life and small business districts. A program of improvements should be advanced after further community consultation.

MD 100 from MD 170 to I-95Much of the congestion problem on MD 100 between I-95 and MD 170 has to do with the spacing of seven interchanges in only 5.5 miles which is uncommonly close for a limited access freeway. Improvements to MD 100 should focus on TSMO strategies that provide safer and smoother merging and weaving areas as vehicles enter and depart the highway. The interchange of MD 295 and MD 100 is a major bottleneck that must be addressed.

Safety Focus Areas have been identified across the county as having the greatest number of vehicle, pedestrian and bicycle crashes.   Detailed analysis of crash causes is required to develop a specific plan of engineering and enforcement activities in the Safety Focus Areas.

1

2

3

4