Page 1: Costing PPT

CA P. Kamthekar 1

Cost & Management Accounting Cost & Management Accounting

presented by

CA Pradeep D. KamthkarM.Com., F.C.A., SET

Page 2: Costing PPT

CA P. Kamthekar 2

Terminology of Cost :Terminology of Cost :Cost classification by elements, variability, cash

flow etc.

By Elemensts :

Material Cost

Labour Cost

Expenses

Page 3: Costing PPT

CA P. Kamthekar 3

Terminology of Cost :Terminology of Cost :

Material Cost :

The substance from which the product is made is known as

material. The cost incurred for same is known as material

cost.

Labour Cost :

For conversion of materials into finished goods, human effort

is needed, such human effort is called as labour. The cost

incurred for same is known as labour cost.

Expenses :

Any other cost besides material and labour is termed as

expense.

Page 4: Costing PPT

CA P. Kamthekar 4

Terminology of Cost :Terminology of Cost :

By Variability :

Direct Cost

Indirect Cost

Page 5: Costing PPT

CA P. Kamthekar 5

Terminology of Cost :Terminology of Cost :

Direct Cost :

The cost which varies directly with the production activity is

called as direct cost.

Direct cost can be

Direct Material Cost

Direct Labour Cost

Direct Expenses

Page 6: Costing PPT

CA P. Kamthekar 6

Terminology of Cost :Terminology of Cost :Direct Material Cost :

All materials which becomes an integral part of the finished

product and which can be conveniently assigned to specific

physical units is termed as

“Direct Material”. Following are some of the examples of direct

material :

All materials or components specifically purchased,

produced or

relinquished from stores.

Primary packing material (e.g. carton, wrapping, cardboard

boxes etc.

Purchased or partly produced components.

Page 7: Costing PPT

CA P. Kamthekar 7

Terminology of Cost :Terminology of Cost :Direct Labour Cost :

Labour which takes an active and direct part in the production of a

particular commodity is called direct labour. Direct labour cost are

therefore, specifically and conveniently traceable to specific

products.

Page 8: Costing PPT

CA P. Kamthekar 8

Terminology of Cost :Terminology of Cost :Direct Expenses :

These are expenses which can be directly, conveniently and wholly

allocated to specific cost centres or cost units.

Examples of such expenses are : hire of some specific machinery

required for a particular contract, cost of defective work incurred in

connection with a particular job or contract etc.

Page 9: Costing PPT

CA P. Kamthekar 9

Terminology of Cost :Terminology of Cost :

Indirect Cost :

The cost which does not vary directly with the production

activity is called as indirect cost.

Indirect cost can be

Indirect Material Cost

Indirect Labour Cost

Indirect Expenses (Overheads)

Page 10: Costing PPT

CA P. Kamthekar 10

Terminology of Cost :Terminology of Cost :

Indirect Material Cost :

All material which is used for purpose ancillary to the business and

which cannot be conveniently assigned to specific physical units is

termed as “Indirect material cost.”

Consumable stores, oil and waste, printing & stationery material

etc. are a few examples of indirect material cost.

Page 11: Costing PPT

CA P. Kamthekar 11

Terminology of Cost :Terminology of Cost :

Indirect Labour Cost :

Labour employed for the purpose of carrying out tasks

incidental to goods, or services provided is indirect labour.

Such labour does not alter the construction, composition or

condition of the product. It cannot be practically traced to

specific units of output. Wages of store-keeper, foremen,

time-keeper, directors fees, salaries of salesman, etc., are

all examples of indirect labour costs.

Indirect labour may relate to the factory, the office or the

selling and distribution divisions.

Page 12: Costing PPT

CA P. Kamthekar 12

Terminology of Cost :Terminology of Cost :

Indirect Expenses (Overheads):

These are expenses which cannot be directly, conveniently

and wholly allocated to cost centres or cost units.

The examples of indirect expenses are rent, rates,

insurance, salaries, lighting charges, etc.

