COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
CONTRACTP/L PROPERTY LINEPLAM PLASTIC LAMINATEPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT POST TENSIONED or
PORCELAIN TILEPTDR PAPER TOWEL DISPENSER
AND RECEPTACLEPVC POLYVINYL CHLORIDEPLYWD PLYWOODPREFAB PREFABRICATEDPL PLATEPLAS PLASTERPNL PANELP PAINT(ED)PR PAIR or PROPOSAL
REQUESTPROJ PROJECTPTD PAPER TOWEL DISPENSERPTN PARTITIONPVMT PAVEMENTPRESTR PRESTRESSEDPBO PROVIDED BY OTHERSPAR PARALLELPREFIN PREFINISHEDPOL POLISHEDPLBG PLUMBINGPKG PARKINGPERIM PERIMETERPERF PERFORATEDPTR PAPER TOWEL RECEPTACLEPRIM PRIMARYPT POINT OF TANGENCYQTY QUANTITYQT QUARRY TILE(R) REMOVER RISERRD ROOF DRAIN or ROADRL RAIN LEADERRO ROUGH OPENINGROD ROOF OVERFLOW DRAINRWC RAIN WATER CONDUCTORRAD RADIUSRE REFER TO or REFERENCEREINF REINFORCEDREC RECESS(ED)REF REFRIGERATOR or
REFRIGERATEDREQD REQUIREDRESIL RESILIENTREV REVISE, REVISED or
REVISION(S)RFG ROOFINGRFL REFLECTEDRM ROOMROW RIGHT OF WAYRBS RUBBER BASE STRAIGHTRBC RUBBER BASE COVERB RUBBER BASERH RIGHT HANDRF RESILIENT FLOORINGRECPT RECEPTACLERBT RUBBER TILERVS REVERSE (SIDE)RPM REVOLUTIONS PER MINUTESPRT SUPPORTS SOUTH or SEALEDSC SOLID CORESCD SEAT COVER DISPENSERSD SOAP DISPENSERSNC SANITARY NAPKIN CABINETSND SANITARY NAPKIN
DISPENSERSNR SANITARY NAPKIN
RECEPTACLESSK SERVICE SINKSS STAINLESS STEELSR SINK RECEPTACLESCHED SCHEDULESEC SECTIONSHWR SHOWERSHT SHEETSHTG SHEATHINGSIM SIMILARSPECS SPECIFICATION(S)SQ SQUARESF SQUARE FEETSTL STEELSTA STATIONSTD STANDARDSTOR STORAGESTRUCT STRUCTURE or STRUCTURALSUSP SUSPEND(ED)SYM SYMMETRICALSYS SYSTEMSOFF SOFFITSPKR SPEAKERSPKL SPRINKLERT&B TOP AND BOTTOMT TREADT&G TONGUE AND GROOVETB TOWEL BARTO TOP OFTPD TOILET PAPER DISPENSERTPTN TOILET PARTITIONTV TELEVISIONTELE TELEPHONETHK THICK or THICKNESSTHLD THRESHOLDTYP TYPICALTEMP TEMPORARY or
TEMPERATURETG TEMPERED GLASSTBC TOP OF BACK OF CURBTS TUBE STEELTOW TOP OF WALLTOS TOP OF STEELTOC TOP OF CONCRETETHERM THERMOSTATUSGS U.S. GEOLOGICAL SURVEYUL UNDERWRITER'S
LABORATORYUON UNLESS OTHERWISE
NOTEDUOS UNLESS OTHERWISE
SPECIFIEDUNFIN UNFINISHEDUR. URINALV VOLTVB VAPOR BARRIERVCT VINYL COMPOSITION TILEVTR VENT THROUGH ROOFVWC VINYL WALL COVERINGVERT VERTICALVEST VESTIBULEVIN VINYL or SHEET VINYLVAR VARY or VARIESVIF VERIFY IN FIELDVER VERIFYVENT VENTILATIONVOL VOLUMEWD WOODW WEST or WIDEW/C WATER CLOSETWPT WORKING POINTW/R WATER RESISTANTWWF WELDED WIRE FABRICW/ WITHW/O WITHOUTWF. WIDE FLANGE or WOOD
ABV ABOVEACOUS ACCOUSTICALACT ACCOUSTICAL CEILING TILEADD ADDENDUMADJ ADJACENT or ADJUSTABLEAGG AGGREGATEAHU AIR HANDLING UNITALUM ALUMINUMALT ALTERNATEAVE AVENUEARCH ARCHITECTURALASPH ASPHALTAUTO AUTOMATICAD AREA DRAIN or ACCESS
DOORANOD ANODIZEDAPPROX APPROXIMATEA/V AUDIO/VISUALAVG AVERAGEAWP ACOUSTICAL WALL PANELB.O.F. BY OWNER, FUTUREBD BOARDB.O. BY OWNERBLDG BUILDINGBIT BITUMINOUSBLKG BLOCKINGBM BEAM or BENCH MARKBOT BOTTOMBRG BEARNINGBSMT BASEMENTB BASECJ CONTROL JOINTCL COLUMN LINECONF CONFERENCEC.L. CENTERLINECIRC CIRCUMFERENCECAB CABINETC CAULKINGCCD CONSTRUCTION CHANGE
DIRECTIVECFL COUNTERFLASHINGCG CORNER GUARDCM CENTIMETERSCMU CONCRETE MASONRY UNITCO CHANGE ORDER or
