e 9281BUREAU OF MINES
INFORMATION CIRCULAR 1991
Cost Benefit Analysis of Computer-Assisted Mining Through Productionand Cost Modeling
By Suresh K Bhatt
UNITED STATES DEPARTMENT OF THE INTERIOR
Page 2
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 2/47
U S Bureau o MinesSpok ne R e ~ p ? r ~ , . h n t
. v il l
" .
l, " .
Mission: As the Nation s principal conservation
agency, the Department of the Interior has respon-
sibility for most of our nationally-owned publiclands and natural and cultural resources . This
includes fostering wise use of our land and water
resources, protecting our fish and wildlife, pre-
serving the environmental and cultural values of
our national parks and historical places, and pro-
viding for the enjoyment of life through outdoor
recreation, The Department assesses our energy
and mineral resources and works to assure that
their development is in the best interests of all
our people. The Department also promotes the
goals of the Take Pride in America campaign by
encouraging stewardship and citizen responsibil-
ity for the publi c lands and promoting citizen par-ticipation in their care. The Department also has
a major responsibility for American Indian reser-
vation communities and for people who live in
Island Territories under U.S. Administration.
Page 3
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 3/47
Information ircular 9281
Cost Benefit Analysis of Computer-
Assisted Mining Through Productionand Cost Modeling
By Suresh K Bhatt
UNITED STATES DEPARTMENT OF THE INTERIOR
Manuel Lujan Jr. Secretary
BUREAU OF MINES
T S Ary Director
Page 4
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 4/47
Library o Congress Cataloging in Publication Data:
Bhatt, S. K Suresh K..
Cost-benefit analysis of computer-assisted mining through production and cost
modeling / by S K Bhatt.
p. cm . - Information circular / Bureau of Mines; 9281)
Includes bibliographical references.
Supt. of Docs. no.: I 28 .27:9281
1 Mining engineering ·Automati on-Cost effectiveness. 2 Mining engineering
Cost effectiveness. I Title. II. Series: Information circular United States. Bureau
of Mines); 9281 .
TN29S.U4 [TN276] 622 s dc20 [622] 90-22024 rp
Page 5
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 5/47
CONTENTS
age
Abstract. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Acknowledgments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2Base criteria and parameters for mining scenarios . . . . . . . . . . . . 2
General mine description . 2
Surface facilities and arrangements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Mining methods and equipment 3
Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Base production and cost models and mining scenarios 3
Mine production model . . 3
Mine cost model . . 5
Mining scenarios for computer assisted mining . 5
Cost benefit analysis for computer assisted mining . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Conclusions . . 8
Appendix A Glossary for production and cost models for appendixes Band C 9
Appendix B. Computer printouts of base production and cost models data 10Appendix C. Computer printouts of improvement models production and cost data . 12
ILLUSTR TION
1 Relationship of productivity and cost of mining. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
T BLES
1 Example of the number of UMWA mine personnel 3
2 Summary of results of 15 production and cost models compared with base case . . . . . . . . . . . . . . . . . . . 7
Page 6
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 6/47
t
in
min
UN T OF ME SURE BBREVI TIONS USED IN THIS REPORT
foot
hour
inch
minute
st
st min
short ton
short tOll per minute
stjworker-day short to per worker-day
/st dollar per short ton
Page 7
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 7/47
COST BEN ANALYSIS OF COMPUTER ASSISTED MININGTHROUGH PRODUCTION AND COST MODELING
By Suresh K Bhatt1
ABSTRACT
A mathematically simulated modeling s used n this U.S. Bureau of Mines to
represent a hypothetical with mining technology and prevalent costs.
Mining scenarios were and evaluated for potential benefits and costs available through
computer-assisted and methodology are described.
IMining engineer Pittsburgh Research Center U.S. Bureau o Mines Pittsburgh PA.
Page 8
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 8/47
Page 9
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 9/47
a of overland A number of sediment-
ation ponds are situated the general mine vicinity.
Trucks are used to coal to the as an
alternate mode. Trucks are also used to refuse
material from the plant to the dumping areas. Electric
power to the complex is supplied from the nearby
power station.
MINING METHODS AND EQUIPMENT
The mining include of main head-
submains, panels, and butt for room
and pillaring. At present, no Iongwall or mmmg is
being conducted. Full roof bolting is practiced throughout
the mine. A two-shuttle-car is used for face coal
haulage. All section belts are 36 in wide and equipped
with feeders. ventilates the wo,rklng
sections. Mining section models are standard-
ized and typically include one Lee Norse 265 HH continuous miner and one Stamler BF-2 feeder.
3
PERSONNEL
A section crew consists of a continuous miner o p ( ~ r a t o r ,continuous miner helper, two shuttle car one
roof bolter, one roof bolter helper, one utility person, and
a mechanic-electrician (total eight). Each section has a
Other UMWA personnel include general
general outside, maintenance, and preparation.
Table 1 gives the UMWA personnel breakdown work
rlltf' .IJI'rv for the mine.
Table 1.-Example of the number
of UMWA mine personnel,by work category
Work category
Section .... . ....... , 96
General inside ........... 32
Maintenance ...... ,. .... 24
Preparation . . , . . . . . ... 25
General outside ,.,., ..... . -1Total 185
BASE PRODUCTION AND COST MODELS AND MINING SCENARIOS
The mine is simulated through the two math-
ematical models, production and cost, utilizing a
I-year and shown by B. Five COIltinU01JS
miners are set for in the following areas:
1) sections 1 and 2 two units in seven-heading
(2) section 3 one unit in three-heading longwall devel
OPlnellt section, (3) section 4 one unit in t l v e : - h ~ a d i n gsut)m:ams, (4) section 5 one unit in room-and-pillar devel
oplnellt section, and (5) &--one unit for
mine construction work.
The following relate to the models
(appendixes B and C) entitled "Mine Production Model
by Continuous Miner Section" and "Cost of Mining
Statement." Various scenarios, which will be con-
sidered in potential analysis for computer-
assisted mining, are also described.
MINE PRODUCTION MODEL
The model rerlre ients a six-section (including construction) mine 504,458 st of clean coal annually.
Most of the items are self-explanatory; however, those
needing defined and include
the me'tholdo\l)gy obtaining them.
Minutes per shift.-Scheduled production shift is 8 h or
480 min.
Travel time. This period includes man-trip in and man
trip out. in is total time to travel from mine
portal to dinner hole in a excluding any
major but including in mantrip cars and
walking. Similarly, man-trip out is time from dinner
hole in the section to the outside (mine portal) and in-
cludes for mantrip and from the dinner
hole to the car, but excludes major
unch time . - I t is normally 30 min. I f a crew is relieved
for lunch, the time for lunch would be zero.
Service time. It is the scheduled maintenance time for
of section during a Pf(Jdtlctlon
shift. In this case, it is with another work ele-
"c l;:arlUp and prepare to mine," described
Rel'na.fnif1 g operating time. Total shift minutes (480)
minus
next
for
lunch, and service time give this value. The
category in the model is downtime
equipment items and mining conditions.
EqllllIJml::nt delays and mine conditions that dis
rupt the production cycle are listed. These can be
due to mechanical breakdowns or other conditions render-
eqlllpiment unavailable for production. These delays
are referred to as the "section downtime." Itemsinclude continuous shuttle car (S.C.), section belt
conveyor, belt feeder, and section power Addi
tional roof control, if in the section because of
roof and rib conditions, comes under timber and rail
Other natural conditions such as floor heaving, rock bursts,
and water and mud in the roadways, are listed under
conditions safety-related delays are listed separately
if time is for the section e.g., in-
creasing to dilute excessive gas and conducting
safety checks on equipment and the in addition
Page 10
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 10/47
me:enng before the crew to the
After the hole, the
''''''r .c ,. holds a meeting discussing safety con
workers, actual accident findings, unsafe
work practices, or new regulations that may the
section safety.
Cleanup to mine C/PTM) is a major work
activity that is done toward the end of the shift. t
includes the equipment and ""'""OJ.J,J,lll'>
shovel or scoop, so that the is ready the
next equipment includes lllilLlUlJlg
sary maintenance checks and
such requirements, bits, lubricating, adjusting
safety or monitoring devices, and the like, which is
cally needed after a operation.
Other preparatory work the meeting,
i.e., traveling from the dinner hole to the equipment and
moving the equipment to the face and
handling) ends when the continuous miner to
load the first S.C. time is consumed in withdrawing
equipment from the working face after the last
walking to the dinner hole, and any (reason-
able) prior to leaving the hole.
AU items (previous paragraph) are lumped in a
delay category; in this case, they are listed under
model adjust delays which also includes any improperly
reported or unaccountable The purpose of this
category is to provide a means of the model to
make it and with normal worker effi
ciency and equipment utilization.
Unit shift is the number of shifts a par-
ticular mining machine unit during the year.The next group of data in the model tabulation is
data and to face
A working s a three-dimensional in this
case, it is a cut made by the continuous miner (approxi-
mately 20 ft by 18 ft wide by 5 ft high). Cubic
place is volume of a and when figure is mul
tiplied by the density pounds per cubic foot) of the mined
material (seam, and floor), it the raw tonnage
per cut (place). figure by the S.c. capacity
the number of S.C.'s per place. Raw product is con-
verted to tonnage applying an appropriate coal re-
covery factor.next group of data is identified as place time and
represents the necessary to complete activities
in a cut. on time and observations,
typical rates for mrOlulg- Oa1amg,
S.c. are developed. These when l l lLOlUIJU -
by number cars per provide total time for a par-
ticular event with one exception. S.c. change is the
time an S c is away from the continuous excluding
delays that prevent the car from to the
continuous miner in the average time governed by the haul
distance. The average S.c. change in a place (cut) isequal to the total car change time divided by number
of car changes (equivalent to total S.c. minus
one).
There is no S c change the last car is loaded nor
before the first car is The normal practice, there-
fore, is to reduce the number of cars by one or ' lUll , ,
the fractional part and multiplying it by average S c
time to obtain the total S c per cut. Total
loading and are by
multiplying total number of cars per place by unit (per
car)
Other place work elements like
every 20 min
erecting posts right after mining (loading) a
before supports (bolts) are installed, constitute
additional necessary in a cycle. The contin
uous miner then has to be trammed to the next this
including handling is listed under tram. These
values are added tota l is called totalplace time.
Maneuvering (continuous miner) time is the for
maneuvering the equipment when the S.c. is with the con-
tinuous miner. As the name implies, bolting placetime is the to complete bolting in a cut so
that the continuous miner can move in another cut. So
long as roof time is less than the miningplace time determines the of
mined per shift. When roofO ' T P l p r than mining time or roof bolting time
comes a bottleneck, the number of cuts are reduced ac-
cordingly, since bolting place time then
Place time, or bolting, is the greater of the two
divided remaining uptime to the number places
unit shift. Productivity in clean short ton per unit shift
obtained by multiplying the number of (cuts) to
the per place. The tonnage minute or hour
represents the value per remaining The value per
unit multiplied by total unit provides total
annual short tons by the mining section. Similarly, the
values are t abulated for other mining The values
(average) line items in the last column of the model are
weighted averages to the shifts insection categories.
Page 11
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 11/47
MINE COST MODEL
This model or cost of mining statement provides de
tailed cost breakdowns by line item. The annual cost is
provided in total dollars and also in dollars per clean short
ton. Individual cost items are termed either fIxed or
variable. Fixed means fIxed dollars for a particular period; in this case, it is 1 year. Examples are labor overhead
and depreciation. Variable cost varies per shift, day ormonth, depending on tonnage produced. Examples are
royalties Federal black lung fee and supplies-operating.
Any change in a mine production model will have an effect
on its cost model. For example, new equipment used for
increasing mine production will have a twofold effect:
(1) overall cost per short ton reduced, and (2) depreciation
line item or leasing cost increased.
The example mine cost model shows a cost of $28.56/st
on clean coal basis for the base year 1988.
MINING SCEN RIOS OR COMPUTER-
SSISTED MINING
While considering potential mining scenarios, all
equipment and mining systems are assumed to remain un
changed in the existing mine with the exception of contin
uous mining machine. The mining machine is envisioned
to be operated by computer-assisted control, from a dis
tance of 250 to 1,000 ft (based on number of headings in
a mining section). The operator compartment is situated
near the section-belt tailpiece in the fresh intake air. The
operator is able to control ll functions of the mining
machine-cutting, tramming, etc. through visual, aural,and other displays in the compartment employing proven
computer technology.
Normal mining cycle begins as the continuous miner
advances the coal face on the ventilation side of a heading
or crosscut. Extraction of coal in the immediate face is
continued using S.c. to haul the coal to the belt tailpiece
until the furthest depth of penetration (20 ft) is reached.
Upon completing both passes in the cut (18 ft), the con
tinuous miner is trammed to the next heading or crosscut,
according to the cut-sequence plan. A roof bolting ma
chine then enters the mined-out face to bolt the place in
accordance with the approved roof control plan. The mine
utilizes conventional shell-type (4 ft) bolts. After the roofbolting is completed, the face area s cleaned up and rock
dusted.
5
A computer-assisted continuous miner will enhance the
section productivity because of the following: (1) reducedequipment downtime, thereby increasing available oper
ating time (uptime); and (2) reduced mining cycle time,
thereby providing additional number of cuts per shift.
The productivity is increased simply by making the
mining equipment available for more time and increasingits utilization (compared to the manually operated
system). By effective planning of mining operations, standardization, maintenance and spare parts inventory, im-
proving the relations between management and labor,
training, and coordination, it is possible to make more
efficient utilization of labor. In addition, the quality of
mined product can be controlled effectively to provide a
consistent output to the benefIciation plant and the user.
The most important team player in the mining section
is the continuous mining machine operator. In the
computer-assisted section, this person is highly skilled to
operate the machine and qualifIed enough to make neces
sary judgments in the mining operations. He or she has
the authority of a section supervisor and is able to work
independently. A mining machine helper is not needed on
a full-time basis. The role of a section supervisor involves
noncontinuous miner operations and can be called a coordinator or nominal section boss. Similarly, the mechanic
electrician is highly skilled to maintain the sophisticatedmining machine. The role of utility personnel is alsoreduced as the mining machine performs the most facecleanup functions. Since the continuous miner operator is
to be involved in management and decisionmaking roles,it may be appropriate to make him or her a salariedemployee. Necessary mine operations data have to flow to
ll employees involved, salaried and UMWA, requiring aneffective mode of distribution and coordination to properlyorganize, operate, and maintain the advanced miningequipment.
Computer technology will enable improved monitoringof equipment condition to help early detection of faultyproblems and breakdowns, allowing necessary preventativemaintenance. Better maintenance planning not only im
proves equipment availability, efficiency, and productivity,but also reduces mining cost by maintaining a minimuminventory of spare parts.
Since the operator s located in a safer, cleaner, andrelaxed environment and not doing monotonous work, he
or she is subject to less physical and mental tension orfatigue and, therefore, able to work with greater effIciency,accuracy, and maintain high standards and housekeeping.
Page 12
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 12/47
In the example mine, two scenarios are considered:
1. Continuous miner operating at existing efficiency
reflected by existing loading rate, but for longer available
time (uptime increased by 60 min, 75 min, and 90 min).
2. Continuous miner operating at improved efficiency
reflected by new loading rate (existing rate increased by25 ,50 , 75%, and 100%) and for longer available time
as stated above.
Both the scenarios have improved maneuvering rate,
but it is not a very significant amount. Other improve
ments that are common to all models include:
1. Elimination of gas test time (2 min) from the place
mining cycle. By having a methane monitoring device on
the continuous miner and an operator's ability to read at
control station, it is not necessary to interrupt mining
operation to take manual gas tests every 20 min.
2. Improved tram time (including cable handling) inthe place cycle. Improved efficiency increases the tram
rate and reduces cable handling delays. An appropriate
percentage for this improvement will be applied in the
models.
Basis of increasing the remaining uptime follows:
Face cleanup is effectively done by the remote-controlled
continuous miner during the mining cycle. The need of
utility personnel otherwise needed (with scoop or shovel)
is significantly reduced. An effective equipment servicing
and maintenance program and face cleanup by the contin
uous miner can reduce the existing C PTM time (60 min)to 30 min. Also, the continuous miner downtime can be
minimized or eliminated (saving 30 to 50 min) . Since the
continuous miner operator is away from the hazardous
work face, it can be assumed that safety related downtime
is improved by 7 min. Prudent engineering and operating
practices can further improve productivity of a mine; for
example, maintain a continuous miner when belt or S.C.'s
are down.
odel adjustment and other delays provide room for
further improvement.