Page 13: Costing PPT

CA P. Kamthekar 13

Terminology of Cost :Terminology of Cost :Indirect expenses (overheads) are further divided into three divisions :1. Factory or Works overheads2. Office or Administration overheads3. Selling & Distribution overheads

1. Factory Overheads : Includes, a) Indirect material used in the factory such as lubricants, oil,

consumable stores etc. b) Indirect labour such as gate keeper’s salary, time keeper’s salary,

work manager’s salary, etc. c) indirect expenses such as factory rent, factory insurance,

factory lighting, etc.

Page 14: Costing PPT

CA P. Kamthekar 14

Terminology of Cost :Terminology of Cost :2. Office & Administration Overheads : Includes,

a) Indirect material used in the office such as printing and stationery

materials, brooms and dusters etc. b) Indirect labour such as salaries of office manager, office accountant,

clerks etc. c) Indirect expenses such as rent, insurance, lighting of the office,

etc.

3. Selling & Distributions Overheads : Includes,

a) Indirect material used such as packing material, printing and

stationery material etc. b) Indirect labour such as salaries of salesmen and sales manager etc.

c) Indirect expenses such as rent, insurance, advertising expenses etc.

Page 15: Costing PPT

CA P. Kamthekar 15

Terminology of Cost :Terminology of Cost : Prime Cost :

It consist of cost of direct material, direct labour and direct expenses. It isalso known as basic, first or flat cost.

Prime Cost = Direct Material + Direct Labour + Direct Expenses

Question : 1Calculate the Prime Cost from the following particulars of an optical manufacturer :

Rs.Cost of lens purchases 10,000Cost of frames purchased 2,000Cost of screws 200Wages paid for manufacturing opticals 4,000Hire of a special machine 800

Page 16: Costing PPT

CA P. Kamthekar 16

Terminology of Cost :Terminology of Cost : Direct Material Consumed :

The term “Direct Mateial” here refers to “cost of direct materials consumed”.It is not necessary that all materials purchased during a period are consumed during the same period. Some materials may remain in stock. Hence. Cost of materials consumed will have to be ascertained by making appropriate adjustments for opening and closing stock of materials.

Direct Material Consumed = Opening Stock + Purchases – Closing Stock

Question : 2From the following compute the value of raw materials consumed.

Rs.Raw Materials purchased 50,000Opening Stock of materials 10,000Closing Stock of materials 10,500

Page 17: Costing PPT

CA P. Kamthekar 17

Terminology of Cost :Terminology of Cost : Factory (Works) Cost :

It comprises of prime cost plus works or factory overheads. This cost is also known as Works Cost, Production or Manufacturing Cost.Works Cost = Prime Cost + Factory OverheadsQuestion : 3Calculate the Factory Cost from the following particulars of an optical manufacturer :

Rs.Material consumed 50,000Productive wages 30,000Unproductive wages 13,000Salary of factory manager 12,000Consumable spares 6,000Rent of factory premises 9,000Machine depreciation and repairs 7,500Oil, grease etc. 4,500Salary of factory clerks 5,000

Page 18: Costing PPT

CA P. Kamthekar 18

Terminology of Cost :Terminology of Cost : Adjustment for Scrap :

Scrap is the incidental residue from certain types of manufacturing operations usually of small amount and low value, recoverable without further processing. The amount realised from sale of scrap should be deducted either from works overheads or gross works cost.

In case of certain materials (before being used) are found to be defective and, therefore sold, the value of materials used should be reduced by the cost of such materials. Any loss on the same should be charged to costing profit and loss account.

Adjustment for Work-in-progress :Work-in-progress means units which are not yet complete but on which some work has been done. Thus, it represents goods which are in the process of manufacturing. Generally such goods bear a proportionate part of factory overheads besides prime cost and, therefore, opening and closing stock of work-in-progress are taken into consideration in the cost sheet while computing the works cost of goods manufactured during the year.