CLEANOUTCT CERAMIC TILECDOT COLORADO DEPARTMENT
OF TRANSPORTATIONCEM CEMENTITIOUSCK CORK TILECLG CEILINGCLOS CLOSETCLR CLEARCTR COUNTERCOL COLUMNCONC CONCRETECONSTR CONSTRUCTIONCONT CONTINUOUSCONTR CONTRACTORCORR CORRIDOR or CORRUGATEDCPT CARPETCIP CAST IN PLACECONN CONNECTIONCATV CABLE TELEVISIONCCTV CLOSED CIRCUIT
TELEVISIONCU CUBICCY CUBIC YARDDEG DEGREEDAMP DAMPROOFINGDF DRINKING FOUNTAINDBL DOUBLEDEPT DEPARTMENTDTL DETAILDIA DIAMETERDIM DIMENSIONDN DOWNDISP DISPENSERDR DOORDS DOWNSPOUTDWG DRAWINGDWR DRAWERDIV DIVISIONDIAG DIAGONALDEMO DEMOLISH or DEMOLITIONEJ EXPANSION JOINT(E) EXISTINGEB EXPANSION BOLTE EASTED EXHAUST DUCTEF EXHAUST FAN or EACH FACEEWC ELECTRIC WATER COOLEREA EACHEL ELEVATIONELEC ELECTRICALELEV ELEVATOREMER EMERGENCYENGR ENGINEEREOS EDGE OF SLABEQ EQUALEQUIP EQUIPMENTEXT EXTERIORES EACH SIDEEWH ELECTRIC WATER HEATEREW EACH WAYEST ESTIMATEFAC FIRE ALARM CABINETFA FIRE ALARMFACP FIRE ALARM CONTROL
PANELFBO FURNISHED BY OTHER(S)FD FLOOR DRAIN or FIRE
DAMPERFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER
CABINETFFL FINISHED FLOOR LINEFHC FIRE HOSE CABINETFR FIRE RESISTIVE or FIRE
PANEL(ING)FT FOOT (FEET)FTG FOOTINGFURR FURRED or FURRINGFUT FUTUREF FARENHEITFVC FIRE VALVE CABINETFHMS FLAT HEAD MACHINE
SCREWFH FIRE HYDRANTFF FINISHED FLOORFURN FURNISH(ED)FOM FACE OF MASONRYFOF FACE OF FINISHFOS FACE OF STUDFOC FACE OF CONCRETEFHWS FLAT HEAD WOOD SCREWFHV FIRE HOSE VALVEGWB GYPSUM WALLBOARDGC GENERAL CONTRACTORGB GRAB BARGYP. BD. GYPSUM BOARDGCMU GLAZED CONCRETE
MASONRY UNIT(S)GA GAUGEGR GRADEGL GLASS or GLAZINGGND GROUNDGALV GALVANIZEDGYP GYPSUMGT GLASS TILEGRT GROUTGI GALVANIZED IRONHC HOLLOW CORE or
ANCHOR STUDHAS HEADED ANCHOR STUDHWY HIGHWAYHWH HOT WATER HEATERHW HOT WATERHTR HEATERIBC INTERNATIONAL BUILDING
CODE or INSTALLED BYCONTRACTOR
ID INSIDE DIAMETERIN INCH(ES)INFO INFORMATIONINSUL INSULATION or INSULATEDINT INTERIORINCAND INCANDESCENTINV INVERTINTMED INTERMEDIATEINCL INCLUD(ED)JST JOISTJT JOINTJC JANITOR CLOSETKD KNOCKDOWNKP KICK PLATEKIT KITCHENKO KNOCKOUTLH LEFT HANDLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLAB LABORATORYLAM LAMINATELAV LAVATORYLBL LABELLKR LOCKER
GRAPHIC STANDARDS
OWNERDOUGLAS COUNTY SCHOOLDISTRICT RE-1620 WILCOX STREETCASTLE ROCK, CO 80104P:303.387.0100
ELECTRICALCEI CONSULTING ENGINEERS1710 CHAPEL HILLS DRIVECOLORADO SPRINGS, CO80920P:719.594.0022
ARCHITECTOZ ARCHITECTURE3003 LARIMER STREETDENVER, CO 80205
P:303.861.5704
ROOFINGSR+dK CONSULTANTS, INC.722 WASHINGTON AVE.GOLDEN, CO 80401
P:720.890.8974
PROJECT TEAMVICINITY MAP - COUGAR RUN
8780 Venneford Ranch RoadHighlands Ranch, CO 80126
COUGAR RUN
100% CD03.15.2013
BUILDING & CODE INFORMATION
GENERAL NOTES
1. DO NOT SCALE DRAWINGS. IF REQUIRED DIMENSION(S) ARE MISSING,REQUEST CLARIFICATION FROM ARCHITECT PRIOR TO STARTINGASSOCIATED PORTIONS OF WORK.
2. THE WORK SHOWN AS EXISTING CONDITIONS WAS TAKEN FROMOWNER-FURNISHED DRAWINGS BY DOUGLAS COUNTY SCHOOL DISTRICT.OZ ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANYINFORMATION OR THE ADEQUACY, SAFETY AND CONFORMANCE TOCURRENT PREVAILING CODES OF ANY WORK SHOWN AS EXISTING ON THEDOCUMENTS.