A review of the section work force indicates that one
person can be eliminated from the crew (now seven
person crew) with the new mining system. Various im-
provement ideas discussed in this section will be modeled
when conducting cost-benefit analysis for computer
assisted mining.
COST BENEFIT ANALYSIS FOR COMPUTER ASSISTED MINING
In the example hypothetical mine, two scenarios are
considered for computer-assisted mining:
1. Continuous miner operating at existing efficiency,
reflected by existing loading rate (1.95 min per car), but
for longer available time (uptime increased by 60 min,
75 min, and 90 min). This situation provides three pro
duction models.
2. Continuous miner operating at improved efficiency,
reflected by new loading rates (existing rate increased by
25%, 50%, 75%, and 100%) and for longer time, i.e., in
creasing uptime by 60 min, 75 min, and 90 min, as stated
above. The new rates are 1.56 min per car, 1.30 min per
car, 1.11 min per car, and 0.97 min per car for the four ef
ficiencies. The figures used in this example signify the rel
ative importance and not necessarily their absolute values.
One minute per car means a loading rate of 7 st/min,
which is a reasonably high number as an annual averagerate. This condition provides a total of 12 production
models.
Other improvements that are common to all models
include:
1. Improved continuous miner maneuver rate of
0.15 min per car.
2. Elimination of gas test time (2 min) from place
mining cycle.3. Improved tram time or 60% of normal time.
Each production model has a corresponding cost model.
The new mining system has resulted in the following
changes:
One person is eliminated from the section crew, now 7
person crew; the total reduction is 12 personnel for 12
working shifts. t is assumed that continuous miner helper
and utility personnel will be needed for one-half of their
times or one person should replace two.
By effective planning of mine operations, stand
ardization, maintenance, and spare-parts inventory, improving the relations between management and labor, it is
possible to more efficiently utilize the work force.
The reduction of 12 personnel out of the total 185
UMWA personnel represents a 6 decrease in the hourly
labor, benefits, and welfare costs. These line items on the
Page 13
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 13/47
cost of mining statement are A2, A4, and All. The new
values for these items are 3,290,000, 846,000, and
282,000.
It is estimated that capital cost requirements for
continuous miner additions including computer and mobile
control structure is 250,000. Assuming interest at 10
and straight line depreciation over 7 years (no salvage
value) , the increase in annual interest expense, line item
B5, is 25,000, and the increase in line item Cl is 35,714.
The new values for B5 and Cl are 525,000 and 585,714,
respectively. Refer to the particular model for details.
The five changes shown above (two scenarios and three
improvements) are applied to all cost models. The
productivity figure (short ton per worker-day) in each cost
model is now calculated using new production and work
force (new mine total, 208).
Table 2 summarizes the results of 15 production and
cost models along with the base case. Detailed
information on base and improvement cost and productionmodels is given in the appendixes.
Table 2.-Summary of results of 15 production and cost
models compared with base case
Uptime Annual Cost of
Mine model increase, production, mining,
min clean st $/st
Existing technology
(base case) . ..... . 0 504,458 28.56
Computer-assisted
mining:
Normal efficiency . . 60 743,047 20.91
Do .. , . . .. . . 75 788,780 20.02
Do . .. .. . 90 833,867 19 .25
Increase efficiency
by 25 . . , . .... 60 807,102 19 .70
Do .. . . . . .. . 75 856,775 18 .89
Do .. .. . .. . . 90 905,725 18 .17
Increase efficiency
by 50 . . . . . . . . 60 856,331 18 .89
Do . .. . . .. 75 909,032 18 .12
Do . . ....... 90 960,950 17.45
Increase efficiency
by 75% .... . . .. 60 896,293 18 .30
Do . . ....... 75 951,451 17 .57
Do . . . . . . . . . 90 1,005,776 16.93
Increase efficiency
by 100% . . . . . . . 60 928,217 17.87
Do . . . . . . . . . 75 985,338 17 .16Do . . . . . . . . . 90 1,041,585 16 .54
7
Comparing the highest production and corresponding
cost figures, 1,041,585 st and 16.54 to the base figures,
504,458 st and 28.56, the resultant improvements are
106 and 42 for production and cost, respectively.
Similarly, comparing the lowest improvement figures,
743,047 st and 20.91, to the base case, the resultant
production and cost improvements are 47 and 27%,respectively. The midpoint of the range is 77 for
production and 35% for cost improvement.
Because of possible variations in mining conditions,data limitations, inherent imprecision in any simulating
system, necessity of using judgments, and the human
factors involved where changes are projected, it is believed
reasonable to expect 75 to 125 attainment of the
results projected.Conservatively , it can be assumed that the new mining
system can improve mine production by 58 , resulting in
a cost-of-mining improvement of 26 .
Although the mine scenario assumes a 6 reduction in
face work force, it is not a true representation as it does
not address potential increase in service personnel Th e
change in work force will vary with company size, orga
nizational philosophy, system's success, and penetration in
the industry, and is not estimated at this time.Figure 1 shows the relationship of productivity (short
ton per worker-day) and cost of mining (dollar per short
ton), as obtained from the base and improvement cost and
production models.
40
35
30(J)
25f)
0u 20
15
105 10 15 20 25 30
PRODUCTIVITY, st worker - day
Figure 1.-Relationship of productivity and cost of mining.
Page 14
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 14/47
8
ON LUSIONS
A mining m chine can Slgltlllicatltly Estimates indicate a increase of 58 in mine
increase productivity and reduce the cost productivity, reducing the cost of 26 .
Also, it provides a safer and healthier work environment.
Page 15
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 15/47
9
PPENDIX A. GlOSSARY PRODUCTION ND COST MODELS
FOR PPENDIXES BAND
Adj. Time St time study data rep,resent
a practical model consistent with normal worker eltlclelrlcy
and equipment utilization.C/PTM. Clean up and prepare to mine.
Model requITed to a
model. improperly reported or unaccountable
Place. A three-dimensional unit or cut mined by a
mining machine approximately 2 t deep by 18 t wide by
5 t high).
Place Time. Time to mine a cut.
Roof Bolting Place Time. Time required to bolt a
place.S.C.-Shuttle car with 7-st raw coal capacity.
Unit mining unit operating an 8·h shift.
WTD average values based upon num-
er ofunit shifts.
Page 16
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 16/47
10
APPENDIX B. OMPUT R PRINTOUTS OF BASE PRODUCTION
AND COST MODELS DATA
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
ITEMIDENTIFICATION
SECTION 1SECTION 2 SECTION 3
SECTION 4 SECTION 5 SECTION
Minutes Per Shi f t 480 . 0 480.0 480.0 480.0 480.0 480.0
Travel Time 60.0 62.0 65.0 58.0 62 . 0 64.0
Lunch Time 30.0 30 . 0 30.0 30.0 30.0 30.0
Serv ice Tima 0.0 0.0 0.0 0.0 0.0 0.0
Remaining Operat ing Time 390.0 388.0 38 5 . 0 392.0 388.0 386.0
6 TOTAL WTD
480 . 0
61. 7
30.0
0.0388.3
Downtime
Miner 52.8 55.0 48.0 59 . 4 40 . 0 60.0 52.9S.C. 15.0 10 . 2 12 .0 15 .5 12 .0 18.2 13 .7
B el t 21.0 22 . 2 28.0 18 .5 21.0 19.5 21. 9
Bol ter 4.8 5 . 0 6.0 5 .9 9 . 0 4.6 5.7
Feeder 3.0 3 . 8 4.2 3 .6 5 . 0 6.8 4 .3
C/PTM 60.5 61. 0 52.0 58 .8 65.0 68 . 0 60.2
Power 1 .8 1 .0 2.0 2.5 2.8 1 .9 2.0
Timber Rai l 2.0 2.9 3.0 5 .0 5 .3 3.0 3 . 5
Condi t ions 5 .0 5.8 6.0 2 .5 4 . 2 2.8 4 .5Saf e t y 18 .0 15.5 16 .8 20.0 17.0 15.1 17 . 2
Model Adjust Delays 20 . 0 18.5 17.8 22 0 15 .0 19.5 19.0Other 0 . 0 0.0 0 .0 0 .0 0.0 0.0 0 . 0
Total Downtime 203.9 20 0 . 9 195.8 213.7 195.3 219.4 20 4 . 7
Remaining Uptime 186.1 187.1 189.2 118.3 192.7 166.6 183.6
Unit Shi f t s /Year 502 480 536 528 354 380 2,780
Cubic Feet /P lace 1 710 .7 1,731. 7 1 857 .4 l S80 . 0 1 642 .8 1 409 .4 1,724 . 9
Densi ty 94.50 94.50 94.50 94 . 50 94.50 94.50 94.50
Raw Tons/Place 80 . S 81. 8 87.8 88 . 8 77 . 6 66 . 6 81. 5
Raw Tons /S.C. 7.0 7.0 7.0 7.0 7.0 7.0 7.0No . S.C./P1ace 11.5 11.7 12 .5 12 .7 11.1 9.5 11 .6
Reject 22 . 80 22.80 22. SO 22.80 22.80 22 . 80 22.80Clean Tons /S.C. 5.40 5.40 5.40 5.40 5.40 5.40 5.40
---------------------------------- ------------------------------------- -------------------------- Place Time
Mining
Maneuvering
S.C. Change
Gas Test Safe ty
Vent i l a t ion Pos ts
Tram
Tota l Place Time
Roof Bol t ing Place Time
Placea/Uni t Shif t
Product iv i ty Clean Coal
Tona/Unit Shi f t
TonS/Hour
TonS/Minute
Annual Product1c-.n, a t
22 . 52
3 . 46
20.
682.00
8.605.80
63.06
53.06
2.951
184.2
59.4
0 . 990
92,445
22.79
3 . 51
20.902 . CO
8 . 60
6.20
64.00
54.00
2.923
l a4 .7
:SS .2
0.937
88,638
24.45
3.76
25.202 . 00
8 . 60
6.38
70.39
60 . 39
2.688
182.1
57 . 8
0 . 963
97,613
24.75
3.81
19.442.00
8.60
7.80
66.39
56.39
2.686
184.2
62.0
1.033
97,240
21. 62
3.33
16.502.00
8.60
5.30
57.35
47.35
3 . 360
201.3
62.71.045
71,277
18.55
2.85
18.002 . 00
8.60
6 . 85
56.86
46.86
2 . 930
15 0 . 6
54 . 3
0.904
57,245
22.70
3.49
20.462.00
8.60
6.44
63.69
53.69
2.92
181. 5
59 . 3
0 . 988
504,458
AV
Page 17
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 17/47
Basis of Est imates
Days of Operation
Total Product ion (Clean Btl (000)
Daily Product ion (Clean st )
Approx. a t /worker- day
A.Coat b a s i s
Direc t Operat i ng Costs
1 . Labor - Sa la r ied
2 . Labor - Hourly
3 . Benef i t e - Sa la r ied
4 . Benef i t s - Hourly
5 . Suppl i e s - Operating
6 . Suppl ies - Maintenance
7 . ower
8 . F I C A ' Unemployment axea
9 . Workmen s Compen.ation Insurance
10 . Black Lung Compenaation insurance
11 . Welfsre - Hourly12 . Welfare - Tonnage
13 . Safe ty Expense.
14 . P r o d u c t i o n ' Safe ty Incen t ives
15. Accident Coat .
16. Re c lamat ion Fe .
17. Federa l Black Lung Fee
18. Other Costs
B .
Total
Other Cash Costs1 . Overhead
2. Roya l t ie s
3. Miscellaneous Taxe.
4. Equipment Leasing Coata
5. I n t e r e s t Expense
6. Miscellaneous I ncome
To ta l
C. Other Co s t s
1 . Deprec ia t ion
2. Amort izat ion of Development Coats
3 . Deplet ion
Total
Tota l Cost of Mining
Fixed Dol la rs Per Year
COST OF MINING STATEMENT
Base Year 1988
Adj. Time St . Data
240
50 4 . 458
2,102
9 . 550
Dol la rs (000)
1,000.000
3,500.000
46.000
900.000
1,513.374
1 800.000
340.000
400.000
175.000
:340.000
300.000
711.790
150.000
250.000
200.000
75.669
252.229
0.000
11,954.062
500.000
302.675
0 . 000
60 0 . 000
50 0 . 000
0.0001 902 .675
550.0000 . 000
0.000
55 0 . 000
14 406 .737
/ s t
1. 982
6.938
091
1 . 784
3 . 000
3 . 568
674
0 . 193
0.347
674
0.5951 . 411
297
0.496
0.396
0 . 150
500
0.000
23.697
0 . 991
0 . 600
0 . 000
1.189
0.991
0.000
3.772
1. 090
0 . 000
0 . 000
1. 090
28.559
Page 18
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 18/47
12
PPENDIX C. COMPUTER PRINTOUTS OF IMPROVEMENT MODELS-
PRODUCTION ND COST D T
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVED UPTIME BY 60 MINUTES
ITEM IDENTIFICATION SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 TOTAL WTD
Minutea Per Shif t
Travel Time
Lunch Time
Serv ice Tima
Remaining Operat ing Time
Downtime
Miner
S.C.
Bel t
Bol ter
Feeder
C/PTM
Power
Timber Rail
Condi t ions
Safe ty
Model Adjus t Delays
Other
Total Downtime
Remaining Uptime
Unit Shi f ta /Year
Cubic Feet /P lace
Densi ty
Raw Tona/Place
Raw Tona/S.C.
No. S. C. /P lace
Rejec t
Clean Tons/S.C.
Place Time
Mining
ManeuveringS.C. Change
Gaa Teat Safe ty
Vent i l a t ion Poats
Tram
Total Place Time
Roof Bol t ing Place Time
P1acea/Uni t Shif t
Product iv i ty - Clean Coal
Tona/Unit Shif t
Tona/Hour
Tona/Minute
Annual Product ion a t
480.0
60.0
30 . 0
0.0
39 0 . 0
22.8
15 .0
21.0
4.83 . 0
30 . 5
1 .8
2 . 0
5 . 0
18.020.0
0.0
143.9
246.1
502
1 710.7
94.50
80.8
7.0
11.5
22.80
5.40
22.52
1.7320.68
0.00
8.60
3.48
57.01
38.80
4.317
269.465.7
1.095
135 228
480.0
62.0
30.0
0.0
388.0
25.0
10 . 2
22.2
5 . 0
3.8
31. 0
1 .0
2.9
5.8
15.518.5
0.0
140.9
247.1
480
1 731.7
94.50
81. 8
7.0
11 .7
22.80
5.40
22.79
1.75
20.90
0.00
8.60
3.72
57.77
40.20
4.278
270.265.6
1 .093
129 694
480.0
65.0
30.0
0.0
385.0
18.0
12 .028 . 0
6.04 . 2
22 . 0
2.0
3 . 0
6.0
16.817.8
0.0
135.8
249.2
536
1 857 .4
94.50
87.8
7.0
12.5
22.80
5.40
24.45
1 . 88
25.20
0.008.60
3.83
63.96
39 . 50
3.896
264.063.6
1 . 059
141 500
480.0
58.0
30.0
0.0
392.0
29.4
15.5
18.5
5.9
3 . 6
28.8
2.5
5 . 0
2.5
20.022.0
0.0
153.7
238.3
528
1 880 .0
94.50
88.8
7.0
12.7
22.80
5.40
24.75
1. 90
19.44
0 . 00
8.60
4.68
59.37
38.75
4.014
275.3
69.3
1.155
145 337
480.0
62.0
30.0
0.0
388.0
10 .0
12 .0
21. 0
8 . 0
5 .0
35 . 0
2 . 8
5.3
4.2
17.015.0
0.0
135.3
252.7
354
1 642 .8
94.50
77.6
7 .0
11.122.80
5 . 40
21. 62
1. 66
16.50
0.00
8.603 .18
51.57
36.80
4.901
293.769.7
1.162
103 953
480 . 0
64.0
30.0
0.0
386.0
30.0
18 . 2
19.5
4.66 . 8
38 . 0
1 .9
3.0
2.8
15.119.5
0.015 9 . 4
226.6
380
1 409 .4
94.50
66.6
7.0
9.5
22.80
5.40
18.55
1.43
18.00
0.00
8.60
4.11
50.69
37.00
4.470
229.860.9
1.014
87 335
48 0 . 0
61. 7
30.0
0.0
388.3
22.9
13.7
21. 9
5.7
4 . 3
30 . 2
2 . 0
3.5
4.5
17.219 .0
0.0
14 4 . 7
243.6
2 780
1 724 .9
94.50
81.5
7.0
11. 6
22.80
5.40
22.70
1.75
20.46
0.008 . 60
3.8657.37
38.67
4.30
267.3
65.8
1. 097
743 047
AV
Page 19
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 19/47
Basis of Estimates
Days of Operation
Total Product ion (Clean at) (000)
Daily Product ion (Clean at)
Approx. st Worker-Day
A. Direot.. 1 . Labor -.. 2. Labor
.. 3.
