Top Banner
Cost Estimating Phase II Group Members: •Gilliland, John •Goodell, Christopher •Jemison, Jennifer •Longden, Katherine •Oliveira, Nickolas
11

Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Dec 17, 2015

Download

Documents

Carmel Hudson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Cost Estimating Phase II

Group Members:•Gilliland, John

•Goodell, Christopher•Jemison, Jennifer •Longden, Katherine•Oliveira, Nickolas

Page 2: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Alternative AEstimated at $3,280,000

Included in Estimate: Not Included in Estimate:• 11,048 S.F. of Heated

Walkways with storm water• 2 Pedestrian Bridges• 2762 L.F. of 24” retaining

wall• 1500 L.F. of Trenching and

Electric Utilities• Permitting• Band Stand

• Landscaping

Page 3: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Alternative BEstimated at $3,770,000

Included in Estimate: Not Included in Estimate:• 15,200 S.F. of Heated

Walkways with Storm Water• 1 Pedestrian Bridge• 3750 L.F. of 24” retaining

wall• 13 Pods• 2000 L.F. of Trenching and

Electric Utilities• Permitting• Band Stand

• Landscaping

Page 4: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Pod Design Estimated at $620,000

Included in Estimate: Not Included in Estimate:• 6,500 S.F. of Heated

Walkways• 325 L.F. of 24” retaining

wall• 325 L.F. of 36” retaining

wall• 26 Park Benches (2 & 3

seat)

• Landscaping

Page 5: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Band Stand Design

Rough estimate: $200,000

Page 6: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Environmental & Permitting

• The application cost, for fourteen of the twenty – eight permits needed, is $56,675

Page 7: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Cost and Benefit AnalysisHeated Sidewalks vs. Sidewalk Maintenance

Page 8: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Cost AnalysisHeated Sidewalks vs. Sidewalk Maintenance

Heated Sidewalks Sidewalk MaintenanceInstallation costs:• Equipment/Source: $20/sq ft• Transmission: $6.67/sq ft• Distribution: $3.33/sq ft

Annual costs:• Gas: $1725/sq ft/yr• Electricity: $1500/yr

Maintenance costs:• Maintenance: $7000/yr

Maintenance costs:• Private Sidewalk

Clearance– Including materials

• Estimate: $1.71/sq ftCRW’s estimates were for Anchorage Downtown Street Sidewalks, may include miscellaneous non-applicable costs.

CRW’s info from Downtown Core Streets Streetscape Plan (2007).

Page 9: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.
Page 10: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Benefit Analysis

Heated Sidewalks• Extend life of landscaping,

lighting, benches & trash cans– Reduced use of

salts/chemicals• Longer useful life

– No exposure to snow removal equipment

• Walking conditions are safer– Reduces liability

• Cleaner exhibit areas– Less gravel/salt dragged in

• More environmentally friendly

Sidewalk Maintenance• Established municipality

relationships with contractors

• No ice-buildup on sides• Less materials needed for

construction– No insulation required

• Less mechanical maintenance required

Page 11: Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas.

Questions

“Life is just one, long high-five: Hindu holy man Baba Hath Khada — last seen at the Ardh Kumbh mela in Allahabad, India — has kept one arm raised over his head for nearly two decades. Why we don’t know.” -AP