3. NOTIFY ARCHITECT IMMEDIATELY SHOULD CONDITIONS BE FOUNDCONTRADICTORY TO THESE DRAWINGS.
4. OBTAIN OWNER APPROVAL OF ANY ELECTRICAL POWER OUTAGESNECESSITATED BY CONSTRUCTION 48 HOURS PRIOR TO SHUT-DOWN.
5. PROVIDE AND MAINTAIN ACCESSIBLE ACCESS TO BUILDING FOR DURATIONOF CONSTRUCTION. CONTRACTOR TO COORDINATE WITH APPROPRIATEJURISDICTIONS FOR ANY TEMPORARY EGRESS NECESSARY DURINGCONSTRUCTION.
6. PROTECT ALL FURNITURE, FINISHES AND EQUIPMENT FROM DUST, DEBRISAND DAMAGE DUE TO WORK INVOLVED.
7. PATCH ALL AREAS AFFECTED BY DEMOLITION OR REPLACEMENT OF ITEMSTO MATCH ADJACENT SURFACES, WHETHER SPECIFICALLY MENTIONED INTHE DRAWINGS OR NOT.
8. UPON DISCOVERY OF HAZARDOUS MATERIALS ENCOUNTERED DURINGDEMOLITION, NOTIFY DESIGNER AND OWNER IMMEDIATELY AND AWAITFURTHER INSTRUCTIONS. THE WORK AREA SHALL BE COMPLETELYSEALED OFF DURING ABATEMENT
9. CONTRACTOR MUST COORDINATE MATERIALS STAGING, SITE ANDBUILDING ACCESS AND SECURITY MEASURES WITH THE OWNER.
DRAWING INDEX
0' 4' 16' 32' 64'8'PLAN NORTH TRUE NORTH
1/16" = 1'-0"1 COUGAR RUN CODE PLAN (SIM. BUFFALO RIDGE)
COUG
AR R
UN &
BUF
FALO
RID
GE
707
5 N
. Sho
reha
m D
rive
C
astle
Roc
k, C
O 8
0108
8780
Ven
nefo
rd R
anch
Roa
dH
ighl
ands
Ran
ch, C
O 8
0126
|
COUGAR RUN & BUFFALO RIDGEELEMENTARY SCHOOLS
7075 N. Shoreham Drive Castle Rock, CO 80108
8780 Venneford Ranch RoadHighlands Ranch, CO 80126 |
VICINITY MAP - BUFFALO RIDGE
ALT. CR-1BASE BID: PROVIDE AND INSTALL A FIRE ALARM SYSTEM ASDESCRIBED IN THE DOCUMENTS WITH SIMPLEX/GRINNELL AS THEMANUFACTURER AND FIRE ALARM CONTRACTOR.
ADD ALTERNATE BID: PROVIDE A FIRE ALARM SYSTEM ASDESCRIBED IN THE DOCUMENTS MANUFACTURED BY NOTIFIERAND INSTALLED BY FIRE DETECTION SYSTEMS, LLC.
ALT. CR-2BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300B, 400A, AND 400B, CORRIDORS 011, 021, AND031.
ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN RESTROOMS KINDERGARTEN 512A,KINDERGARTEN 513A, STAFF 500, HEALTH OFFICE 514C, HEALTHOFFICE TOILET 514.1C, AND KITCHEN 402E. RE. SPEC FORINCLUDED WORK.
ALT. CR-3BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300B, 400A, AND 400B, CORRIDORS 011, 021, AND031.
ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN RESTROOMS STAFF 500B, STAFFLOUNGE 509A, SPECIAL ED 508A. RE. SPEC FOR INCLUDED WORK.
ALT. CR-4BASE BID: DO NOT MAKE ANY CHANGES TO DOOR 405A.
ADD ALTERNATE BID: AT DOOR 405A, LEADING TO MULTI-PURPOSE ROOM 406, PROVIDE AND INSTALL MAGNETIC HOLDOPENS AS DESCRIBED IN THE DOCUMENTS.
ALT. CR-5BASE BID: DO NOT MAKE ANY CHANGES TO THE LIGHTING INRESTROOMS 100A, 100B, 200A, 200B, 300A, 300B, 400A, AND 400B.
AD ALTERNATE BID: IN RESTROOMS 100A, 100B, 200A, 200B, 300A,300B, 400A, AND 400B ADD EMERGENCY LIGHTING AS DESCRIBEDIN THE DOCUMENTS.
ALT. BR-1BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300, BHEALTH OFFICE 514C, AND HEALTH OFFICETOILET 514.1C, .
ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN KITCHEN 402A, STORAGE 402D,TOILET 402E, LAUNDRY 402F, AND PASSAGE 402H. RE. SPEC FORINCLUDED WORK.
ALT. BR-2BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300B, HEALTH OFFICE 514C, AND HEALTH OFFICETOILET 514.1C.
ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN STAFF 500A, STAFF 500B, ANDSPECIAL ED 508A. RE. SPEC FOR INCLUDED WORK.
ALT. BR-3BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300B, HEALTH OFFICE 514C, AND HEALTH OFFICETOILET 514.1C.
ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN 400A, 400B, KINDERGARTEN 512A,KINDERGARTEN 513A, AND STAFF LOUNGE 509A. RE. SPEC FORINCLUDED WORK.
ALTERNATE LIST
KNEE
FC
FC
FCBC COMP
KNEE
BC
FC
KNEE
COMP
A.V.
