Introduction PT. BIMA Green Energi Presented by: Jhody Arya Prabawa (Managing Director) 1 Thursday, December 13, 12
42

Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

May 22, 2018

Download

Documents

buicong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

IntroductionPT. BIMA Green Energi

Presented by:Jhody Arya Prabawa(Managing Director)

1Thursday, December 13, 12

Page 2: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

2Thursday, December 13, 12

Page 3: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

       Is energy which comes from natural resources  such as sunlight, wind, rain, geothermal heat, which are          renewable (naturally). The applica<ons will be Solar Panel, Wind  Turbine  & Micro Hydro.

Renewable Energy

3Thursday, December 13, 12

Page 4: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

It is technology which environmentally friendly, created and used  in a way that conserves natural resources and environment. Our  applica:on for this technology will be LED ligh:ng & Energy  Management System.

Green Technology

4Thursday, December 13, 12

Page 5: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

We build tower for   telecommunica:on industry in  Indonesia. The electricity our t owe r s   c a n b e s u p p l i e d f r om conven:onal   power, but for remote area we   ini:ate building them with green   and renewable energy, that is, photovoltaic-­‐powered BTS   and   Micro-­‐hydro.

BTS Tower SIS-SITAC-IMB-CME

5Thursday, December 13, 12

Page 6: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Fiber Optic

6Thursday, December 13, 12

Page 7: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Project Reference

7Thursday, December 13, 12

Page 8: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

PERTAMINA DAY

8

Pertamina President Director’s House 2 KwH (December 2012)

8Thursday, December 13, 12

Page 9: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

TELKOMSEL  TOWERMOROWALI  2012

9Thursday, December 13, 12

Page 10: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

WHY DO WE

NEED TO SAVE

ENERGY?

10Thursday, December 13, 12

Page 11: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

11Thursday, December 13, 12

Page 12: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Electrification Ratio

12Thursday, December 13, 12

Page 13: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

PV & WT Power Plant

13Thursday, December 13, 12

Page 14: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Renewable Energy Roadmap

14Thursday, December 13, 12

Page 15: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

15

Meanwhile, We Also Have Rivers!!!

15Thursday, December 13, 12

Page 16: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Preparation Kit at PSI workshopSMART HYDRO POWER INSTALLATION SADAP, KALIMANTAN – INDONESIA

16Thursday, December 13, 12

Page 17: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Container Loading and Shipping

17Thursday, December 13, 12

Page 18: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Trucking and unloading

18Thursday, December 13, 12

Page 19: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Panel shuttle housing

19Thursday, December 13, 12

Page 20: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

1st Cage Installation

20Thursday, December 13, 12

Page 21: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

SHP INSTALLATION

21Thursday, December 13, 12

Page 22: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

SHP on EMBALOH River

22Thursday, December 13, 12

Page 23: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Kinetic Hydropower

23Thursday, December 13, 12

Page 24: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

1. Kinetic Hydropower

2. Turbine Overview3. Turbine Specification4. Power Curve of Generator 5. Cost Effective Technology

6. Environmentally Friendly

7. Market Segments8. Impressions9. The Company

Table of Contents

24Thursday, December 13, 12

Page 25: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• The energy possessed by a body because of its motion

• The amount of energy depends on the mass and the velocity of the moving body

• Kinetic turbines create energy from flowing water with no head requirement

Kinetic Hydropower

25Thursday, December 13, 12

Page 26: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Turbine Overview

1.

2.

3.

4.

5.

6.

1. 3 fiberglass- reinforced rotor blades (Apoxy)

2. Underwater generator3. Diffusor (HDPE*)4. Floats5. 4 anchor points 6. Stabilizing ring

* maximum power point tracking

26Thursday, December 13, 12

Page 27: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• Nominal output: 5.0 kW at 2.75 m/s• River speed: No add. output >2.75 m/s• Dimensions (LxWxH): 1850x1740x1970 mm• Rotor diameter: ∅1000 mm• Rotor speed: 90-230 rpm (closed circuit)• Weight: 360kg (incl. floats)

Turbine Specification

27Thursday, December 13, 12

Page 28: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• Min. river depth: 1.8 m • Min. river wide: 2 m • Operational range: 1.0 m/s minimum• Nominal output: 2.75 m/s• Injection point: max 500

meters distance from turbine

Site Requirements

28Thursday, December 13, 12

Page 29: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Generator power curve

Third party tested (SVA Potsdam) under controlled conditions. Curve does not account for electrical losses. Results in natural rivers or canals may vary from above .