. 4. Benefi ts
Power
Cost bas is
Hourly
Operating- Maintenanoe
5... 6.
.. 7.,. 8.
.. 9.
.. 10.
* 11.
FICA , Unemployment Taxes
Workmen'. Compensation InsuranceBlack Lung Compensation InsuranceWelfare - HourlyWelfare Tonnage
safety Expen ...s
12... 13... 14.
* 15.
Product ion , Safety Inoent ivesAccident Cost .
16.17.
18.
ReclllJllatlon FeeFederal Black Lung
Other Costs
Total
Fee
B. Oth . r Cash Costs
* 1. Overhead
2.
3. Tax ...
4. Equipment Leasing Costs
* 5. In terest Expense.
6. Miscellaneous Income
Total
C. Other Costs1.2. of D .velopment
3. Depletion
Total
Total Cost of Mining
* Fixed Dollars Per Year
Costs
COST OF MINING STATEMENT
Base Year 1988
Adj. Time St. Data
240
504.458
2,102
9.550
DollarsCOOOI 1st
1,000.0003,500.000
46.000
900.000
1,513.3741,800.000
340.000400.000
115.000
340.000
300.000
711.790
150.000
250.000
200.000
75.669252.229
0.000
11,954.062
500.000
302.675
0.000
600.000
500.000
0.000
1,902.675
550.000
0.000
0.000
550.000
14,406.737
1.982
6.938
0.0911.784
3.0003.568
0.674
0.793
0.341
0.674
0.5951.411
0.2970 .U6
0.396
0.1500.500
0.000
23.697
0.991
0.600
0.000
1.189
O. 991
0.0003.772
1.090
0.000
0.000
1.090
28.559
Uptime by 60 Minutes
240743.047
3,096
14.885
Dol1ars(OOO) / s t
1,000 .0003,290.000
46.000
846.000
2,229.1411 ,800 .000
340.000
400.000
115.000
340.000
282.0001,048 .439
150 000
250.000
200.000
111. 457
371.524
0.000
12,879.561
500.000
445.8280.000
600.000
525.000
0.000
2,070.828
585.714
0.000
0.000
585.714
15,536.103
1.3464.428
0.062
1.139
3.000
2.422
0.458
0.538
0.236
0.458
0.380
1.411
0.202
0.336
0.269
0.1500.500
0.000
17.333
0.673
0.600
0.000
0.807
0.707
0.000
2.787
0.788
0.000
0.000
0.188
20.909
13
Page 20
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 20/47
14
ITEM IDENTIFICATION
Minutes Per Sbif t
Trav.l '1 '1_
Lunch Time
Service Time
Remaining Operating T i _
Downtime
Miner
S.C.
BeltBolterFeed.rC/PTM
Power
Timber RailCondit ion.
Delaya
OtherTotal Downti"",
Remaining Upt i_
Unit Shifta /Year
Cubic Feet/PlaceDensi tyRaw ' rona/Plae.Raw Tona/S.C.
No. S.C./PlaeeRejectClean 'rona/S.C.
Place Time
MiningManeuveringS.C. Change
Gall Teatent i la t ion
'rram
Total Plae. Time
Roof Bolt ing Place Time
Places/Unit Shif t
Productivity - Clean Coal
Sh1ft
'ronlll/Minute
Annual Production,at
SECTION
480.0
60.0
30.0
0.0
390.0
12.8
15.0
21.0
4.8
3.0
30.5
1 .8
2.0
5 0
13.020.0
0 .0
128.9
261.1
502
1 710 .7
94.50
80.87.0
11.522.80
5.40
22.52
1.7320.68
0.00
8.60
3.48
57.01
38.80
4.580
285.8
65.7
1 .095
143,470
1 SECTION
480.0
62.0
30.0
0.0
388.0
15 0
10.2
22.2
5.0
3.8
31.0
1.0
2 .9
5.8
10 .518.5
0.0
125.9
262.1
480
1,731. 7
94.50
81.8
7.0
11 .722.80
5 40
22.79
1. 75
20.90
0.00
8.60
3.72
57.17
40.20
4.537
286.6
65.6
1.093
131,567
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVE UPTIME BY 15 MINUTES
2 SECTION
480.0
65.0
30.0
0 .0
385.0
B O
12 .0
28.0
fLO
4.2
22 0
2.0
3 .0
6.0
11.8
17.80 .0
120.8
264.2
536
1,857 .4
l4.50
81.8
7.012 .5
22.90
5.40
24.45
1. 88
25.20
0.008.60
3.1Il
63.96
39.50
4.131
279.963.6
1.059
150,018
3 SECTION
480.0
58.0
30.0
0 .0
392.0
19 .4
lS 5
IB.5
5 .9
3 .6
28.8
2 .5
5 .0
2 .5
15 .0
22.00 .0
138.1
253 3
528
1 880 .0
l4.50
88.8
7 .0
12 .7
22.80
5.40
24.75
1 .90
19.440.00
8.60
4.68
59.37
38.15
4.261
292.69.3
1.155
154,485
4 SECTION
480.0
62 0
30. a
0.0388.0
0.0
12 a21.0
8.0
5.0
35.0
2.8
5 .3
4 2
12 .0
15 .0
0 .0
120.3
267.1
354
1 642 .8
94.50
11.6
7.011.1
22.80
5.40
21.62
1 . 66
16.50
0.00
9 .60
3 .18
51.51
36.80
5.191
311.1
69.1
1 .162
1 1 0 1 2 3
5 SECTION
480.0
64 0
30.0
0.0386.0
20.0
18.2
19.5
4.6
6.8
38.0
1 .9
3.0
2.8
10.1
19 5
o 0
144.4
241. 6
380
1 409 .4
94.50
66.67.09.5
22.80
5.40
18.551 .43
18.00
0.00
8.60
4.11
50.69
37.00
4.166
245 0
60.9
1 .014
93,117
6 TOTAL/WTD V
480.061. 7
30.0
0.0388.3
12.9
13.721. 9
5.1
4.3
30.2
2 0
3 5
4 S
12.219 .0
0 .0
129.7
258.6
2,780
1 724 .9
94.50
81.5
7.0
11.22.80
5.40
22.10
1 . 75
20.46
0.00
8.60
3.86
51.37
38.67
4.57
283.7
65.8
1.097
788,7BO
Page 21
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 21/47
Basis o f Est imates
Days o f v p ~ L j ' ~ J . UTota l (Clean e t l (000)
Dai ly P roduc t ion (Clean s t l
Approx. a t /worker -day
Cost bas ie
A. Direot Operat ing C os ts
1. Labor Sa la r ied
2. Labor Hourly
.. 3. Benef i t s - Sa l a r i ed
4. Benef i t s -
Power
5
6... 7.
.. 8.
9.10.
11.
FICA , Unemployment Taxes
Workmen . Compensation Insurance
Black Lung Compensation Insuranca
Welfare - Hourly
Welfare - Tonnage2... 13.
.. 14.
15.
, Safe ty Incen t ives
Accid en t Cost .
16.17.
18 .
Reclamation Fee
Federa l Black Lung Fee
Other C os ts
Tota l
B. Other Cash C os ts
1. Overhead
2. R oyal t ie l l
3. Miscel laneous Taxes
4. Equipment Leas ing Costs
5 . In tere l l t Expense
6. Misce l laneous Income
Total
C. Other Costs
1 Deprec ia t ion
2. Amort i :za t ion o f Development
3. Deple t ion
Tota l
Tota l Coat o f Mining
Fixed Dol la rs Per Year
C os ts
COST OF MINING STATEMENT
Base Year 1998
Adj. Time St . Data
240
504.458
2,102
9.550
Dol la rs 1000) /st
1,000.000
3,500.000
46.000
900.000
1,513.3 14
1,800.000
340.000
400.000
115 000
340.000
300.000
711. no150.000
250.000
200.000
15.669252.229
0.000
11,954.062
500.000
302.675
0.000
600.000
500.000
0.000
1,902.675
550.000
0.000
0.000
550.000
14,406.137
1.982
6.938
0.091
1.784
3.000
3.568
0.614
0.793
0.347
0.674
0.595
1.411
0.297
0.496
0.396
0.150
0.500
0.000
23.691
0.991
0.600
0.000
1 189
0.991
0.000
3.712
1.090
0.000
0.000
1.090
29.559
upt ime by 15 Minutes
240
188.780
3,281
15.901
Dol la rs (000) / s t
1,000 .000
3,290.000
46.000
846.000
2,366.340
1,800.000
340.000
400.000
115.000
340.000
282.000
1,112 .968
150.000250.000
200.000
119.311394.390
0.000
13,111. 016
500.000
413.268
0.000
600.000
525.000
0.0002,0911.268
585.714
0.000
0.000
585.714
15,194.998
1.268
4.171
0.058
1.073
3.000
2.282
0.4131
0.507
0.222
0 ~ 3 10.358
1.4.11
0.190
0.311
0.254
0.150
0.500
0.000
16.622
0.634
0.600
0.000
0.761
0.666
0.000
2.660
0.743
0.000
0.000
0.143
20.025
5
Page 22
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 22/47
16
ITEM IDENTIFICATION
Minutes Per Sh i f t
Trave l 1 i _
Lunch T i _
Serv ice ' l1i_
Remaining Operat ing Time
Downtime
Miner
S.C.
B41t
Bol ter
Feeder
C/PTM
Power
Timber , Rai l
Condi t ion .
Saf e t y
Model Adjust Delay .
o t h e r
Tota l Downtime
Remaining Uptime
Unit Sbi f t_ /Year
Cubic Fee t / P l ace
Oena i ty
Raw To n a/P laceRaw Tons/S.C.
No. S.C./P1ace
R ej ec t
Clean TOnls/S.C.
SECTION 1 SECTION 2
480.0 480.0
60.0 62.030.0 30.0
0.0 0.0390.0 388.0
0 .0 0.0
15 .0 10 .2
21.0 22.24.8 5 .0
3.0 3.8
30.5 31.01 .8 1 .0
2 .0 2.51
5 .0 5 .8
11 .0 8 .5
20.0 18.50 .0 0.0
114.1 10B. iI
275.9 279.1
502 480
1 ,710 .7 1,731. 1
94.50 94.50
SO.II 81.8
7 0 1 0
11.5 11 .7
22 80 22.80
5.40 5 .40
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVE UPTIME BY 90 MINUTES
SECTION 3 SECTION 4 SECTION 5 SECTION 6 TOTAL/ViTO V
480.0 480.0 480.0 480.0 480.0
65.0 511. 0 62.0 64.0 61. 7
30.0 30.0 30.0 30.0 30.0
0.0 0 .0 0 .0 0.0 0.0
385.0 392 0 388.0 386.0 388.3
0 .0 0.0 0.0 0.0 0.0
12.0 15 .5 12 .0 18.2 13.1
28.0 18.5 21. 0 19.5 21. 9
6.0 5.9 8 .0 4.6 5 .1
4.2 3 .6 5 .0 6.8 4.3
22.0 28.8 35.0 3B.O 30.2
2 .0 2.5 2.8 1 .9 2 .0
3.0 5 .0 5 .3 3.0 3.5
Ii a 2.5 4.2 2.8 4.5
iI.8 13.0 10 .0 8.1 10 .2
17 .8 22.0 15.0 U . S 19.0
0 .0 0.0 0.0 0.0 0.0
110.11 117.3 118.3 122.4 114.8
274.2 274.7 269.7 263.6 273.4
536 528 354 380 2,780
1,B51.4 1 ,880 .0 1 ,642 .8 1 ,409 .4 1 ,724 .9
94.50 94.50 94.50 514.50 514.50
81.11 88.8 11.6 66.6 81.5
7.0 7 0 7 0 7 .0 7 .0
12.5 12.7 11.1 9.5 11 .6
22.BO 22.110 22.80 22.80 22.80
5 40 5 40 5.40 5 .40 5 40
Place i_
Mining
Maneuvering
S.C. Cbange
Gall T,u t Safe ty
Vent i l a t ion Poats
r_
Tota l Place Time
Roof Bol t ing Place Tima
Places /Uni t Sbi f t
- Clean COdl
Annual Produet ion , s t
22.52
1 . 73
20 68
0.008 60
3.48
57.01
311.80
4.840
302.065.7
1 . 095
151,603
22.19
1 . 75
20. il0
0.00
8.60
3.72
57.17
40.20
4.832
305.2
65.6
1 093
146,490
24.45
1 .88
25 20
0.00
II 60
3.83
63.96
39 50
4.287
290 5
63.6
1.059
155,696
24.75
1 .90
19.44
0.00
8.60
4.68
59.37
38.75
4.627
311.3
69.3
1.155
161,531
21.62
1 .66
16.50
0.00
8.60
3.18
51.57
36 80
5.230
313.469.7
1 .162
110,946
18.55
1 . 43
18.00
0.00
11.60
4.11
50.69
37.00
5.200
267.460. iI
1 014
101,596
22 70
1 . 15
20 46
0.00
8.60
3 .86
57.37
38.67
4.83
300.0
65.S
1.097
833,867
Page 23
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 23/47
Bas i s o f Est imates
Days o f Operat ion
Tota l P roduc t ion (Clean at) (000)
Dai ly P roduc t ion (Clean Bt)
Approx. a t /worker -day
Cost ba .s is
A. Direc t Opar t ing Costa
.. 1. Labor -
.. 2 L a b o r
,. 3. Benef i ta
,. 4. Benef i t s -
5.,. 6.
7 Power
' 8 FIC
,. g. Workmen' a Inaurance
,. 10. Blll.ck Lung Inau rance
,. 11. Welfare -
1 2 . Welf a r e - Tonnage
.. 13.
.. 14. • Safe ty Incen t ives
,. 15. Acciden t Costs
16. Reclamation Fee17. Federa l Black Lung Fee
,. 18. Other Costs
Total
B. Other Cash Costs
1. Overbead
2. Roya l t ie s
3. Misce l laneous Taxes
,. 4. Leasing Coats,. 5. ExpenSE
.. 6. Misce l laneous Income
Total
C. Otber Costs
.. 1. Deprec ia t ion
2. Amort izat ion o f Development Costs
3. Deple t ion
Tota l
Tota l Cost o f Mining
,. Fixed Dol la rs Per Year
COST OF MINING STATEMENT
Base Year 1988
Adj. Tima St. Data
240
504.458
2,102
9.550
Dol la rs (000)
1,000.000
3,5()O.000
46.000
900.000
1,513.374
1,800 000
340.000
400.000
115.000
340.000
300.000
711 790
150.000
250.000
200.000
75.669252.229
0.000
11,954.062
500.000
302.675
0.000
600.000
500.000
0.000
1,902.675
550.000
0.000
0.000
550.000
14,406.137
$/ s t
1.982
6.938
0.091
1.784
3.000
3.568
0.674
0.793
0.341
0.674
0.595
1.411
0.297
0.496
0.396
0.1500.500
0.000
23.697
0.991
0.600
0.000
1.189
0.991
0.000
3.772
1.0900.000
0.000
1 090
28.559
Uptime by 90 Minutes
240
833.861
3,414
16.704
Dol1ars (000)
1,000.000
3,290.000
46.000
846.000
2,501.601
1,800.000
340.000
400.000
175.000
340.000
282.000
1.176 .586
150.000
250.000
200.000
125.081416. l34
0.000
13.339.201
500.000
500.321
0.000
600.000
525.000
0.000
2.125.321
585.114
0.000
0.000585.714
16,050.236
$ / s t
1.199
3.945
0.055
1.015
3.000
2.159
0.408
0.480
0.210
0.408
0.338
1 4110.1110
0.300
0.240
0.1500.500
0.000
15.997
0.600
0.6000.000
0.720
0.630
0.000
2.549
0.702
0.000
0.0000.102
19.248
7
Page 24
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 24/47
18
ITEM IDENTIFICATION
Minutea Per Shif t
Travel Time
Lunch T i _
Service T i _
Remaining Operating Time
Downtime
Miner
S.C.