INSTR.
ELEC514.1D
KINDERGARTEN513
TOILET513A
TOILET514.1C
CORRIDOR008
CLOSET
WORK514D
A. PRIN.514E
PRIN.514B
CORRIDOR007
COMPUTER511
PASSAGE006
STOR.501B
TOIL.509A
SPECIAL ED.508
TOILET508A
CORRIDOR004
PASSAGE003
RES. OFFICE505
CUST.500C
CONF.503
COMMUNITY502
VESTIBULE001B
KITCHEN402A
TOIL.402E
CUST.402D
FREEZER402B
STORAGE402C
DINING/MUSIC PLATFORM402
STOR.402F
MUSIC403
MUSIC404
WOMEN400A
MEN400B
RAMP405
MULTI-PURPOSE406
CUSTODIAN408
OFFICE407
MECHANICAL406A
STORAGE406C
ELECTRICAL406B
VESTIBULE406E
STORAGE409
MEDIA CENTER501
TOIL.500B
HEALTH514C
GALLERIA001
CONFERENCE514A
OFFICE514
VESTIBULE001A
CLASSROOM306
GIRLS300A
BOYS300B
CLASSROOM305
CLASSROOM304
CORRIDOR032
CLASSROOM303
GROUP ROOM307
CLASSROOM301
CORRIDOR030
CLASSROOM302
L. D.507
KINDERGARTEN512
TOILET512A
OFFICE501A
TELEPHONE
TEACHER OFFICE510
SPEECH506
TOIL.500A
CHAIRS406D
READING ROOM308
CORRIDOR031
KILN
TEACHER LOUNGE509
PSYCH/OFF504
PASSAGE402F
INTERCOM
WATER HTR
STORAGE108
CORRIDOR010 CORRIDOR
012
CORRIDOR002
COR
CORR02
STORAGE208
CORRIDOR005
DOOR405A
P
12
14
OPQR
6
15
16
17
EGIKN
5.8
7
DEMO LEGEND
REMOVE FLOOR FINISH AND BASE FORNEW FLOORING.
REMOVE AND STORE TOILET PARTITIONFOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTER NEW FLOORING HASBEEN POURED.
REMOVE FLOOR MOUNTED PLUMBINGFIXUTRE FOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTERN NEW FLOORING HASBEEN POURED.
1 / AD2.11
1 / AD2.10
1 / AD2.111 / AD2.10
1.1
1.1
1.4
1.3
1.3
1.3
1.3
1.3
1.3
1.4
1.11.1
1.3
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0 1.0
1.0 1.0
THIS WORK IS PART OF ALT. CR-2
THIS WORK ISPART OF ALT. CR-2
THIS WORK IS PART OF ALT. CR-2
THIS WORK IS PARTOF ALT. CR-2
THIS WORK IS PARTOF ALT. CR-2
THIS WORK IS PARTOF ALT. CR-3
THIS WORK IS PARTOF ALT. CR-3
THIS WORK IS PARTOF ALT. CR-3
DEMO FLAGNOTES
REMOVE AND STORE FOR REINSTALLATION (E) FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) TOILET PARTITIONS FORDEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) CASEWORK/EQUP.REMOVE (E) VINYL SHEET FLOORING AND BASE. REMOVE ALL MATERIALTO STRUCTURAL FLOOR.REMOVE (E) CONTINUOUS EPOXY FLOORING AND BASE. REMOVE ALLMATERIAL
1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION2. (E) BULIDING, ITEMS, ETC. TO REMAIN ARE DENOTED LIGHTLY U.ON.,
ITEMS SHOWN DASHED OR BOLD SHALL BE REMOVED U.O.N.3. VERIFY ALL LOCATIONS OF PUBLIC AND PRIVATE, AND ON-SITE UTILITIES
BEFORE PROCEEDING.4. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION
INFORMATION.5. COORDINATE ALL DEMOLITION WORK WITH NEW CONSTRUCTION.
EXECUTE DEMOLITION AS REQUIRED TO COMPLETELY ACCOMMODATEWORK AS DELINEATED IN THE PLANS, DETAILS AND SPECIFICATIONS.
6. RELOCATION OF ALL FREESTANDING FURNITURE BY OWNER, U.O.N.7. ALL ELECT, MECH, FIRE ALARM, SECURITY AND PAGING SYSTEMS MUST
REMAIN OPERATIONAL WHILE BUILDING IS OCCUPIED ANDOPPERATIONAL.
8. ALL ITEMS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY ANDLEGALLY DISPOSED OF.
0' 2' 8' 16' 32'4'
PLAN NORTH TRUE NORTH
1/8" = 1'-0"1 DEMO FLOOR PLAN - AREA A
KEY PLAN - AREA A
513A
TOIL.509A
CORRIDOR004
RES. OFFICE
CUST.500C
TELEPHONE
TOIL.500A
WATER HTR
STORAGE108
CORRIDOR010 CORRIDOR
012
CORRIDOR002
CORRIDOR011
CLASSROOM102
CLASSROOM101
GROUP ROOM107
CLASSROOM103
CLASSROOM104
CLASSROOM105
BOYS100B
GIRLS100A
CLASSROOM106
CORRIDOR020
CORRIDOR022
STORAGE208 GROUP ROOM
207
CLASSROOM202
CLASSROOM203
CLASSROOM201
GIRLS200A
CLASSROOM204
CLASSROOM205
CORRIDOR021
BOYS200B
CLASSROOM206
CORRIDOR005
7
9
11
13
12
10
8
6
5
4
DEFHJMN GIK C B A
3
2
1
1 / A2.11
1 / A2.10
1 / A2.111 / A2.10
1.4
1.11.1
1.4
1.1
1.1
FLOOR SLIGHTLYRAISED AROUNDDRAIN.