29Thursday, December 13, 12

Page 30: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• No special infrastructure necessary

• Base-load capability requiring little battery

• Low installation costs• Low operation costs• Scaleable from a singular

turbine to hundreds

Cost Effective Technology

30Thursday, December 13, 12

Page 31: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• No changes to river bed• Slow turning generator (fish

friendly)• Replacing diesel thereby

reducing CO2 emissions

• Minimal audible disturbance• Minimal space requirement• Removable at any time

Environmentally Friendly

31Thursday, December 13, 12

Page 32: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• Decentralized electrification• Agriculture / irrigation canals• Hybrid (grid connected /

micro-grid application)• Temporary supply• Expansion of existing

hydropower stations (i.e. in outflow canals, etc.)

Market Segments

32Thursday, December 13, 12

Page 33: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Impressions: Industrial Applications

33Thursday, December 13, 12

Page 34: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Impressions: Decentralized Electrification

34Thursday, December 13, 12

Page 35: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• A turbine which creates energy from kinetic hydropower

• Can be used in grid-connected, hybrid or off-grid systems

• Synchronization to the existing network is possible

The System

35Thursday, December 13, 12

Page 36: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• Permanent magnet synchronous generator (5 kW)

• 3-phase AC power / slow RPM (90-230) closed circuit

• Horizontal axis (waterproof + water cooled)

• Cut in speed 0.7 m/s• Voltage range 70 - 600V,

(dependent on river velocity)

Underwater Generator

36Thursday, December 13, 12

Page 37: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

• Converts into stabile 3-Phase• Using MPPT controllers to

secure power curve• 230-240V, 50 Hz / 110-127V,

60 Hz, or direct current 96V• Using only authorized

technologies for electrical installations

Energy Management

* maximum power point tracking

37Thursday, December 13, 12

Page 38: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Dependent On:• Hydrological characteristics (for ex. Riverbed type: rock,

sand, etc.)• Ship traffic/kayak/tourism• Amount/type of flotsam/

debris • Width and depth variation of

river

Anchor Options:• Weighted anchor (concrete,

or stones à different forms)• Steel cable• Danforth „ship“ anchor • Ground screw

Anchorage

38Thursday, December 13, 12

Page 39: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

6. Wearing parts are designed for 10 year usage

7. Rectifier/Inverter system (Specify voltage and frequency)

9. User manual (English or German)

10.Ex works delivery preferred, FOB/CIF possible. Transport arrangement upon request.

1. Permanent magnet, AC generator

2. Diffusor (three pieces)3. Three blade rotor 4. Diffusor, Rotor and Generator

(swimming turbine) are delivered assembled

5. Steel anchoring cable 12mm (20m)

Scope of Delivery

39Thursday, December 13, 12

Page 40: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Additional Services What else

is needed?

Anchorage for turbine

Debris protection for turbine

Local permit

24 Volt DC power supply (grid-connection only)

Additional installation costs

Battery bank for off-grid application

40Thursday, December 13, 12

Page 41: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...

Conclusions on Greener Telecommunication Tower

FINANCIALLY: CAPEX (Fast BEP); OPEX (Low Maintenance); Business Model (Financial Institutions).

TECHNICALLY: Technology Designs (Low Powered Devices); Power Source (Power Generator Types); Power Management System (Behavior); Storage System (Battery); Geography (Site Profile & Community Issues).

POLICY: Tax Incentives Program (Tax Holiday/Special Rate); Local Content Regulation (TKDN); EP Vs PPA; Stakeholders Transparency (Government, Manufacturers, System Integrators, End-users, etc); National Roadmap (Green Strategic Policy).

COMPETITION: Technology Innovations; Effective Project Management Practices.

41Thursday, December 13, 12

Page 42: Corporate Branding BIMA Corporation - GSMA Branding BIMA Corporation Author zaki Created Date 12/13/2012 4:33:11 AM ...