Page 19: Costing PPT

CA P. Kamthekar 19

Terminology of Cost :Terminology of Cost :Question : 4

From the following calculate the Works Cost :

Rs.Materials Purchased 60,000Materials : Opening Stock 13,000

: Closing Stock 11,000Productive Labour 40,000Unproductive Labour 25,000Direct Expenses 10,000Factory Managers Salary 50,000Factory Machinery : Depreciation 18,000Oil & Grease 6,000Work-in-progress : Opening Stock 10,000

: Closing Stock 8,000Sale of scrap 3,000

Page 20: Costing PPT

CA P. Kamthekar 20

Terminology of Cost :Terminology of Cost : Office Cost (Cost of goods produced) :

If office and administrative overheads are added to factory cost, office cost is arrived at. This is also termed as administrative cost or cost of production.The inclusion of office and administration overheads in the cost of production is based on the presumption that such overheads solely relate to production. Office Cost = Factory Cost + Office & Administration overheads

Question : 5From the following particulars compute the Cost of Production of the product :

Rs.Material consumed 12,400Labour employed 9,700Salary of inspector engaged on this product 4,500Proportionate lighting and heating (factory & office 3:2) 3,000Proportionate depreciation, repairs and rent (50% factory) 2,400Municipal taxes and insurance of building (40% office) 1,800

Page 21: Costing PPT

CA P. Kamthekar 21

Terminology of Cost :Terminology of Cost : Adjustment for Finished Goods Stocks to ascertain

Cost of goods produced & sold :In the cost of production relating to a particular commodity or unit of production, the opening stock of finished goods is added and closing stock is substracted to find out the cost of goods sold.

Stock of finished goods is generally valued at the total cost of production.

Question : 6From the following calculate the Cost of Production of goods sold.

Rs.

Cost of Production 1,00,000

Opening Stock of Finished Goods 17,500

Closing Stock of Finished Goods 15,000

Page 22: Costing PPT

CA P. Kamthekar 22

Terminology of Cost :Terminology of Cost : Total Cost or Cost of Sales :

Total cost is ascertained by adding selling and distribution overheads to Cost of Production of goods sold.Total Cost (Cost of Sales) = Cost of Production of goods sold + Selling &

Distribution overheads

Question : 7From the following calculate the Cost of Sales of goods sold.

Rs.Cost of goods produced & sold 1,15,000Salesman’s Salary 16,000Sales Department Stationery 2,500Depreciation on Delivery Van 14,000Salesman’s Commission 3,600

Page 23: Costing PPT

CA P. Kamthekar 23

Terminology of Cost :Terminology of Cost : Computation of Profit :

While preparing a cost sheet may have to be calculated either as a percentage of cost or as a percentage of selling price. This can be given in different ways as given below :Example (1) Cost price is Rs. 20,000Profit is 10% on costSolution :First take cost price as Rs. 100. Then the profit will be 10% on Rs. 100, i.e.Rs.10. Therefore, the profit on a cost of Rs. 20,000 will be :20,000 x 10/100 = 2,000

Example (2) Cost price is Rs. 27,000Profit is 10% on Selling PriceSolution :First take selling price as Rs. 100. Then the profit will be 10% on Rs. 100, i.e.Rs.10. So the cost will become (100 – 10) Rs. 90. Therefore, the profit on a cost of Rs. 27,000 will be :27,000 x 10/90 = 3,000

Page 24: Costing PPT

CA P. Kamthekar 24

Terminology of Cost :Terminology of Cost : Computation of Profit :

Example (3) Selling price is Rs. 44,000Profit is 10% on costSolution :First take cost price as Rs. 100. Then the profit will be 10% on Rs. 100, i.e.Rs.10. So the selling price will become (100 + 10) Rs. 110.Therefore, the profit on a selling price of Rs. 44,000 will be :44,000 x 10/110 = 4,000

Example (4) Selling price is Rs. 50,000Profit is 10% on Selling PriceSolution :First take selling price as Rs. 100. Then the profit will be 10% on Rs. 100, i.e.Rs.10. Therefore, the profit on a selling price of Rs. 50,000 will be :50,000 x 10/100 = 5,000