1.01.0
1.0
1.0
DEMO LEGEND
REMOVE FLOOR FINISH AND BASE FORNEW FLOORING.
REMOVE AND STORE TOILET PARTITIONFOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTER NEW FLOORING HASBEEN POURED.
REMOVE FLOOR MOUNTED PLUMBINGFIXUTRE FOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTERN NEW FLOORING HASBEEN POURED.
DEMO FLAGNOTES
REMOVE AND STORE FOR REINSTALLATION (E) FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) TOILET PARTITIONS FORDEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) CASEWORK/EQUP.REMOVE (E) VINYL SHEET FLOORING AND BASE. REMOVE ALL MATERIALTO STRUCTURAL FLOOR.REMOVE (E) CONTINUOUS EPOXY FLOORING AND BASE. REMOVE ALLMATERIAL
1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION2. (E) BULIDING, ITEMS, ETC. TO REMAIN ARE DENOTED LIGHTLY U.ON.,
ITEMS SHOWN DASHED OR BOLD SHALL BE REMOVED U.O.N.3. VERIFY ALL LOCATIONS OF PUBLIC AND PRIVATE, AND ON-SITE UTILITIES
BEFORE PROCEEDING.4. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION
INFORMATION.5. COORDINATE ALL DEMOLITION WORK WITH NEW CONSTRUCTION.
EXECUTE DEMOLITION AS REQUIRED TO COMPLETELY ACCOMMODATEWORK AS DELINEATED IN THE PLANS, DETAILS AND SPECIFICATIONS.
6. RELOCATION OF ALL FREESTANDING FURNITURE BY OWNER, U.O.N.7. ALL ELECT, MECH, FIRE ALARM, SECURITY AND PAGING SYSTEMS MUST
REMAIN OPERATIONAL WHILE BUILDING IS OCCUPIED ANDOPPERATIONAL.
8. ALL ITEMS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY ANDLEGALLY DISPOSED OF.
KEY PLAN - AREA B
KNEE
FC
FC
FCBC COMP
KNEE
BC
FC
KNEE
COMP
A.V.
INSTR.
ELEC514.1D
KINDERGARTEN513
TOILET513A
TOILET514.1C
CORRIDOR008
CLOSET
WORK514D
A. PRIN.514E
PRIN.514B
CORRIDOR007
COMPUTER511
PASSAGE006
STOR.501B
TOIL.509A
SPECIAL ED.508
TOILET508A
CORRIDOR004
PASSAGE003
RES. OFFICE505
CUST.500C
CONF.503
COMMUNITY502
VESTIBULE001B
KITCHEN402A
TOIL.402E
CUST.402D
FREEZER402B
STORAGE402C
DINING/MUSIC PLATFORM402
STOR.402F
MUSIC403
MUSIC404
WOMEN400A
MEN400B
RAMP405
MULTI-PURPOSE406
CUSTODIAN408
OFFICE407
MECHANICAL406A
STORAGE406C
ELECTRICAL406B
VESTIBULE406E
STORAGE409
MEDIA CENTER501
TOIL.500B
HEALTH514C
GALLERIA001
CONFERENCE514A
OFFICE514
VESTIBULE001A
CLASSROOM306
GIRLS300A
BOYS300B
CLASSROOM305
CLASSROOM304
CORRIDOR032
CLASSROOM303
GROUP ROOM307
CLASSROOM301
CORRIDOR030
CLASSROOM302
L. D.507
KINDERGARTEN512
TOILET512A
OFFICE501A
TELEPHONE
TEACHER OFFICE510
SPEECH506
TOIL.500A
CHAIRS406D
READING ROOM308
CORRIDOR031
KILN
TEACHER LOUNGE509
PSYCH/OFF504
PASSAGE402F
INTERCOM
WATER HTR
STORAGE108
CORRIDOR010 CORRIDOR
012
CORRIDOR002
COR
CORR02
STORAGE208
CORRIDOR005
DOOR405A
P
12
14
OPQR
6
15
16
17
EGIKN
5.8
7
1 / A2.111 / A2.10
10.1
10.1
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
10.110.1
9.0
1 / A2.11
1 / A2.10
9.1
9.1
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0 10.0
10.0 10.0
THIS WORK IS PART OF ALT. CR-2
THIS WORK ISPART OF ALT. CR-2
THIS WORK IS PART OF ALT. CR-2
THIS WORK IS PARTOF ALT. CR-2
THIS WORK IS PARTOF ALT. CR-2
THIS WORK IS PARTOF ALT. CR-3
THIS WORK IS PARTOF ALT. CR-3
THIS WORK IS PARTOF ALT. CR-3
THIS WORK IS PARTOF ALT. CR-4
FLAGNOTES
PATCH/PREP. (E) SUB FLOOR FOR NEW MMA RESINOUS FLOOR.PARCH/REPAIR CRACKS IN (E) SUB FLOOR WITH MANUFACTURERAPPROVED PATCHING MATERIAL BEFORE APPLYING NEW MMARESINOUS FLOOR.REPLACE (E) FLOOR MOUNTED PLUMBING FIXTURES.REPLACE (E)TOILET PARTITIONS.
