▪ Cost Basis: $30,468,138 ▪ Accelerated: $28,655,376 (94%) ▪ 1st Year Savings: Over $1,812,000* ▪ 10-Year NPV Savings: Over $6,870,000** NEW CONSTRUCTION Carbon Fiber Plant ▪ Cost Basis: $34,437,006 ▪ Accelerated: $10,152,361 (29.5%) ▪ 1st Year Savings: Over $153,000* ▪ 10-Year NPV Savings: Over $2,420,000** NEW CONSTRUCTION Food Manufacturing Plant ▪ Cost Basis: $136,214,739 ▪ Accelerated: $121,742,226 (89.4%) ▪ 1st Year Savings: Over $9,240,000* ▪ 10-Year NPV Savings: Over $33,680,000** NEW CONSTRUCTION Carbon Fiber Plant ▪ Cost Basis: $21,033,993 ▪ Accelerated: $20,559,232 (97.7%) ▪ 1st Year Savings: Over $313,000* ▪ 10-Year NPV Savings: Over $4,850,000** NEW CONSTRUCTION Oil Refinery “ cost segregation studies underway.” Jerry B. | CPA COST SEGREGATION STUDIES INDUSTRIAL * Estimate of first year savings based on a 40% tax rate. ** Estimate of 10-yr net present value savings based on a 40% tax rate and 8% discount rate. 800.257.8962 | www.bedfordteam.com