BeltBolter 'Feeder
C/PTMPower
Timber , Rai l
Condit ioneSafetyModel Adjust Delay .
Other' rota l DowntimeRemaining Uptime
Unit Shifta /Year
Cubic Feet/PlaceDensity
Raw Tonll/l'laceRaw Tona/S.C.
No. S.C./PlaceReject ,
Clean 'lana/S.C.
Place TimeMining
Maneuvering
S.C. Change
Gaa 'reat " SafetyVent i la t ion , POGtG
Tram1'ota1 Place 1'ime
Roof Eolting Place Time
PlaceG/Unit Shif t
- Clean Coal
Tonlll/Minute
Annual Produotion,at
SECTION 1
480.0
60.0
30.00.0390.0
22.8
15.021.0
4.83.0
30.51.8
2.05.0
18.020.0
0.0143.9
246.1
502
1,710.794.50
90.87.0
11.522.80
5.40
18.01
1.1320.68
0.00
8.603.48
52.51
38 80
4.687
292.571.3
1.188
146,821
SECTION
480.062.0
30.0o 0388.0
25.0
10.222.25.03.8
31.0
1.02 9
5.815.518.5
0.0140.9247.1
480
1,731. 7
94.50
111.8
7.0
11.122.80
5.40
111.23
1. 7520.90
0.0011.60
3.7253.21
40.20
4.644
293.3
71.21.191
140,806
2
KINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVED UPTIME BY 60 MINUTES FOR 25'11
SECTION 3
480.0
65.0
30.00.0
385.0
18.012.028.0
6.04.2
22.02.03.06.0
16.811.8
0.0135.8
249.2
536
1,857.494.50
81.117.0
12.522.80
5.40
19.561.88
25.20
0.0011.60
3.8359.07
3 1.50
4.219
285.1168.8
1.147
153,214
SECTION 4
480.0
58.0
30.00.0
392.0
29.4
15.518.5
5.93.6
28.82.55.02.5
20.022.0
0.0153.7238.3
528
1,980.094.50
88.81.0
12.122.80
5.40
19.801. 90
19.014
0.0011.60
4.6854.42
3B."I5
4.379
300.315.6
1.260
158,554
SECTION 5
480.0
62.030.0
0.0388.0
10.012.021. 0
8.05.0
35.02.85.34.2
11.015.0
0.0135.3
252.7
354
1,642.11
94.50
77.6
1.011.1
22.805.40
17.30
1 6616.50
0.008.603. lS
47.24
36.80
5.349
320.576.1
1. 268
113 469
EFFICIENcY
SECTION 6
480.0
64.0
30.00.0
386.0
30.0
19.219.5
4.66.9
38.01.93.02.8
15.119.5
0.0159.4226.6
3BD
1,409.494.50
66.61.09.5
22.805.40
14.84
1 4318.00
0.008.60
4.11
46. l8
37.00
4.824
248 0
65.1
1.094
l4,233
TOTAL/WTD
480.0
61. 7
30.00.0
388.3
22.913.721. 9
5.74.3
30.22.03.54.5
17.219.0
0.0144.7
243.6
2,780
1,724.994.50
111.51.0
11 .622.80
5.40
18.16
1.1520.46
0.008.60
3.8652.83
38.67
4 67
290.371.5
1.191
807,102
AV
Page 25
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 25/47
Bas i s o f Est imates
Days o f Operat ionTota l P roduc t ion (Clean at) (000)
Daily Produc t ion (Clean a t )Approx. s t /worker -day
Cost b a s i .
A. Direc t Operat ing co s t s
• 1 . Labor - Sa la r ied
• 2... 3.
• 4.5.
.. 6.
• 1. Po .... r8. F I C A ' Unemployment Taxes
.. 9. Workmen s Compensation Insurance
• 10. Black Insurance
11.12 . Welfare - Tonnage
• 13. Expensea14. , Safe ty Incen t ives
.. 15 Accident Co s t .16. Reclamation Fee17. Federal Black Lung Fee
18. Other CostsTota l
B. Other Cash Costa
1 . Overhead
2. Royal t i e .
3. Miscel laneous Taxes
• 4. Equipment Leasing Costs
• 5. I n t e r e a t Expense
• 6. Miscel laneous Income
Tota l
C. Other Costa.. 1 . Deprec ia t ion
2. Amort izat ion o f Development Coate
3. Deplet ion
Tota l
Tota l Cost o f Mining
• Fixed Dol la r s Per Year
COST OF MINING STATEMENT
Base Year 1988
Adj. Time s t . Data
240
504.458
2,1029.550
Dol la rs (000)
1,000.000
3,500.000
46.000
900.000
1,513.374
1,800.000
340.000
400.000
175.000
340.000
300.000
711.790
150.000
250.000
200.00075.669
252.229
0.000
11,954.062
500.000
302 615
0.000
600.000
500.000
0.000
1,902.615
550.000
0.000
0.000
550.000
14,406.131
/ s t
1 . 982
6.938
0.091
1.784
3.000
3.568
0.614
0.793
0.347
0.674
0.595
1.411
0.297
0.496
0.3960.150
0.500
0.000
23.691
O. In0.600
0.000
1.189
O. In0.000
3.712
1.090
0.000
0.000
1.090
211.559
Uptime
For 25
60 Minutes
240
1107.102
3,36316.168
Dollars (000)
1,000 .000
3,290.000
46.000
8Ui.000
2,421.306
1,800 .000
340.000
400.000
175.000
340.000
2112.000
1,138.821150.000
250.000
200.000121.066
403.551
0.000
13,203.743
500.000
484.262
0.000
600.000
525.000
0.000
2,109.262
585.114
0.000
0.000
585.714
IS, a98. 719
$/81;
1.239
4.016
0.057
1. 048
3.000
2.230
0.421
0.496
0.217
0.421
0.349
1.4110.186
0.310
0.2480.150
0.500
0.000
16.359
0.620
0.600
0.000
0.743
0.650
0.000
2.613
0.726
a 000
0.000
0 726
19.699
19
Page 26
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 26/47
20
MINE PRODUCTION HODEL
BY CONTINUOUS MINER SECTIONIMPROVE UPTIME BY 75 MINUTES FOR 25 EFFICIENCY
ITEM IDENTIFICATION SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 TOTAL/WTD
Minutea Per Shif t 48 0 . 0 480.0 480.0 480.0 480 . 0 480.0 48 0 . 0
Travel Time 60.0 62 . 0 65.0 58 . 0 62.0 64.0 61. 7
Lunch Time 30.0 30.0 30 . 0 30.0 30 . 0 30.0 30.0
Serv ice TilDB 0.0 0.0 0.0 0.0 0 .0 0 . 0 0.0Remaining Operat ing Time 390 . a 388.0 385.0 392.0 388.0 386.0 38 8 . 3
DowntilDBMiner 12 . 8 15.0 8 . 0 19.4 0 .0 20.0 12 . 9
S.C. 15 . 0 10.2 12 . 0 15.5 12 . 0 18.2 13 . 7
Bel t 21.0 22.2 28 . 0 18.5 21 . 0 19.5 21. 9
Bo l t e r 4 . 8 5.0 6.0 5.9 8.0 4.6 5.7
Feeder 3 . 0 3.8 4.2 3 .6 5 . 0 6.8 4 . 3
C PTM 30 5 31.0 22.0 28.8 35.0 38.0 30.2
Power 1 . 8 1 .0 2 . 0 2.5 2 . 8 1 .9 2 .0
Timber Rail 2.0 2 .9 3 . 0 5 . 0 5.3 3.0 3.5
Condi t iona 5 0 5.8 6 . 0 2 . 5 4 . 2 2.8 4.5
Safe ty 13.0 10 .5 11.8 15.0 12 0 10.1 12 . 2
Model Adjullt De1aya 20 . 0 18.5 17 .8 22.0 15.0 19 .5 19 .0
o ther 0 . 0 0.0 0.0 0.0 0 .0 0.0 0 .0
Tota l Downtime 128.9 125.9 120.8 138.7 120.3 144.4 129.7
Remaining UptilDB 261.1 262.1 264.2 253.3 267.7 241. 6 258.6
Unit Shi f ta /Year
CUbic Feet /P1ace
Denai ty
Raw Tona/P1ace
Raw Tona/S.C.
No . S.C. /Place
Rejec t ..
Clean Tona/S.C.
Place Ti ....Mining
Maneuvering
S . C. Change
Gaa Teat Safe ty
Vent i l a t ion Poat .
Tram
Tota l P lace Time
Roof Bol t ing Place Time
P1acea/Uni t Shif t
Product iv i ty - Clean Coal
Tona/unit Shif t
Tona/Hour
Tona/Minute
Annual Product ion at
502
1 710.7
94.50
80 . 87.0
11 .5
22 . 80
5 . 40
18.01
1.7320 . 68
0.008.60
3 . 4852 . 51
38.80
4 . 973
310.371.3
1.188
155 776
480
1 731 .7
94.50
81.8
7 . 0
11. 722.80
5.40
18.23
1 . 75
20.90
0.00
8 . 60
3 . 72
53 . 21
40 . 20
4 . 926
311.271 . 2
1.187
14 9 354
536
1 857.4
94.50
87.8
7.0
12.5
22.80
5.40
19.56
1 . 88
25.20
0 . 00
8.60
3.8359.07
39.50
4.473
303.1
68.8
1.147
162 436
528
1 880 .0
94.50
88.8
7.0
12 .7
22.80
5 . 40
19.80
1 . 90
19.44
0.008 . 60
4.6854 . 42
38 . 75
4.655
319.2
75.6
1.260
168 534
354
1 642 .8
94.50
77.6
7.0
11.1
22.80
5.40
17.30
1.66
16.50
0 . 00
8 . 60
3.1847.24
36 . 80
5.667
339.6
76.1
1 .268
120 204
380
1 409 . 494.50
66.6
7.0
9.522 . 80
5.40
14.841 . 43
18 . 00
0.0060
4 . 11
46.98
37 . 00
5.143
264 . 465.7
1. 094
100 471
2 780
1 724 .9
94.50
81.57 .0
11. 622.80
5 . 40
18.16
1 . 75
20.46
0.008 . 60
3.86
52.83
38.67
4.96
30 8 . 271.5
1.191
856 775
AV
Page 27
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 27/47
Bas i s o f Es t ima tes
Days of Operat ion
Tota l P roduc t ion (Clean a t (000)
Daily Produot ion (Clean at)Approx. a t /worker -day
Coat .basis
A. Direc t.. 1
.. 2.
.. 3.
4.5.
,. 6.
7.
8
9.... 10.
l12.13.
14 .
15 .16
17.
' 18.
Ben e f i t .
Suppl i e s
Suppl i e s
Power
- Hourly
Operat ing
- Maintenance
FICA Unemployment TaxesWorkmen's Compensation Insurance
Blaok Lung InsuranoeWelfare
Welfare Tonnage
Safe ty Expenses
Produc t ion , Safe ty Inoent ives
Aocident Cost .Reclamation Fee
Federa l Black Lung Fee
Other Costs
Tota l
B. Other Cash Costa
1 Overhead
2.
3 . Taxes
'4. Equipment Leasing Costs
'5. I n t e r e s t Expense
6. Miscel laneous Income
Tota l
C. Other Costs
1. Deprec ia t ion
2. Amort izat ion o f Development Costs
3. Deplet ion
Total
Tota l Cost o f Mining
Fixed Dol la r s Per Year
COST OF MINING STATEMENT
Base Year 198a
Adj Time S t Data
240
504.458
2,1029.550
Dol la rs (000) / s t
1,000.000
3,500.000
46.000
900.000
1,513.374
1,800.000
340.000
400.000
175 000
340.000
300.000
7 1 1 7 ~ 0150.000
250.000
200.00075.669
252.229
a 000
11,954.062
500.000
302.675
0.000
600.000
500.000
0.000
1,902.675
550.000
0.000
0.000
550.000
14,406.737
1.982
6.938
0 091
1.7843.000
3.568
0.614
0.193
0.347
0.674
0.595
1.4110.291
0.496
0.3960.1500.500
0.00023.691
0.991
0.600
0.000
1.189
0.991
0.000
3.712
1.090
0.0000.000
1.090
28.559
Uptime
For 25%
240
856.775
3,57017.163
Dol la rs (000)
1,000 .000
3,290.000
46.000
846.000
2,570.325
1,800.000
340.000
400.000
115.000
340.000
282.000
1,208.909
150.000
250.000
200.000128.517
428.388
0.000
13,455.138
500.000
514. 065
0.000
600.000
525.000
0.000
2,13 L065
585.714
0.000
0.000
585.714
16,179. He
/ s t
1.167
3 840
0.054
0.987
3.000
2.101
0.397
0.467
a 204
0.397
0.329
1.411
0 . l i5
0.292
0.2330.150
0.500
0.000
15.704
0.584
0.600
0.0000.100
0.613
0.000
2.497
0.6114
0.000
0.000
0.684
18.885
21
Page 28
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 28/47
22
ITEM IDENTIFICATION
Minutes Per Sh i f t
Trave l Time
Lunch T i _
Serv ice T i _Remaining Operat ing Time
Downtime
Miner
S.C.
B el t
Bo l t e r
Feeder
C/p' M
Power
Timber , Rai l
Condi t iona
Delays
Other
Tota l Downtime
Remaining Uptime
Unit Shi f t s /Year
Cubic Fee t / P l ace
DenSity
Raw Tonll/Place
Raw Tona/S.C.
Ho. S.C. /Place
Rejec t ..
Clean Tona ?. C.
Place Time
Mininq
Maneuve;r:lnq
S.C. Change
Ga. T e . t ,
Vent i l a t ion "Tram
Tota l Place Time
Roof Bol t inq Place Time
Plllcell /Unit Sh i f t
Tona/UnitTOI . . . /Bour
Tons/Minut .
- Clean Co .
Annual Product ion ,s t
SECTION
480.0
60.0
30.0
0 .0390 0
0.0
15 .0
21.
4.8
3 .0
30 5
1 .8
2.0
5 .0
11 .0
20.0
0 .0
114.1
215.9
502
1 ,710 .7
94.50
BO.B7 .0
11.5
22.80
5.40
IB.01
1 . 73
20.68
0.00
8.60
3.48
52.51
38.80
5.255
327. 971. 3
1.188
164,606
1 SECTION
480.0
62.0
30.0
0.0
388.0
0.0
10.2
22.2
5.0
3 .8
31.0
1 .0
2 .9
5 8
8 .5
18.5
0.0
108.9
279.1
480
1 ,731 . 714 .50
Sl.B7.0
11 .7
22 BO
5 .40
18.23
1. 75
20.90
0.00
8.60
3.72
53.21
40.20
5.245
331.3
71.2
1.187
159,041
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVE UPTIME BY 90 MINUTES FOR 25% EFFICIENCY
2 SECTION
480.0
65.0
30.0
0.0385.0
0.0
12.0
28.0
6.0
4.2
22 .0
2 .0
3 .0
6.0
9.8
17 .8
0.0
110.8
274.2
536
I ,B57 .