1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION.2. EXISTING BUILDING IS SHOWN AS LIGHT SHADED LINES.3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF
DOOR, UNLESS OTHERWISE NOTED.5. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR
MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND THEINTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISEON THE DRAWINGS.
6. TOUCH-UP WALLS & FINISHES AS NECESSARY WHERE BASE ISREPLACED.
7. PATCH/REPAIR CRACKS WITH MANUFACTURER APPROVED PATCHINGMATERIAL.
STRAIGHT SAW CUT 1/4" DEEP, ATPERIMETER OF FLOOR AREA TOPROVIDE EXTRA ADHEASION ATEDGES.
1/2"
MAX
.
1 1/2"
SEAMLESS RESIN COVEBASE
MMA, EPOXY RESINOUSFLOORING
(E) CONCRETE SUBFLOOR
(E) WALL
CO
VEH
EIG
HT
4"-6
"
1 / A2.11
1 / A2.11
1 / A2.10
9.0
10.110.1
9.010.1
10.1
9.1
9.1
10.010.0
10.0
10.0
THIS WORK IS PART OF ALT. CR-2
FLAGNOTES
PATCH/PREP. (E) SUB FLOOR FOR NEW MMA RESINOUS FLOOR.PARCH/REPAIR CRACKS IN (E) SUB FLOOR WITH MANUFACTURERAPPROVED PATCHING MATERIAL BEFORE APPLYING NEW MMARESINOUS FLOOR.REPLACE (E) FLOOR MOUNTED PLUMBING FIXTURES.REPLACE (E)TOILET PARTITIONS.
1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION.2. EXISTING BUILDING IS SHOWN AS LIGHT SHADED LINES.3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF
DOOR, UNLESS OTHERWISE NOTED.5. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR
MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND THEINTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISEON THE DRAWINGS.
6. TOUCH-UP WALLS & FINISHES AS NECESSARY WHERE BASE ISREPLACED.
7. PATCH/REPAIR CRACKS WITH MANUFACTURER APPROVED PATCHINGMATERIAL.
8. RE: SHEET A2.11 FOR TYPICAL FLOOR DETAILS.
3" = 1'-0"2
TRANSITION @ (E) FLOOR ANDEPOXY RESINOUS FLOORING
3" = 1'-0"3 EPOXY BASE
0' 2' 8' 16' 32'4'
PLAN NORTH TRUE NORTH
1/8" = 1'-0"1 FLOOR PLAN - AREA B
KEY PLAN - AREA B
3" = 1'-0"4 SUBFLOOR CRACK REPAIR
3" = 1'-0"5 FLOOR DRAIN WITH REPAIR
15
15
300B 300A
KNEE
FC
FC
FCBCCOMP
KNEE
BC
FC
KNEE
COMP
A.V.
INSTR.
ELEC
KINDERGARTEN513
TOILET513A
TOILET514.1C
CORRIDOR
CLOSET
WORK514D
A. PRIN.514B
PRIN.514A
CORRIDOR
COMPUTER511
PASSAGE
STOR.
TOIL.509A
SPECIAL ED.508
TOILET508A
CORRIDOR
PASSAGE
RES. OFFICE505
CUST.
CONF.503
COMMUNITY502
VESTIBULE
KITCHEN402A
TOIL.402E
CUST.402G
FREEZER402C
STORAGE402D
DINING/MUSIC PLATFORM402
STOR.
MUSIC403
MUSIC404
WOMEN400A
MEN400B
RAMP
MULTI-PURPOSE406
CUSTODIAN
OFFICE407
MECHANICAL
STORAGE
ELECTRICAL
VESTIBULE
STORAGE
MEDIA CENTER501
TOIL.500B
HEALTH514C
GALLERIA
CONFERENCE514E
OFFICE514
VESTIBULE
CLASSROOM306
GIRLS300A
BOYS300B
CLASSROOM305
CLASSROOM304
CORRIDOR
CLASSROOM303
GROUP ROOM307
CLASSROOM301
CORRIDOR
CLASSROOM302
L. D.507
KINDERGARTEN512
TOILET512A
OFFICE
TELEPHONE
TEACHER OFFICE510
SPEECH506
TOIL.500A
CHAIRS
STORAGE
CORRIDOR
KILN
TEACHER LOUNGE509
PSYCH/OFF504
PASSAGE402H
INTERCOM
WATER HTR
STORAGE CORRIDORCORRIDOR
CORRIDOR
ORRIDOR
CORRIDOR
STORAGE
M
CORRIDOR
F.S. ROOM
REF.402B
CUST.
LAUNDRY402F
P
14
O P Q R
15
16
17
E G I K N
5.8
DEMO LEGEND
REMOVE FLOOR FINISH AND BASE FORNEW FLOORING.
REMOVE AND STORE TOILET PARTITIONFOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTER NEW FLOORING HASBEEN POURED.
REMOVE FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTERN NEW FLOORING HASBEEN POURED.
