Short presentation of Flexalen installled at the Coronado Bay hotel in Panama
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Coronado Bay Instalacion En

Flexalen the solution.

Thermaflex Insulation México

REFERENCE PROJECT:

Coronado Bay Panamá

Chilled water project

Page 2: Coronado Bay Instalacion En

The project

PROJECT INFORMATION

• HOTEL Coronado Bay – 60 room boutique hotel

• OWNER Empresas BERN

• LOCATION: Republic of Panama, Central America

• INSTALLATION COMPANY Empresas BERN

• APPLICATION Indoor – Chilled Water

• USED LIQUID Pure potable water

• THERMAFLEX PRODUCTS 8 coils Flexalen 60 (400 meters)

Flexalen 600 single pipe (360 metros)

ThermaSmart Insulation

• INSULATION Thermasmart 1” wall thickness

• WELDING TECHNIQUES Poli-fusion and Electro-fusion

• ANCHORING done by installation company

• AVERAGE OUTSIDE TEMP: 34 degrees Celsius

• AVERAGE HUMIDITY: 85%

Page 3: Coronado Bay Instalacion En

Coronado Bay Hotel

• Hotel and condominiums tower, located on the beautiful beaches of Coronado, Panama.

• The project: Hotel of six floors, installation of chilled water network. Other floors are condominiums with mini splits.

• Luxury and comfort is offered by the Coronado Bay Hotel, all material with top quality were required.

• Flexalen was selected as the best option for chilled water supply.

• As the hotel is directly in front of the Pacific Ocean and humidity levels can go up to 90%, Flexalen was selected as security against condensation problems

Page 4: Coronado Bay Instalacion En

Flange connectors

• Connection of chiller machine and machine room to the main network with flange connectors.

• This system was connected to steel network in the machine room. The steel valves were inserted in the Flexalen pipes.

Page 5: Coronado Bay Instalacion En

Installation

• Flexalen 60 was installed for small diameters in derivation to fan coils. Additional insulation ½” was necessary to prevent condensation.

• Its flexibility allows to save couplings and saving labor.

• The pictures shows the connection of fan coils to they main line in the corridor.

Page 6: Coronado Bay Instalacion En

Installation

• Electro fusion tees show the strongest point of the system with a double security wall.

• The corrugated protection in HDPE with excellent mechanical protection & condensation control.

Page 7: Coronado Bay Instalacion En

Installers in action

• The original plan considered one week per floor to install the steel network. With Flexalen one day per floor was enough to install a complete floor. (80% time was reduced).

• The installers received the training on site, and Thermaflex offered support all the time the installation was executed.

Page 8: Coronado Bay Instalacion En

Installation

• With the fixingpoints, anchoring system and flexibility, the Flexalen pipes could be installed very easily.

• The architect responsible of the design visited several times the site to supervise the trajectory of the pipes. He could not believe the fast and easy installation.

Page 9: Coronado Bay Instalacion En

Installation

• The picture shows a comparison with PVC pipes:• Saving accessories• Easy installation• Clean• Esthetic• Fast • Pre-insulated• Mechanical

protection• Free of glue

Page 10: Coronado Bay Instalacion En

Installation

• This picture shows the connection of fan coil equipment. This connections were made in every single room.

• The installers accept the Flexalen system immediately and they recognized how easy is the process and no more spray of polyurethane was necessary.

• This picture shows the flexibility and bending range of PB pipes.

Page 11: Coronado Bay Instalacion En

Installation reference pictures

Page 12: Coronado Bay Instalacion En

Installation reference pictures

Page 13: Coronado Bay Instalacion En

Testimonies

• Supervisor of installers:• I am happy to see my installers working with enthusiasm and

security, I´ve received only positive comments about Flexalen system.

• Installers:• We have a lot of experience installing different kind of systems

and materials like steel, PVC, cupper, PE and PEX but this system is more easy to install; the training is very easy to understand and we received the course on site, where the problems could occur. I know how to handle the welding machines and also my colleagues.

• Responsible of chilled water installation:• I didn´t believe the information I read in the brochures, now