94 50
B7.8
7 .0
12 .5
22.80
5.40
19.56
1.8B
25.20
0.00
8.60
3 .83
59.07
39.50
4.642
314.5
68.S
1.147
168,584
: SECTION
480. a58.0
30.0
0 .0392.0
a.o15.5
18.5
5 .9
3 .6
28 .8
2 5
5.0
2 .5
13 .0
22.0
0.0
111.3
274.7
528
1 .880 .0
94.50
IIB.B7.0
12 .7
22.BO
5 .40
19.80
1 .90
U .44
0.00
8.60
4.68
54.42
38.75
5.048
346.275.6
1.260
182,773
4 SECTION
480.0
62.0
30.0
0 .0388.0
0.0
12 .0
21.0
8 .0
5 .0
35.0
2.8
5 .3
4.2
10 .0
15 .0
0 .0
118.3
269.1
354
1.642.11
94.50
77.6
7 a11.1
22.80
5 . 0
17.30
1 . 66
16.50
0.00
8.60
3.18
47.24
36.80
5.709
342.1
16 .1
1.268
121,102
5 SECTION
480.0
64.0
30.0
0 .0386.0
0.0
18.219 .5
4,.6
6.8
31LOlog
3.0
2 8
S.l19.5
0.0
122.4
263.6
380
1 ,409 .4
94.50
66.6
7.0
9.5
22.80
5.40
14.84
1. 43
18.00
0.00
8 60
4.1146.98
37.00
5.611
288.565.7
1 .094
109,620
6 TOTAL/WTD
480.0
61.1
30 a0.0
388.3
0.0
13 .7
21 .9
5 7
I I30 2
2 .0
3.5
4.5
10 .2
I. a0 .0
114.11
273.4
2 ,780
1 ,724 .9
94 50
111.5
7 .0
11 .6
22.805./10
111.16
1 . 75
20 . 6
0.00
8 .60
3 .86
52 83
38.67
5.24
325.8
71.5
1 191
905,725
AV
Page 29
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 29/47
Basis of Estimatea
Days of OperationTotal Produotion (Clean at) (000)
Daily Produotion (Clean at)
Approx. at/worker-day
Cost basia
A. Direot uner .u;>.na
. l2.
:3.. 4.
5.
6.
1.8.
.. 9.
*.. 11.
12... 13.. 14.,. 15.
16.11.
,. 18.
Benef i t s Hourly- Operating- Maintenanoe
PowerFICA , Unemployment taxesWorkmen's Compensation InsuranoeBlack InsuranceWelfare -
Welfare - Tonnage
Safety ExpensesProduction , Safety InoentivesAcoident CostaReolamation Fe .
Federal Black Lung FeeOther Costs
Total
B. Other Cash Costs
.
c.
l OVerhead
2. Royalt ies3. Miscellaneous Taxes4. Equipment Leasing Costs5. Interes t Expense6. Miscellaneous Income
Total
Other Costs1. Depreciation2. Amortization of Development costa
3. DepletionTotal
Total Coat of Mining
Fixed Dollars Per Year
COST OF MINING STATEMENT
Base Year 1988
Adj. Time St . Data
240
504 1158
2,102
9.550
Dollars 000)
1,000.0003,500.000
46. 000
900.0001,513.3141,800.000
340.000400.000175.000340.000300.000711.190150.000250.000200.000
15.6611
252.2290.000
11,954.062
500.000
302.6750.000
600.000500.000
0.0001,902.615
550.0000.000
0.000550.000
14,406.137
/_t
1.9826.9380.0911.1843.000
3.5680.674O.H
0.3410.614
0.5951.4110.2910.4960.3960.1500.5000.000
23.697
0.9910.6000.0001.1890.9910.000
3.172
1.0900.000
0.0001.090
28.559
Optime by 110 MinutesFor 25\ Efficiency
240
905.1253,114
18.144
Dol l an (000)
1,000.0003,290.000
46.000846.000
2,111.115
1,800.000340.000400.000115.000
340.000282.000
1,211.918150.000250.000200.000135.859452.863
0.00013,102.814
500.000543 435
0.000600.000525.000
0.0002,168.435
585.1140.000
0.000585.114
16.457.024
/_t
1.1043.6320.0510.9343.000
1.IIS70.375
0.442D.H3D.37S
0.3111.4110.1660.2160.2210.1500.500
0.00015.129
0.5520.6000.0000.6620.5800.0002.394
0.6410.000
a 0000.641
18.170
23
Page 30
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 30/47
24
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVED UPTIME BY 60 MINUTES FOR SO ll EFFICIENCY
ITEM IDENTIFICATION SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 TOTAL WTD lW
Minute.. Per Shif t 480.0 480.0 480.0 480.0 480.0 480.0 480.0
Travel Time 60.0 62.0 65.0 58.0 62.0 64.0 61. 7
Lunch Time 30.0 30.0 30.0 30.0 30.0 30.0 30.0
Service Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Remaining Operating Time 390.0 388.0 385.0 392.0 388.0 386.0 388.3
Downtime
Miner 22.8 25.0 18.0 29.4 10.0 30.0 22.9
S.C. 15.0 10.2 12.0 15 .5 12.0 18.2 13 .7
Belt 21.0 22.2 21l.0 18.5 21.0 111.5 21.9
Bolter 4.8 5.0 6.0 5.9 8.0 4.6 5 .7
Feeder 3 .0 3.B 4.2 3 .6 5.0 6.8 4.3
C/PTM 30.5 31.0 22.0 28.8 35.0 38.0 30.2
Power 1.8 1 .0 2.0 2.5 2.8 1 .9 2.0
Timber i Rail 2.0 2.9 3 .0 5 .0 5.3 3.0 3.5
CondH:ions 5.0 5.B 6.0 2 .5 4.2 2 .8 4.5
18.0 15 .5 16.8 20.0 17.0 15 .1 11 .2
Delay . 20.0 18.5 1.7.8 22 0 15.0 19.5 19 .0
Other 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Downti_ 143.9 140.9 135.8 153.7 135.3 159.4 144.1
Remaining Uptime 246.1 247.1 249.2 238.3 252.7 226.6 243.6
Unit Shifta /Year
Cubic Feet/PlaceDensi tyRaw ' fona/PlaceRaw Tons/S.C.
No. S.C./Place,"rona/S.C.
Place rimaMining
ManeuveringS.C. Chang'Galli T• • & SafetyVent i la t ion i PostsTram
Total Place Time
Roof Bolt ing Place Time
Places/Unit Shif t
Productivity Clean Coal
Tona/Unit Shif t
Tonll/Hour
Tons/Minute
Annual Production,st
502
1 710.7
94.50
80.8
7.0
11 .522.80
5.40
15.01
1 . 73
20.68
o 00
8.60
3.4849.50
38.80
4.971
310.275 6
1.261
155,731
480
1,131 . /
94.50
81. 87.0
11. /
22.80
5.40
15.20
1 . 75
20.90
0.008.60
3.72
50.17
40.20
4.925
311.115.5
1 . 259
149,336
536
1,851.494.50
87.8
7.0
12.522.80
5.40
16.30
1.88
25.20
0.00
8.60
3.11355.81
39.50
4.465
302.5
72.S
1.214
162,163
528
1 880 .0
94.50
88.8
7.0
12.7
22.80
5.40
16.50
1. 90
19.44
0.008.60
4.68
51.12
38.75
4.662
319.780.5
1.341
168,181
354
1 642 .8
94.50
77.67.0
11.1
22.80
5.40
14.C2
1. 66
16.50
0.00
B.60
3.18
44.36
36.80
5.697
341.4
81.1
1.351
120,844
380
1 409 .4
I4.50
66.6
1.0
9.522.80
5.40
12.37
1 .4318.00
0.00
8.60
4.11
44.50
37.00
5.092
261. 869.3
1.155
99,410
2,180
1 724.9
94.50
81.5
7.0
11.6
22.80
5.40
15.14
1 .15
20.46
0.00
8.60
3.86
49.80
38.67
4. l5
308.0
75.8
1.264
856,331
Page 31
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 31/47
Bas i s of Es t ima tes
Day. of Operat ion
Tota l P roduc t ion (Clean .t (000)
Daily Produc t ion (Clean s t )Approx. a t /worker -day
Cost b a s i .
A. Direc t Opera t ing Costs
• 1. Labor - Sa la r ied
• 2. Labor - Hourly
• 3. Ben e f i t . - Sa la r ied
• 4 . Benef i t s - Hourly5 . Supp1ie8 - Opera t ing
6. Suppl i e s - Maintenance
7 Power
8 . FICA Unemployment Taxes
• 9. Workmen'. Compensation In8urance
• 10. Black Lung Compensat ion Insurance
11. Welfare - Hourly
12 . Welfare - Tonnage
• 13. Safe ty Expenses
• 14. Produc t ion Safe ty Incen t ives
• 15. Accident Cost .
16. Recl m£tion Fee
17. Federa l Black Lung Fee
• 18. Other Cost8Tota l
B .
•
••
C .
•
Other Cash Cost8
1. Overhead
2. Roya l t ie s
3. Misce l laneous Taxes
4 . Equipment Leaaing Costs
5. I n t e r e s t Expen.e
6 . Misce l laneous Income
Total
Other Costa1. Deprec ia t ion
2. Amort izat ion o f Development Costs
3 . Deplet ion
Total
Tota l Cost o f Mining
• Fixed Dol la r s Per Year
COST OF MINING STATEMENT
Base Year 1988
Adj . Time St . Data
240
504.458
2,1029 . 550
Dol la rs (000)
1,000.000
3,500.000
46.000
900.000
1,513 . 374
1,800.000
34 0 . 000
400.000
17 5 . 000
340.000
300.000
711.790
15 0 . 000
250.000
20 0 . 000
75 . 669
252.229
0 . 000
ll, 954 . 062
500.000
30 2 . 675
0 . 000
600 . 000
50 0 . 000
0.000
1,902.675
550.000
0 . 000
0 .000550.000
14,406.737
/8 t
1. 982
6.938
0.091
1 . 784
3 . 000
3.568
0.674
0.793
0.347
0.674
0.595
1.411
0.297
0.496
0.3960.150
0 . 500
0.000
23.697
0 . 991
0.600
0.000
1 . 189
0 . 991
0 . 000
3.772
1 . 090
0.000
0.0001.090
28 . 559
Uptime by 60 Minutes
For 50 ' Ef f ic iency
240
856.331
3,56817.154
Dol la rs (000)
1,000 . 000
3,290.000
46 . 000
84 6 . 000
2,568.993
1,800 . 000
340.000
400.000
175.000
340.000
28 2 . 000
1,208 .283
150.000
250.000
200.00012 8 . 450
42 8 . 166
0.000
13 452.891
500.000
513.799
0.000
600.000525.000
0.000
2,138.799
585.714
0.000
0.000585.714
16,177 . 404
/ s t
1.168
3.842
0.054
0.988
3.000
2.102
0.397
0.467
0.204
0.397
0.329
1 . 4 l l
0.175
0.292
0.234
0.150
0.500
0.000
15.710
0.584
0.600
0.000
0.701
0.613
0 . 000
2 . 498
0 . 684
0.000
0.0000.684
18 . 892
5
Page 32
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 32/47
26
ITEM IDENTIFICATION
Minutes Per Shif t
Travel T i _
Lunch T i _
Service Tima
Remaining Operating Time
Downtime
Miner
S.C.
Belt
Bolter
Feeder
C/PTM
Power
TimberRail
Condit ionsSafetyMod . 1 Adjust Delay .
OtherTotal Downtime
Remaining Uptime
Unit Shlfta/Year
Cubic Feet/PlaceDensity
Raw Tona/Place
Raw Tona/S.C.
No. S.C./P1aceReject ,
Clean Tona/S.C.
Place Time
tUning
Maneuvering
S.C. Change
Gaa TeatVent i la t ion
Tr ....
Total Place Time
Roof Bolt ing Place Time
Placea/Uni t Shif t
Produc t iv i ty - Clean Coal
Tona/Unit Shif t
Tona/Hour
Tona/Minute
Annual Production,at
SECTION
480.0
60.0
30.0
0.0390.0
12 8
15.021. 0
4.83.0
30.51.82.05.0
13.020.0
0.0128.9261.1
502
1,710.794.50
&0.8
1.0
11.522.80
5.40
15.01
1.1320.68
0.00
8.603.48
n 5 0
38.80
5.274
329.175.6
1 261
165,223
1 SECTlON
480.0
62.0
30.00.0
388.0
15.010.222.2
5.03.8
31.01.02
5.810.518.5
0.0125.9262.1
480
1,731.794.50
81.87.0
11.722.80
5.40
15.20
1 . IS
20.90
0.008.60
3.7250.11
40.20
5.224
330.075.5
1.259
158,401
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVE UPTIME BY 15 MINUTES FOR 50% EFFICIENCY
2 SECTION
4800
65.0
30.00.0
385.0
8.0
12.028.0
fLO
4.222.0
2.03.06.0
11.&
11.&
0.0120.8264.2
536
1,851.494.50
87.81.0
12.522.&0
5.40
16.301 . 88
25.20
0.00
8.603.83
55.81
39.50
4.734
320.&
72.&
1.214
171,924
3 SECTION
480.058.0
30 0
0.0392.0
1 L4
15.518.5
5.93 .6
28.82.55.02.5
15.022.0
0.0138.7
253.3
52&
1,880.094.50
88.8
7.0
12.7
22.80
5.40
16.50
1 . 90
19.114
0.00
8.60
4.6&
51.12
38.15
4.955
339.1180.5
1.341
179,412
4 SECTION
480.0
62.0
30.0
0.0388.0
0.012.021.08 .05 .0
35.02.8
5 .34.2
12.015.0
0.0120.326"/.7
354
1,642.894.50
7 1.6
7 0
11.122.&0
5.40
14 42
1 66
16.500.008.603.19
44.36
36.80
6.035
361. 6
81 1
1.351
128,017
5 SECTION
480.0
64.0
30.0
0.0386.0
20.0
18.219.5
4.66.8
38.01.93.02 &
10.119.5
0.0144.4
241. 6
380
1,409.494.50
6Ii.6
7.09.5
22.80
5.40
12.3 1
1.4318.00
0.008.60
4.11
44.50
3 1.00
5.429
279.1
69.3
1.155
106,055
Ii TOTAL/WTD
480.0
61. I30.0
0.0388 3
12.913.121. 9
5.14.3
30.22.0
3.54.5
12.21 9 0
o 0129. I258.6
2,180
1 ,124 .994.50
&1.5
7.0
11. 622.80
5.40
15.14
1 75
20.460.008.60
3.11649.80
38.61
5.26
321.075.8
1.264
909.032
AV
Page 33
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 33/47
Basis of Estimates
of OperationProduct ion (Clean lit) 000)
Daily Produotion (Clean at)Approx. s t /worker-day
Cost basis
A. Direot1 . Labor -
'
2. Labor - Hourly
3. Benef i t . - Salar ied
4. Benef i t .
5. Suppl ies -
• 6. Suppl ies -
• 7. Power8. FICA
9.• 10.
• I I .12.
InsuranceInsurance
13.
• 14' 15.
Welfare Tonnage
Safety Expenses
Product ion SafetyAccident CostsRealam tioD Fe .
Federal Black Lung
Other Costs
Incentives
16.
17.
18Total
B. Other Cash Costs
• I . Overhead
2. Royalt ies3. Misoellaneous Taxes
Fee
4. Equipment Leasing Costs
5. In t e re s t Expense
' 6. Miscellaneous Income
Total
C. Other Costs' 1. Depreciat ion
2. Amort izat ion of Development Costs
3. Deplet ionTotal
Total Cost of Mining
Fixed Dollars Per Year
COST OF MINING STATEMENT
Base Year 1988
Adj. Time St. Data
240
504.458
2,1029.550
Dollars/OOO) / s t
1,000.0003,500.000
46.000
900.000
1,513.3741,800.000
340.000
400.000
175.000
340.000
300.000
711.790150.000
250.000200.000
75.669252.229
0.000
11,954.062
500.000
302.675
0.000
600.000
500.0000.000
1,902.675
550.000
0.000
0.000550.000
14,406.737
1.982
6.938
O. 091
1.784
3.000
3.5680.674
0.793
0.347
0.674
0.595
1.4110.297
0.4960.396
0.150
0.500
0.000
23.697
0.9910.600
0.000
1.1811
0.9910.000
3.712
1.090
0.000
0.0001. 090
28.559
Uptime
for 50\
240
909.032
3,18818.210
Dollars (000) /at
1,000.000
3,290.00046.000
846.000
2,727.0961,800.000
340.000
400.000115.000
340.000282.000
1,282.644150.000
250.000200.000
136.355454.516
0.00013,719.611
500.000
545.420
0.000600.000
525.1)00
0.000
2,170.420
585.714
0.000
0.000585.714
16,475.745
1.100
3.619
0.051
0.931
3.000
1.980
0.314
0.440
0.193
0.374
0.310
1.4110.165
0.2750.2200.150
0.500
0.00015.093
0.550
0.600
0.0000.660
0.5780.000
2.388
0.644
0.000
0.0000.644
18.124
27
Page 34
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 34/47
28
ITEM IDENTIFICATION
Minutes Per Shif t
'l.'ravel Time
Lunch Time
Service Time
Remaining Operating Time
Downtime
Miner
S.C.BeltBol terFeederC/PTMPower
rimber RailConditionsSafetyModel Adjust DelaysOtherTotal Downtime
Remaining Uptime
Unit Shifts/Year
Cubic Feet/PlaceDensityR I . Tons/PlaceRaw Tons/S.C.