1.3
1 / AD2.11
1 / AD2.10
1 / AD2.111 / AD2.10
1.3
1.3
1.3
1.3
1.1
1.1
1.5 1.2
1.3
1.11.1
1.3
1.3
1.2
1.3
1.0
1.0
1.0
1.0
1.01.0
1.0
1.0
1.0
1.0
1.0
THIS WORK ISPART OF ALT.BR-1
THIS WORK IS PART OF ALT. BR-2
THIS WORK IS PARTOF ALT. BR-2
THIS WORK IS PARTOF ALT. BR-2
THIS WORK IS PARTOF ALT. BR-3
THIS WORK IS PARTOF ALT. BR-3
THIS WORK IS PARTOF ALT. BR-3
THIS WORK IS PARTOF ALT. BR-3
DEMO FLAGNOTES
REMOVE AND STORE FOR REINSTALLATION (E) FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) TOILET PARTITIONS FORDEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) CASEWORK/EQUP.REMOVE (E) VINYL SHEET FLOORING AND BASE. REMOVE ALL MATERIAL TOSTRUCTURAL FLOOR.REMOVE (E) CONTINUOUS EPOXY FLOORING AND BASE. REMOVE ALLMATERIAL TO STRUCTURAL FLOOR.REMOVE (E) CEMENTITIOUS FLOORING AND BASE. REMOVE ALL MATERIALTO STRUCTURAL FLOOR.
1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION2. (E) BULIDING, ITEMS, ETC. TO REMAIN ARE DENOTED LIGHTLY U.ON.,
ITEMS SHOWN DASHED OR BOLD SHALL BE REMOVED U.O.N.3. VERIFY ALL LOCATIONS OF PUBLIC AND PRIVATE, AND ON-SITE UTILITIES
BEFORE PROCEEDING.4. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION
INFORMATION.5. COORDINATE ALL DEMOLITION WORK WITH NEW CONSTRUCTION.
EXECUTE DEMOLITION AS REQUIRED TO COMPLETELY ACCOMMODATEWORK AS DELINEATED IN THE PLANS, DETAILS AND SPECIFICATIONS.
6. RELOCATION OF ALL FREESTANDING FURNITURE BY OWNER, U.O.N.7. ALL ELECT, MECH, FIRE ALARM, SECURITY AND PAGING SYSTEMS MUST
REMAIN OPERATIONAL WHILE BUILDING IS OCCUPIED ANDOPPERATIONAL.
8. ALL ITEMS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY ANDLEGALLY DISPOSED OF.
0' 2' 8' 16' 32'4'
PLAN NORTH TRUE NORTH 1/8" = 1'-0"1 DEMO FLOOR PLAN - AREA A
KEY PLAN - AREA A
TOIL.509A
CORRIDOR
PASSAGE
RES. OFFICE505
CUST.
CONF.503
TELEPHONE
TOIL.500A
WATER HTR
STORAGE CORRIDORCORRIDOR
CORRIDOR
CORRIDOR
CLASSROOM102
CLASSROOM101
GROUP ROOM107
CLASSROOM103
CLASSROOM104
CLASSROOM105
BOYS100B GIRLS
100A
CLASSROOM106
CORRIDOR
CORRIDOR
STORAGEGROUP ROOM
207
CLASSROOM202
CLASSROOM203
CLASSROOM201
GIRLS200A
CLASSROOM204
CLASSROOM205
CORRIDOR
BOYS200B
CLASSROOM206
CORRIDOR
7
9
11
13
12
10
8
6
5
4
D E F H J M NG I KCBA
3
2
1
1 / AD2.11
1 / AD2.10
1 / AD2.111 / AD2.10
1.3
1.1 1.1
1.3
1.1
1.3
1.0
1.0
1.01.0
DEMO LEGEND
REMOVE FLOOR FINISH AND BASE FORNEW FLOORING.
REMOVE AND STORE TOILET PARTITIONFOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTER NEW FLOORING HASBEEN POURED.
REMOVE FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTERN NEW FLOORING HASBEEN POURED.
DEMO FLAGNOTES
REMOVE AND STORE FOR REINSTALLATION (E) FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) TOILET PARTITIONS FORDEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) CASEWORK/EQUP.REMOVE (E) VINYL SHEET FLOORING AND BASE. REMOVE ALL MATERIAL TOSTRUCTURAL FLOOR.REMOVE (E) CONTINUOUS EPOXY FLOORING AND BASE. REMOVE ALLMATERIAL TO STRUCTURAL FLOOR.REMOVE (E) CEMENTITIOUS FLOORING AND BASE. REMOVE ALL MATERIALTO STRUCTURAL FLOOR.
1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION2. (E) BULIDING, ITEMS, ETC. TO REMAIN ARE DENOTED LIGHTLY U.ON.,
ITEMS SHOWN DASHED OR BOLD SHALL BE REMOVED U.O.N.3. VERIFY ALL LOCATIONS OF PUBLIC AND PRIVATE, AND ON-SITE UTILITIES
BEFORE PROCEEDING.4. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION
INFORMATION.5. COORDINATE ALL DEMOLITION WORK WITH NEW CONSTRUCTION.
EXECUTE DEMOLITION AS REQUIRED TO COMPLETELY ACCOMMODATEWORK AS DELINEATED IN THE PLANS, DETAILS AND SPECIFICATIONS.
6. RELOCATION OF ALL FREESTANDING FURNITURE BY OWNER, U.O.N.7. ALL ELECT, MECH, FIRE ALARM, SECURITY AND PAGING SYSTEMS MUST
REMAIN OPERATIONAL WHILE BUILDING IS OCCUPIED ANDOPPERATIONAL.
8. ALL ITEMS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY ANDLEGALLY DISPOSED OF.
KEY PLAN - AREA B
KNEE
FC
FC
FCBCCOMP
KNEE
BC
FC
KNEE
COMP
A.V.
INSTR.
ELEC
KINDERGARTEN513
TOILET513A
TOILET514.1C
CORRIDOR
CLOSET
WORK514D
A. PRIN.514B
PRIN.514A
CORRIDOR
COMPUTER511
PASSAGE
STOR.
TOIL.509A
SPECIAL ED.508
TOILET508A
CORRIDOR
PASSAGE
RES. OFFICE505
CUST.
CONF.503
COMMUNITY502
VESTIBULE
KITCHEN402A
TOIL.402E
CUST.402G
FREEZER402C
STORAGE402D
DINING/MUSIC PLATFORM402
STOR.
MUSIC403
MUSIC404
WOMEN400A
MEN400B
RAMP
MULTI-PURPOSE406
CUSTODIAN
OFFICE407
MECHANICAL
STORAGE
ELECTRICAL
VESTIBULE
STORAGE
MEDIA CENTER501
TOIL.500B
HEALTH514C
GALLERIA
CONFERENCE514E
OFFICE514
VESTIBULE
CLASSROOM306
GIRLS300A
BOYS300B
CLASSROOM305
CLASSROOM304
CORRIDOR
CLASSROOM303
GROUP ROOM307
CLASSROOM301
CORRIDOR
CLASSROOM302
L. D.507
KINDERGARTEN512
TOILET512A
OFFICE
TELEPHONE
TEACHER OFFICE510
SPEECH506
TOIL.500A
CHAIRS
STORAGE
CORRIDOR
KILN
TEACHER LOUNGE509
PSYCH/OFF504
PASSAGE402H
INTERCOM
WATER HTR
STORAGE CORRIDORCORRIDOR
CORRIDOR
DOR
RIDOR
STORAGE
CORRIDOR
F.S. ROOM
REF.402B
CUST.
LAUNDRY402F
P
12
14
O P Q R
6
15
16
17
E G I K N
5.8
7
1 / A2.11
1 / A2.10
1 / A2.111 / A2.10
9.0
9.0
9.0
9.0
9.0
10.1
10.1
9.0
9.0
10.1
9.0
9.0
9.0
9.1
11
11
10.0
10.0
10.0
10.0
10.010.0
10.0
10.0
10.0
10.0
10.1
10.0
THIS WORK ISPART OF ALT.BR-1
THIS WORK IS PART OF ALT. BR-2
THIS WORK IS PARTOF ALT. BR-2
THIS WORK IS PARTOF ALT. BR-2
THIS WORK IS PARTOF ALT. BR-3
THIS WORK IS PARTOF ALT. BR-3
THIS WORK IS PARTOF ALT. BR-3
THIS WORK IS PARTOF ALT. BR-3
FLAGNOTES
PATCH/PREP. (E) SUB FLOOR FOR NEW MMA RESINOUS FLOOR .PARCH/REPAIR CRACKS IN (E) SUB FLOOR WITH MANUFACTURERAPPROVED PATCHING MATERIAL BEFORE APPLYING NEW MMARESINOUS FLOOR.REPLACE (E) FLOOR MOUNTED PLUMBING FIXTURES.REPLACE (E)TOILET PARTITIONS.REPLACE (E) CASEWORK/EQUIP.
1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION.2. EXISTING BUILDING IS SHOWN AS LIGHT SHADED LINES.3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF
DOOR, UNLESS OTHERWISE NOTED.5. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR
MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND THEINTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISEON THE DRAWINGS.
6. TOUCH-UP WALLS & FINISHES AS NECESSARY WHERE BASE ISREPLACED
7. PATCH/REPAIR CRACKS WITH MANUFACTURER APPROVED PATCHINGMATERIAL.
STRAIGHT SAW CUT 1/4" DEEP,AT PERIMETER OF FLOOR AREATO PROVIDE EXTRA ADHEASIONAT EDGES.
1/2"
MAX
.
1 1/2"
1 / A2.11
1 / A2.10
1 / A2.111 / A2.10
9.0
10.1 10.1
10.1
9.0
10.1
10.0
10.0
10.010.0
FLAGNOTES
PATCH/PREP. (E) SUB FLOOR FOR NEW MMA RESINOUS FLOOR .PARCH/REPAIR CRACKS IN (E) SUB FLOOR WITH MANUFACTURERAPPROVED PATCHING MATERIAL BEFORE APPLYING NEW MMARESINOUS FLOOR.REPLACE (E) FLOOR MOUNTED PLUMBING FIXTURES.REPLACE (E)TOILET PARTITIONS.REPLACE (E) CASEWORK/EQUIP.
1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION.2. EXISTING BUILDING IS SHOWN AS LIGHT SHADED LINES.3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF
DOOR, UNLESS OTHERWISE NOTED.5. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR
MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND THEINTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISEON THE DRAWINGS.
6. TOUCH-UP WALLS & FINISHES AS NECESSARY WHERE BASE ISREPLACED
7. PATCH/REPAIR CRACKS WITH MANUFACTURER APPROVED PATCHINGMATERIAL.