No. S.C./PlaceRejeot ,
Clean 'lions/S.C.
Place TimeMining
ManeuveringS.C. CbangeGa. Teat , SafetyVent i la t ion , PostsTramTotal Place Time
Roof Bolt ing Place Time
Place . /Uni t Shif t
Productivity - Clean Coal
'ron . /Unit Shift
Ton . /Hour'rons/Minute
Annual Produotion,at
SECTION
480.0
60.0
30.0
0.0
390.0
0.0
15 .0
21.0
4.8
3.0
30.5
1 .8
2 .0
5.0
11. a20.0
0.0
114.1
275.9
502
1 710 .1
94.50
80.8
7.0
11.5
22.80
5.40
15.01
1.1320.68
0.00
8.60
3.48
49.50
38.80
5.573
347.8
75.6
1.261
174,589
1 SECTION
480.0
62.0
30.0
0 .0
388.0
0.0
10.2
22.2
5.0
3.8
31. 0
1 .0
2.9
5.8
8.5
18.5
0.0
108.9
279.1
480
1 131. 7
94.50
81 8
7.0
11 .1
22.80
5.40
15.20
1.75
20.90
0.00
8.60
3.72
50.17
40.20
5 563
351.475.5
1.259
168,615
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVE UPTIME BY 90 MINUTES FOR 50 EFFICIENCY
2 SECTION
480.0
65.0
30.0
0 .0
385.0
0.0
12.028.0
6.04.2
22.0
2.0
3 .0
fLO
9.8
17.8
0.0
110.8
274.2
536
1 857.4
94.50
87.8
7.0
12.522.80
5.40
16.30
1.88
25.20
0.00S.IiO
3.8355 81
39 50
4.913
332. iI
12 .81 214
178,432
3 SECTION
480.0
51LO
30.0
0.0
392.0
0.0
15.518.5
5.9
3.6
28 8
2.5
5 .0
2.5
13.0
22.0
0.0
117.3
274.7
528
1.880 094.50
88.87.0
12.7
22.80
5.40
16.50
1.90
19.440.00
8.60
4.6851.12
38.75
5.374
31iB.580.5
1 .341
194,569
4 SECTION
480.0
62.0
30.0
0.0
388.0
0.0
12.0
21.0
8.0
5 .0
35.0
2.8
5.3
4.2
10.0
15.0
0.0
118.3
269.7
354
1 642.8
94.50
77.6
7.0
11.1
22.80
5.40
14.42
1.66
16.50
a.oo8.60
3.18
44.36
36.80
6.080
364.3
111.1
1.351
128.973
5 SECTION
480.0
64.0
30 0
0.0
386.0
0.0
18.2
19.5
4.1i6.8
38.0
1 .9
3.0
2.8
8 .1
19.5
0.0
122.4
263. Ii
380
1 409 .4
94.50
66.6
7 .0
9.5
22.80
5.40
12.37
1 . 43
18.00
0.00
8.60
4.1144.50
37.00
5.923
304.5
69.3
1.155
115,112
I TOTAL/WTD
480.0
61. 1
30.0
0.0
388.3
0.0
13.721.
5.7
4.3
30.2
2.0
3.5
4.5
10 2
U.O
0.0
114.8
273 ...
2,780
1 724 .9
94.50
81.5
7.0
11.6
22.80
5.40
15 14
1.75
20.46
0.00
8.60
3.86
49.110
38 67
5.56
345.7
75.11
1.264
960,950
AV
Page 35
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 35/47
Basia of Estimates
Days of V ' - < ; ~ . U l 1Total (Clean at) (000)
Daily Production (Clean s t)
Approx. s t /worker-day
A. Direct
1 . Labor -
2. Labor -
3.<I Benef i t s5.15
7. Power
Cost basis
8. FICA ' Unemployment Taxes9. Workmen s Compensation Insurance
10. Blsck Lung Compensation Insurance11. Welfare Hourly12. Welfare - Tonnage
13. Safety Expenses
14. P roduc t i on ' Safety Incent ives15. Accident Costs115. Reclamation Fee
17. Federal Black Lung Fee
18. Other Costs
Total
B. Other Cash Costs1- Overhead
2. Royal t i es3 . Miscellaneous Taxes
4. Equipment Leasing Costs5. In te res t Expense
15 Miscellaneous Income
Total
C. Other Costsl2. o f Development
3. DepletionTotal
Total Cost of Mining
Fixed Dollars Per Year
Costs
COST OF MINING STATEMENT
Base Year 1988
Adj. Time St . Data
240
504.458
2,102
9.550
Dollars (000)
1,000.000
3,500.00046.000
900.000
1,513.374
1,800.000340.000
400.000115.000
340 000
300.000
711. 790
150.000
250.000200.000
75.6159
252.229
0.00011,954.062
500.000
302 1515
0.000
600.000
500.000
0.000
1,902.615
550.000
0.000
0.000550.000
14,406.731
/ s t
1. 982
15.938
0.091
1. 784
3.000
3.569
0.674
0.1930.347
0.6740.595
1.4110.297
0.08960.396
o 150
0.500
o 000
23.697
0.991
0.600
0.000
1.1890.991
0.000
3.172
1.090
0.000
0.0001.090
28.559
Uptime y 90 Minutes
For 50 Eff i c i ency
240
960.950
4,004
19.250
Dollars (000)
1,000.000
3,290.000
46.000
846.0002,882.8501,800.000
340.000
400.000175.000
340.000
282.000
1,355.900150.000
250.000200.000
144.143
480.4750.000
13,982.368
500.000
5115.510
a 000
600.000
525.000
0.000
2,201. 510
585.714
a 000
0.000585.714
16,769.652
/ s t
1.041
3.424
0.048
0.8803.000
1.873
0.354
0.4160.182
0.354
0.293
1.4110.156
0.21500.208
0.150
0.500
0.000
14.551
0.520
0.600
0.000
0.624
0.546
0.000
2.291
0.610
0.000
0.000
0.610
11.451
29
Page 36
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 36/47
3
ITEM IDENTIFICATION
Minutes Per Shi f t
Travel Time
Lunch Time
Serv ice Time
Remaining Operat ing Time
Downtime
Miner
S.C.
Bel t
Bol t e r
Feeder
C/PTM
Power
Timber , Rai l
Condi t ions
Safe ty
Model Adjus t Delays
OtherTota l Downtime
Remaining Uptime
Unit Shi f t s /Year
Cubic Feet /P lace
Densi ty
Raw Tons/PlaceRaw Tons/S.C.
No. S.C./P1aceReject
Clean Tons/S . C.
Place Time
Mining
Maneuvering
S.C. Change
Gas Test , Safe ty
Vent i l a t ion , Pos ts
Tram
Tota l P lace Time
Roof Bol t ing Place Time
Places /Uni t Shif t
Product iv i ty - Clean Coal
Tons/Unit Shif t
Tona/Hour
Tons/Minute
Annual Produc t ion , a t
SECTION
480 . 0
60 . 0
30.0
0.0390.0
22.8
15.0
21. 0
4.8
3.0
30.5
1 .8
2 . 0
5 . 0
18 . 0
20 . 0
0 . 0
14 3 . 9
246.1
502
1 710 .7
94.50
80.8
7.0
11 .522 . 80
5 . 40
12.82
1.7320 . 68
0 . 00
8.60
3.4847.31
38.80
5 . 202
324 . 6
79.11 . 319
162 953
1 SECTION
480 . 0
62 . 0
30.0
0.038 8 . 0
25.0
10.2
22.2
5 . 0
3.8
31. 0
1 .0
2 . 9
5 . 8
15 . 5
18.5
0 . 0
140.9
247.1
480
1 731. 7
94.50
81. 8
7.0
11.722.80
5.40
12.97
1 . 75
20 . 90
0.00
8 . 60
3 . 72
47.95
40 . 20
5 . 154
32 5 . 5
79.0
1. 317
156 253
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVED UPTIME BY 60 MINUTES FOR 75
2 SECTION
480.0
65.0
30 . 0
0.0385 . 0
18 . 0
12 . 0
28.0
6 . 0
4.2
22.02 . 0
3.0
6 . 0
16.8
11.8
0.0135.8
249.2
536
1 857 .4
94.50
87.81.0
12.5
22.805.40
13.92
1. 88
25.20
0.00
8.60
3 . 83
53 . 43
39 . 50
4 . 664
31 6 . 0
76.11. 268
16 9 , 394
3 SECTION
480.0
58.0
30 . 0
0 . 0392 .0
29.4
15.5
18.5
5 . 9
3.6
28.8
2.5
5.0
2.5
20.0
22 . 0
0 . 0
15 3 . 7
23 8 . 3
528
1 880.0
94.50
88.81 . 0
12.722 . 80
5 . 40
14 . 09
1. 90
19.44
0 . 00
8.60
4.6848 . 71
38.75
4 . 892
335.5
84.5
1. 408
177 142
4 SECTION
480.0
62.0
30.0
0.038 8 . 0
10.0
12 .0
21.0
8.0
5.0
35.0
2 .8
5.3
4.2
17 .0
15.0
0 .0
135.3
252.7
354
1 , 642.8
94.50
77.6
1.0
11.122 . 80
5.40
12 . 31
1 . 66
16.50
0 . 00
8 . 60
3 . 18
42.25
36.80
5.981
358.4
85.1
1 .418
126 869
5
EFFICIENCY
SECTION
480 . 0
64.0
30 . 0
0.0386.0
30 . 0
18.2
19.5
4.6
6 . 8
38.0
1 .9
3.0
2.8
15.1
19 .5
0.0
159.4
22 6 . 6
380
1 409.4
94.50
66.6
7.0
9 . 5
22.805 . 40
10.56
1 43
18 . 00
0 . 00
8 . 60
4 . 11
42.70
31.00
5.307
272.8
72.2
1. 204
103 681
6 TOTAL/WTD
48 0 . 0
61. 7
30 . 0
0 . 038 8 . 3
22.9
13 . 7
21. 9
5.7
4 . 3
30.2
2.0
3.5
4.5
17.2
19 .0
0.0
14 4 . 7
243.6
2 , 780
1 724 .9
94 . 50
81.5
7.0
11 . 6
22 . 80
5.40
12.92
1.75
20 . 46
0.008.60
3.8647 . 59
38.67
5.19
32 2 . 4
79 . 4
1 . 323
89 6 , 293
AV
Page 37
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 37/47
Basis of Est imates
Days of Operat ion
Total Produc t ion (Clean s t ) (000)
Daily Product ion (Clean a t )
Approx. at/worker - day
Cost bas i .
A. Direc t Operat ing Costs1 . Labor - Salar i ed
2. Labor - Hourly
3 . Benef i t s - Salar i ed
4. Benef i t s - Hourly
5. Supplies - Operat ing
6 . Suppl i e s - Maintenance
7 . Power
8. FICA ' Unemployment Taxes
9. Workmen . Compensation Insurance
10 . Black Lung Compensation Insurance
11. Welfare - Hourly
12 . Welfare - Tonnage
13. Safe ty Expense.
14. P r o d u c t i o n ' Safe ty Incen t ives15. Accident Cost .
16. Reclamation Fee
17 . Federal Black Lung Fee
18 . other CostsTotal
B . Other Cash Costs
1 . Overhead
2 . Roya l t ie s
3 . Miscel laneous Taxes
4. Equipment Leasing Costs
5. I n t e r e s t Expense6 . Miscel laneous Income
Total
C. Other Costs
1. Deprecia t ion
2. Amort izat ion of Development Costs
3 . Deplet ionTotal
Total Cost of Mining
Fixed Dollars Per Year
COST OF MINING STATEMENT
Base Year 1988
Ad j . Time St . Data
240
50 4 . 458
2 102
9 . 550
Dollars (000)
1,000.0003 50 0 . 000
46.000
900.000
1,513.374
1,800.000340.000
400.000
115.000
340.000
300.000
711. 790
150.000
250.000200.000
75.669
252.229
0.000
11,954 . 062
50 0 . 000
30 2 . 675
0.000600.000
50 0 . 000
0 . 000
1 902 . 675
55 0 . 000
0 . 000
0 . 000
55 0 . 000
14,406.737
/a t
1 . 982
6.938
O. 091
1 . 784
3.000
3 . 568
0.674
0 . 793
0 . 347
0.674
0 . 595
1.411
0.297
0.4960 . 396
0.1500.500
0 . 000
23 . 697
0.9910 . 600
0.000
1.189
0.991
0.000
3.772
1. 090
0.000
0.0001.090
28.559
Uptime by 60 Minutes
For 75 Eff ic iency
240
896.293
3,735
17.955
Dollars (000) /a t
1,000.000
3 29 0 . 000
46.000
846.000
2,688.879
1,800.000
340.000
400 . 000
17 5 . 000
34 0 . 000
28 2 . 000
1,264 . 669
150.000
250 . 000200 . 000
13 4 . 444
448.147
0.000
13 655 . 139
500.000537.776
0.000
600.000
525.000
0.000
2,162.776
585.714
0.000
0.000585.714
16 403.629
1.116
3 . 671
0.051
0.944
3.000
2.008
0.379
0.446
0 . 195
0 . 379
0 . 315
1.4110 . 167
0 . 2790 . 223
0 . 150
0 . 500
0.000
15.235
0.558
0.600
0.000
0.669
0.5860.000
2.413
0.653
0.000
0 . 000
0.653
18.302
31
Page 38
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 38/47
32
ITEM IDENTIFICATION
Minutes Per Shi f tTra.vel T i _
Lunch T i _Service l i _Remaininq Operatinq Time
DowntimeMiner
S.C.BeltBolterFeederC/PTM
Power
Timber Ra.ilConditionsSafetyMod . Adjust Delays
OtherTotal Downti_Remaininq Upt i_
Onit Shifts /Year
Cubio Feet/PlaceDensityRaw Tons/PlaceRaw Tons/S.C.
No. S.C./PlaceReject ,Clean fans/S.C.
1'111.0 T i _Mining
Man .uveringS.C. Change
Gall T.at ..Venti lat ion Ii
l ram
Total Place Time
Roof Bolting Place Time
Placea/Unit Shift
Productivi ty - Cl .an Coal
rona/Unit ShiftTons/Hour
Tona/Minute
Annua.l Production,at
SECTION
480.0
60.0
30.00.0
390.0
12.B
15 .0
21.0
4.83 .0
30.S
1.82 .0
5.0
13 .0
20.0
0 .0
128.9
261.1
502
1 ,nO.7
94.50
80.S
7.0
11 .522.80
5.40
12.82
1. 73
20.68
0.00
8.60
3.48
47.31
38.80
5.519
344.4
79.1
1.319
172,886
1 SECTION
480.0
62.0
30.00.0
388.0
15.0
10.2
22.2
5 .0
3.8
31.0
1 .0
2.11
5.8
10.5
111 5
0.0
125.9262.1
480
1,731. 794.50
81. 87.0
11 .7
22.80
5.40
12 . n
1.7520.90
0.00
8.60
3.72
47.95
40.20
5.466
345.3
79.0
1.311
165,738
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVE uprIME BY 75 MINurES FOR EFFICIENCY
2 SECTION
480 0
6S.0
30.00 .0
385.0
8.0
12 .0
28.0
6 .0
4.2
22.0
2 .0
3.0
fi 0
11.817 .8
0 .0
120.8
264.2
536
1 ,857 .4
94.50
87.8
7 .0
12 .5
22.80
5.40
13.92
1.118
25.20
0.00
8.60
3.83
53.43
39.50
4.945
335.176.1
1 .269
179,590
3 SECTION
480.0
58.0
30.00.0
392.0
19.4
15.518.5
5 .9
3 .6
28.8
2 .5
S.O
2.S
15.0
22.0
0.0138.1
253.3
528
1 ,880 .0
94.50
88.87.0
12 .7
22.80
5.40
14.09
1 .9019.44
0.00
8.60
4.68
48.71
38.75
5.200
356.6
84.5
1.408
188,293
4 SECTION
480.0
62.0
30.00.0
3B8.0
0.0
12.0
21.0
8 .0
5.0
35.0
2.8
5.3
4.2
12.0
15 .0
0 .0
120.3
267.7
354
1 ,642 .8
94.50
77.67.0
11.122.80
5.40
12.31
1.6616.50
0.00
8.60
3.18
42.25
36.110
6.336
319 7
95.1
1 . 419
134,400
5 SECTION
480.0
64.0
30.00 .0
386.0
20.0
18.2
19 .5
4 .6
6.B
38.0
1 .9
3.0
2 .8
10.1
19.5
0.0U 4 . 4
241.6
380
1 ,409 .4
I f . 50
66.6
7.0
9.522.80
5.40
10.56
1.4318.00
0.00
8.60
4.11
42.70
31.00
5.658
290.972.2
1.204
110,544
6 rOTAL/WTD
480.0
61.7
30 .00.0
388.3
12 .9
13 721. 9
S.7
4.3
30.2
2 .0
3 .5
4.5
12 .2
19 .0
0 .0
129.7
258.6
2 ,780
1 ,724 .9
94.50
81.57 .0
11 .6
22.80
5 .40
12.92
1 . 75
20.46
0.008 .60
3 .86
47.59
38.61
5.51
342 2
79.4
1.323
951,451
AV
Page 39
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 39/47
Basis of Estimates
o f(Clean st) (000)
Daily Product ion (Clean Btl
Approx. s t /worker-day
Cost bas i s
A Direct Operat ing Costs
* 1 . Labor - Sala r ied2. Labor - Hourly
* 3. Benef i t . - Salar ied
* 4. Benefi ts - Hourly
5. - Operating
* 6. - Maintenance
, . Power
8. FICA Unemployment Taxes
9. Workmen s Compensation Insurance10. Black Insurance
* 11.12. Welfare - Tonnage
13. Safety Expenses
* 14. Product ion .. Safety Incentives15. Accident Cost .
16. Reclamation Fee17. Federal Black Lung Fee
18. Other osts
B
Total
Other Cash Costs
1 . Overhead
2 .
3. Taxes4. Leasing Costs
5. Expense
6. Miscellaneous Income
Total
C. Other C o t s
1 .2. of Development Costs3 . Depletion
Total
Total ost of Mining
Fixed Dollars Per Year
COST OF MINING STATEMENT
Base Year 1988
Adj. Time St . Data
240
504.458
2,102
9.550
Dollars 000)
1,000.000
3,500.00046.000
900.000
1,513.374
1,800.000
340.000
400.000
175.000
340.000
300.000
711.790
150.000
250.000
200.000
75.669252.229
0.00011,954.062
500.000
302.675
0.000
600.000
500 000
0.000
1,902.675
550.0000.000
0.000
550 000
14,406.731
/ s t
1.982
6.938
0.091
1. '843.000
3.568
0.674
0.793
0.347
0.674
0.595
1.4110.297
0.496
0.396
0.1500.500
0.00023.697
0.991
0.600
0.000
1.189
0.9S1l
0.000
3.712
l .0900.0000.000
l .090
211.559
240
951.451
3,964
19.060
Dollars (000) fist
1,000.000
3,290.000
46.000
846.000
2,854.353
1,1100.000
340.000
400.000175.000
340.000
2112.000
1,342.4511150.000
250.000200.000
142.118475.726
0.000
13,934.294
500.000
570.871
0.000
600.000
525.000
0.000
2,195.871
585.114
0.0000.000
585.714
16,115.879
1.051
3.458
0.048
0.889
3.000
1.892
0.357
0.420
0.1114
0.357
0.296
l .4110.158
0.263
0.210
0.1500.500
0.000
14.645
0.526
0.600
0.000
0.631
0.5520.000
2.308
0.616
0.0000.000
0.616
11.569
33
Page 40
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 40/47
4
ITEM IDENTIFICATION
Minutes Per Shi f t
Travel Time
Lunch TimeServ ice Time
Remaining Operat ing Time
Downtime
Miner
S.C.
Bel t
Bol ter
Feeder
C/PTM
Power
Timber Rai lCondit ions
Delays
OtherTota l Downt i_
Remaining Uptime
Unit Shi f t s /Year
CUbic Feet /P lace
Densi ty
Raw Tona/PlaceRaw Tona/S.C.
No. S C./Place
'onll/S.C.
Pl ace Time
Mining
Maneuvering
S.C. Change
Gas Teat & Safe ty
Vent i l a t ion POllts
Tram
Tota l P lace Time
Roof Bolt ing Place Time
Places /Uni t Shi f t
- Clean Coal
Annual Product ion s t
SECTION
480.0
60.0
30.00.0
390.0
0 .0
15.0
21 0
4.83.0
30.5
1.S
2 0
5.0
11 .0
20.0
0 .0
114.1
215.9
502
1 710 .7
94.50
80.81 0
11 .5
22.80
5.40
12.82
1 .73
20.68
0.00
8.60
3.48
41 31
38.80
5.832
363.9
19.1
1.:319
182,685
1 SECTION
480.0
62.0
30.0t . 0
388.0
0.0
10.2
22.2
5 .0
3 .8
31. 0
1 .0
2 9
5.B
8 .5
HI.5
o 0
108.9
219.1
480
1 731 .1
94.50
81.11
7.0
11. 722.S0
5.40
12.97
1 . 75
20.90
0.00
8.60
3.72
47.95
40.20
5.821
367.119.0
1.311
176,488
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVE UPTIME BY 90 MINUTES BY 75
2 SECTION
480.0
65.0
30.00.0
385.0
0.0
12 .0
28.0
6 .0
4 2
22.0
2 .0
3 0
6.0
9.8
17.8
0.0
110.8
274.2
536
1 851 .4
94.50
87.S
1 .0
12.522.80
5.40
13.92
1.8825.20
0.00
8.60
3.83
53.43
39.50
5.132
347.776.1
1 .268
186,3S8
3 SECTION
480.0
58.0
30.00 .0
392.0
0.0
15 .5
18 .5
5.9
3 .6
28.8
2 .5
5 .0
2 .5
13 .0
22.0
0.0
111.3
274.1
528
1,1180.0
94.50
S8.11
1 .0
12 .1
22.80
5.40
14.09
1. 90
19.44
0.00
8 60
4.68
48.71
38.15
5.640
386.184.5
1 . 408
204,200
4 SECTION
480.0
62.0
30.00.0
388.0
0.0
12 .0
21.0
8 .0
5.0
35 .0
2 .8
5.3
4.2
10.015 .0
0.0
118.3
269.7
354
1 642 .8
94.50
71.67 .0
11.1
22.90
5.40
12.31
1 .66
16.50
0.008.60
3.111
42.25
36.80
6.383
382.585.1
1 .418
135,404
EFFICIENCY
5 SECTION'
480.0
64.0
30.00 .0
386.0
0.0
18 .2
B . 5
4 .6
6.e
38.0
1 .9
3.0
2 .8
8.1
19.5
0 .0
122.4
263.6
380
1 409 .4
94.50
66.6
1 .0
11.5
22.80
5.40
10 .56
1 . 43
18.00
0.00
8.60
4.11
42.70
37.00
6.174
317.472.2
1.204
120,611
6 TOTAL/WTD AV
480.0
61.1
30.00 .0
388.3
0.0
13.721. il
5.1
4.3
30.2
2 .0
3 .5
4.5
10.2
B. O
0.0
114.11
273.4
2,780
1,724 9
94.50
81. 5
7.0
11 .6
22.110
5.40
12.92
1 . 75
20.46
0.00
8.60
3 .86
41.59
38.61
5 .82
361.87 L4
1 . 323
1 005 176
Page 41
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 41/47
Bas i s o f Est imates
Days o f Opera t ion
Tota l P roduc t ion (Clean .t (000)
Dai ly Produc t ion (Clean s t )
Approx . a t /worker -day
Cost b a s i s
A. Direc t Operat ing Costs
1 . Labor - S a l a r i e d
2. Labor - Hourly
3. Ben e f i t . - S a l a r i e d
4 . Benef i t s - Hourly
5. Suppl i es - Operat ing
6. Suppl i e s - Maintenance
7. Power
8.
9 .
10.
11.12.
13.
14.
15 .16 .
17.
18 .
FICA Unemployment Taxes
Workmen . Compensat ion In su rance
Black Lung Compensat ion Insurance
Welfare - Sourly
Welfare - Tonnage
Safe ty Expensea
Produc t ion Safe ty Incent ives
Accident Cost .Reclamation Fee
Federa l Black Lung Fee
Other Coats
Total
B. Other Caah C os ts
C.
1. Overhead
2. Roya l t ie s
3. Misce l laneous Taxes
4 . Equipment Leas ing Costa
5. I n t e r e s t Expense
6. Misce l laneous Income
Total
Other Costs
1. Deprec ia t ion
2. Amort izat ion o f Development Costs
3. Deple t ion
Total
Tota l Cost o f Mining
Fixed Dol la rs Pe r Year
COST OF MINING STATEMENT
Base Year 1988
Adj . Time s t . Data
240
504.458
2,102
9.550
Dol la rs (000)
1 00 0 . 000
3,500.000
46 . 000
900.000
1,513.374
1,800.000
340.000
400.000
17 5 . 000
34 0 . 000
300.000
71 1 . 790
15 0 . 000
250.000
200.00075.669
252.229
0.000
11,954 . 062
500.000
302.675
0.000
60 0 . 000
50 0 . 000
0 . 000
1 90 2 . 675
550.000
0 . 000
0.000
55 0 . 000
14,406.737
/ s t
1 . 982
6 . 938
0 . 091
1.784
3 . 000
3.568
0 . 674
0 . 793
0 . 347
0 . 674
0.595
1.411
0.297
0.496
0.3960 . 150
0.500
0.000
23 . 697
0.991
0 . 600
0 . 000
1.189
0.991
0.000
3.772
1. 090
0.000
0 . 000
1. 090
28.559
Uptime by 90 Minutes
For 75 Eff ic iency
240
1 ,005 . 776
4,191
20 . 148
Dol la rs (000)
1,000.000
3,290.000
46.000
84 6 . 000
3,017 . 32 8
1 ,800 . 000
340.000
400.000
1 75 . 000
34 0 . 000
282.000
1,419 . 149
150.000
250.000
20 0 . 000150.867
502.888
0.00014,209.232
500.000
60 3 . 466
0.000
600.000
525.000
0.000
2,228.466
585.714
0.000
0 . 000
585.714
17,023 . 412
/ s t
0.994
3.271
0.046
0.841
3.000
1. 790
0.338
0.398
0 . 1 74
0.338
0.280
1.411
0.149
0.249
0 . 1990.150
0.500
0.000
14.128
0 . 497
0.600
0.000
0 . 597
0 . 522
0 . 000
2 . 216
0.582
0.000
0.000
0.582
16.926
35
Page 42
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 42/47
36
ITEM IDENTIFICATION
Minutea Per Shif t
Travel Tima
Lunch Time
Serv ice Tima
Remaining Operat ing Time
Downtime
Miner
S.C.
Bel t
Bol t e r
Feeder
C/PTM
Power
Timber , Rai l
Condi t iona
Safe ty
Model Adjuat De1aya
Other
Total Downt i_
Remaining Uptime
Unit Shi f ta /Year
Cubic Feet /P lace
Densi ty
Raw Tona/P1ace
Raw Tona/S.C.
No. S.C./P1ace
Reject
Clean Tona/S . C.
Place Time
Mining
Maneuvering
S . C. Change
Gaa Teat , Safe ty
Vent i l a t ion , Poata
Tram
Tota l P lace Time
Roof Bol t ing Place Time
Placea/Uni t Shif t
Product iv i ty - Clean Coal
Tona/Unit Shif t
Tona/Hour
TonS/Minute
Annual Produc t ion a t
SECTION
480.0
60 . 0
30.0
0.0
39 0 . 0
22 . 8
15.0
21. 0
4.83.0
30.5
1.8
2.0
5.0
18 .020 . 0
0 . 0
143.924 6 . 1
502
1 710 . 7
94.50
80 . 8
7.0
11 . 5
22.80
5.40
11 . 20
1 . 73
20 . 68
0 . 00
8 . 60
3.48
45 . 69
38.80
5 . 386
336.1
81. 9
1. 366
16 8 , 719
1 SECTION
480.0
62.0
30 . 0
0.0
388.0
25 . 0
10 . 2
22 . 2
5.0
3.8
31 . 0
1 .0
2 . 9
5.8
15.5
18.5
0 . 0
140.9
24 7 . 1
480
1 731 . 7
94.50
81. 8
7.0
11. 7
22.80
5.40
11.34
1. 75
20.90
0 . 00
8.60
3.7246.31
40.20
5.336
337.0
81 . 8
1. 364
161 774
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVED UPTIME BY 60 MINUTES FOR 100
2 SECTION
480.0
65.0
30 . 0
0.0
385.0
18 . 0
12.0
28.0
6.0
4.2
22.02 .0
3.0
6.0
16.8
17.8
0.0
135.8
249.2
536
1 857 .4
94.50
87 . 8
7.0
12 .5
22.80
5.40
12.16
1 . 88
25.20
0.00
8 . 60
3 . 83
51.67
39.50
4.823
326.8
78.7
1.311
175 148
3 SECTION
480.0
58.0
30 . 0
0.0
392 . 0
29.4
15.5
18.5
5 . 9
3 . 6
28.82.5
5 .0
2 . 5
20.0
22 . 0
0 . 0
15 3 . 7
238.3
528
1 880 .0
94.50
88.8
7 . 0
12.7
22 . 80
5 . 40
12.31
1 . 90
19.44
0.008 . 60
4.68
46.93
38.75
5 . 077
348.287.7
1.461
183 848
4 SECTION
48 0 . 0
62.0
30.0
0.0
388.0
10 .0
12 . 0
21.0
8 . 0
5.0
35.02 . 8
5.3
4.2
17 . 0
15.0
0.0
135.3
252.7
354
1 642 . 8
94.50
77.6
7 .0
11.1
22 . 80
5.40
10.76
1 . 66
16.50
0.008.60
3.18
40.70
36.80
6 . 209
37 2 . 1
88.3
1.472
131 708
5
EFFICIENCY
SECTION
480 . 0
64.0
30.0
0.0
386.0
30.0
18 . 2
19.5
4.6
6.8
38.0
1 .9
3.0
2.8
15.119 . 5
0.0
159.4
226.6
380
1 409 .4
94.50
66.6
7 . 0
9 . 5
22.805 . 40
9.23
1. 43
18 . 00
0.00
8.60
4.11
41. 37
37 . 00
5 . 478
281.674.6
1 .243
107 020
6 TOTAL WTD
480.0
61. 7
30 . 0
0.0
38 8 . 3
22 . 9
13 . 7
21. 9
5 . 7
4 . 3
30.22 . 0
3 . 5
4 . 5
17.2
19.0
0.0
14 4 . 7
243.6
2 780
1 724 . 9
94.50
81. 5
7.0
11 .6
22.80
5.40
11 . 29
1 . 75
20 . 46
0.00
8.60
3.86
45.96
38 . 67
5 . 37
33 3 . 9
82.2
1.370
928 217
AV
Page 43
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 43/47
Basis of Est imates
Daya o f Operat ion
Tota l P roduc t ion (Clean s t ) (000)
Daily Produc t ion (Clean s t )
Approx . a t /worker -day
Cost bas i s
A. Direc t Operat ing Costs
1 . Labor - Sa la r ied
2. Labor - Hourly
3. Benef i t s - Sa la r ied
4. Bene f i t . - Hourly
5. Suppl i e s - Operat ing
6 . Suppl i e s - Maintenance
7. Power
8. FICA Unemployment Taxes9 . Workmen . Compensation Insurance
10 . Black Lung Compensation Insurance
11 . Welfare - Hourly
12 . Welfare - Tonnage
13. Safety Expenses
14. Produc t i on Safety Incen t ives15. Accident Costs16 . Reolamation Fee
17. Federa l Black Lung Fee
18. O ther Coats
Tota l
B . Other Cash Costs
1. Overhead
2. Roya l t ie s
3. Miscellaneous Taxes
4 . Equipment Leasing Costs
5. I n t e r ea t Expense6. Miscel laneous Income
Tota l
C. Other Costs
1. Deprec ia t ion
2. Amort1l:ation of Development
3 . Deplet ionTota l
Tota l Cost of Mining
Fixed Dol la r s Per Year
Costs
COST OF MINING ST TEMENT
Base Year 1988
Adj. Time S t . Data
240
504.458
2 , 102
9 . 550
Dol la rs (000) $ / s t
1,000 . 000
3,500.000
46 . 000
900 . 000
1,513.374
1 , 800.000
340.000
400.000
175.000
34 0 . 000
300.000
711 . 790
15 0 . 000
25 0 . 000200.000
75.669
252 . 229
0.00011,954. 062
500.000
302.675
0 . 000
60 0 . 000
500.000
0.000
1 , 90 2 . 675
550.000
0.000
0 . 000
550 . 000
14,406.737
1.982
6.938
0.091
1.7843 . 000
3.568
0 . 674
0.7930.347
0.674
0.595
1.4110.297
0.4960 . 396
0.150
0.500
0.00023 . 697
0.991
0 . 600
0 . 000
1.189
0.991
0.000
3.772
1. 090
0.000
0.0001 . 090
28.559
Uptime by 60 Minutes
For 100\ Eff ic iency
240
928.217
3,868
18.594
Dol la rs (000) $/a t
1,000 . 000
3,290.000
46 . 000
846.000
2,784 . 651
1,800.000
34 0 . 000
400.000
17 5 . 000
340.000282.000
1,309.714
15 0 . 000
25 0 . 000200.000
139.233
464 . 109
0.00013,816.706
500.000
556.931
0.000
600 . 000
525.0000.000
2 , 181. 931
585.714
0.000
0.000585.714
16 , 584.351
1.077
3 . 544
0 . 050
0.911
3 . 000
1 . 939
0.366
0 . 431
0.189
0 . 366
0 . 304
1.411
0.162
0 . 2690.215
0.150
0.500
0 . 000
14 . 885
0 . 539
0.600
0.0000 . 646
0 . 566
0.000
2.351
0.631
0 . 000
0.0000.631
17.867
37
Page 44
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 44/47
38
ITEM IDENTIFICATION
Minutes Per Shi f tTravel Time
Lunch rime
Service T i _
Remaining Operating 1 1100
DowntimeMiner
S.C.BeltBol terFeeder
C/PTKPower
Timber Ii RailCondi t ions
Adjust Delays
OtherTotal DowntimeRemaining Uptime
Unit Shifts /Year
CUbic Feet/PlaceDensityRaw Tona/PlaceRaw Tons/S.C.
No. S.C./PlaceReject ,
Clean fons/S.C.
Place 'fimeMining
Maneuvering
S.C. Change
Gas Test Ii SafetyVentilation , PoatsTram
Total Place Time
Roof Bolting Place Time
Places/Unit Shift
Productivity - Clean CoalTons/Unit ShiftTons/Hour
Tons/Minute
Annual Proauction,s t
SECTION
480.0
60.0
30.0
0.0390.0
12.8
15.021. 0
4.8
3.0
30.5
1.8
2.0
5.0
13.0
20.0
0.0
128.9
261.1
502
1 710 .7
94.50
80.8
7.0
11.5
22.80
5.40
11.20
1.13
20.68
0.00
8.60
3.48
45.69
38 80
5.714
356.681.9
1 .366
179,002
1 SECTION
480.0
62.0
30.0
0.0
388.0
15.0
10.2
22.2
5.0
3.8
31. 0
1 .0
2.9
5.8
10.5
18.5
0.0
125 9
262.1
480
1 731. 7
94.50
81. 8
7.0
11. 7
22.110
5.40
11.34
1 . 75
20.90
0.00
9.60
3.1246.31
40.20
5.660
357.5
81.S
1. 364
171,594
MINE PRODUCTION MODEL
BY CONTINUOUS MINER SECTION
IMPROVE UPTIME BY 15 MINUTES FOR 100
2 SECTION
480.0
65.0
30.0
0.0
385.0
8.0
12.0
211.0
6.0
4.2
22.0
2 .a
3 .0
6.0
11.811.8
0.0
120.8
264.2
536
1 957 .4
94.50
81.8
7 .0
12.5
22.110
5.40
12.16
1.811
25.20
0.00
9.60
3.113
51.61
39.50
5.113
346.418.7
1 .311
185,691
3 SECTION
480.0
58.0
30.0
0.0
392.0
19.«15.5
18.5
5 .9
3.6
28.82.5
5.0
2.5
15.022.0
0.0
138.7
253.3
528
1 880.0
1I4.50
88.11
7.0
12.7
22.110
5.40
12.31
1.9019.44
0.00
8.60
4.6846.93
38.15
5.391
370.1
81.7
1 . 461
195,420
SECTION
480.0
62.0
30.0
0 .0
388 0
0.0
12 .0
21.0
B.O
5.0
35.0
2.8
5 .3
4 .2
12 .0
15 .0
0.0
120.3
261.7
354
1 642 .9
94.50
77.6
7.0
11.1
22.110
5.40
10.16
1.66
16.50
0.00
8.603.18
40.70
36.80
6 578
394.188.3
1 .472
139,527
5
EFFICIENCY
SECTION
480.0
64.0
30.0
0.0
386.0
20.0
111.2
19.5
4.6
6.11
38.0
1.9
3.0
2.11
10.1
19.5
0.0
144 .4
241. 6
380
1 409 .4
94.50
66.6
7.0
9.5
22.110
5.40
I. 23
1.4318.00
0.0011.60
4.11
41.31
37.00
5.841
300.3
74.6
1 .243
114,104
6 TOTAL/WTD
480.0
61.1
30 a
0.0388.3
12 .9
13.1
21. 9
5.1
4.3
30.2
2.0
3.5
4.5
12.2
19 .0
0.0
129.7
258.6
2 ,780
1724. I94.50
Ill.S7.0
11.6
22.110
5.40
11.29
1 75
20.46
0.0011.60
3.116
45.96
311.61
5 70
354.482.2
1 370
985,338
AV
Page 45
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 45/47
Basis o t Est imates
Days o f Opera t ion
Tota l P roduc t ion (Clean s t ) (000)
Dai ly Product ion (Clean s t )Approx. s t /Worker-Day
Cost baa is
A. Direc t Operat ing Costs
1 . Labor - Sa la r ied
2 . Labor - Hourly
3. Ba n e t i t s - S a l a r i e d
4. Benef i t s - Hourly
5. Suppl i e s - Opera t ing
6 . Suppl i e s - Maintenance
7. Power
8 . FICA Unemployment Taxes
9 . Workmen's Compens a t i o n I n s u ran ce
10 . Black Lung Compensat ion Insurance
11 . Welta r e - Sour ly
12 . Welfare - Tonnage
13 . Safe ty Expenses
14 . P r o d u c t i o n ' Sa te ty Incen t ives
15. Accident Coata16. Reclamation Fee
17. Federa l Black Lung ee
18 . Other Costs
Total
B . Other Cash Costs
1 . Overhead
2. Roya l t ie s
3. Misce l laneous Taxes
4. Equipment Leas ing Cost .
5. I n t e r e s t Expense
6. Misce l laneous Income
Total
C. Other Costs
1. Deprec ia t ion
2 . Amort izat ion o t Development Costs3. Deplet ion
Total
Tota l Cost o f Mining
Fixed Dol la r s Per Year
COST OF M N N ~ STATEMENT
Base Year 1988
Adj. Time s t . Data
240
50 4 . 458
2 1029.550
Dol la rs (000) / s t
1 000 . 000
3,500.000
46 . 000
900.000
1 51 3 . 374
1,800 . 000
34 0 . 000
40 0 . 000
17 5 . 000
340.00030 0 . 000
71 1 . 790
150.000
25 0 . 000
20 0 . 00075 . 669
252.229
0 . 000
11,954.062
50 0 . 000
302.675
0 . 000
600.000
50 0 . 000
0 . 000
1,902.675
55 0 . 000
0.000
0 . 000
550.000
14 406.737
1 . 982
6 . 938
0.091
1 . 784
3.000
3.568
0.674
0.793
0 . 347
0 . 674
0 . 595
1.4110.297
0.496
0 . 3960 . 150
0 . 500
0 . 000
23 . 697
0.991
0.600
0.000
1.189
0 . 991
0 . 000
3 . 772
1 . 090
0.000
0.000
1 . 090
28 . 559
Uptime by 75 Minute.
For 100 Eff ic iency
240
985.338
4,10619.738
Dol la rs (000)
1,000.000
3,290 . 000
46.000
846.000
2,956.014
1,800.000
340.000
400.000
17 5 . 000
340.000
282.000
1 390.311
150.000
250.000
200.000147.801
492.669
0 . 000
14 10 5 . 796
500.000
591.203
0 . 000
60 0 . 000
525.000
0.000
2 216.203
585.714
0.0000.000
585.714
16 907.713
/s t
1. 015
3.339
0.047
0 . 859
3.000
1.827
0.345
0.406
0.178
0.345
0 . 286
1.411
0.152
0.254
0.2030.150
0.500
0 . 000
14.316
0.507
0.600
0.000
0 . 609
0.533
0.000
2.249
0 . 594
0.0000.000
594
17.159
9
Page 46
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 46/47
40
ITEM IDENTIFICATION
Minutes Per Shi f t
Travel Time
Lunch TimeService TimeRemaining Operating Time
SECTION 1
480.0
60.0
30.00.0
3510.0
MINE PRODUCTION MODEL
BY CONTINUOUS HINER SECTION
IMPROVE UPTIME BY 90 MINUTES
SECTION 2 SECTION :3 SECTION 4
480 0 4110.0 480.0
62.0 65.0 511.0
30.0 30.030.0
0.0 0.0 0.0
388.0 385.0 392. )
FOR 100 EFFICIENCY
SECTION 5 SECTION 6 TOTAL/WTD V
480.0 480.0 4S0.a62.0 64.0 61 73a.0 3a.a 30.0
0.0 0.0 0.03811.0 396.0 388.3
Downtime
Miner
S.C.BeltBolterFeeder
C/PTM
Power
Timber , Rail
Condi t ions
Adjust Delays
OtherTotal Downtime
Remaining Uptime
Unit Shifts/Year
Cubic Feet/PlaceDensity
Rsw Tons/PlaceRaw Tons/S.C.No. S.C./Place
Tons/S.C.
Place Time
Mining
Maneuvering
S.C. Change
Gas Test ..
Venti lat ion ..Tram
Total Place Time
Roof Bolting Place Time
Places/Unit Shi f t
- Clean Coal
Annual Produc t ion ,s t
0.015.021.0
4.83.0
30 5
1 8
2.05.0
11. 020.0
o 0
114.1275.9
502
1,710.194.50
80.81.0
11.522.80
5.40
11.201. 73
20.68
0.008.60
3.48
45.69
38.80
6.038
376.881. 9
1.366
189,149
0.0
10.222.2
5.0
3 11
31. 0
1.02.95.811 5
18.50.0
10S.92751.1
480
1,731.794.50
81. 8
7.0
11.722.80
5.40
11.34
1.1520.90
0.008.603.72
46.31
40.20
6 021
380.7Sl S
1 364
182,724
0 <0
12.028.0
6 0
4.222.02.0
3.06 0
SI.817.9
0.0110.8
274.2
536
1,857.494.50
87.87.0
12.522.80
5.40
12.161 .88
25.20
0.008.60
3.83
51.67
39.50
5.307
359.6711.7
1.311
192,719
0.015.518.5
5 51
3.628.8
2.55.02.5
13.022.0
0.0117.3274.7
528
1,880.094.50
98.8
7.012.1
22.80
5.40
12.31
1 . 90
19.440.008.604.68
46.93
38.75
5.853
401. 4
87.7
1. 461
211,930
0.012.0
21.011.0
5.035.0
2.85.34.2
10.015.0
0.0118.3269.7
354
1,642.894.5077.6
7.011.1
22.80
5.40
10.76
1.6616.50
0.008.603 18
40.70
36.80
6.621
397.188.3
1.412
140,569
o.a18.219.5
6
6 11
39.0LSI
3.02.88.1
19.50.0
122.4
263.6
3S0
1,409.494.50
66.67.09.5
22.805.40
11.23
1.4318 00
0.008.60
.1141.37
37.00
6.373
321.614.6
1.243
0.013.721.9
5.74.3
30.2
2.0
3.54.5
10.219.0
0.0114.S213.4
2,780
1,724.994.50
81. 5
7.0
11.622.80
5.40
11.211
1 .7520.46
0.008.60
3.86
45.96
38 67
6.03
374.182.2
1.370
124,494 1,041,585
Page 47
8/13/2019 Cost-Benefit Analysis of Computer
http://slidepdf.com/reader/full/cost-benefit-analysis-of-computer 47/47
Basi s o f Es t ima tes
Day8 o f O per a t ion
Tota l P roduc t ion (Clean .t (000)
D ai ly Produc t ion (Clean s t )Approx. a t /w or ker - day
Cost baais
A . Direc t O per a t ing Co at s
1 . Labor - Sa l a r i ed
2 . Labor - Hourly
3. Be n e f i t . - Sa l a r i ed
4 . B en ef i t . - Hourly
5. Suppl i e s - O per a t ing
6 . Suppl i e s - Maintenance
7. Power
8 . F I C A Unemployment Taxea
9. Workmen's Compensat ion I nsur ance
10. Black Lung Compenaa t ion I nsur ance
11. Welfare - Hourly
12 . Welfare - Tonnage
13. Saf e t y Expenses
14 . P r o d u c t i o n Safe ty Incen t ives
15. A cc ident Cost .
16. Reclam at io n Fee
17 . Federa l Black Lung Fee
18 . O ther Costs
Total
B. Oth er Cash Costs
1 Overbead
2 . Roya l t i e s
3 . Misce l laneous Taxes
4 . Equipment Leas ing Cos t s
5 . I n t e r e s t Expense
6 . Misce l laneous Income
Total
C. Oth er C o s t .
1 . Deprec ia t ion
2 . A mor t iza t ion o f Development Costs
3.Deplet ion
Tota l
Tota l Cost o f Mining
Fixed Dol la r s Per Year
COST OF MINING STATEMENT
Base Year 1988
Adj . Time St . Data
240
504.458
2,1029 . 550
Dollars (000)
1,000 . 000
3,500 . 000
46.000
900.000
1,513 . 374
1,800.000
34 0 . 000
40 0 . 000
17 5 . 000
34 0 . 000
300.000
711.790
150.000
250.000
200.000
75.669
252.229
0.000
11,954 . 062
50 0 . 000
302.675
0.000
600.000
50 0 . 000
0.000
1,902.675
550.000
0.000
0.000550.000
14,406 .737
S/ s t
1.982
6.938
0.091
1 . 784
3.000
3.568
0 . 674
0.793
0 • .34 7
0 . 674
0.595
1.411
0 . 297
0.496
0.3960.150
0 . 500
0.000
23 . 697
0.991
0.600
0.000
1.189
0.991
0.000
3 . 772
1.090
0 . 000
0.0001 . 090
28 . 559
Uptime by 90 Minutes
For 100 Eff i c i ency
240
1,041 .585
4,34020 .865
Dol la r s (000)
1,000 .000
3 ,290 .000
46 .000
846.000
3,124 .755
1 ,800 .000
340.000
400.000
175.000
340.000
28 2 . 000
1,469 .676
150.000
25 0 . 000
200.000156 .238
520. H 3
0.000
14,390 .462
500.000624.951
0.000
600.000
525.000
0.000
2,249.951
585.714
0.000
0 . 000
585.714
17 226.127
S/ s t
0.960
3 . 159
0.044
0.812
3.000
1. 728
0.326
0 . 384
0.168
0.326
0.271
1.411
0.144
0.240
0 . 192
0.150
0.500
0.000
13.816
0.480
0.600
0.000
0 . 576
0.504
0 . 000
2.160
0.562
0 . 000
0 . 000
0 . 562
16 . 538
41